Attachment D Draft Key Programs Milestones Deliverables

View the file

Other files

File Type Posted
DEOS_Question_and_Answer_IL6.docx DOCX document
Attachment_C_Draft_Performance_Work_Statement.docx DOCX document
Attachment_E_Draft_Price_Discount.xlsx XLSX spreadsheet
Attachment_B_Draft_DEOS_Statement_of_Objectives.docx DOCX document
Attachment_F_Draft_Quote_Sheet.xlsx XLSX spreadsheet
Draft_RFQ_Instructions_to_Quoters.pdf PDF
Attachment_A_Draft_Functional_Requirements_Document.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

SOO/PWS Task # ReferenceMilestone IDMilestone AcronymMilestone NameTypeResponsibilityDeliverable / Activity NameFormatDue Date
(Notional)DistributionClassificationFrequency
TermsDefinition
Limited Deployment Decision NoticeAuthorizes the contractor to start onboarding users to the DEOS service.
IOC Declaration NoticeIOC will be declared when the DEOS service has been migrated to the initial customer base part of the first NIPR task order execution; the vendor has executed all proposal, design, integration, test & evaluation and deployment milestones up to IOC6; the DEOS COR and PM have accepted all milestones deliverables and activities up to milestone IOC6; and the DEOS service has operated without critical or high incidents for an agreed-to period of 30 consecutive calendar days after completion of milestone IOC6.
Full Deployment Decision NoticeAuthorizes the contractor to move on to the next phase of the contract and start enabling additional integration points.
FOC Declaration NoticeFOC will be declared when the DEOS service has been migrated to all customers part of the first NIPR task order execution; the vendor has executed all proposal, design, integration, test & evaluation and deployment milestones up to milestone FOC2; the DEOS COR and PM have accepted all milestones deliverables and activities up to milestone FOC2; and the DEOS service has operated without critical or high incidents for an agreed-to period of 30 consecutive calendar days after completion of Milestone FOC2.

Insert the reference # associated with the SOO/PWS.

Insert a unique Milestone ID.

Insert the major milestone Acronym associated with the milestone title (e.g., PDR) Insert the major milestone Name associated with the activities or deliverable (e.g., Preliminary Design Review Insert the type of action (i.e. notice, activity, deliverable , etc.).

Insert the corresponding responsibility category based on the definition outlined below:

B (*) - 50% Government responsibility and 50% contractor responsibility

C (**) - 100% Contractor responsibility

G (***) - 100% Government responsibility

(†) - These artifacts are built upon the packages submitted as part of the vendor's DoD PA Insert the Deliverable/Activities Title/Name (e.g., Testing Report, Cybersecurity Assessment, etc.).

Insert the format that will be used to develop the required deliverable, report, assessment, etc.

Insert the due date/duration in which the activities will occur or the initial deliverable will be provided (e.g., 30 days after PDR, After Task Order execution, etc.).

Insert Distribution Category/Statements based on the DoDI 5230.24 classifications:

Distribution A - Public Release Distribution B - U.S. Govt. Only Distribution C - U.S. Govt & Contractors Distribution D - DoD & US DoD Contractors Distribution E - DoD only Distribution F - Further dissemination only as directed by controlling office

Insert the Deliverable classification in according with DoD procedures for identification marking found in DoDM 5200.01 Vol 4 Insert the frequency in which the deliverable/activities will be performed, provided, or updated (e.g., One time Annually, as required, etc.).

Key Milstones, Act, Deliv.

