This document contains a federal contract opportunity notice for an on-ramp solicitation to increase the award pool of an existing Indefinite Delivery Indefinite Quantity (IDIQ) contract. The solicitation seeks to add up to two more awardees to the existing pool of five contractors for construction services in Washington and Oregon. Services include design, engineering, and construction of interior and exterior projects for the General Services Administration and other federal agencies. The response due date is November 17, 2021 with anticipated awards by February 1, 2022 and performance through July 31, 2023. The North American Industry Classification System code is 236220 and it is set aside for small businesses. Task order requirements will utilize construction, design-bid-build, bridging design-build, or design-build project delivery methods with an order magnitude between $25,000 to $5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A02
10PQF
To Be Provided on Award Documents
Jessica Campbell, jessica.campbell@gsa.gov
Amendment A02 - 'On-Ramp to SOUTH MATOC IDIQ'
Amendment A02 makes the following changes to this on-ramp solicitation issued as 'A01 47PL0022R0001 On Ramp South MATOC IDIQ' dated 01/11/2022. The offer response date is changed to 02/15/2022. See page 2 of this SF30 for the complete amendment.
General Services Administration (GSA) Public Buildings Service (PBS), Acquisition Management Division (AMD), Policy Branch (10PQF) 400 15th Street SW Auburn, WA 98001
See Block 6
47PL0022R0001
"On-Ramp South MATOC IDIQ"
47PL0022R0001
02/08/2022
2/8/2022
01/11/2022
DocuSign Envelope ID: 490BDEC5-4AA0-496B-BC05-E895CC339A7B
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Solicitation 47PL0022R0001
Amendment A02 makes the following changes to the solicitation A01 On-Ramp South MATOC IDIQ issued on 01/11/2022;
1. The offer response date is changed to 02/15/2022. Offers are due by close of business or 4:00pm Pacific Time. Submit proposals by email to jessica.campbell@gsa.gov
2. This amendment incorporates the below solicitation request for information (RFI) questions and responses.
Thank you for your interest in this GSA opportunity.
A02-1
RFI:
Will an SF1442 with current bid sic(d)ate be provided?
RESPONSE:
Offerors are instructed to remove and replace the SF1442 with the form annotated as A02 dated 02/08/22.
A02-2
RFI:
For Volume II, Project Experience, the 10 page limit per project does not seem obtainable based on the amount of supporting documents for each is being required (i.e., design documents, submittals, project schedules, cost estimates, SOVs, Change Order requests, resumes for PM and Superintendent, submittal logs, RFIs, etc.). Request the page limit be removed or doubled.
RESPONSE:
Offerors are encouraged to provide example documents to demonstrate the capability and experience of the Offeror to perform the tasks. The Government is not seeking a complete record set of any project documentation. No changes to the page limits.
A02-3
RFI
The due date in block 10 of the SF 1442 states the proposal is due 02/01/2018 at 4:00PM. Is the government planning on issuing new SF 1442 or are offerors to use the old one?
RESPONSE
Offerors are instructed to remove and replace the SF1442 with the form annotated as A02 dated 02/08/22.
A02-4
RFI
In the solicitation the government has request offerors to submit Tab 2 – Vendor Scoring Table of the Exhibit 5. Can the government please clarify if Tab 2 should be submitted as it’s own file in a separate volume from Volume 1-4, or should Tab 2 – Vendor Scoring Table of the Exhibit 5 Vendor Proposal Workbook be submitted in one of the four volumes?
RESPONSE
Offerors are instructed to return Tab 2 Vendor Scoring Table as a stand-alone document.
A02-5
RFI
For the Exhibit 5 Vendor Workbook – do offerors need to complete each tab’s checklist and return the workbook as a whole in excel format? Or, are offerors to pull out each completed tab and submit it as a PDF in it’s corresponding volume (i.e. Tab 3 is submitted at the beginning of Volume I, Tabs 4 and 5 are submitted at the beginning of Volume III and Tab 7 is submitted in Volume IV?
RESPONSE
Offeror's have the discretion to return the proposal as a .pdf or in an excel format. The Government will accept both formats. Refer to The Solicitation, Section II. Proposals A and B on pages 5, 6, 7.
A02-6 RFI: In Exhibit 5, Tab 4, subfactor 1.8 the government requests “Provide IDIQ resource plan with key project team members. Include proposed project manager and site superintendent(s) with relevant experience with projects of similar complexity. Include high level organizational chart to demonstrate lines of communication, ability to staff multiple projects with concurrent performance, indicate which construction activities and/or trades that are self-performed.
Provide 1 page resume of project manager and site superintendent(s) identified in organizational chart.”
(1) Could the government please clarify if offerors are to include a resume for the PM and Site Superintendent proposed to performed work on the On-Ramp South MATOC IDIQ, or if they are to include a resume for the PM and Site Superintendent that performed on each of the five projects being proposed?
(2) If the former is true, submitting the proposed PM and Site Superintendent, can offeror include the organizational chart and 2 resumes (1 for each role) under the first project and a reference to those three items under the four other projects as it would be the same information repeated between all five projects?
RESPONSE: Part 1 - Offerors are instructed to provide resumes for personnel who are proposed to staff this MATOC IDIQ.
Part 2 - answered by response to Part 1.
A02-7 RFI: Would the government please provide a two-week extension to allow offerors enough time to gather the extensive information required for the 10-page projects + PPQs?
RESPONSE: Offerors are instructed that the proposal response date is extended to February 15, 2022.
| 2022-02-08T09:01:49-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .