This document contains a past performance questionnaire and details of a related federal contract opportunity. The past performance questionnaire is a template for evaluating a contractor's performance on a previous contract and includes ratings for requirements, timeliness, and overall performance.

The related federal contract opportunity is a solicitation seeking construction services to replace heating, ventilation, and air conditioning equipment and venting at the U.S. Custom House in New Orleans, Louisiana. The estimated cost range for the work is between $1 to $5 million. The North American Industry Classification System code for this project is 238220 with a size standard of $16.5 million. The solicitation is set aside 100% for small businesses. The selected contractor must perform at least 90% of the work. The anticipated period of performance is 245 calendar days. Source selection will use a best value methodology.

PPQ

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY - SOURCE SELECTION SENSITIVE – FAR 2.101 and 3.104

Solicitation 47PH0519R0021

PAST PERFORMANCE QUESTIONNAIRE

CONTRACTOR/OFFEROR: ________________________________________________

Reference Contacted:

Name: ____________________________________________________________

Company: __________________________ Telephone No.: _________________

Title:_________________________________Fax No.________________________

Building location of contractor’s performance: ______________________________

Start/End date of Contract Performance:___________________________________

Estimated price/cost for services:_________________________________________

Construction period (# of days):___________________

EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.

Evaluation Definitions – The following definitions should be used in the assessment of Contractor performance.

EXCEPTIONAL

Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.

VERY GOOD

Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.

ACCEPTABLE

Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.

MARGINAL

Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.

POOR

Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.

UNACCEPTABLE Performance information reveals major deficiencies not readily correctable

Past Performance Evaluation

Question 1. Performance

What is your assessment of the Contractor’s ability to meet your requirements?

Exceptional Very

Good Acceptable Marginal Poor Unacceptable

Performance

Comments, if any.

Questions 2/3/4. Timeliness

Was your project completed on time?

Were any delays (if any) due to the fault of the contractor?

Where problems (if any) relsolved in a timely manner?

Timeliness

Ability Resolve Timeliness Problems

Comments, if any.

Questions 5/6. Overall Rating of Contractor’s performance

What is your overall rating of Contractor’s performance (requirements, schedule, and price) on contract being assessed?

Would you use the contractor on future projects?

Performance

General Comments:

Name of Interviewer: __________________________ Date: __________

Evaluation Definitions –
The following definitions should be used in the assessment of Contractor performance.
EXCEPTIONAL
Unacceptable
Unacceptable
Unacceptable

File details come from the government source that posted it. Updated .