This document provides an amendment to a solicitation for an indefinite delivery/indefinite quantity (IDIQ) multiple award task order contract for construction services in Region 10 of the General Services Administration Public Buildings Service. The amendment extends the proposal due date to October 11, 2019 and makes changes to the solicitation, IDIQ price schedule, sample task orders, and pre-proposal conference materials. Eligible offerors are invited to submit proposals to be considered for future task orders for construction, renovation, and related services in Zone 1 (North/Western Alaska) and Zone 2 (South/Central Alaska) under an IDIQ agreement. The solicitation identifies relevant procurement details including response dates, applicable federal agencies, and pricing requirements.

A02 Zone 2 Sample Task Order package

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

G

1'EMO

---DOOR AND

WALL

INS�LL NEW SEqJRE DOOR (#5)

PACE

INSTALL NEW SECURE DOOR

TO BE PROVIDED BY AGENCY (#

NEW WALL

INSTALL N SECUJ DOOR (#3)

G G

D

INSTALL MAIN ENTRANCE DOOR---

u l41 � x-NEW WA , DEMO WA

---DEMO

G G l G

173-:-5129 squo.re

INSTALL

NEW

SECURE

DOOR: T

BE

PROVIDE

BY AGEN

(#2)

J

RELITE WINDOW_/

ft.

I s ACE

�1� "--_J

�J�

G -

Sample Task Order

TENANT SPACE

AutoCAD SHX Text

DN

UP

NOAA SPACE

NOAA LAW SPACE

EPA

173.0329 square ft.

8'-6"

9'-4"

10'-11"

12'-1"

DEMO WALLS & DOOR

INSTALL NEW SECURE DOOR TO BE PROVIDED BY AGENCY (#1)

INSTALL NEW SECURE DOOR: TO BE PROVIDED BY AGENCY (#2)

DEMO WALL

DEMO DOOR AND WALL

INSTALL NEW SECURE DOOR (#5)

INSTALL NEW SECURE DOOR (#4)

INSTALL NEW SECURE DOOR (#3)

RELITE WINDOW

INSTALL MAIN ENTRANCE DOOR

JessicaMCampbell

Highlight

Highlight

Sheets and Views

Model

ZONE 2 – SAMPLE TASK ORDER SCOPE OF WORK

ANCHORAGE FEDERAL BUILDING (AFB)-5th Floor Cross Corridor Build Out

U.S. GENERAL SERVICES ADMINISTRATION, NORTHWEST/ARCTIC REGION 10

Section 1:

Project Location & Building Number

Section 2:

Background

Section 3:

Work Hours

Section 4:

Parking/ Loading Dock

Section 5:

General Information

James M. Fitzgerald Federal Building & U.S. Courthouse 222 W 7th Ave Anchorage, AK 99513

Building Number: AK0032ZZ

The United States General Services Administration requires occupied space in {FEDERAL AGENCY} to be renovated to meet current requirements of the National Fire Protection Association (NFPA) 72, NFPA 101, Region 10 Fire Alarm Design, Installation, and Testing Policy (R10), and GSA PBS-P100 Facility Standards (P100). The current floor layout incorporates a dead end corridor and a sprinkler not in code compliance.

The purpose of this project is to create a code compliant corridor within the NOAA workspaces and eliminate current safety deficiencies. There will be design requirements for this project.

This project shall be accomplished outside of normal working hours, after 5:00 PM on weekdays, except Federal holidays. Contractor shall schedule the work in writing at least five (5) business days in advance with the GSA Project Manager (PM).

Contractor parking at the Anchorage Federal Building is very limited and generally unavailable. Access to the loading dock requires written coordination with the GSA PM at least five (5) business days in advance.

SAMPLE TASK ORDER

ASSUME NO PARKING WITHIN FACILITY

ASSUME LAYDOWN SPACE IS AVAILABLE

1. All work shall comply with the latest versions of GSA’s PBS-P100, Facility Standards for the Public Buildings Service http://www.gsa.gov/portal/content/104821, and GSA Region 10 Fire Alarm Design, Installation and Testing Policy

2. Specific attention should be given to PBS P-100 Chapter One requirements including Laws, Regulations, Codes and Standards, and Key Sustainable Product requirements for carpet, interior paint, gyp board, ceiling tiles, and concrete.

3. Contractor shall provide all supplies, equipment, materials, services, and labor to perform the work.

4. Contractor shall be responsible for obtaining all necessary local, state, and federal permits, licenses, and clearances.