SOO/PWS Task # ReferenceMilestone IDMilestone AcronymMilestone NameTypeResponsibilityDeliverable / Activity NameFormatDue Date
(Notional)DistributionClassificationFrequency
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableBArchitecture, DoDAF Artifacts/Diagrams (AV, OV, SV, StdV, CV) *Government Determined Format30 days after Task Order ExecutionDistribution DCUIAs Needed
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableCSystem Design Document **Government Determined Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableCInterfaces, Ports & Protocols Baseline **Contractor Determined Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableBService Support Functions and Integration Plan *Contractor Determined / Government Approved Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.3DM1PDRPreliminary Design ReviewDeliverableBD-DIL Architecture/ Integration Plan *Government Determined Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableBPerformance Monitoring Strategy *Contractor Determined / Government Approved Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableBSecurity Architecture Analysis *Contractor Determined / Government Approved Format30 days after Task Order ExecutionDistribution D
Distribution FCUIOne Time; updated as required
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewDeliverableBCommunication Plan *Contractor Determined / Government Approved Format30 days after Task Order ExecutionDistribution D
Distribution FCUIOne Time; updated as required
4.1, 4.2, 4.3, 4.8DM1PDRPreliminary Design ReviewDeliverableBMigration Schedule *Contractor Determined Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.5DM1PDRPreliminary Design ReviewDeliverableBLicensing & Subscription Structure *Contractor Determined Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM1PDRPreliminary Design ReviewActivityBConduct PDR *Contractor Determined Format30 days after Task Order ExecutionDistribution DCUIOne Time; updated as required
4.4DM2TENANCYTenancy ReviewDeliverableCTenancy Execution Plan **
(Based on submitted Tenancy Plan during proposal submission)Contractor Determined Format30 days after Acceptance of DM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM2TENANCYTenancy ReviewDeliverableCService Management Plan **

(To Address: Access Management, Event Management, Incident Management, Request Fulfillment, Storefront Integration, Service Desk Support Network Operations (NetOps) Service Desk Integration (i.e., GSD and/or Mission Partner)

OSS/JMN and Out of Band (OOB) management)Contractor Determined / Government Approved Format30 days after Acceptance of DM1Distribution DCUIOne Time; updated as required
4.11MGMTMGMTManagementDeliverableCContractor Project Management Plan (CPMP) **Contractor Determined Format30 days after Acceptance of DM2Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM3PRRProduction Readiness ReviewDeliverableBChange Management Plan *Contractor Determined / Government Approved Format30 days after Acceptance of DM2Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM3PRRProduction Readiness ReviewDeliverableBIncident Response Plan and Procedures *Contractor Determined / Government Approved Format30 days after Acceptance of DM2Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM3PRRProduction Readiness ReviewDeliverableBService Desk Strategy *Contractor Determined Format30 days after Acceptance of DM2Distribution DCUIOne Time; updated as required
4.7DM4PRRProduction Readiness ReviewDeliverableBCore Capability Data Readiness Plan **Contractor Determined FormatDraft 45 Calendar Days after TO ExecutionDistribution DCUIOne Time, Updated

monthly as required

4.7 DM5 PRR Production Readiness Review Deliverable B Core Capability Data Readiness ** Contractor Determined Format Draft 45 Calendar Days after TO Execution Distribution D CUI One Time, Updated monthly as required

4.7 DM6 PRR Production Readiness Review Deliverable B Review Checklist ** Contractor Determined Format Draft 45 Calendar Days after TO Execution Distribution D CUI One Time, Updated monthly as required

