SF30_47PL0219R0010_AMD0002.pdf

PDF 188 KB Posted

Attached to
Annual Fire Safety Inspections for R10 Daycares
Solicitation number
47PL0219R0010
Issued by

About this file

Amendment 2 to Solicitation #47PL0219R0010

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

10PQD

Jessica Wilde Contracting Officer

Please refer to the continuation/attachment page for further details.

10PQD

GSA Public Building Service Acquisitions Division

400 15TH ST SW

AUBURN, WA 98001 United States

GSA Public Building Service Acquisitions Division

400 15TH ST SW

AUBURN, WA 98001 United States

EQ10PME-19-0004

9A. AMENDMENT OF SOLICITATION

NO.

47PL0219R0010

1 2

07/03/2019

06/20/2019

Attachment Page (AM0002 to 47PL0219R0010)

The purpose of this Amendment 000 to solicitation 47PL0219R0010 is to issue the following additional information/clarification/answer(s) in response to the questions(s) GSA received as of June 26 & 27, 2019.

Question(s) and Answer(s):

Q1. The cover page of the solicitation, part of file "GSA Daycare Inspection 2010 47PL0219R0010 Draft Solicitation 1.pdf", referenced in the above subject line stated the locations are in the States of Idaho, Washington, and Oregon.

However, the list of the facilities within the same document indicate the locations are in Alaska, Washington, and Oregon.

Can you please clarify the locations of where the site inspections are to be performed?

[A1]: This amendment serves to correct information on The Cover sheet of the solicitation, which incorrectly sites “Various GSA Buildings – Washington, Idaho, and Oregon” as the locations for this solicitation.

Section F, correctly lists the following buildings where services shall be performed:

1. Building Blocks Child Development Center – FEDERAL 520 15th Street, SW Auburn, WA 98001

2. Growing Years Child Development Center-FEDERAL 4735 E Marginal Way South Seattle, WA 98134

3. Green Tree Early Childhood Center- LEASED 1200 6th Avenue, Suite 200 Seattle, WA 98101

4. Joyful Noise EAST – FEDERAL 911 NE 11th Ave Portland, OR 97232

5. Joyful Noise Child Care Center, Inc. – LEASED Robert Duncan Plaza 333 SW 1st Avenue, Suite A Portland, OR 97204

6. Tundra Tykes Child Care Center –LEASED 750 D Street Anchorage, AK 99501

7. Gold Creek Child Care Center- FEDERAL Fed Bldg-Post Office & Courthouse 709 W. 9th Street Juneau, AK 99802

Q2. Are you able to provide copies of the previous inspection reports (or single example)? Did previous reports submitted meet expectations?

[A2]. Sample reports or examples may be provided, if requested, after contract award to the contractor selected (only).

Yes, the previous reports submitted met the requirements of the contract.

Q3. The spec requires a registered professional engineers to perform the fire inspections. Would NICET II qualification be acceptable to comply with this requirement. Can you please provide the device counts and previous inspection reports for every location.

[A3]. The proposed will not meet the requirements of the contract. As a minimum, a registered fire protection engineer shall perform the inspections.

Attachment Page (AM0002 to 47PL0219R0010)

The device counts and previous inspection reports (sample only) may be provided, if requested, after contract award to the contractor selected (only). Please reference section C- Statement of Work of the solicitation for qualification.