Section 6:

Description

6. Contractor Use of Premises: The Contractor shall coordinate with the GSA PM to arrange a schedule for site access during construction. Construction processes disruptive to normal facility operations shall be coordinated with the GSA PM in writing at least 5 business days in advance. The Contractor shall be authorized to use building restrooms.

7. Utilities: Contractor shall be authorized to use utilities during the course of this project. The contractor is responsible for making connections to the existing utility systems. Temporary electrical work shall meet the requirements of NFPA 70. When temporary connections are removed, the Contractor is responsible for restoring existing utility services to their original condition.

8. Utility Outages and Locates: No utility outages will be approved without the written consent and approval of the GSA PM. Requests for utility outages shall be coordinated in writing at least 5 business days in advance with the GSA PM.

9. Protection of Public: The building site will continue to be used by tenants. The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.

10. Housekeeping: The project site shall be kept in a neat, orderly, and safe condition at all times and all work areas shall be cleaned at the end of each work day. A final cleaning of the entire construction area will be required at substantial completion of the project. Final Cleaning to include (1) Removal of all tools, equipment, surplus material, and rubbish/debris; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Removal of grease, dirt, stains, foreign materials, and labels from finished surfaces; and (4) thoroughly clean building interiors.

11. Disposal: Ensure all waste materials and debris is disposed at an Alaska

Department of Environmental Conservation (DEC) approved disposal site, in accordance with applicable environmental regulations. Unless otherwise specified, all material(s) removed becomes the property of the Contractor. Use of AFB trash receptacles is not authorized.

12. Painting/Staining: All painting, staining, or other activity which may cause noxious or undesirable fumes must be performed outside of the normal working hours of 8AM-5PM. Painting/Staining shall be coordinated in writing with the GSA Project Manager at least 5 business days in advance. The Contractor is responsible for using “low or no VOC” paints and stains.

13. Communications: Contractor project designee must be available to provide project status updates to GSA each work day.

Execute the project using a Design-Build project delivery method:

1. Investigation and Design: Investigate the existing systems and floor layout and submit a detailed replacement and renovation design (65%) with product data to the

GSA Contracting Officer (CO) and Project Manager (PM) for approval.

a. Reference attached 5th Floor Corridor Proposed layout drawing

b. Include proposed fire alarm layout to include device location, conduit runs, j-boxes, etc.

c. Include proposed egress lighting/exit sign locations

d. Include proposed sprinkler head location(s)

e. Include proposed light fixture, outlet, switch, coaxial cable, RJ45 jacks, diffuser, and other miscellaneous device locations

f. Contractor proposed layout drawing

g. Drawings shall be submitted electronically in PDF format to GSA CO and PM at 65%

h. Allow 15 working days for GSA to review the 65% submittal; the contractor shall have 10 working days for any corrections/additions after GSA acceptance of the 65% review

i. After approval of 65% design, the contractor has 15 working days to submit a 95% design; upon approval of the 95% design, a separate NTP for construction will be issued by the GSA CO

j. Drawings shall be in compliance with NFPA 72, NFPA 101, IBC, R10 and P100 requirements

2. Construction: Upon GSA approved 95% design drawings and NTP for construction issued by the Contracting Officer, the contractor shall proceed with construction as follows. Contractor shall provide all supplies, material, equipment and labor required to perform this work:

a. Demo and dispose of existing wall(s) and cove base in accordance with GSA approved layout

b. Contractor shall provide and install metal studs for new walls in accordance with GSA approved drawings

a. Walls will be framed/constructed from deck to grid using 20 gauge metal studs

b. Add seismic bracing as required

c. Carpeting shall be removed/cut and bottom plate shall be anchored into floor

i. Provide and install carpet in new corridor and conference room

ii. Contractor shall submit color samples to GSA for approval

c. Contractor shall provide and install gypsum board for new walls

a. Attach gypsum to studs using properly rated screws

b. Contractor shall mud/tape/sand and texture walls to match existing wall texture

c. Contractor shall prime/paint all new walls to match existing colors

d. Contractor shall patch and patch any areas after removal of devices if drywall is marred

d. Contractor shall remove and demo existing chair rail in conference room

a. Contractor shall patch, paint, and texture to match existing conditions

e. Contractor shall provide and install cove base on all new walls

a. Color and size to match existing

f. Constructed corridors shall be six (6) feet wide

g. Contractor shall isolate and demo all electrical components to include light fixtures, switches, receptacles, etc. in accordance with approved drawings

a. Contractor shall provide and install additional light fixtures as necessary

(reference ANC Building Standard)

b. Contractor shall provide and install new wire, electrical switches, receptacles, etc.

h. Contactor shall relocate thermostats and diffusers in accordance with approved drawings

a. Balance HVAC in work area after relocation procedures

b. Contractor shall provide and install additional HVAC components as required (reference ANC Building Standards)

c. Use existing devices and boxes

i. Contractor shall relocate fire alarm devices in accordance with approved drawings

a. Fire alarm testing will be required prior to project acceptance, in accordance the R10 and P100 requirements

j. Contractor shall relocate existing sprinklers to meet current code requirements

a. Cutting and burn permit will be required prior to task

b. Contractor shall contact GSA PM at least three (3) days in advance before isolation of sprinkler lines

k. Contractor shall remove and dispose of existing relite window and trim

(reference drawing)

a. Contractor shall frame in existing window area and install drywall on both sides of wall

b. Contractor shall mud/tape/sand and match existing wall texture on both sides of wall

c. Contractor shall prime and paint area to match existing color and paint to nearest wall breaks on both sides of wall

l. Contractor shall remove existing doors/frames/hardware (reference drawing)

a. Contractor shall reuse existing door hardware and closers

b. Contractor shall save doors/frames; GSA will keep doors

m. Contractor shall provide and install factory finished doors in accordance with building standards

a. Doors, frames, and hardware shall match existing AFB requirements

i. Contractor to supply and install three (3) doors, frames, and hardware sets; refer to attached drawing, doors labeled #3, #4, #5

ii. Contractor to install main entrance door in location as referenced in drawing; reuse hardware sets and frame

iii. Agency will provide two (2) glass doors, frames, and hardware sets; refer to attached drawing, doors labeled #1, #2

b. Doors shall fit and swing properly

n. Move services are not required for this project

a. Close coordination will be required with GSA PM and agency to identify timelines as agency will move furniture and office equipment

3. Operational Testing. Complete 100% acceptance test of all zones and controls with GSA Project Manager and/or designee shall be accomplished as required in R10 and P100 standards.

Section 7:

Submittals

Section 8:

Attachments

Submittals required by this contract are the following:

1. Project Schedule

2. Project Design-65%, 95%, and 100% (as built drawings) upon project completion

a. Proposed fire alarm and egress device design/location on PDF

b. Proposed egress lighting and exit sign locations on PDF

c. Proposed electrical/data locations on PDF

d. Proposed HVAC locations on PDF

3. Final drawings shall be provided to GSA in AutoCAD and PDF formats

4. Material specifications

a. Metal studs

b. Gypsum

c. Paint

d. Electrical and fire alarm devices

e. HVAC devices

f. Sprinkler pipe and components

g. Carpet/glue

h. Cove base

i. Doors

5. Detailed narrative explaining Region 10 Fire Alarm proposed fire watch plan

6. HVAC balancing report

7. Burn permit

8. Fire Alarm Pre-Test records

Attachments:

1. Region 10 Fire Alarm Policy

2. 5th Floor Corridor Proposed layout drawing

3. ANC Building Standards

a. Glazing and Doors

b. Standard Finishes

c. Mechanical and Electrical

END OF SCOPE

Northwest/Arctic Region

IDIQ-TASK ORDER SOLICITATION

TABLE OF CONTENTS

I.TASK ORDER SOLICITATION (TOS)

A. TASK ORDER INSTRUCTIONS

1. Project Name

2. Project Location

3. Site Visit Instructions

4. Task Order Period of Performance (TO POP)

5. TO RFP Acquisition Schedule

6. GSA Project Team

7. Task Order Solicitation and Contract

8. Availability of Funds

9. Project Delivery Method

10. TO Solicitation Documents

B. TO RFP SUBMITTAL REQUIREMENTS

1. Estimated task order construction value

2. Receipt of offers

3. Proposals

4. Proposal Instructions

5. Method of Award (Offer Evaluation)

6. Determination of Responsibility

7. Price Reasonableness

8. Unbalanced Prices

9. Total Evaluated Price

10. Non-Price Factor

11. Task Order Contract Award

II. TASK ORDER CONTRACT (TOC)

1. Task Order Contract Summary

2. TOC Period of Performance (POP)

3. Work Conditions / Site Requirements

4. Authorized Representatives

5. Liquidated Damages

6. Buy American Exceptions

7. Basis of Pricing, see Price Schedule, pg. 3, SF1442

8. TOC Unique Terms and Conditions

9. Task Order Contract – Order of Precedence

10. Project Schedule

SECTIONS A AND B WILL BE REMOVED AT TIME OF AWARD

TASK ORDER SOLICITATION

This is a sample project for solicitation 47PL0019R0001. This is not a funded project and no task order will be awarded from this task order solicitation.

I. TASK ORDER INSTRUCTIONS

1. Project Name: Anchorage Federal Building (AFB) Cross Corridor Build Out

2. Project Location: Anchorage Federal Building 222 W 7th Ave

Anchorage, AK 99513

3. Site Visit Instructions: Not Applicable (sample task order solicitation only)

A. Maximum group size per tour: Not Applicable

B. Site Visit Instructions: Not Applicable

4. Task Order Period of Performance: 180 calendar days from date of ___ Award / _X_ NTP

5. TO RFP Acquisition Schedule:

A. Issue TO RFP: 08/16/2019 B. Site Visit Registration Due: N/A C. Site Visit: N/A D. Solicitation RFI Due: 09/12/2019 E. GSA RFI Responses: 09/17/2019 F. TO Proposal Due: 09/26/2019, 4:00pm local time

6. GSA Project Team:

A. Contracting Specialist / Officer:

Jessica Campbell / jessica.campbell@gsa.gov / 253-736-4678 B. Project Manager: TBD

C.Other Project Team Member(s): Not Applicable

7. Task Order Solicitation and Contract:

A. This solicitation establishes the requirements for proposals submitted in response to AFB Cross Corridor Build Out for the project as described in the attached Task Order Contract (TOC) and incorporated Task Order Exhibits. Proposals conforming to the TO solicitation will be evaluated in accordance with the Method of Award as established in this document. All terms and conditions in the ALASKA IDIQ for CONSTRUCTION are hereby incorporated into this solicitation and any resultant Task Order Contract.

Cross-Out

Changed to 10//11/2019 by A02

B. Neither the Solicitation nor any part of an Offerors proposal shall be part of the Task Order Contract (TOC) except to the extent expressly incorporated therein by the Contracting Officer.

C. The Offerors proposal submitted in response to this Solicitation shall constitute a firm offer.

No contract shall be formed unless and until the Contracting Officer has countersigned the SF1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF1442 with original signatures together with the TOC reflecting the Offerors proposed prices.

D. Changes to the solicitation prior to the deadline for receipt of proposals will be executed via issuance of SF30 Amendment to the Solicitation. Amendments will be sequentially number beginning with the notation ‘A01’. Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the offerors proposal on the SF1442.

8. Availability of Funds:

Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.

9. Project Delivery Method:

____ Non-Complex Construction (no formal design documents).

____ Design-Bid-Build, A/E Firm:

_X__ Design-Build

10. TO Solicitation Documents:

A. SF1442, Solicitation, Offer, and Award [Construction, Alteration and Repair]

B. TO RFP Solicitation and Task Order Contract

C. TOC Wage Determination: AK20190001 dated 08/02/2019

D. Project Documents:

D.1 Scope of Work – AFB Cross Corridor Build Out D.2 Drawing - Zone 2 Sample Task Order, AFB Floorplan

II. TO RFP SUBMITTAL REQUIREMENTS

1. Estimated TOC award value Pursuant to FAR 36.204: the magnitude of construction is:

____ between $25,000 and $100,000 _X__ between $100,000 and $250,000 ____ between $250,000 and $500,000 ____ between $500,000 and $1,000,000 ____ between $1,000,000 and $5,000,000

2. Receipt of offers Task Order Proposals are to be submitted by email to the Contracting Officer. Offers will be considered received as of the date and time the email is in the inbox of the recipient. The maximum email inbound attachment for GSA is 25MB per single email.

3. Proposals Offerors are responsible for reading and understanding the entire Task Order solicitation and contract. Only complete proposals will be evaluated. A ‘complete’ proposal means that all the data and information as required by the solicitation is included in the proposal package. If the Offeror communicates in its proposal any qualifications, exclusions, or conditions which are material changes to the terms of the TOC, the Contracting Officer may reject the proposal as non-responsive.

4. Proposal Instructions Submit the documents below by email, as separate files, no later than the date and time due as established by this TO RFP as noted on the SF1442. Additional information may be submitted as it relates to the project. There are no page restrictions.

A. TO RFP 001 – SF1442:

Complete form and executed by the authorized signer(s).

B. Task Order Technical Approach:

Provide brief narrative describing the overall project approach and the proposed project schedule. The narrative project approach is to identify work to be self-performed, activities that will be subcontracted, and a description of the Prime Contractor’s proposed project team. The project schedule is required to adhere to the requirements of the IDIQ Agreement. The schedule should be in sufficient detail to illustrate the proposed sequencing and duration of all project activities required to complete this project.

C. Task Order Price Proposal:

Provide a price proposal which corresponds to the work divisions specified in the Project Documents and as proposed by the offeror.

5. Method of Award (Offer Evaluation):

___ Low price _X_ Technical approach and price ___ Other than low price (technical exchanges)

A. Evaluation Standard:

GSA will evaluate the technical approach using the criteria established in item 4.B.

B. Evaluation submittal(s):

Technical proposal package should include a one or two page project approach plus the proposed project schedule.

6. Determination of Responsibility GSA is required to affirm responsibility per the requirements of FAR 9.104 for all MATOC IDIQ contract holders. GSA will review information provided with proposals and will also verify information by publicly available systems, such as but not limited to the System for Award Management (SAM). The Contracting Officer's determination of an Offerors responsibility or non-responsibility may be based upon any information obtained by the Contracting Officer.

7. Price Reasonableness The proposed prices will be evaluated for reasonableness. Price reasonableness determines whether an Offerors price is too high or too low for the anticipated work effort and is used when Certified Cost or Pricing Data is not required. Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404-1.

8. Unbalanced Prices Offers must include balanced prices. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of price analysis techniques. All offers with separately priced line items or subline items shall be analyzed to determine if the prices are unbalanced. If price analysis techniques indicate that an offer is unbalanced, the contracting officer shall:

Consider the risks to the Government associated with the unbalanced pricing in determining the competitive range and in making the source selection decision; and

Consider whether award of the contract will result in paying unreasonably high prices for contract performance. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

9. Total Evaluated Price The Government will evaluate the prices proposed based on the Price Schedule on page 3 of the SF1442. The Government will use price analysis to determine whether it is reasonable.

Price proposals will not be assigned a numerical weight, point score, or adjectival rating.

Reference item 7, Basis of Price section in TOC below.

10. Non-Price Factor GSA will evaluate technical proposals based on the project approach. Project approach is defined as a complete technical proposal which addresses how the offeror intends to fulfill the requirements identified in the basis of design, maximization of sequencing, proposed substantial completion date earlier than the maximum allowed SCD as established, etc.

11. Task Order Contract award The Government intends to award a single task order resulting from this Task Order RFP. The Government may award without discussions. If discussions are required, then the Task Order Contracting Officer will establish the competitive range (if required), open negotiations, close negotiations, and determine the award selection.

TASK ORDER CONTRACT (TOC)

This section will be incorporated in the TOC award

1. Task Order Contract Summary This task order is issued in accordance with the terms and conditions of the ALASKA IDIQ for CONSTRUCTION. The Task Order Contract is comprised of the following documents:

A. SF1442, Solicitation, Offer, and Award [Construction, Alteration and Repair]

B. TO RFP Solicitation and Task Order Contract

C. TOC Wage Determination: AK20190001 dated 08/02/2019

D. Project Documents:

D.1 Scope of Work – AFB Cross Corridor Build Out D.2 Drawing - Zone 2 Sample Task Order, AFB Floorplan

E. Security Clearance Package: Not Applicable – Sample TOC for solicitation

47PL0019R0001

2. TOC Period of Performance (POP): 180 cd after issuance of NTP

3. Work Conditions/Site Requirements: As stated in the Project Documents and as incorporated into this task order contract.

4. Authorized Representatives: N/A

5. Liquidated Damages: Liquidated damages have been determined as unnecessary for this Task Order Contract.

6. Buy American Exceptions: The Government has not identified any exceptions to the Buy American Act (BAA) for this project. Offeror’s who intend to propose a BAA exception shall do so in accordance with clause 52.225-11(d).