4.1, 4.2, 4.3DM4CDRCritical Design ReviewDeliverableCProvide Document Updates for DM1, DM2 and DM3 **Government Determined Format30 days after Acceptance of DM3Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3DM4CDRCritical Design ReviewActivityBConduct CDR *Government Determined Format30 days after Acceptance of DM3Distribution DCUIOne Time; updated as required
4.9DM5TRAININGTrainingDeliverableBTraining Strategy/Plan *Contractor Determined / Government Approved Format15 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.9DM5TRAININGTrainingDeliverableBEnd User Fact Sheets/Manuals *Government Determined Format15 days after Acceptance of DM4Distribution D
Distribution FCUIOne Time; updated as required
4.1, 4.2, 4.3DM5TRAININGTrainingDeliverableBSystem Administrator Configuration Guides for NIPR, SIPR, and D-DIL Environments*Contractor Determined / Government Approved Format15 days after Acceptance of DM4Distribution D
Distribution FCUIOne Time; updated as required
4.9DM6TRAININGTrainingActivityBTraining for System Administrator for NIPR, SIPR, and D-DIL Environments*Contractor Determined / Government Approved Format15 days after Acceptance of DM4Distribution D
Distribution FCUIAs Needed
4.9DM5TRAININGTrainingDeliverableBTraining Requirements Definition *Contractor Determined Format15 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.9DM5TRAININGTrainingDeliverableBTraining Material *Contractor Determined / Government Approved Format15 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.9DM5TRAININGTrainingDeliverableBTraining Feedback Forms *Contractor Determined / Government Approved Format15 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBImpact Assessment Report *Government Determined Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBImplementation Status Report *Contractor Determined Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBImplemented Cybersecurity Controls Checklist *Contractor Determined Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBCybersecurity Assessment Report *Government Determined Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBSelected Security Control Assessment *Government Determined Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBIssue Resolution/Remediation Report *Contractor Determined / Government Approved Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectDeliverableBRisk Acceptance Recommendation *Contractor Determined Format30 days after Acceptance of DM4Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM1ATCAuthority to ConnectActivityCRisk Assessment **Government Determined Format30 days after Acceptance of DM4Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityCIdentify DNS Names (FQDNs) and structure and notional record types **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBDetermine process to add URLs *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityGRequest and Obtain IP Addresses from the NIC (For DoD IPs) ***30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityCRequest and Obtain IP Addresses from the CSP (For CSP IPs) **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityCConfigure IP Addresses in CSP Routers **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityGConfigure IP Addresses in DISA Routers ***30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityCConfigure Secure NAT (If needed) **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConfigure TTL and other parameters *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConfigure Domain in CSP Portal *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConfigure DNS Whitelist (Vendor's URLs) *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConfigure DNS Resource Records *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConfigure DNS Failover *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConfigure external/internal DNS; Ensure auto discover is working *30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBReview external DNS records and SSL certificates *
(T&E Activity)30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBConnectivity Test *
(T&E Activity)30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBTest SNAT Translation (If needed) *
(T&E Activity)30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBTest DNS Queries *
(T&E Activity)30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBTest FQDN reachability *
(T&E Activity)30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityBTest DNS Routing issues, sink holing, reverse proxy *
(T&E Activity)30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM2HOSTINGDNS, Network, Transport, Hosting (FRD section 7.3)ActivityCFinal Facility Clearance granted from DSS to host IL6 **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityCContractor provides FedRAMP PA to DISA for Validation **30 days after Acceptance of CIM1Distribution D
