This is a Request for Information (RFI) document containing 19 questions and answers regarding an office suite remodel project at the Bismarck Federal Building for the Bureau of Indian Education (BIE). The work involves offices 365, 358, and 360, focusing on paint and carpet replacement, with specific attention to lead paint remediation.

Key details include: contractors must repair drywall after scraping loose lead paint (full abatement not required), provide their own dumpsters, move GSA furniture, and achieve Level 4 with orange peel finish on drywall. The scope includes painting heat registers white, removing and patching nail holes, and painting door frames up to thresholds. While GSA will provide a lead report and identify dumpster locations, contractor parking is not provided. Interior doors require painting only on the office side, not the hallway side. The existing baseboards are to be kept and repainted according to the Statement of Work. A tack board between offices 360 and 358 must be removed, and both sides of that door and trim must be painted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIE Tennant Fit UP RFI - 11/26/24

1. Will the hallway and elevator require any work? Or will work strictly only be performed in offices 356, 358, and 360?

a. Work will only be in offices 365, 358 & 360.

2. Will contractors be expected to replace/repair drywall after removing lead paint?

a. Repair drywall after scraping the loose lead paint.

3. Will contractors be responsible for moving GSA furniture?

a. Yes.

4. Just to confirm, will dumpsters be provided for the carpet project?

a. Dumpsters will be provided by the contractor

5. Will a lead report be given to contractors by the GSA?

a. The GSA can provide a lead report.

6. Should contractors hire a tester before beginning any abatement work?

a. Not required.

7. We would like to know how far lead may have penetrated and if wall substrates may require restoration too

a. Only scrape loose/peeling paint as needed.

8. Will the current baseboards need to be replaced by carpet team or just kept as is and repainted?

a. Keep the existing baseboard and repaint as per the SOW.

9. Will the GSA be open to receiving lead stabilization services instead of a full abatement?

a. Full abatement is not required. Only remove any peeling or loose paint

10. Is a full LCP Abatement required on all items requiring new paint, or is lead paint stabilization required in areas where the paint is peeling/cracking/chipping?

a. Full abatement is not required. Only remove any peeling or loose paint.

11. Has there been an LCP and Asbestos report on the rooms for this project that can be shared with us?

a. The GSA can provide a lead report.

12. Are there a parking spaces for contractors to park?

a. Unfortunately, there is not.

13. Is there a place to put a dumpster?

a. GSA will identify a location for the contractor supplied dumpster.

14. Does the door/frame/trim between the office 360 and office 358 get painted? Currently there is a tack board over the door in the middle office and SOW makes no mention of removing the tack board.

a. Remove the existing tack board and paint both sides of door and trim between rooms 360 & 358.

15. Do we have to paint both sides of the doors in particular on the hall side?

a. The hallway side of the door does not need to be painted. Paint the door frame up to the threshold.

16. What level of finish on drywall is required? Level 4, Level 5, Level 4 w/orange peel, Level 4 w/texture.

a. Level 4 w/orange peel

17. Do you want the heat registers painted?

a. Paint the heat registers white.

18. What to do with the nails in the wall, pull or leave?

a. Pull all nails and patch the walls as required.

19. Who is responsible for moving furniture?

a. The contractor will be responsible.