Amend0004_WMATOC RFI and Responses.pdf

PDF 41 KB Posted

Attached to
47PL0123R0035 - Western Multiple Award Task Order Contract MATOC Replacement - Solicitation Federal contract opportunity
Solicitation number
47PL0123R0035
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document contains responses to contractor questions regarding Amendment 0004 to solicitation number 47PL0123R0035 from the General Services Administration for the Western Multiple Award Task Order Contract replacement. Key details include requirements for a bid guarantee for the seed project, specifications for furniture disposal and tenant improvements such as new entrance doors and demising walls, clarification that city permits are not required, and confirmation that contractors should provide UEI numbers for subcontractors rather than listings.

View the file

Other files for this federal contract opportunity

Other files attached to 47PL0123R0035 - Western Multiple Award Task Order Contract MATOC Replacement - Solicitation, newest first.
File Type Posted
PreAward Notice WMATOC.pdf PDF
Amend 0004_SF1442.pdf PDF
Solicitation Amendment 47PL0123Q0013_0004.pdf PDF
Solicitation Amendment 47PL0123R0035_0006.pdf PDF
Amend0006_Attachment D_SOW OIG Space Reduction 2023 08 17.pdf PDF
Amend0005 RFI and Responses.pdf PDF
Solicitation Amendment 47PL0123R0035_0005.pdf PDF
Solicitation Amendment 47PL0123Q0013_0003.pdf PDF
Solicitation Amendment 47PL0123R0035_0004.pdf PDF
47PL0123Q0013 OIG Space Reduction Amend0002.pdf PDF
Amend 0003_Attachment D_SOW OIG Space Reduction 2023 07 17.pdf PDF
Solicitation Amendment 47PL0123R0035_0003.pdf PDF
Amend0003_WMATOC RFI and Responses.pdf PDF
Seed Project Amend_0001_Time Extension.pdf PDF
Seed Project Site Visit 2023 07 13.pdf PDF
Amend 0002 RFI and Responses.pdf PDF
WMATOC Agreement.pdf PDF
Exhibit 7 IDIQ Price Schedule.xlsx XLSX spreadsheet
Exhibit 6 GSA Security Manual.pdf PDF
Attachment E_Seed Project Price and Services Schedule and Associated Worksheets.xlsx XLSX spreadsheet
WMATOC Solicitation Amendment_0002.pdf PDF
GSA527.pdf PDF
Exhibit 00 Read Me First - CUI Document.pdf PDF
Seed Project SF 1442.pdf PDF
WMATOC SF1442.pdf PDF
Exhibit 5 Past Performance Questionnaire.pdf PDF
Exhibit 3 Project Experience Form.pdf PDF
Attachment F_ WD WA20230011 2023 02 03.pdf PDF
Attachment B Example of TO Reps and Certs.docx DOCX document
WMATOC RFP.pdf PDF
Attachment A WMATOC Terms and Conditions.docx DOCX document
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 2 GSAAffiliatedCustomerAccounts.pdf PDF
Exhibit 4 Sample Key Personnel Resume Format.pdf PDF
Solicitation Amendment 0001.pdf PDF
Attachment D_ SOW OIG Space Reduction 2023 05 19.pdf PDF
Amend 0001_WMATOC Solicitation RFP.pdf PDF
Amend 0001_Contractor RFI and Responses 2023 07 12.pdf PDF
Attachment C TORFP OIG Space Reduction.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0004 WMATOC Solicitation No.47PL0123R0035

Contractor RFI and Responses

1. On the SF 1442 for the Seed Project that was issued in Amendment 1 has it marked in Block 13 that a guarantee is required. Do offerors need to provide a Bid Bond for the Seed Project?

If so, will it be located in Tab 1 or 2 in Volume IV?

Answer: Yes. A bid guarantee is required pursuant to FAR Part 28. A “bid guarantee” is sometimes referred to as an “offer guarantee” or “bid bond.” Bonding must be submitted under Volume 1, please see L-3.2 of Amend 0001_WMATOC Solicitation RFP.

2. For Bid Item 05 Furniture Disposal Work, can you please provide a list of furnishings that will need to be disposed? During the site visit the PM was unsure of what was going to be disposed of and they would not permit any photos. It is very difficult to put a price together without knowing the overall scope of this bid line item.

Answer: Please see section 2.3 of the SOW for details on furniture disposal work. Attachment

7.12 Furniture List is also included with the SOW.

3. In the SOW OIG Space document, under section 2.2.3. Tenant Improvement, 2.2.3.2.

Openings, 2.2.3.2.1. Install new Glass entrance door matching the existing glass door and automatic closer.

A. During the site walk it was mentioned that we are to relocate the existing assembly to this new location by the conference room. Please advise if we are to provide a new Glass entrance door assembly with a new automatic closer or only relocate the existing unit, as is, to this new location.

Answer: SOW Section 2.2.3.2.1 calls for a new entrance door.

B. Under openings, 2.2.3.2.1. and Attachment 7_4 Exhibit 4 - OIG Intent Drawing, there is no instructions or notes related to the existing Glass entrance door assembly. Please advise what work and requirements are for this existing Glass entrance door assembly.

Answer: Refer to SOW 2.2.3.2.1- Install new Glass entrance door matching the existing glass door and automatic closer.

4. In the SOW OIG Space document, under section 2.2.3. Tenant Improvement, 2.2.2.3.1.

New demising wall shall be floor to slab. Sound transmission levels for wall shall comply with the standard private office sound levels.

A. What is the GSA standard private office walls assembly / STC rating for a standard private office sound level?

Answer: Refer to GSA P-100 FACILITIES STANDARDS

B. On Attachment 7_4 Exhibit 4 - OIG Intent Drawing, Shows Wall 1, starting from the exterior wall though the area to the corridor wall. Is this the only wall(s) in the work area that is required to be modified as a new demising wall?

Answer: Correct. There are no other demising walls for this project.

5. Please provide site walk sign in sheet.

Answer: The site walk sign in sheet was provided in Amendment 2 and is titled, “Seed Project Site Visit 2023 07 13”.

6. Attachment 7_4 Exhibit 4 - OIG Intent Drawing There is a note pointing to the existing IT room,it states “Discuss the Open Wall”. Please advise the intent of the note.

Answer: The intent of the note is to ensure that the Contractor (awardee) has a discussion with the COR regarding protection of the IT equipment during construction from dust, debris and accidental damage.

7. Please confirm GSA will label and disconnect and reconnect the wiring and cabling at the IT rack. Contractor will relocate the IT rack into the new IT room and pull wiring and cables into the new IT room. Please Advise.

Answer: See SOW Section 2.2.2.10.

8. Can the Government please confirm that the seed project does not require a permit for the alteration of the building from the City of Seattle?

Answer: City of Seattle permits are not required.

9. Volume 1, Tab 1-2 states that the offeror shall include a listing of all subcontractors to include UIE. Can the Government confirm that this is a typo and the Government is asking for the UEI number instead?

Answer: Correct, please include UEI.

[End of Document]