Distribution FCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityCCoordinate Technical Kick Off meeting with DISA SCA and CSP Representatives; include site visits if applicable **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityCValidate deltas between CSP inherited controls and required inherited controls **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityCValidate Implemented inheritable controls deltas **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityGApproved SAR is submitted to AO office***30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityGPrepare POA&M addressing residual risk ***30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityCSubmit eMASS Package **30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityGSubmit Provisional Authorization (PA) recommendation ***30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityGProvisional Authorization Package Review ***30 days after Acceptance of CIM1Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM3PAProvisional AuthorizationActivityCDSAWG Review and Recommendation for receiving Provisional Authorization**30 days after Acceptance of CIM1Distribution D
Distribution FCUIAs Needed
4.1, 4.2, 4.3CIM4IATTInterim Authority to Test (IATT)DeliverableCContinuous monitoring strategy/plan **/†Government Determined Format30 days after Acceptance of CIM3Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM4IATTInterim Authority to Test (IATT)DeliverableCSystem Security Plan (SSP) **Government Determined Format30 days after Acceptance of CIM3Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM4IATTInterim Authority to Test (IATT)ActivityCInitiate RMF Security Plan /Update System Security Plan (SSP) **30 days after Acceptance of CIM3Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM4IATTInterim Authority to Test (IATT)ActivityCConduct Site/ ST&E Visit if applicable **
(T&E Activity)30 days after Acceptance of CIM3Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM4IATTInterim Authority to Test (IATT)ActivityCVendor ISSM prepares POA&M addressing residual risk findings **30 days after Acceptance of CIM3Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM4IATTInterim Authority to Test (IATT)ActivityGComplete self-assessment and IA controls, System Implementation Plan (SIP), RMF Implementation Plan (DIP), RMF Scorecard, System POA&Ms ***30 days after Acceptance of CIM3Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)DeliverableCDirectory Replication Plan **Contractor Determined Format45 days after Acceptance of CIM3Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)DeliverableBOCSP/CRL Integration Plan *Contractor Determined Format45 days after Acceptance of CIM3Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityCRemove duplicate attributes from Government Directories **45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityCUpdate blank / invalid attributes with valid attributes **45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityCRemove invalid / questionable characters in attributes **45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityCIdentify Directory attributes to be replicated **45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityBGenerate Server Side Certificates *45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityBIdentify MILDEP POCs (Local Registration Authority) for CSR submission *45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityBFacilitate DoD PKI Certificate Generation/Signing *45 days after Acceptance of CIM3Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityGTest Identity assertion redirect to DISA EDS as the IdP ***
(T&E Activity)45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityGTest Identity claims access provided by CSP to user based on information provided by DISA EDS as the IdP ***
(T&E Activity)45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM5IDAMIdentity & Access Management Integration (FRD Section 7.2)ActivityGTest client certificate verification/revocation status based on queries to the DoD RCVS OCSP responders ***
(T&E Activity)45 days after Acceptance of CIM3Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBProvisioning / Authentication Assessment Documentation */†Government Determined Format15 days after Acceptance of CIM5Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBPrivacy Impact Assessment */†Government Determined Format15 days after Acceptance of CIM5Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBPrivacy Threshold Analysis */†Government Determined Format15 days after Acceptance of CIM5Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBResidual Risk Statement */†Government Determined Format15 days after Acceptance of CIM5Distribution DCUIYearly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBVulnerability Assessment */†Government Determined Format15 days after Acceptance of CIM5Distribution DCUIMonthly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBBusiness Impact Analysis *Government Determined Format15 days after Acceptance of CIM5Distribution DCUIMonthly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)DeliverableBContingency Plan *Contractor Determined / Government Approved Format15 days after Acceptance of CIM5Distribution DCUIMonthly; as required
