This document includes an amendment to a solicitation for new boiler system projects at two locations in Alaska. The solicitation seeks proposals to design and install new boiler systems at the Haines Land Port of Entry and Skagway Land Port of Entry. Proposals are due by December 14, 2021 at 10:00 AM Alaska Standard Time. Performance and payment bonds are required within 10 days of award notice. The amendment provides responses to contractor questions, clarifying that separate bid bonds are required for each location and interior photos are not available, among other details. Site visits were held on specific dates in November 2021. Controlled Unclassified Information access is required to view an attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 47PL0122R0001_AM0002.pdf | ||
| 47PL0122R0001 Generated PDF with TOC.pdf | ||
| Exhibit 1 GSA Affiliated Custom Accounts.pdf | ||
| Exhibit 0 Read Me First - CUI Document.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
R10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
10PQCB2
Kimberly Johnson, Supervisory Contracting Officer
Solicitation number 47PL0122R0001 entitled "New Boiler Projects for Skagway, AK and Haines, AK" is hereby amended as follows"
1. PROVIDES: Questions and Responses
2. CLARIFIES: RFP section I.H. Receipt of Offers at paragraph C(1) should read "Proposals Due Date...
[See Description of Modification Continuation Page]
10PQCB2
Acquisition Management Division Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
Acquisition Management Division Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
EQ10PCPB2-22-0001
47PL0122R0001
1 2
12/6/2021
11/9/2021
PAGE OF PAGES
47PL0122R0001/0001
Description of Modification Continuation Page
... December 14, 2021"
3. All other terms and conditions remain unchanged by this amendment.
Attachment(s): Questions and Responses
Amend No. Item #
Date
Submitted
Question
Type
(Technical or
Admin) Question
Response
Date Response
Responded
By
0001 01 12/2/2021 Admin
I understand that we are to submit two separate proposals, but they are combined on one SF1442 and the pricing schedules are also combined.
Are you wanting us to submit two different bid bonds, one for each of the proposals or are you wanting one for the entire SF1442? 12/6/2021 Yes; two different bid bond are required per project proposal. GSA CO/Mark
0001 02 12/3/2021 Technical
Are pictures available of interior finishes or copy of interior finish legend for each building ? 12/6/2021 No pictures are available to my knowledge GSA PM/Paul
0001 03 12/6/2021 Technical
Can you please address the following?
1 - Is the Fuel oil tank being replaced?
2- Are we assuming that ventilation rates from original design are to remain? 12/6/2021
1. Per SOW, Section 2.1.1.3: Fuel Oil System - Piping: Contractor shall design and install new fuel oil transfer pump, associated fuel oil piping, leak protection, and required appurtenances to serve the new boiler equipment. New fuel oil system shall be designed in accordance with latest codes and standards, including NFPA 30.
Fuel oil tank is NOT to be replaced as part of this project.
2. Ventilation rates are to be determined during the design phase and are to take into account current existing conditions of each facility. The ventilation rates from the original design are NOT to be used. GSA PM/Paul
0001 04 12/6/2021 Admin
1. Can you please clarify which factor you would like the PPQ’s in?
2. Can CPARS be submitted for factor 2 instead of PPQ’s?
3. For Factor 2: Experience of Comparable Projects we would like to see if instead of the last 3 years can it be 7 years?
4. Can previous GSA PPQ’s be used in the solicitation proposal? 12/6/2021
1. PPQ’s are a FACTOR 2 requirement.
2. No, we are looking for no more than a 2-page narrative.
3. This factor requires relevant projects “completed within the last 3 years”.
4. The contractor must ensure that the PPQ’s provided meets the requirements of FACTOR 2 of this solicitation. GSA CO/Mark
0001 05 12/6/2021 Admin Are proposals due 12/13/2021 or 12/14/2021? 12/6/2021
Correction: RFP section I.H. Reciept of Offers at paragraph C(1):
Proposals Due Date should read: December 14, 2021. *Proposal are due
December 14, 2021 at 10:00 AM AKST. GSA CO/Mark
MarkAMitchell Typewriter Questions and Responses as of 12/6/2021