Price Evaluation Totals
OFFEROR: EXAMPLE
PRICE EVALUATION FORM
Fee to be listed in this Price Evaluation Form shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form.
| (A) BASE AWARD | |
| (1) Executive Office of Imigration Review (EOIR) | $0.00 |
| (2) 1st Floor, Future Tenant Improvement | $0.00 |
| (3) Environmental Protection Agency (EPA) - R9 | $0.00 |
| (4) Environmental Protection Agency (EPA) - CID | $0.00 |
| (5) Grand Jury | $0.00 |
| (6) 4th Floor, Conference Room | $0.00 |
| (7) Fire Pump Replacement | $0.00 |
| (8) New Emergency Generator | $0.00 |
| (9) Cleaning of South Building Facade | $0.00 |
| (A) Total Base Award | $0.00 |
| (B) OPTION AWARD | |
| (10) 4th Floor, Public Corridor Finish Upgrade | $0.00 |
| (11) Recaulking of Storefront Glazing - South Building Facade | $0.00 |
| (B) Total Option Award | $0.00 |
| (C) HAZMAT ALLOWANCE | ||
| Abatement Items | Quantity | Price |
| Unit Price for removing, stock-piling and disposal of Sprayed Applied Ceiling | 5,000 s.f. | $38,000.00 |
| Unit Price for removing, stock-piling and disposal of Floor Tile/Mastic | 5,000 s.f. | $32,000.00 |
| (C) Total Hazmat Allowance | 5,000 s.f. | $70,000.00 |
| (D) GRAND JURY FLOOR LEVELING ALLOWANCE | ||
| (D) Grand Jury Floor Leveling Allowance | $20,000.00 | |
| OFFEROR: | EXAMPLE |
PRICE EVALUATION FORM
| (E) HVAC ALLOWANCE | |
| See "Project Specific Notes" as shown repeatedly in Mechanical Drawings (e.g., sheet MZ101, MD101, M101, MP101, etc). As part of the Base Bid, Contractors are responsible to perform functional tests of existing systems as described in the narrative. This HVAC Allowance is set aside as part of this Construction Award to cover any deficiencies and corrective actions that may result from the various functional tests | |
| (E) HVAC Allowance | $100,000.00 |
| TOTAL AWARD INCLUDING BASE, OPTION, & ALLOWANCE | |
| (A) Base Award | $0.00 |
| (B) Option Award | $0.00 |
| (C) Hazmat Allowance | $70,000.00 |
| (D) Grand Jury Floor Leveling Allowance | $20,000.00 |
| (E) HVAC Allowance | $100,000.00 |
TOTAL AWARD (Base, Option, & Allowance) $190,000.00
&"Arial,Bold"&8DB Contractor Solicitation - Price Evaluation Form &"Arial,Regular"Schwartz FY16 Design-Bid-Build Tenant Improvement Project&9
&10Page &P of 14
1 EOIR
OFFEROR: EXAMPLE
| (1) EXECUTIVE OFFICE OF IMMIGRATION REVIEW | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for EOIR, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (1) EOIR on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (1) EXECUTIVE OFFICE OF IMMIGRATION REVIEW DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (1) Total Executive Office of Immigration Review Base Award | $0.00 |
&10Page 3 of 14
2 Future Tenant
OFFEROR: EXAMPLE
| (2) 1ST FLOOR, FUTURE TENANT IMPROVEMENT | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for the 1st Floor Future Tenant Improvement, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (2) 1st Floor, Future Tenant Improvement on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (2) 1ST FLOOR, FUTURE TENANT IMPROVEMENT DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (2) Total 1st Floor Future Tenant Improvement Base Award | $0.00 |
&10Page 4 of 14
3 EPA R9
OFFEROR: EXAMPLE
| (3) ENVIRONMENTAL PROTECTION AGENCY - R9 | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for EPA R9, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (3) EPA R9 on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (3) ENVIRONMENTAL PROTECTION AGENCY - R9 DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (3) Total Environmental Protection Agency - R9 Base Award | $0.00 |
&10Page 5 of 14
4 EPA CID
OFFEROR: EXAMPLE
| (4) ENVIRONMENTAL PROTECTION AGENCY - CID | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for EPA CID, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (4) EPA CID on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (4) ENVIRONMENTAL PROTECTION AGENCY - CID DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (4) Total Environmental Protection Agency - CID Base Award | $0.00 |
&10Page 6 of 14
5 Grand Jury
OFFEROR: EXAMPLE
| (5) GRAND JURY DETAILED BREAKDOWN | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for Grand Jury, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (5) Grand Jury on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (5) GRAND JURY DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (5) Total Grand Jury Base Award | $0.00 |
&10Page 7 of 14
6 Fourth Floor Conference
OFFEROR: EXAMPLE
| (6) 4TH FLOOR, CONFERENCE ROOM | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for the 4th Floor Conference Room, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (6) 4th Floor, Conference Room on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (6) 4TH FLOOR, CONFERENCE ROOM DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (6) Total 4th Floor, Conference Room Base Award | $0.00 |
&10Page 8 of 14
7 Fire Pump
OFFEROR: EXAMPLE
| (7) FIRE PUMP REPLACEMENT | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for Fire Pump Replacement, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (7) Fire Pump Replacement on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (7) FIRE PUMP REPLACEMENT DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (7) Total Fire Pump Replacement Base Award | $0.00 |
&10Page 9 of 14
8 Emergency Generator
OFFEROR: EXAMPLE
| (8) NEW EMERGENCY GENERATOR | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for the New Emergency Generator, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (8) New Emergency Generator on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (8) NEW EMERGENCY GENERATOR DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (8) Total New Emergency Generator Base Award | $0.00 |
&10Page 10 of 14
9 Cleaning South Facade
OFFEROR: EXAMPLE
| (9) CLEANING OF SOUTH BUILDING FACADE | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the base bid for Cleaning of South Building Facade, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the base award for (9) Cleaning of South Building Facade on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (9) CLEANING OF SOUTH BUILDING FACADE DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (9) Total Cleaning of South Building Facade Base Award | $0.00 |
&10Page 11 of 14
10 Fourth Floor Corridor Finish
OFFEROR: EXAMPLE
| (10) 4TH FLOOR, PUBLIC CORRIDOR FINISH UPGRADE | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the option bid for the Fourth Floor Corridor Finish Upgrade, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the option award for (10) 4th Floor, Public Corridor Finish Upgrade on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (10) 4TH FLOOR, PUBLIC CORRIDOR FINISH UPGRADE DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (10) Total 4th Floor, Public Corridor Finish Option Award | $0.00 |
&10Page 12 of 14
11 Recaulking Storefront
OFFEROR: EXAMPLE
| (11) RECAULKING STOREFRONT GLAZING SOUTH BLDG FACADE | |
| DETAILED BREAKDOWN | |
| Provide your detailed breakdown of the proposed amount for the option bid for Recaulking of Storefront Glazing at South Building Facade, broken down into the standard MasterFormat divisions in the table below. The total from this page should match the option award for (11) Recaulking of Storefront Glazing - South Building Facade on page 1 of this price evaluation. | |
| Fees listed below shall already include GC markup (Corporate Overhead, Profit, etc.) as listed on Page 14 of this Price Evaluation Form. | |
| Please enter "N.A." where a work item is not applicable. | |
| (11) RECAULKING OF STOREFRONT GLAZING - SOUTH BUILDING FACADE DETAILED BREAKDOWN | |
| Division 1 - General Requirements | $0.00 |
| Division 2 - Existing Conditions | $0.00 |
| Division 3 - Concrete | $0.00 |
| Division 4 - Masonry | $0.00 |
| Division 5 - Metals | $0.00 |
| Division 6 - Wood, Plastics, and Composites | $0.00 |
| Division 7 - Thermal and Moisture Protection | $0.00 |
| Division 8 - Openings | $0.00 |
| Division 9 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - Heating, Ventilating, Air Conditioning | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Electronic Safety and Security | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| (11) Total Recaulking of Storefront Glazing - South Building Facade Option Award | $0.00 |
&10Page 13 of 14
GC Overhead and Profit
OFFEROR: EXAMPLE
GENERAL CONTRACTOR OVERHEAD & PROFIT
Construction Stage Services
1. Corporate Overhead %
2. Profit %
3. Prime Contract Modification Markup %
4. Tier 1 Subcontractor Contract Modification Markup %
5. General Conditions
6. Daily Compensable Delay Rate
7. Payment & Performance Bond Cost
8. Any Other (Insurance, G&A, Fee)