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)ActivityBInitial Threat Assessment *15 days after Acceptance of CIM5Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)ActivityCCooperative Vulnerability Penetration Assessment (CVPA) **
(T&E Activity)15 days after Acceptance of CIM5Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)ActivityGAdversarial Assessment (AA) ***
(T&E Activity)15 days after Acceptance of CIM5Distribution DCUIAs Needed
4.1, 4.2, 4.3CIM6DODIN-CSDoDIN Protection / Cybersecurity Assessment (FRD Sections 3, 7.4)ActivityGPersistent Cyber Operations Evaluation ***
(T&E Activity)15 days after Acceptance of CIM5Distribution DCUIAs Needed
4.1, 4.2, 4.3TEM1TEPTest & Evaluation PlanningDeliverableBContinuous Monitoring Test Plan */†Contractor Determined / Government Approved Format30 days after Acceptance of CIM6Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM1TEPTest & Evaluation PlanningActivityCConfigure / Deliver Test Environment(s) **30 days after Acceptance of CIM6Distribution DCUIAs Needed
4.1, 4.2, 4.3TEM1TEPTest & Evaluation PlanningActivityBTest Environment Assessment *30 days after Acceptance of CIM6Distribution DCUIAs Needed
4.1, 4.2, 4.3TEM2CS-TECybersecurity T&E Activities / CSP Interoperability & Integration TestingDeliverableBCybersecurity Requirements Definition *Government Determined Format30 days after Acceptance of TEM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM2CS-TECybersecurity T&E Activities / CSP Interoperability & Integration TestingDeliverableCIncident Response Plan and Procedures **Contractor Determined / Government Approved Format30 days after Acceptance of TEM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM2CS-TECybersecurity T&E Activities / CSP Interoperability & Integration TestingActivityBCybersecurity Interoperability & Integration Test *30 days after Acceptance of TEM1Distribution DCUIAs Needed
4.1, 4.2, 4.3TEM3IATIntegration & Acceptance Testing (I/AT)Deliverable + ActivityBI/AT for FRD Section 2 (Core System Requirements) *Government Determined Format60 days after Acceptance of TEM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM3IATIntegration & Acceptance Testing (I/AT)Deliverable + ActivityBI/AT for FRD Section 4 (DoDIN Protection) *Government Determined Format60 days after Acceptance of TEM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM3IATIntegration & Acceptance Testing (I/AT)Deliverable + ActivityBI/AT for FRD Section 7 (Core Service Support Functions & Integration Points) *Government Determined Format60 days after Acceptance of TEM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM3IATIntegration & Acceptance Testing (I/AT)Deliverable + ActivityBI/AT for FRD Section 9 (Performance Objectives and Environmental Metrics) *Government Determined Format60 days after Acceptance of TEM1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3TEM4IOT&EInitial Operational Test & EvaluationDeliverableCRecommended Production Configuration Changes **Contractor Determined Format15 days after Acceptance of TEM3Distribution D
Distribution FCUIOne Time; updated as required
Govt OnlyTEM4IOT&EInitial Operational Test & EvaluationDeliverableGIOT&E Report (based on Government conducted IOT&E) ***Contractor Determined Format15 days after Acceptance of TEM3Distribution D
Distribution FCUIOne Time; updated as required
Govt OnlyTEM4IOT&EInitial Operational Test & EvaluationActivityGT&E and JITC Operational Evaluation ***15 days after Acceptance of TEM3Distribution D
Distribution FCUIAs Needed
4.1, 4.2, 4.3TEM4IOT&EInitial Operational Test & EvaluationActivityCCooperative Vulnerability Penetration Assessment (CVPA) **15 days after Acceptance of TEM3Distribution DCUIAs Needed
Govt OnlyTEM4IOT&EInitial Operational Test & EvaluationActivityGAdversarial Assessment (AA) ***15 days after Acceptance of TEM3Distribution DCUIAs Needed
Govt OnlyTEM4IOT&EInitial Operational Test & EvaluationActivityGPersistent Cyber Operations Evaluation ***15 days after Acceptance of TEM3Distribution DCUIAs Needed
Govt OnlyTEM4IOT&EInitial Operational Test & EvaluationActivityGIOT&E ***15 days after Acceptance of TEM3Distribution D
Distribution FCUIAs Needed
Govt OnlyTEM5FOT&EFollow-on Operational Test & EvaluationDeliverableGFOT&E Report (based on Government conducted FOT&E) ***Government Determined Format45 days after Acceptance of TEM4Distribution DCUIOne Time; updated as required
Govt OnlyTEM5FOT&EFollow-on Operational Test & EvaluationActivityGT&E and JITC Operational Evaluation ***45 days after Acceptance of TEM4Distribution DCUIAs Needed
4.1, 4.2, 4.3TEM5FOT&EFollow-on Operational Test & EvaluationActivityCCooperative Vulnerability Penetration Assessment (CVPA) **45 days after Acceptance of TEM4Distribution DCUIAs Needed
Govt OnlyTEM5FOT&EFollow-on Operational Test & EvaluationActivityGAdversarial Assessment (AA) ***45 days after Acceptance of TEM4Distribution DCUIAs Needed
Govt OnlyTEM5FOT&EFollow-on Operational Test & EvaluationActivityGPersistent Cyber Operations Evaluation ***45 days after Acceptance of TEM4Distribution DCUIAs Needed
Govt OnlyTEM5FOT&EFollow-on Operational Test & EvaluationActivityGFOT&E ***45 days after Acceptance of TEM4Distribution DCUIAs Needed
Govt OnlyIOC1ATOAuthority to Operate (ATO)DeliverableGSecurity Assessment Report (SAR) ***Government Determined Format10 days after Acceptance of TEM5Distribution DCUIOne Time; updated as required
Govt OnlyIOC1ATOAuthority to Operate (ATO)DeliverableGFinal POA&M ***Government Determined Format10 days after Acceptance of TEM5Distribution DCUIOne Time; updated as required
Govt OnlyIOC1ATOAuthority to Operate (ATO)DeliverableGAuthorization Decision Document ***Government Determined Format10 days after Acceptance of TEM5Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3IOC1ATOAuthority to Operate (ATO)ActivityBDSAWG Review and Recommendation for receiving Enterprise Reciprocity *10 days after Acceptance of TEM5Distribution DCUIAs Needed
4.1, 4.2, 4.3IOC2LUDLimited User DeploymentDeliverableBLimited Fielding Implementation Plan *Government Determined Format45 days after Acceptance of IOC1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3IOC2LUDLimited User DeploymentDeliverableBSystem & Configuration Definition (i.e. – “As Built”) *Contractor Determined / Government Approved Format45 days after Acceptance of IOC1Distribution DCUIMonthly; as required
4.1, 4.2, 4.3IOC2LUDLimited User DeploymentDeliverableBDefect Tracking List *Contractor Determined Format45 days after Acceptance of IOC1Distribution DCUIWeekly; as required
Govt OnlyIOC2LUDLimited User DeploymentActivityGLD User Test ***
(T&E Activity)Government Determined Format45 days after Acceptance of IOC1Distribution DCUIAs Needed
Govt OnlyIOC3LDD-CCCore Capabilities Deployment (LDD Decision)NoticeGLimited Deployment Decision Notice ***Government Determined Format90 days after Acceptance of IOC2Distribution DCUIOne Time
Govt OnlyIOC4IOCInitial Operational CapabilityNoticeGIOC Declaration Notice ***Government Determined Format5 days after Acceptance of IOC3Distribution DCUIOne Time
Govt OnlyFOC1FDDFull Deployment DecisionNoticeGFull Deployment Decision Notice ***Government Determined Format60 days after Acceptance of IOC4Distribution DCUIOne Time
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCAdditional Support Services Integration Plan **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.1, 4.2, 4.3FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)Deliverable + ActivityBI/AT for remaining FRD Sections *
(As needed and as executed by individual customers)Government Determined Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
Govt OnlyFOC3FOCFinal Operational Capability (DISA Core Capabilities + Integration Points)NoticeGFOC Declaration Notice ***Government Determined Format60 days after Acceptance of FOC2Distribution DCUIOne Time
4.1, 4.2, 4.3SM1SUSSustainmentDeliverableBEvergreen Strategy *Government Determined FormatOngoing after FOC Declaration until the end of the contractDistribution D
Distribution FCUIOne Time; updated as required
4.1, 4.2, 4.3SM1SUSSustainmentDeliverableCChange Management Documentation (including Risk Analysis) **Government Determined FormatOngoing after FOC Declaration until the end of the contractDistribution DCUIOne Time; updated as required
4.1, 4.2, 4.3SM1SUSSustainmentDeliverableBUsage Reports (by feature capability) *Contractor Determined FormatOngoing after FOC Declaration until the end of the contractDistribution D
Distribution FCUIMonthly; as required
4.1, 4.2, 4.3SM1SUSSustainmentDeliverableBIncident Reports *Contractor Determined / Government Approved FormatOngoing after FOC Declaration until the end of the contractDistribution DCUIWeekly; as required
4.1, 4.2SM1SUSSustainmentDeliverableBFISMA Reporting and Updates */†Government Determined FormatOngoing after FOC Declaration until the end of the contractDistribution DCUIYearly; as required
4.1, 4.2SM1SUSSustainmentDeliverableBFEDRAMP Reporting and Updates */†Government Determined FormatOngoing after FOC Declaration until the end of the contractDistribution DCUIYearly; as required
4.11MGMTMGMTManagementDeliverableCWork Breakdown Schedule (WBS) **Contractor Determined FormatMonthly, on 5th workday after TO executionDistribution DCUIMonthly, as required
4.11MGMTMGMTManagementDeliverableBIntegrated Master Schedule (IMS) *Government Determined Format30 Calendar Days after TO ExecutionDistribution D
Distribution FCUIMonthly, as required
4.11MGMTMGMTManagementDeliverableCTask Order Status and Progress Report **Contractor Determined FormatMonthlyDistribution D
Distribution FCUIMonthly, as required
4.11MGMTMGMTManagementDeliverableCSubcontractor Management Plan **Contractor Determined Format30 Calendar Days after Contract AwardDistribution DCUIOne Time; Updated

