4827-0200 McDowell County Acq Bid Worksheet.xlsx
XLSX spreadsheet 628 KB Posted
- Attached to
- Foothills Group 3 Acquisition and Demolition
- Solicitation number
- Doc2464765382
- Issued by
- Sampson County, North Carolina
About this file
This is a bid worksheet for McDowell County (GovTribe ID: 9e930cf7e5cd243c96d7e8b9c48693b0). The document serves as an acquisition bidding tool for the county, establishing the framework for soliciting competitive bids on goods or services. The worksheet outlines the bidding process requirements, including specified response timelines, evaluation criteria, and bid submission procedures necessary for interested vendors to participate in the county's procurement process.
The worksheet establishes the pricing structure and evaluation methodology for bid submissions. It includes provisions for documenting bid prices, quantities, and line items to enable consistent comparison across all responding bidders. The document provides the administrative infrastructure for McDowell County to conduct a competitive acquisition while maintaining compliance with applicable procurement regulations and ensuring transparency in the vendor selection process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4827-0013 (Batch 2) - Rutherford - Acquisition Bid Worksheet.xlsx | XLSX spreadsheet | |
| 19-IFB-2464765364-RMT Foothills Group 3 Acquistion and Demolition.pdf | ||
| 4827-0017- McDowell County Group 1- Acquisition Bid Worksheet.xlsx | XLSX spreadsheet | |
| 4827-0091 City of Shelby Acquisition Bid Worksheet.xlsx | XLSX spreadsheet | |
| 4827-0013 (Batch 1) - Rutherford - Acquisition Bid Worksheet.xlsx | XLSX spreadsheet | |
| 4827-0122 McDowell Group 2 Acquisition Bid Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Construction Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
Option- 110 Hummingbird Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | ||||||
| STORM #: | 4827 | STREET ADDRESS: | 110 Hummingbird Dr | |||
| PROJECT #: | 200 | CITY: | Old Fort | |||
| Optioned | ||||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Acquisition | Intake / DOB Calculation | $0.00 | ||||
| Appraisal | $0.00 | |||||
| Title Research | $0.00 | |||||
| Document Prep | $0.00 | |||||
| Legal Fees | $0.00 | |||||
| Closing Fees | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Septic System | $0.00 | ||||
| Misc. | Carport | $0.00 | ||||
| Misc. | Garage | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Option-122 Executive Estates Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | ||||||
| STORM #: | 4827 | STREET ADDRESS: | 122 Executive Estates Dr | |||
| PROJECT #: | 200 | CITY: | Old Fort | |||
| Optioned | ||||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Acquisition | Intake / DOB Calculation | $0.00 | ||||
| Appraisal | $0.00 | |||||
| Title Research | $0.00 | |||||
| Document Prep | $0.00 | |||||
| Legal Fees | $0.00 | |||||
| Closing Fees | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Septic System | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Option-264 Alpine Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | ||||||
| STORM #: | 4827 | STREET ADDRESS: | 264 Alpine Dr | |||
| PROJECT #: | 200 | CITY: | Marion | |||
| Optioned | ||||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Acquisition | Intake / DOB Calculation | $0.00 | ||||
| Appraisal | $0.00 | |||||
| Title Research | $0.00 | |||||
| Document Prep | $0.00 | |||||
| Legal Fees | $0.00 | |||||
| Closing Fees | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Septic System | $0.00 | ||||
| Misc. | Garage | $0.00 | ||||
| Misc. | Shed/Carport | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
REF-LASTSHEET-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
image1.wmf
File details come from the government source that posted it. Updated .