4827-0077_0050_and+0200+Attachment+A+supplement+Acquisition+Bid+Worksheet.xlsx
XLSX spreadsheet 620 KB Posted
- Solicitation number
- Doc2443438147
- Issued by
- Chatham County, North Carolina
About this file
This is a Bid Summary Sheet and Property Worksheet document issued by the North Carolina Department of Public Safety, Division of Emergency Management (NCEM) for acquisition and demolition construction services under the Hazard Mitigation Grant Program (HMGP). The RFB covers three properties: 188 Jamestown Road in Pittsboro (Project #77), 313 South 4th Street in Smithfield (Project #50), and 163 Creek Bend Road in Vass (Project #200), all associated with Storm #4827. Vendors must complete the bid worksheet in its entirety for each property, providing itemized costs for acquisition work phases (intake/DOB calculation, appraisal, title research, document preparation, and closing attorney fees) and site demolition work phases (asbestos/lead inspection and remediation, structure demolition, UST/other clearance, and grade/seed). Vendors must also provide unit prices, quantities, and units of measure for each line item, and must supply construction management costs and profit and overhead costs for each property. The worksheet includes three miscellaneous cost line items per work phase for vendors to propose additional eligible costs. Vendors must provide an anticipated overall project timeframe in days from Notice to Proceed through closeout for all contracted work, which will be used by the State in evaluating bids against HMGP goals and deadlines.
The bid worksheet is an auto-calculating form that totals work phase costs (acquisition, site demolition, profit and overhead, and construction management costs) to derive a grand total. Vendors are expressly prohibited from modifying the worksheet structure, including adding or removing line items or altering formulas, with noncompliance constituting grounds for bid rejection. Vendors must verify all calculations are correct and report any errors or concerns to the State immediately using the contact method specified in the RFB. All cost fields currently display $0.00 as placeholders, requiring vendors to input actual pricing data. The document provides three blank property worksheets with identical formats, allowing prequalified vendors approved under prior qualification processes (19-RFPQ-2327812727-TMM or 19-RFPQ-1653309857-GSX) to submit bids for the specified construction services in accordance with the IFB terms, conditions, and any addenda.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19-IFB-2443438128-RMT Central North Carolina Acquisition and Demolition.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
188 Jamestown Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 188 Jamestown Road |
| PROJECT #: | 77 | CITY: | Pittsboro |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Acquisition Total: | $0.00 | |||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||
| Asbestos / Lead Remediation | $0.00 | |||
| Structure Demolition | $0.00 | |||
| UST / Other Clearance | $0.00 | |||
| Grade / Seed | $0.00 | |||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Site Demolition Total: | $0.00 | |||
| Other | Profit & Overhead | |||
| Construction Management Costs | ||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
313 S 4th St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 313 South 4th Street |
| PROJECT #: | 50 | CITY: | Smithfield |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Acquisition Total: | $0.00 | |||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||
| Asbestos / Lead Remediation | $0.00 | |||
| Structure Demolition | $0.00 | |||
| UST / Other Clearance | $0.00 | |||
| Grade / Seed | $0.00 | |||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Site Demolition Total: | $0.00 | |||
| Other | Profit & Overhead | |||
| Construction Management Costs | ||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
163 Creek Bend Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 163 Creek Bend Road |
| PROJECT #: | 200 | CITY: | Vass |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Acquisition Total: | $0.00 | |||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||
| Asbestos / Lead Remediation | $0.00 | |||
| Structure Demolition | $0.00 | |||
| UST / Other Clearance | $0.00 | |||
| Grade / Seed | $0.00 | |||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Misc. | N/A or Provide Details | $0.00 | ||
| Site Demolition Total: | $0.00 | |||
| Other | Profit & Overhead | |||
| Construction Management Costs | ||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
REF-LASTSHEET-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
image1.wmf
File details come from the government source that posted it. Updated .