annually as required

4.11MGMTMGMTManagementDeliverableCKick-Off Meeting **Contractor Determined FormatFor each Task Order, or unless otherwise specified in the Task Order.Distribution D
Distribution FCUIAs required based on Task Order execution
4.11MGMTMGMTManagementDeliverableCQuarterly Program Reviews **Contractor Determined FormatAnnually listing all personnel under each Task Order.Distribution D
Distribution FCUIQuarterly
4.11MGMTMGMTManagementDeliverableCPersonnel Manpower Report **Contractor Determined FormatQuarterly; unless otherwise specified by the Procuring Contracting Officer or Contracting Officer Representative.Distribution DCUIAnnually, as required
4.11MGMTMGMTManagementDeliverableCContract Status Report **Contractor Determined FormatWithin five business days after conclusion of the meetings/conferencesDistribution DCUIQuarterly, as requierd
4.11MGMTMGMTManagementDeliverableCPost Award Task Order Meetings/Conferences **Contractor Determined Format30 Calendar Days after TO ExecutionDistribution DCUIAs required
4.4DM2TENANCYTenancy ReviewDeliverableBMultiple/Split Domain Management Approach *Contractor Determined Format30 Calendar Days after PDR**Distribution DCUIOne Time; updated as required
4.4DM2TENANCYTenancy ReviewDeliverableCBriefing Slides **Government Determined FormatAs requiredDistribution DCUIAs required
4.5LICLICENSESSubscription and LicensesDeliverableBSoftware License Management Plan *Contractor Determined Format30 Calendar Days after TO ExecutionDistribution DCUIOne Time; Updated annually as required

4.5 LIC LICENSES Subscription and Licenses Deliverable C Licensing & Subscription Structure ** Contractor Determined Format 30 Calendar Days after TO Execution Distribution D CUI One Time; Updated annually as required

4.5LICLICENSESSubscription and LicensesDeliverableCSoftware License Reports **Contractor Determined / Government Approved Format5th workday after TO Execution
Distribution DCUIMonthly, or as required

4.5 LIC LICENSES Subscription and Licenses Deliverable C Briefing Slides ** Government Determined Format 30 Calendar Days after TO Execu-tion Distribution D CUI Weekly, as required

4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCInfrastructure Review Checklist **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCInfrastructure Analysis/Evaluation Report **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCEngineering Artifacts **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCWhite Papers **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIAs required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCArchitecture, DoDAF Artifacts/Diagrams (AV, OV, SV, StdV, CV) **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCInterfaces, Ports & Protocols Baseline **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCCybersecurity Monitoriing Strategy **Contractor Determined / Government Approved Format20 days after Acceptance of FOC1Distribution DCUIOne Time; updated as required
4.6FOC2LDD-INTOptional Integration Points Deployment (LDD Decision)DeliverableCTransition/Decommission Plan **Contractor Determined / Government Approved FormatWithin 5 business days after requestDistribution DCUIOne Time; updated as required
4.8MIGRMIGRUser and Data MigrationDeliverableCData Migration & Management Plan/Strategy **Contractor Determined / Government Approved FormatWithin 5 business days after requestDistribution DCUIOne Time; Updated

annually as required

4.8 MIGR MIGR User and Data Migration Deliverable C Monthly User Migration Reports ** Contractor Determined / Government Approved Format Within 5 business days after request Distribution D CUI Monthly, as required

4.8 MIGR MIGR User and Data Migration Deliverable C Migration Schedule ** Contractor Determined / Government Approved Format Within 5 business days after request Distribution D CUI Monthly, as required

4.10ENGENGEngineering ServicesDeliverableCEngineering Artifacts (e.g., Network/System Diagrams) **Contractor Determined FormatWithin 10 business days after assignmentDistribution DCUIMonthly, as required
4.10ENGENGEngineering ServicesDeliverableCWhite Papers, Information Papers and Decision **Contractor Determined FormatWithin 10 business days after assignmentDistribution DCUIMonthly, as required