View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
RFQ_Fire Protection Facility Assessment Reports and Surveys-Revised.pdf PDF
12- Location 12 Reference Only.xlsx XLSX spreadsheet
14- Location 14 Reference Only.xlsx XLSX spreadsheet
17- Location 17 Reference Only.xlsx XLSX spreadsheet
3- Location 3 Reference Only.xlsx XLSX spreadsheet
5- Location 5 Reference Only.xlsx XLSX spreadsheet
9- Location 9 Reference Only.xlsx XLSX spreadsheet
2- Location 2 Reference Only.xlsx XLSX spreadsheet
SF18.pdf PDF
20- Fire Protection Program Policy Document.pdf PDF
10- Location 10 Reference Only.xlsx XLSX spreadsheet
6- Location 6 Reference Only.xlsx XLSX spreadsheet
13- Location 13 Reference Only.xlsx XLSX spreadsheet
19- FLS Contractor Quote Sheet.xlsx XLSX spreadsheet
1- Location 1 Reference Only.xlsx XLSX spreadsheet
15- Location 15 Reference Only.xlsx XLSX spreadsheet
8- Location 8 Reference Only.xlsx XLSX spreadsheet
FAR52204 Representations.pdf PDF
RFQ_Fire Protection Facility Assessment Reports and Surveys.pdf PDF
16- Location 16 Reference Only.xlsx XLSX spreadsheet
4- Location 4 Reference Only.xlsx XLSX spreadsheet
18- Location 18 Reference Only.xlsx XLSX spreadsheet
7- Location 7 Reference Only.xlsx XLSX spreadsheet
11- Location 11 Reference Only.xlsx XLSX spreadsheet
Combined Synopsis-Solicitation.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

RFQ 47PF0021Q0102 RFIs

Q1: With regards to the above referenced solicitation, can you advise of an estimated start date and/or whether the project would be required to start prior to 7/31/21?

A1: The project will start immediately upon award. The winning contractor should plan to begin the clearance process on or about May 12th. It is the GSA’s intent to begin the surveys as soon as possible.

Q2: Our understanding is that the solicitation requires that the surveyor have 3 years of the last 5 years experience in fire safety surveys and that the surveyor or the firm's reviewer be a Certified Safety Professional (CSP). We would like to know if our reviewer, as a degreed and registered Fire Protection Engineer with 47 year's experience, can be considered equivalent to the CSP?

A2: Incorrect qualifications were added to the Method of Award section. Amendment 0001 replaces the following experience qualifications:

The experience requirements are:

1. At least three years of experience conducting safety inspections/audits in compliance with 29 CFR 1910 in the past five years.

2. Knowledge of federal and state OSHA regulations, where applicable to the contracted maintenance and janitorial employees.

3. Certified Safety Professional /credential from the Board of Certified Safety Professional

With:

The experience requirements are in Section E.4. of Attachment 20.

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 5P1QEB
Copies[0]: 1
CheckBox9[0]: 1
Code[2]:
NameandTitleOfficer[0]: Jeffrey Whelpley, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 2
AmendmentNo[0]: 0001
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]:
FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ5P2MF-21-0002
Dated9B[0]: 4/5/2021
C13[0]:
Description[0]: 47PF0021Q0102 - Fire Protection Assessment Report & Risk Management Surveys

Amendment 0001 is being issued to answer the attached Requests for Information. Please be sure to sign and return a copy of this amendment with your quote. The RFQ closing date remains 11:00 am (CST) on April 26, 2021.

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PF0021Q0102
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 4/8/2021
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: R5 AMD Specialized Contracting Team

230 S. Dearborn St.

Room 3500 Chicago, IL 60604 USA NameandTitleSigner[0]: