This document provides guidance on the use of revised GSA Forms 2630 and 2631 for architect-engineer cost estimates and cost summaries. The forms are used to ensure contract awards for architect-engineer services do not exceed the 6% statutory limit on design fees under the Brooks Act.

The guidance instructs contracting staff to clearly identify basic and excluded services for each project phase using the definitions in Table One. The revised GSA Form 2630 requires architects-engineers and estimators to itemize costs for direct salaries, consultants, other direct costs, overhead pools and profit for both basic and excluded services by project phase. It also requires calculating the ratio of basic services costs to the estimated construction cost. The revised GSA Form 2631 summarizes cost information from the Form 2630 in a consolidated manner by cost category and project phase for basic and excluded services.

View the file

Other files

File Type Posted
QandA RESP FINAL_Foley_LDG Gate Replacement.pdf PDF
Site Visit CheckIn Information.pdf PDF
47PK0521R0009_AMEND 0002.pdf PDF
47PK0521R0009_AMEND 0001.pdf PDF
N47PK0521R0009_RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

ARCHITECT - ENGINEER COST ESTIMATE

Basic Services (See Instructions)

GSA 2630 (9/2014)

GENERAL SERVICES ADMINISTRATION

PROJECT PROPERTIES

GSA 2631 (REV. 9/2014)

GENERAL SERVICES ADMINISTRATION

COST BY PROJECT PHASE

(Dollar Value)

PRE-DESIGN

DESIGN CONCEPTS

DESIGN DEVELOPMENT

CONSTRUCTION DOCUMENTS

POST-CONSTRUCTION CONTRACT SERVICES

OTHER

(State)

SUBTOTAL

COST ELEMENTS

DIRECT SALARY COSTS

OTHER DIRECT COSTS

CONSULTANTS

OVERHEAD POOL TITLES

TOTAL COST TO A - E

PROFIT

TOTAL COST TO GOVERNMENT

EXCLUDED SERVICE

BASIC SERVICE

EXCLUDED SERVICE

BASIC SERVICE

EXCLUDED SERVICE

BASIC SERVICE

EXCLUDED SERVICE

BASIC SERVICE

EXCLUDED SERVICE

BASIC SERVICE

EXCLUDED SERVICE

BASIC SERVICE

EXCLUDED SERVICE

BASIC SERVICE

ARCHITECT ENGINEER

BASIC SERVICES FEE / DESIGN-TO COST LIMIT

Instructional Guidance I. Purpose

A. The purpose of the instructional letter is to provide guidance to the acquisition, contractor and PBS program offices for the use and application of the revised GSA Form 2630, Architect-Engineering Cost Estimate, and the revised GSA Form 2631, Architect-Engineering Cost Summary. Revision of the Forms 2630 and 2631 will enable the PBS estimating and acquisition communities the ability to ensure the contract awards for Architect-Engineer services fall within the statutory limits of the Public Law 92-582 (ie Brooks Act).

II. Background A. The Federal Acquisition Regulation (FAR) Part 15.404-4(c)(4)(i)(B) states "For architect-engineer services for public works or utilities, the contract price or estimated cost and fee for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent of the estimated cost of construction of the public work or utility, excluding fees."

B. Guidance for use of the A-E Fee Estimating Forms 2630 and 2631 was cancelled in 1992. Since that time, there has not been guidance in the use of the forms. Because of the need for better enforcement of the statutory limits of the Brooks Act, the forms 2630 and 2631 have been revised to prepare fee proposal and Independent government estimates in terms of the estimated cost of construction, in order to ensure PBS doesn’t pay in excess of the 6% statutory limits for production and delivery of designs, plans, drawings, and specifications.

III. Effective Date – Effective upon Issuance

IV. Termination/Cancellation Date: This Instructional letter will remain in effect until superseded or cancelled.

V. Applicability

A. This instructional letter applies to all PBS procurements of A-E services. The Form 2630 and 2631 is used for all Professional Services required by PBS. The statutory limit of A-E Design Services applies to only a portion of the full array of Professional Services required at any given time throughout the execution of a project.

VI. References

A. 41 U.S.C.254 B. Brooks Act Public Law 92-582 C. FAR 36.6, Architect-Engineer Services D. FAR 15.4, Contract Pricing E. PBS Procurement Instructional Bulletin PIB 13-04, Application of the Architect-Engineer (A-E) 6% Design Fee Limitation

VII. Instructions

A. In accordance with the PBS goal of consistency in the way we do business it is mandatory that each procurement of A-E design services must apply the Brooks Act limitation consistently.

B. To ensure the contractors and estimators apply consistency in the interpretation of the Brooks Act and PIB 13-04 (PBS Acquisition Policy), Table One - PBS Application of the 6% Statutory AE Design Fee Limitation defines the types of services deemed to be considered as either “Basic Service” or “Excluded Services” in the preparation of AE (Professional Services) Fee Proposal and Independent Government Estimates for Professional Services. The PBS Application of the 6% Statutory AE Design Fee Limitation (Table One) is to be used in preparation of the estimate and is consistent with the deliverable requirements of the PBS P-100, Facilities Standards for the Public Buildings Service.

GSA 2631 (REV. 9/2014) PAGE 2

C. GSA Form 2630, Architect Engineer Cost Estimates, is to be used by the Prime Contractor and all Sub Consultants on any Professional Services Contract for PBS. The GSA Form 2630 is required to reflect all work identified in the contract statement of work, based on the phasing of the project. Most importantly, the revision to the SF 2630 requires each phase of services to be estimated / proposed by basic service and excluded services, defined by PIB 13-04. The completion of the SF 2630 is better defined in Provision 8.0 Revised 2630, Architect Engineer Cost Estimates. D. GSA Form 2631, Architect Engineer Cost Estimate Summaries is to be prepared by the Prime Contractor (or Estimator), and will provide a summary, per project phase of all cost proposed (or estimated) for the work defined in the contract statement of work. Most importantly, the revision to the SF 2631 requires each phase of services to be reported as basic service and excluded services, defined by PIB 13-04. The completion of the SF 2631 is better defined in Provision 8.0 Revised 2630, Architect Engineer Cost Estimates. E. Procedures for Defining Services – Upon review of the attached Table One, the Architect-Engineer shall define which elements in the scope of work for the contract at question. The Proposal will be developed based on the project phase, per sub-consultant and Prime Contractor. The same is true for the preparation of the Government Estimate. VIII. Description of Forms A. GSA Revised Form 2630 i. General

1. Whether addressing the estimate/proposal for basic or excluded services, the Revised GSA Form 2630 requires the following elements be addressed: • Project Text • AE Firm Text • Direct Salary Costs • Consultants • Other Direct Costs • Overhead Pools • Profit - %% • Signature 2. In addition to the above, when completing the GSA Revised Form 2630 for Basic Services, the user must calculate and report the percent (of ECC - Design to Cost Limit) paid for Basic Services. ii. Direct salary costs – Applies to Basic and Excluded Cost Forms 1. General. Direct salary costs normally include salaries for regular time and overtime (excluding overtime premium costs) of architects, engineers, and draftsmen. Also included is the cost of partners' or principals' time when they are directly engaged in the architectural, engineering, estimating, scheduling, or other technical services to be rendered under the contract. For any employee not devoting full time to work performed under the contract, only the cost of actual time of work under the contract can be included. The compensation of a partner or principal shall be included as direct cost only for the time that he is expected to perform work under the contract and only if it is the A-E's normal practice to charge such time directly to all jobs. The rate of compensation of a partner or principal shall be commensurate with the cost of employing another qualified person to do such work, but the salary portion shall not exceed the actual salary rate of the person using the partner. 2. Proposal instructions. List the categories of professional or technical personnel necessary to perform each major element of work under the contract scope of services on the Architect-Engineer Cost Estimate. Estimate man-hours for each category and extend them by the wage rates to be paid during the actual performance of the work. Current rates, adjusted for project increases, if any, shall be used for the actual categories of labor contemplated. All projected increases shall be supported by recent experience or established personnel policy. Furnish a supporting narrative statement explaining in detail (1) the method of estimating and the computations used in developing the proposed man-hours, (2) the computation technique used in arriving at proposed labor and overhead rates, and (3) the specific documents, books, or other records used as factual source material to develop proposed man-hours and labor rates. To the extent feasible, detailed rate computations shall be furnished with the proposal. Voluminous computations or other data impracticable to submit must be identified in writing but may be retained as part of your proposal file. The file may be examined by GSA auditors or requested by the contracting officer prior to or during negotiations.

GSA 2631 (REV. 9/2014) PAGE 3

iii. Consultants' fees. – Applies to Basic and Excluded Services

1. General. Consultants' price proposals frequently represent a significant portion of the total A-E proposal. Consequently, the Government expects that consultants' proposals will be evaluated by A-Es prior to their incorporation into the total submission with correction/adjustments made prior to inclusion in A/E's submittal.

2. Proposal instructions. Consultants' price proposals shall be identified individually under the appropriate work element in the proposal. The data requirements and presentation estimates required in this instruction shall also be required of consultants. Each consultants' detailed cost and the A-Es' analysis thereof must be appended to the A-Es' proposal. Consultants will be required to certify as to the accuracy, currency, and completeness of their cost or pricing data when required by FAR.

iv. Other direct costs - Applies to Basic and Excluded Services

1. General. The following items illustrate costs which may be included in this category:

a.Travel costs, including transportation, lodging, subsistence, and incidental expenses incurred by A-E personnel or consultants while in a travel status in connection with the performance of services required by the contract. FAR 31.205-46 generally forbids the use of first-class air accommodations and also limits the use of private aircraft.
b.Reproduction costs, including blueprints, black and white prints, solid print, photographs, photostats, negatives, and express mail charges. (3) Commercial printing, binding, artwork, and models.
c.Proposal instructions. When included in the proposal, other direct costs must be detailed sufficiently to permit evaluation by GSA personnel. Furnish a narrative statement describing the basis for other direct costs proposed and identify the factual sources of costs, rates, etc., used in computing the proposed amount of each cost element.

v. Overhead costs. – Applies to Basic and Excluded Services

1. General.

a. Overhead costs consist of pools of expenses. The expenses are grouped by benefits as they would accrue to the cost objectives represented by the distribution base or bases to which they are allocated. Since accounting practices vary, the use of particular groupings is not required. Neither is the use of any particular allocation base mandatory. However, it is mandatory that the method used result in an equitable allocation of indirect costs to the cost objectives that they support.

b. Normally, the A-E's accounting system and estimating practices will determine the method used to allocate overhead costs. The A-E's practices will generally be accepted. Proposed overhead rates shall represent the A-E's best estimate of the rates to be experienced during the contract period. They shall be based upon recent experience and be adjusted for known factors which will influence experienced trends.

c. Common overhead groupings in A-E firms are overhead on direct labor, and general and administrative expenses. The first group usually includes employment taxes, fringe benefits, holidays, vacations, idle time, bonuses, etc., applicable to direct labor. The second generally includes the remaining costs, which, because of their incurrence for common or joint objectives, are not readily subject to treatment as direct costs. It is expected, however, that proposed groupings will correspond with the A-E's normal method of accumulating indirect costs. No special categorization is required provided the results are realistic and equitable.

d. Direct salaries are the normal distribution base for overhead costs. In some circumstances a direct labor-hour base produces more equitable results. As in the case of overhead cost groupings, the method used will depend on the A-E's normal practices and the equity of the results produced.

vi. Profit. A fair and reasonable provision for profit cannot be made by simply applying a certain predetermined percentage to the total estimated cost. Rather, profit shall be established as a dollar amount after considering: (1) degree of risk, (2) nature of the work to be performed, (3) joint venture responsibilities, (4) extent of A-E's investment, (5) subcontracting of work, and (6) other criteria discussed in GSAM.

vii. Calculation of Design to Cost Limit – The GSA Revised Form 2630 requires the proposal or estimate to contain the ratio (%%) of the AE Basic Services Cost divided by the Estimated Cost of Construction (Design to cost limit).

GSA 2631 (REV. 9/2014) PAGE 4

B. GSA Revised Form 2631

i. General – The fee proposal and cost estimate must both be summarized with the GSA Revised Form 2631. The user must input the values for each of the project phases, reporting cost summaries for basic and excluded services. The GSA Revised Form 2631 must be completed by the Architect Engineer and the GSA Estimator.

ii. The GSA Revised Form 2631 must report the following:

1. Direct Salary Costs

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

2. Consultant Services

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

3. Other Direct Costs

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

4. Overhead Pool Titles

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

GSA 2631 (REV. 9/2014) PAGE 5

5. Total Cost to A-E (Prime)

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

6. Profit

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

7. Total Cost to Government

a. Basic Services

b. Excluded Services

c. Per Each Project Phase (Pre-Design, Concepts, Design Development, Working Drawings, Post Construction Services, Other as Stated

d. Subtotal

e. Basic Services Total Cost – Percent Ratio – Total Basic Services Cost/Estimated Cost of Construction (Design to Cost Limit) iii. Proposal submission. The completed proposal and all cost or pricing data described in preceding paragraphs shall be submitted in accordance with the instructions contained in the proposal invitation.

For questions regarding the use of the GSA Revised Forms 2630 and 2631, please contact the PBS Office of Design and Construction, Cost Management Program.

GSA 2631 (REV. 9/2014) PAGE 6

GSA 2631 (REV. 9/2014) PAGE 7

Feasibility Studies, Prospectus Development Studies including Functional and Economic Studies and Analysis Environmental impact assessments, statements, and supporting data Environmental (asbestos, hazardous waste, etc.) investigations, studies, reports, permits Studies, Investigations, and Surveys:

Historic Preservation Studies Traffic Studies Existing Facility Investigation Surveys - topographic/boundary/utility Soil Borings Special Energy Analysis over & above normal calculations to design a typical HVAC System and supporting electrical and instrumentation systems Measured Drawings Development (verify site measurements) Roof Samples and reports Flow gauging, model testing Services related to out-lease space Site Selection Predesign programming Preparation of general and development criteria Preparation of general and feature design memoranda Feasibility Studies, Prospectus Development Studies including Functional and Economic Studies and Analysis Design Development

IN

OUT

OUT

IN

SERVICE

SERVICE

Design Estimate Application of the 6% Fee Limitation Concept Services including Design Alternatives Review of local code, permit, and inspection requirements Design Narratives Value Engineering - VE Consultant Changes to drawings / specifications resulting from value engineering, etc.

Concept Presentations Display Models and Renderings Landscape Design Notes

• Special consultant services specifically applied to the actual preparation of drawings or specifications are considered Basic Services and are included within the 6% Statutory A-E Design Fee Limitation.

• Special consultant services NOT specifically applied to the actual preparation of working drawings or specifications of the project for which the services are required are considered outside the limits of Basic Services and are excluded from being within the 6% Statutory A-E Design Fee Limitation.

• Value Engineering AE Design Team Participation is included in the 6%.

• Note, the 6% limitation only applies to contracts for complete design services and do not apply to AE contracts for the preparation of performance specification or bridging documents for design build contracts.

Table One - PBS Application of the 6% Statutory AE Design Fee Limitation Interior space design (permanent partitions/walls) Value Engineering - VE Consultant Landscape Design Changes to drawings / specifications resulting from value engineering, clarifications, unforeseen conditions Graphic communication services Special Energy Services Construction Documents Phase Drawings, specifications, cost estimates (furnished by A-E) Changes to drawings / specifications resulting from value engineering, clarifications Preparation of bid packages and amendments Critical path method / computer scheduling Costs applicable to all Phases Travel costs (including labor and per diem) Meetings Reproduction costs (above 1 set ) Design / Build Services Building Information Modeling (BIM) Services Postage, telephone costs Secondary cost estimates Art-in-Architecture Services Art in Architecture Coordination Construction Phase Concept Phase Interior space design, space layout drawings, drapes, free standing partitions, FF&E Master planning Pre-design / architectural programming Determination of program requirements Critical path method / computer scheduling Site slides, photographs Post construction contract services (review of shop drawings and sample approval), maintenance manuals Compiling operating and maintenance manuals Modifications for changes to drawings / specifications resulting from value engineering, clarifications (RFI's, etc), unforeseen conditions, post construction contract award changes, etc.

Record documents - “as built” drawings and marked specifications Secondary cost estimates Building Information Modeling (BIM) Services Post Occupancy Evaluation X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 11.0.0.20130303.1.892433.887364

FacilityName:
State:
City:
ProjectDescription:
BuildingNo:
ProjectNo:
Amounts $:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Rates $:
Rates $:
Rates $:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Amounts $:
FirmName:
Address:
Telephone:
Fax:
WebSite:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Design Development - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Design Concepts - Excluded Service :
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service: 0
Subtotal - Excluded Service: 0
Design Development - Excluded Service:
Design Concepts - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
Pre-Design - Basic Service:
Pre-Design - Excluded Service:
Post-Construction Contract Services - Basic Service:
Post-Construction Contract Services - Excluded Service:
Construction Documents - Basic Service:
Rates $:
Design Development - Basic Service:
Rates $:
Design Concepts - Excluded Service :
Rates $:
Other (State) - Basic Service:
Other (State) - Excluded Service:
Subtotal - Basic Service:
Subtotal - Excluded Service:
BASIC SERVICES FEE / DESIGN-TO COST LIMIT (%):
Remarks: