AWARD ALLOCATION FORM IRA .xlsx
XLSX spreadsheet 175 KB Posted
- Solicitation number
- 47PM0024R0001
About this file
This document contains an award allocation form and bid tabulation form for a federal construction project. The award allocation form provides budget details for various construction divisions and trades for a building rehabilitation project with an estimated start date to be determined. Budget line items include design, general requirements, existing conditions, concrete, masonry, metals, and other construction areas. The bid tabulation form shows the independent government estimate and bids from four contractors for each construction division, with Contractor A's total bid coming in lowest at $4,185. The related federal contract opportunity is for construction management support services for the St. Elizabeths West Campus in Washington, D.C. being conducted by the General Services Administration Public Buildings Service National Capital Region.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Information
POST AWARD ALLOCATION FORM IRA
| PROJECT NAME | ||||
| BUILDING NAME | ||||
| BUILDING ADDRESS | BUILDING NUMBER | |||
| ESTIMATED | ||||
| START DATE | PERIOD OF PERFORMANCE DAYS | |||
| SOLICITATION # | DELIVERY METHOD | Design Bid Build |
| OWNER INFORMATION | CONTRACTOR INFORMATION | ||
| OWNER | |||
| COMPANY NAME | CONTRACTOR COMPANY NAME | ||
| OWNER | |||
| CONTACT NAME | CONTRACTOR CONTACT NAME | ||
| ADDRESS | ADDRESS | ||
| OWNER | |||
| PHONE | CONTRACTOR PHONE | ||
| OWNER | |||
| CONTRACTOR EMAIL |
| SCOPE OF WORK |
| TEXT |
| MATERIALS AND SERVICES NOT INCLUDED |
| TEXT |
| ASSUMPTIONS |
| TEXT |
| NET ZERO CONTRIBUTIONS |
| TEXT |
Masterformat CSI
PBS MASTERFORMAT CSI
| Masterformat | |||
| CSI | System Elements (Trade Work) | Self Performed/ | |
| Subcontracted? | Amount |
| Div. 00 | Design Services - for Design Build | |
| Div. 00A | High Performing Green Buildings | |
| Div. 00B | Emerging and Sustainable Technologies | |
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | |
| Div. 02 | Existing Conditions | |
| Div. 03 | Concrete | 0 |
| Div. 03A | Low Embodied Carbon Concrete | |
| Div 03.B | Non LEC Concrete | |
| Div. 04 | Masonry | |
| Div. 05 | Metals | 0 |
| Div. 05A | Low Embodied Carbon Steel | |
| Div 05.B | Non LEC Metals | |
| Div. 06 | Wood, Plastics, Composites | |
| Div. 07 | Thermal and Moisture Protection | |
| Div. 08 | Openings | 0 |
| Div. 08A | Low Embodied Carbon Glass | |
| Div 05.B | Non LEC Openings | |
| Div. 09 | Finishes | |
| Div. 10 | Specialties | |
| Div. 11 | Equipment | |
| Div. 12 | Furnishings | |
| Div. 13 | Special Construction | |
| Div. 14 | Conveying Equipment | |
| Div. 21 | Fire Suppression | |
| Div. 22 | Plumbing | |
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| Div. 26.1 | Electrical | |
| Div. 26.2 | Lighting | |
| Div. 27 | Communications | |
| Div. 28.1 | Electronic Safety | |
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | |
| Div. 31 | Earthwork | |
| Div. 32 | Exterior Improvements | 0 |
| Div. 32.A | LEC Asphalt | |
| Div. 32.B | Rest of Exterior Improvements | |
| Div. 33 | Utilities | |
| Div. 34 | Transportation | |
| Div. 35 | Waterway and Marine Construction | |
| Div. 40 | Process Integration | |
| Div. 41 | Material Processing and Handling Equipment | |
| Div. 42 | Process Heating, Cooling and Drying Equipment | |
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| Div. 44 | Pollution and Waste Control Equipment | |
| Div. 45 | Industry Specific Manufacturing Equipment | |
| Div. 46 | Water and Wastewater Equipment | |
| Div. 48 | Electrical Power Generation | |
| Subtotal | Trade Cost | $0.00 |
| General Conditions | ||
| Insurances (General Liability, Subcontractor Performance, Builders Risk Program) | ||
| Payment and Performance Bond |
| Subtotal | Estimated Cost of Work | $0.00 |
| Overhead | ||
| Profit | ||
| ERROR:#NAME? | $0.00 |
Bid Tabulation
| PBS BID TABULATION FORM | ||||||
| Company Name: | Project No.: | |||||
| Project Name: | ||||||
| Location: | ||||||
| Architect: | Independent Government Estimate (IGE) | 0 | CONTRATOR B | CONTRACTOR C | CONTRACTOR D |
| Bid Date: | |||||||||||||
| BID QUANTITIES | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | |||
| Ref # | Item Description | Qty. | UNIT | ||||||||||
| Div. 00 | Design Services - for Design Build | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | 900 | $900.00 | 1000 | $1,000.00 | $ - | $ - | $ - | |||||
| Div. 02 | Existing Conditions | 600 | $600.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 03 | Concrete | 210 | $210.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div. 03A | Low Embodied Carbon Concrete | 200 | $200.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div 03.B | Non LEC Concrete | 4.5 | $45.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 04 | Masonry | 5 | $50.00 | 6 | $60.00 | $ - | $ - | $ - | |||||
| Div. 05 | Metals | 6 | $60.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 05A | Low Embodied Carbon Steel | 1.4 | $280.00 | 1.5 | $300.00 | $ - | $ - | $ - | |||||
| Div 05.B | Non LEC Metals | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 06 | Wood, Plastics, Composites | 1.25 | $250.00 | 1.25 | $250.00 | $ - | $ - | $ - | |||||
| Div. 07 | Thermal and Moisture Protection | 590 | $590.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 08 | Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 05A | Low Embodied Carbon Glass | $ - | $ - | $ - | $ - | $ - | |||||||
| Div 05.B | Non LEC Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 09 | Finishes | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 10 | Specialties | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 11 | Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 12 | Furnishings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 13 | Special Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 14 | Conveying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 21 | Fire Suppression | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 22 | Plumbing | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.1 | Electrical | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.2 | Lighting | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 27 | Communications | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.1 | Electronic Safety | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 31 | Earthwork | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32 | Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.A | LEC Asphalt | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.B | Rest of Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 33 | Utilities | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 34 | Transportation | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 35 | Waterway and Marine Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 40 | Process Integration | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 41 | Material Processing and Handling Equipment | $ - | $ - | ||||||||||
| Div. 42 | Process Heating, Cooling and Drying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | $ - | $ - | ||||||||||
| Div. 44 | Pollution and Waste Control Equipment | $ - | $ - | ||||||||||
| Div. 45 | Industry Specific Manufacturing Equipment | $ - | $ - | ||||||||||
| Div. 46 | Water and Wastewater Equipment | $ - | $ - | ||||||||||
| Div. 48 | Electrical Power Generation | $ - | $ - | ||||||||||
| $4,185.00 | $4,310.00 | ||||||||||||
| $426.69 | $426.69 | ||||||||||||
| $4,611.69 | $4,736.69 |
image1.png
File details come from the government source that posted it. Updated .