47QTCB20R0005_Amendment 02.pdf
PDF 640 KB Posted
- Solicitation number
- 47QTCB20R0005
- Issued by
-
GSA Federal Acquisition Service
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
47QTCB20R0005, Amendment 02
1. Delete the last sentence of G.10.2: Per FAR 19.303, all Orders must reference the applicable NAICS code which best describes the principal purpose of the IT services being acquired.
Replace the last sentence of G.10.2 with: Per FAR 19.102(b), all Orders must reference the applicable NAICS code which best describes the principal purpose of the IT services being acquired.
2. Delete the content at H.1 and mark that paragraph as “Reserved”.
3. Delete: H.12.3 (3) Non-compliance with FAR 52.219-14, Limitations on Subcontracting.
Willful failure or refusal to furnish the required reports, or gross negligence in managing the subcontracting limitation, or falsification of reports constitutes sufficient grounds to terminate the Contractor for Cause.
Replace with: H.12.3 (3) Non-compliance with FAR 52.219-14, Limitations on Subcontracting. Willful failure or refusal to furnish the required reports, or gross negligence in managing the subcontracting limitation, or falsification of reports constitutes sufficient grounds to terminate the Contractor for Default.
4. Delete: H.17.1 OCOs have the discretion to require a re-representation of the
Contractor’s size status as a condition of competitive order award. This is not necessary for sole source Orders, as a separate offer and acceptance by the SBA is required per paragraph G.11.
Replace with: H.17.1 OCOs have the discretion to require a re-representation of the Contractor’s size status as a condition of competitive order award. This is not necessary for sole source Orders, as a separate offer and acceptance by the SBA is required per paragraph G.13.
5. Delete: Attachment J-7 and replace it with: Attachment J-7 (version 2)
47QTCB20R0005, Amendment 02
6. Update the table at L.12.2 to clarify that both the Mentor-Protégé Agreement and the SBA approval letter combined as a single document is an ‘if applicable’ attachment; to change the page limitation for Attachment J-7; and to change the file type for Attachment J-9 as follows:
Para # Title Format or Template Page Limit Example File Name
L.9.6 Mentor-Protégé Agreement and SBA approval letter (if applicable)
As described in paragraph L.9.6. Combine both documents into a single .pdf file.
No page limitations
ABC_MPA.pdf
L.17 Relevant Experience Projects
(REP)
For each REP, Attachment J-7 with all supporting documents should be submitted in a single .pdf in the following order:
1. Attachment J-7
2. FPDS, if applicable
3. Award Form, if applicable
4. Contract Statement of Work, if applicable
5. Other supporting documents, if applicable
Completed Template is limited to three pages for each
REP.
No page limitations for supporting documents.
ABC_REP1.pdf ABC_REP2.pdf
L.19 Price Proposal Attachment J-9 Limited to the template
ABC_Price_ Proposal.xlsx
7. Delete: L.13 (3) Joint Venture Agreement, Mentor-Protégé Agreement approval letter, and/or Subcontractor Letter(s) of Commitment (if applicable)
Replace with: L.13 (3) Joint Venture Agreement; Mentor-Protégé Agreement and SBA approval letter; and/or Subcontractor Letter(s) of Commitment (as applicable)
| 47QTCB20R0005_A02_SF30_signed.pdf |
| 47QTCB20R0005_pg 2-3.pdf |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 02 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Jean E. Fluevog, Contracting Officer |
| Description[0]: The purpose of this amendment is: |
To make changes to the Request for Proposal as indicated on pages 2 through 3 and to issue a revised Attachment J-7.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: GENERAL SERVICES ADMINISTRATION |
2300 MAIN ST, KANSAS CITY, MO 64108
| NameandAddress[0]: | |
| AdministeredBy[0]: | |
| ContractIDCode[0]: | |
| ReqNumber[0]: | |
| AmendmentNo[1]: 47QTCB20R0005 | |
| ModificationNo[0]: | |
| ProjectNo[0]: | |
| Page[0]: 1 | |
| Pages[0]: 3 | |
| EffectiveDate[0]: 07/29/2020 | |
| Dated9B[0]: 07/06/2020 | |
| Dated10B[0]: | |
| CheckBox9[0]: 1 | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: Off | |
| Is[0]: Off | |
| Extended[0]: Off | |
| NotExtended[0]: 1 | |
| 2020-07-29T09:33:57-0500 | |
| JEAN FLUEVOG |
| DateSigned[0]: |
| DateSigned[1]: 7/29/2020 |
| Copies[0]: 0 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .