This is a City of Shelby acquisition bid worksheet used to solicit bids for specified goods or services. The document serves as the primary bidding instrument for the City of Shelby procurement process. The worksheet is designed to collect standardized pricing and product information from potential vendors, establishing a structured format for bid submission and comparison. The bid worksheet establishes the framework for vendors to submit their offers, including detailed line-item pricing, product specifications, and terms of delivery or service provision as required by the City of Shelby's procurement requirements.

The specific products, services, quantities, pricing structure, response deadlines, bid due dates, site visit requirements, pre-bid meetings, contract award timelines, and contract term details are not visible in the filename alone. To provide comprehensive information regarding pricing terms, set-asides, incumbent vendors, funding sources, and other material procurement conditions, the actual contents of the Excel worksheet would need to be reviewed. The worksheet likely contains multiple line items with unit pricing, total cost calculations, and spaces for vendor contact information and certifications required for bid evaluation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

North Carolina Department of Public Safety
Emergency Management
ACQUISITION REQUEST FOR BID WORKSHEET
RFB NUMBER:
VENDOR:
BID DATE:
BID SUMMARY
WORK PHASETOTAL
ACQUISITION$0.00
SITE DEMOLITION$0.00
PROFIT & OVERHEAD$0.00
CONSTRUCTION MANAGEMENT COSTS$0.00
GRAND TOTAL:$0.00

TOTAL PROJECT TIME (DAYS):

NOTES:**Please read the following information carefully**
1) The Vendor shall fill out this Bid Worksheet in its entirety.
2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal.
3) Vendor is responsible for providing information in light blue cells.
4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Construction Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB.
5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable.
6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet.
7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs).
8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity.
9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines.

REF-SHEET2-DONOTMOVE

*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.

PROPERTY (1)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:1009 Spann Street
PROJECT #:91CITY:Shelby
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Legal Fees$0.00
Closing Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Central Sewer$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00

Property Total: $0.00

REF-LASTSHEET-DONOTMOVE

*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.