7. Basis of Pricing

_X__ Lump Sum, with supporting CSI Level 3 Price Data (per Agreement) ____ Unit Price Schedule included ____ Alternate Price for Select Components ____ Options

8. TOC Unique Terms and Conditions

A. No additional terms and conditions are specified for this Task Order.

B. Additional Tenant Specific security procedures apply to this TOC. See the project documents for instructions and procedures to obtain additional security clearances for this effort.

9. Task Order Contract – Order of Precedence:

A. Section IV, Contract Clauses, of the IDIQ Agreement

B. Sections I, II, and III of the IDIQ Agreement

C. ALASKA IDIQ for Construction - Scope of Work

D. Task Order Clauses (within the Task Order Agreement) – N/A

E. Other Provisions of the Task Order Agreement (within the Task Order Agreement) –

N/A

F. The Statement of Work (Task Order)

G. The Specifications (Task Order)

H. The Drawings (Task Order)

I. Exhibits and Other Attachments (Task Order)

10. Project Schedule

A. TO RFP Award Date: Range established based on plus the target award 180 days for offer acceptance from SF1442.

B. Payment and Performance Bonds Due: 10 days after award

C. Security Clearances Completed: No later than 4 weeks following award.

D. Substantial Completion Date (SCD): No later than 14 weeks following award.

E. Fire Alarm/System Testing Complete: No later than CCD.

F. Construction Completion Date (CCD): 180 cd

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg

(See ).

SOLICITATION, OFFER,AND AWARD(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by

(hour) award, YES

NO

notice to proceed.

This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

PAGE

OF PAGES

\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg

\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE

FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN(Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on thissolicitation is hereby accepted as to the items listed. This award consummates thecontract, which consists of (a) the Government solicitation and your offer, and (b)this contract award. No further contractual document is necessary.

30b. SIGNATURE

30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( )

41 U.S.C. 3304(a) ( )

20b. SIGNATURE

20c. OFFER DATE

1. SOLICITATION NUMBER: Zone 2 - Sample TO

4. CONTRACT NUMBER: SAMPLE Task Order Solicitation

7. ISSUED BY:

***This is a sample task order solicitation*** No contract will be awarded from this task order solicitation

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

Reference Solicitation: 47PL0019R0001 Alaska IDIQ for Construction Reference: The Solicitation, Section II. Proposals, Item F. Category D, "Category D: Task Order Proposal Evaluation"

Evaluation Subfactor: (b) Sample task order request for proposal Zone 2: South/Central Alaska Sample Project Project Title: Alaska Federal Building Cross Corridor (5th Floor)

Sample task order solicitation package includes the following:

A. Task Order solicitation SF1442 (this document) B. IDIQ - Task Order Solicitation C. Task Order Contract (TOC) Wage Determination D. Project Document(s) D.1. Scope of Work: AFB Cross Corridor (5th Floor) D.2. Drawing - AFB Cross Corridor Floorplan

8. ADDRESS OFFER TO:

5. REQUISITION/PURCHASE REQUEST NUMBER: Not Applicable

7. CODE:

9. a. NAME: Jessica Campbell

9. b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS): 253-736-4678 jessica.campbell@gsa.gov

6. PROJECT NUMBER: Zone 2 - AFB Cross Corridor

PAGE: 1

OF PAGES: xx

2. TYPE OF SOLICITATION. SEALED BID (IFB): 0

2. TYPE OF SOLICITATION. NEGOTIATED (RFP): 1

3. DATE ISSUED. Enter 2 digit month, 2 digit day and 4 digit year.: 2019-08-23

DATE DUE. Enter 2 digit month, 2 digit day and 4 digit year.: 2019-10-11

11. The contractor shall begin performance calendar days and complete it within calendar days after receiving award: 0

12. A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES", indicate within how many calendar days after award in Item 12b.) YES: 1

13. b. An offer guarantee is required.: 1

13. b. An offer guarantee is not required.: 0

12. A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES", indicate within how many calendar days after award in Item 12b.) NO: 0

11. The contractor shall begin performance calendar days and complete it within calendar days after receiving notice to proceed.: 1

11. This performance period is mandatory: 0

11. This performance period is negotiable: 1

Begin within calendar days: 0

Number of copies: 1 calendar days: 60

Hour: 4:30pm

13. c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by: Zone 2 Sample Task Order Proposal for solicitation 47Pl0019R0001 Alaska IDIQ for Construction complete within calendar days: 180

12b. CALENDAR DAYS: 10 calendar days

See: Task Order Solicitation

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code): Offeror to complete boxes 14, 15, 16, 17, 20a, b, c.

15. TELEPHONE NUMBER (Include area code):

14. CODE:

19. AMENDMENT NUMBER. Column 1:

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print):

23. ACCOUNTING AND APPROPRIATION DATA:

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print):

24. ITEM:

10 U.S.C. 2304(c) :

41 U.S.C. 3304(a):

26. CODE:

Number of copies:

26. ADMINISTERED BY:

27. PAYMENT WILL BE MADE BY:

21. ITEMS ACCEPTED:

Date. Column 2. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 2:

Date. Column 3. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 4:

Date. Column 5. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 5:

Date. Column 6. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 6:

Date. Column 7. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 7:

Date. Column 8. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 8:

Date. Column 9. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 9:

Date. Column 10. Enter 2 digit month, 2 digit day and 4 digit year.:

20c. OFFER DATE. Enter 2 digit month, 2 digit day and 4 digit year.:

30c. DATE. Enter 2 digit month, 2 digit day and 4 digit year.:

31a. NAME OF CONTRACTING OFFICER (Type or print):

31b. UNITED STATES OF AMERICA BY:

31c. DATE. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 10:

Date. Column 4. Enter 2 digit month, 2 digit day and 4 digit year.:

19. AMENDMENT NUMBER. Column 3:

Calendar Days:

14. FACILITY CODE:

16. REMITTANCE ADDRESS (Include only if different than Item 14.):

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.) Amounts.:

Date. Column 1. Enter 2 digit month, 2 digit day and 4 digit year.:

22. AMOUNT:

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c): 0

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.: 0

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.: 0

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 41 U.S.C. 253(c): 0

30b. Signature. Sign here if you are the person authorized to sign on behalf of the contractor. :

20b. Sign here if you are the person authorized to sign offer. :

9/19/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/AK20190001/12/document 1/21

"General Decision Number: AK20190001 09/06/2019

Superseded General Decision Number: AK20180001

State: Alaska

Construc�on Types: Building and Heavy

Coun�es: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residen�al construc�on consis�ng of single family homes and apartments up to and including 4 stories)

Note: Under Execu�ve Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicita�on was issued) on or a�er January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classifica�on listed on this wage determina�on at least $10.60 per hour (or the applicable wage rate listed on this wage determina�on, if it is higher) for all hours spent performing on the contract in calendar year

2019. If this contract is covered by the EO and a classifica�on considered necessary for performance of work on the contract does not appear on this wage determina�on, the contractor must pay workers in that classifica�on at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-men�oned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Addi�onal informa�on on contractor requirements and worker protec�ons under the EO is available https://beta.sam.gov/wage-determination/AK20190001/12/document 2/21 at www.dol.gov/whd/govcontracts.

Modifica�on Number Publica�on Date

0 01/04/2019

1 01/11/2019

2 01/18/2019

3 02/22/2019

4 03/01/2019

5 03/29/2019

6 03/29/2019

7 04/12/2019

8 04/19/2019

9 06/14/2019

10 08/02/2019

11 08/30/2019

12 09/06/2019

ASBE0097-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator

(includes applica�on of all insula�ng materials protec�ve coverings, coa�ngs and finishings to all types of mechanical systems).........................$ 38.68 21.57

HAZARDOUS MATERIAL HANDLER

(includes prepara�on, we�ng, stripping, removal scrapping, vacuming, bagging, and disposing of all insula�on materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55

BOIL0502-002 10/01/2017

https://beta.sam.gov/wage-determination/AK20190001/12/document 3/21

BOILERMAKER......................$ 46.17 29.70

BRAK0001-002 07/01/2018

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Se�er, Terrazzo Worker.....$ 40.81 19.77

Tile & Terrazzo Finisher.........$ 34.79 19.62

CARP1501-001 09/01/2016

MILLWRIGHT.......................$ 36.74 22.99

CARP2520-003 09/01/2018

Diver

Stand-by....................$ 42.65 25.66

Tender......................$ 41.65 25.66

Working.....................$ 82.45 25.66

Piledriver

Piledriver; Skiff Operator and Rigger..................$ 38.34 25.66

Sheet Stabber...............$ 38.34 25.66

Welder......................$ 43.90 25.66

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot

101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

https://beta.sam.gov/wage-determination/AK20190001/12/document 4/21

SATURATION DIVING:

The standby rate applies un�l satura�on starts. The satura�on diving rate applies when divers are under pressure con�nuously un�l work task and decompression are complete. the diver rate shall be paid for all satura�on hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combina�on of classifica�ons within the diving crew (except dive supervisor) in a shi� are paid in the classifica�on with the highest rate for that shi�.

CARP4059-001 09/01/2018

CARPENTER

Including Lather and

Drywall Hanging.............$ 38.34 25.66

ELEC1547-004 04/01/2019

CABLE SPLICER....................$ 40.03 3%+27.23

ELECTRICIAN......................$ 39.70 3%+27.48

ELEC1547-005 04/01/2019

Line Construc�on

CABLE SPLICER....................$ 56.05 3%+31.78

Linemen (Including Equipment

Operators, Technician)...........$ 54.30 3%+31.78

Powderman........................$ 52.30 3%+31.78

TREE TRIMMER.....................$ 36.21 3%+25.19

https://beta.sam.gov/wage-determination/AK20190001/12/document 5/21

ELEV0019-002 01/01/2019

ELEVATOR MECHANIC................$ 57.23 33.705+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vaca�on paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday a�er

Thanksgiving, and Christmas Day

ENGI0302-002 01/01/2019

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.53 23.65

GROUP 1A....................$ 42.29 23.65

GROUP 2.....................$ 39.76 23.65

GROUP 3.....................$ 39.04 23.65

GROUP 4.....................$ 32.83 23.65

TUNNEL WORK

GROUP 1....................$ 44.58 23.65

GROUP 1A...................$ 46.52 23.65

GROUP 2....................$ 43.74 23.65

GROUP 3....................$ 42.94 23.65

GROUP 4....................$ 36.11 23.65

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and

Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and

Cablecars; Cleaning Machine; Coa�ng Machine; Concrete

Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and a�achments): (a) Hydrali�s https://beta.sam.gov/wage-determination/AK20190001/12/document 6/21 or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching

Machine (16 inch or over); Drilling Machines, core, cable, rotary and explora�on; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gu�er

Machine; Helicopters; Hover Cra�, Flex Cra�, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all a�achments): Forkli�s with telescopic boom and swing a�achment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, eleva�ng belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combina�on; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Direc�onal Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power

Plant, Turbine Operator, 200 k.w. and over (power plants or combina�on of power units over 300 k.w.); Scrapers-through

40 yards; Service Oiler/Service Engineer; Sidebooms-under

45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all a�achments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry

Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and a�achments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment

Operator; Loaders over 5 yds.; Cer�fied Welder, Electrical

Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all a�achments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 https://beta.sam.gov/wage-determination/AK20190001/12/document 7/21 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump

Operator; Conveyors (except as listed in group 1); Hoist on steel erec�on; Towermobiles and Air Tuggers;

Horizontal/Direc�onal Drill Locator;Licensed Grade

Technician; Loaders, (i.e., Eleva�ng Grader and Material

Transfer Vehicle); Locomo�ves: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under

16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: ""A"" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cu�er; Compressor; Farm tractor; Forkli�, industrial type; Gin Truck or Winch Truck with poles when used for hois�ng; Grade Checker and Stake Hopper; Hoist, Air

Tuggers, Elevators; Loaders: (a) Eleva�ng-Athey, Barber

Green and similar types (b) Forkli�s or Lumber Carrier

(on construc�on job site) (c) Forkli�s with Tower (d)

Overhead and Front-end, under 2 1/2 yds. Locomo�ves:Dinkey

(air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribu�on; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all a�achments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and

Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spo�er; Steam Cleaner; Drill

Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant

Engineer shall be required on cranes over 85 tons or over

100 feet of boom.

IRON0751-003 07/01/2018

https://beta.sam.gov/wage-determination/AK20190001/12/document 8/21

IRONWORKER

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 37.90 31.48

FENCE, BARRIER INSTALLER....$ 34.40 31.48

GUARDRAIL INSTALLERS........$ 35.14 31.48

GUARDRAIL LAYOUT MAN........$ 35.14 31.48

HELICOPTER, TOWER...........$ 38.90 31.48

LABO0341-001 04/01/2019

LABORER (South of the 63rd

Parallel & West of Longitude

138 Degrees)

GROUP 1.....................$ 30.71 27.51

GRO…