Amendment_002_Contractor_Questions_EngineLathe_0016_5202025.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
AFLCMC Engine Lathes
Solicitation number
47QSWC25Q0104
Issued by

About this file

This document is an Amendment with Contractor Questions and Responses for a Request for Quote (RFQ) for engine lathes issued by the Air Force Life Cycle Material Command (AFLCMC). The solicitation (Number 47QSWC25Q0104) is a small business set-aside, firm-fixed price supply contract for nine engine lathes to be purchased in a single, one-time procurement across eight different shipping destinations, including three overseas locations in Okinawa and Qatar.

Key details include shipping instructions specifying that contractors will ship equipment to designated U.S. port locations, with the government assuming transportation responsibility beyond the port. All shipping costs up to port delivery must be included in the quoted price. The technical specifications allow for substitute lathe products that meet or exceed the minimum requirements outlined in Section C of the RFQ. Contractors are required to complete a DD 1149 form and obtain a Transportation Control Number before shipping to aerial ports. The procurement is being conducted under FAR Part 13 Simplified Acquisition Procedures and Part 12 for commercial products and services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Answers 5202025

AFLCMC Engine Lathe Questions and Responses Form
PageSectionParaQuestionGovernment Answer
General QuestionIs this a contract for purchases made during a 365 day period, or are all 9 lathes being purchased at one time?All equipment are to be purchased as a single, one-time procurement. The Government will not be making recurring or periodic purchases throughout the year under this requirement.
General QuestionThere appears to be 8 different shipping destinations as well.
Is this correct?That is correct. There are eight (8) different shipping locations.
General QuestionThe specification appears to be for Clausing lathes. Will you accept a substitute?Yes, a substitue product is acceptable; however, it must fully meet or exceed all the minimum technical specifications outline in Section C of the RFQ and technical spreadsheet.
General QuestionCan you confirm where/who the purchaser is. Is it Robins AFB?Air Force Life Cycle Material Command, Robins AFB
General QuestionCan you please make an arrangement for export directly?Contractor will ship the equipment to a port location . For document #FE705080373403 ship to SUU/Travis AFB, CA, for FE527063480069 ship to SUU/Travis AFB, CA, and for FE705040383310 ship to Dover AFB. (Note we will have to get Transportation Control Number assigned for these assets before shipping to the aerial port. DD 1149 must be filled out prior to tranportation.
General QuestionIs the destination the individual military bases or will it be a destination state side and shipped from there?Yes. only 3 assets are being shipped overseas. See above for document numbers that will be sent to a Port and shipped overseas from there.
General QuestionAre the two machines that have an overseas location, Okinawa and Qatar, to be shipped to a point of consolidation in the US or shipped directly to the APO?Contractor will ship the equipment to a port location . For document #FE705080373403 ship to SUU/Travis AFB, CA, for FE527063480069 ship to SUU/Travis AFB, CA, and for FE705040383310 ship to Dover AFB. (Note we will have to get Transportation Control Number assigned for these assets before shipping to the aerial port. DD 1149 must be filled out prior to tranportation.
General QuestionRegarding line item 3AA on the Pricing Spreadsheet, are all the freight charges to be totalled on this line?Yes, that is correct.
General QuestionThe 3 locations you have listed overseas are PO boxes… to quote delivery we’d need the ship-to delivery address for each – can you provide an extension for this?The Contractor will be responsible for shipping the equipment to the designated U.S. port. The Government will assume responsibility for transportation beyond the port. All shipping costs up to and including delivery to the port shall be included in the Offeror's quoted price.