GCE
| FY19 - Fire Protection CRM Surveys (Southern IL) - CONTRACTOR BID's | | | | | | | | | | | A | B | C |
| | | | | | | | | | Sq. Ft. | | | |
| Location 1 = IL0154ZZ - Federal Building & U.S. Courthouse, 100 N.E. Monroe St., Peoria, IL. 61602-1003 | | | | | | | | | 105,659 Sq.Ft. | | | |
| | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | |
| | Fire Protection Engineer | | x | | (+) | | (+) | | $0.00 | | | |
| | | | x | | (+) | | (+) | | $0.00 | | | |
| | | | x | | (+) | | (+) | | $0.00 | | | |
| | | | x | | (+) | | (+) | | $0.00 | | | |
| | | | x | | (+) | | (+) | | $0.00 | | | |
| | LABOR SUBTOTAL | | | 0 | | 0 | | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | | |
| Travel Expenses | | x | | x | | $0.00 | | | |
| Lodging & Per Diem (Lodging, M&IE) | | x | | x | | $0.00 | | | |
| Other | | x | | x | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | | | $0.00 | | | |
| LOCATION 1 TOTAL | | | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| Location 2 = IL0222ZZ - Federal Building, 105 S. 6th Street, Mt. Vernon, IL., 62864-4127 | | | | | | | | | 18,268 Sq.Ft. |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Fire Protection Engineer | | x | | (+) | | (+) | 12 | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| LABOR SUBTOTAL | | | 0 | | 0 | | 12 | $0.00 |
SUBTOTAL
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | | |
| Travel Expenses | | x | | x | | $0.00 | | | |
| Lodging & Per diem (Lodging = $94.00, ME&I = $41.25 (3/4 Travel Day) | | x | | x | | $0.00 | | | |
| Other | | x | | x | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | | | $0.00 | | | |
| LOCATION 2 TOTAL | | | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| Location 3 = IL0220ES - Federal Building, 650 W Missouri Ave., East St. Louis, IL 62201 | | | | | | | | | 34,828 Sq.Ft. |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Fire Protection Engineer | | x | | (+) | | (+) | 14 | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| LABOR SUBTOTAL | | | 0 | | 0 | | 14 | $0.00 |
SUBTOTAL
LAB SUBTOTAL
| Per Person | Number of People | Number of Days | | SUBTOTAL | | | |
| Travel Expenses | | | | | $0.00 | | | |
| Lodging & Per diem (Lodging & ME&I) | | | | NOTE: For 3 nights for the East St. Louis area properties included Locations 3, 4, 5 and 6 | $0.00 | | | |
| Other | | | | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | | $0.00 | | | |
| LOCATION 3 TOTAL | | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| Location 4 = IL0301ES - Melvin Price Federal Building (Newer addition to Ct. Hse.) 750 Missouri Ave. East St Louis, IL 62201-2954 | | | | | | | | | 62,860 Sq.Ft. |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Fire Protection Engineer | | x | | (+) | | (+) | 14 | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| LABOR SUBTOTAL | | | 0 | | 0 | | 14 | $0.00 |
SUBTOTAL
LAB SUBTOTAL
| Per Person | Number of People | Number of Days | SUBTOTAL | | | |
| Travel Expenses | | | | $0.00 | | | |
| Lodging & Per diem | | | | $0.00 | | | |
| Other | | | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | $0.00 | | | |
| LOCATION 4 TOTAL | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| Location 5 = IL0069ES - Melvin Price Federal Courthouse, 750 Missouri Ave., East St. Louis, IL 62201-2933 | | | | | | | | | 56,121 Sq.Ft. |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Fire Protection Engineer | | x | | (+) | | (+) | 14 | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| LABOR SUBTOTAL | | | 0 | | 0 | | 14 | $0.00 |
SUBTOTAL
LAB SUBTOTAL
| Per Person | Number of People | Number of Days | SUBTOTAL | | | |
| Travel Expenses | | | | $0.00 | | | |
| Lodging & Per diem | | | | $0.00 | | | |
| Other | | | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | $0.00 | | | |
| LOCATION 5 TOTAL | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| Location 6 = IL0206ZZ - William L. Beatty U.S. Courthouse & Federal Building, 501 Belle Street, Alton, IL 62002 | | | | | | | | | 29,191 Sq.Ft. |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Fire Protection Engineer | | x | | (+) | | (+) | 12 | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| LABOR SUBTOTAL | | | 0 | | 0 | | 12 | $0.00 |
SUBTOTAL
LAB SUBTOTAL
| Per Person | Number of People | Number of Days | SUBTOTAL | | | |
| Travel Expenses | | | | $0.00 | | | |
| Lodging & Per diem | | | | $0.00 | | | |
| Other | | | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | $0.00 | | | |
| LOCATION 6 TOTAL | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| Location 7 = IL0302ZZ - U.S. Courthouse, 201 S. Vine, Urbana, IL., 61802-3369 | | | | | | | | | 45,595 Sq.Ft. |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Fire Protection Engineer | | x | | (+) | | (+) | 12 | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| | | x | | (+) | | (+) | | $0.00 |
| LABOR SUBTOTAL | | | 0 | | | | 12 | $0.00 |
SUBTOTAL
LAB SUBTOTAL
| | Per Person | Number of People | Number of Days | SUBTOTAL | | | |
| Travel Expenses | | | | $0.00 | | | |
| Lodging & Per diem (Lodging, ME&I) | | | | $0.00 | | | |
| Other | | | | $0.00 | | | |
| EXPENSES SUBTOTAL | | | | $0.00 | | | |
| LOCATION 7 TOTAL | | | | $0.00 | $0.00 | $0.00 | $0.00 |
| ..END | | | | | | | | |
| City Locations via Map Link HERE | | | | | | | |
| GCE | | Bidder A | | Bidder B | | Bidder C | |
| Location 1 | $0.00 | Location 1 | $0.00 | Location 1 | $0.00 | Location 1 | $0.00 |
| Location 2 | $0.00 | Location 2 | $0.00 | Location 2 | $0.00 | Location 2 | $0.00 |
| Location 3 | $0.00 | Location 3 | $0.00 | Location 3 | $0.00 | Location 3 | $0.00 |
| Location 4 | $0.00 | Location 4 | $0.00 | Location 4 | $0.00 | Location 4 | $0.00 |
| Total Hours | Location 5 | $0.00 | Location 5 | $0.00 | Location 5 | $0.00 | Location 5 | $0.00 |
| Location 6 | $0.00 | Location 6 | $0.00 | Location 6 | $0.00 | Location 6 | $0.00 |
| Location 7 | $0.00 | Location 7 | $0.00 | Location 7 | $0.00 | Location 7 | $0.00 |
TOTAL $0.00 TOTAL $0.00 TOTAL $0.00 TOTAL $0.00
Tabulation
TABULATION BIDDER A BIDDER B BIDDER C
| Location 1 Dirksen IL 0205 | | | | | | | | | 1,412,473 | Location 1 Dirksen IL 0205 | | | | | | | | | 1,412,473 | Location 1 Dirksen IL 0205 | | | | | | | | | 1,412,473 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 160 | (+) | 280 | $57,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 160 | (+) | 280 | $57,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 160 | (+) | 280 | $57,000.00 |
| Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 80 | $10,500.00 | | Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 80 | $10,500.00 | | Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 80 | $10,500.00 |
| Lead Technician | $125.00 | x | 16 | (+) | 160 | (+) | 280 | $57,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 160 | (+) | 280 | $57,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 160 | (+) | 280 | $57,000.00 |
| Project Manager | $175.00 | x | 12 | (+) | 0 | (+) | 48 | $10,500.00 | | Project Manager | $175.00 | x | 12 | (+) | 0 | (+) | 48 | $10,500.00 | | Project Manager | $175.00 | x | 12 | (+) | 0 | (+) | 48 | $10,500.00 |
| CADD Operator | $100.00 | x | 40 | (+) | 0 | (+) | 320 | $36,000.00 | | CADD Operator | $100.00 | x | 40 | (+) | 0 | (+) | 320 | $36,000.00 | | CADD Operator | $100.00 | x | 40 | (+) | 0 | (+) | 320 | $36,000.00 |
| LABOR SUBTOTAL | | | 88 | | 320 | | 1008 | $171,000.00 | | LABOR SUBTOTAL | | | 88 | | 320 | | 1008 | $171,000.00 | | LABOR SUBTOTAL | | | 88 | | 320 | | 1008 | $171,000.00 |
| Each | | Number of samples | SUBTOTAL | | Each | | Number of samples | SUBTOTAL | | Each | | Number of samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | x | 400 | $4,000.00 | Sample Analysis by PLM | $10.00 | x | 400 | $4,000.00 | Sample Analysis by PLM | $10.00 | x | 400 | $4,000.00 |
| Lead Chip Sample Analysis | $10.00 | x | 100 | $1,000.00 | Lead Chip Sample Analysis | $10.00 | x | 100 | $1,000.00 | Lead Chip Sample Analysis | $10.00 | x | 100 | $1,000.00 |
| LAB SUBTOTAL | | | 400 | $5,000.00 | LAB SUBTOTAL | | | 400 | $5,000.00 | LAB SUBTOTAL | | | 400 | $5,000.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | x | 2 | x | 20 | $2,000.00 | Travel Expenses | $50.00 | x | 2 | x | 20 | $2,000.00 | Travel Expenses | $50.00 | x | 2 | x | 20 | $2,000.00 |
| Lodging & Per diem | $100.00 | x | 2 | x | 20 | $4,000.00 | Lodging & Per diem | $100.00 | x | 2 | x | 20 | $4,000.00 | Lodging & Per diem | $100.00 | x | 2 | x | 20 | $4,000.00 |
| Other | $250.00 | x | 2 | x | 1 | $500.00 | Other | $250.00 | x | 2 | x | 1 | $500.00 | Other | $250.00 | x | 2 | x | 1 | $500.00 |
| EXPENSES SUBTOTAL | | | | | | $6,500.00 | EXPENSES SUBTOTAL | | | | | | $6,500.00 | EXPENSES SUBTOTAL | | | | | | $6,500.00 |
| LOCATION 1 TOTAL | | | | | | $182,500.00 | LOCATION 1 TOTAL | | | | | | $182,500.00 | LOCATION 1 TOTAL | | | | | | $182,500.00 |
| Location 2 Ford MI0137 | | | | | | | | | 270,705 | Location 2 Ford MI0137 | | | | | | | | | 270,705 | Location 2 Ford MI0137 | | | | | | | | | 270,705 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 |
| Licensed Management Planner | $125.00 | x | 8 | (+) | 0 | (+) | 24 | $4,000.00 | | Licensed Management Planner | $125.00 | x | 8 | (+) | 0 | (+) | 24 | $4,000.00 | | Licensed Management Planner | $125.00 | x | 8 | (+) | 0 | (+) | 24 | $4,000.00 |
| Lead Technician | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 |
| Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 16 | $3,500.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 16 | $3,500.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 16 | $3,500.00 |
| CADD Operator | $100.00 | x | 32 | (+) | 0 | (+) | 80 | $11,200.00 | | CADD Operator | $100.00 | x | 32 | (+) | 0 | (+) | 80 | $11,200.00 | | CADD Operator | $100.00 | x | 32 | (+) | 0 | (+) | 80 | $11,200.00 |
| LABOR SUBTOTAL | | | 76 | | 64 | | 280 | $50,700.00 | | LABOR SUBTOTAL | | | 76 | | 64 | | 280 | $50,700.00 | | LABOR SUBTOTAL | | | 76 | | 64 | | 280 | $50,700.00 |
| Each | | Number of Samples | SUBTOTAL | | Each | | Number of Samples | SUBTOTAL | | Each | | Number of Samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 | Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 | Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 |
| Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 | Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 | Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 |
| LAB SUBTOTAL | | | | $1,500.00 | LAB SUBTOTAL | | | | $1,500.00 | LAB SUBTOTAL | | | | $1,500.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | x | 2 | x | 4 | $400.00 | Travel Expenses | $50.00 | x | 2 | x | 4 | $400.00 | Travel Expenses | $50.00 | x | 2 | x | 4 | $400.00 |
| Lodging & Per diem | $100.00 | x | 2 | x | 4 | $800.00 | Lodging & Per diem | $100.00 | x | 2 | x | 4 | $800.00 | Lodging & Per diem | $100.00 | x | 2 | x | 4 | $800.00 |
| Other | $250.00 | x | 1 | x | 1 | $250.00 | Other | $250.00 | x | 1 | x | 1 | $250.00 | Other | $250.00 | x | 1 | x | 1 | $250.00 |
| EXPENSES SUBTOTAL | | | | | | $1,450.00 | EXPENSES SUBTOTAL | | | | | | $1,450.00 | EXPENSES SUBTOTAL | | | | | | $1,450.00 |
| LOCATION 2 TOTAL | | | | | | $53,650.00 | LOCATION 2 TOTAL | | | | | | $53,650.00 | LOCATION 2 TOTAL | | | | | | $53,650.00 |
| Location 3 Whipple MN0086 | | | | | | | | | 630,733 | Location 3 Whipple MN0086 | | | | | | | | | 630,733 | Location 3 Whipple MN0086 | | | | | | | | | 630,733 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 40 | (+) | 80 | $17,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 40 | (+) | 80 | $17,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 40 | (+) | 80 | $17,000.00 |
| Licensed Management Planner | $125.00 | x | 0 | (+) | 0 | (+) | 32 | $4,000.00 | | Licensed Management Planner | $125.00 | x | 0 | (+) | 0 | (+) | 32 | $4,000.00 | | Licensed Management Planner | $125.00 | x | 0 | (+) | 0 | (+) | 32 | $4,000.00 |
| Lead Technician | $125.00 | x | 16 | (+) | 40 | (+) | 80 | $17,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 40 | (+) | 80 | $17,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 40 | (+) | 80 | $17,000.00 |
| Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 24 | $4,900.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 24 | $4,900.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 24 | $4,900.00 |
| CADD Operator | $100.00 | x | 24 | (+) | 0 | (+) | 200 | $22,400.00 | | CADD Operator | $100.00 | x | 24 | (+) | 0 | (+) | 200 | $22,400.00 | | CADD Operator | $100.00 | x | 24 | (+) | 0 | (+) | 200 | $22,400.00 |
| LABOR SUBTOTAL | | | 60 | | 80 | | 416 | $65,300.00 | | LABOR SUBTOTAL | | | 60 | | 80 | | 416 | $65,300.00 | | LABOR SUBTOTAL | | | 60 | | 80 | | 416 | $65,300.00 |
| Each | | Number of Samples | SUBTOTAL | | Each | | Number of Samples | SUBTOTAL | | Each | | Number of Samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 | Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 | Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 |
| Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 | Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 | Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 |
| LAB SUBTOTAL | | | | $1,500.00 | LAB SUBTOTAL | | | | $1,500.00 | LAB SUBTOTAL | | | | $1,500.00 |
| Per Person | Number of People | Number of Days | SUBTOTAL | | Per Person | Number of People | Number of Days | SUBTOTAL | | Per Person | Number of People | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | 2 | 5 | $500.00 | Travel Expenses | $50.00 | 2 | 5 | $500.00 | Travel Expenses | $50.00 | 2 | 5 | $500.00 |
| Lodging & Per diem | $100.00 | 2 | 5 | $1,000.00 | Lodging & Per diem | $100.00 | 2 | 5 | $1,000.00 | Lodging & Per diem | $100.00 | 2 | 5 | $1,000.00 |
| Other | $250.00 | 1 | 1 | $250.00 | Other | $250.00 | 1 | 1 | $250.00 | Other | $250.00 | 1 | 1 | $250.00 |
| EXPENSES SUBTOTAL | | | | $1,750.00 | EXPENSES SUBTOTAL | | | | $1,750.00 | EXPENSES SUBTOTAL | | | | $1,750.00 |
| LOCATION 3 TOTAL | | | | $68,550.00 | LOCATION 3 TOTAL | | | | $68,550.00 | LOCATION 3 TOTAL | | | | $68,550.00 |
| Location 4 Burger MN0087 | | | | | | | | | 399,938 | Location 4 Burger MN0087 | | | | | | | | | 399,938 | Location 4 Burger MN0087 | | | | | | | | | 399,938 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 |
| Licensed Management Planner | $125.00 | x | 8 | (+) | 0 | (+) | 24 | $4,000.00 | | Licensed Management Planner | $125.00 | x | 8 | (+) | 0 | (+) | 24 | $4,000.00 | | Licensed Management Planner | $125.00 | x | 8 | (+) | 0 | (+) | 24 | $4,000.00 |
| Lead Technician | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 32 | (+) | 80 | $16,000.00 |
| Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 16 | $3,500.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 16 | $3,500.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 16 | $3,500.00 |
| CADD Operator | $100.00 | x | 32 | (+) | 0 | (+) | 80 | $11,200.00 | | CADD Operator | $100.00 | x | 32 | (+) | 0 | (+) | 80 | $11,200.00 | | CADD Operator | $100.00 | x | 32 | (+) | 0 | (+) | 80 | $11,200.00 |
| LABOR SUBTOTAL | | | 76 | | 64 | | 280 | $50,700.00 | | LABOR SUBTOTAL | | | 76 | | 64 | | 280 | $50,700.00 | | LABOR SUBTOTAL | | | 76 | | 64 | | 280 | $50,700.00 |
| Each | | Number of Samples | SUBTOTAL | | Each | | Number of Samples | SUBTOTAL | | Each | | Number of Samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 | Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 | Sample Analysis by PLM | $10.00 | x | 100 | $1,000.00 |
| Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 | Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 | Lead Chip Sample Analysis | $10.00 | x | 50 | $500.00 |
| LAB SUBTOTAL | | | | $1,500.00 | LAB SUBTOTAL | | | | $1,500.00 | LAB SUBTOTAL | | | | $1,500.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | x | 2 | x | 4 | $400.00 | Travel Expenses | $50.00 | x | 2 | x | 4 | $400.00 | Travel Expenses | $50.00 | x | 2 | x | 4 | $400.00 |
| Lodging & Per diem | $100.00 | x | 2 | x | 4 | $800.00 | Lodging & Per diem | $100.00 | x | 2 | x | 4 | $800.00 | Lodging & Per diem | $100.00 | x | 2 | x | 4 | $800.00 |
| Other | $250.00 | x | 1 | x | 1 | $250.00 | Other | $250.00 | x | 1 | x | 1 | $250.00 | Other | $250.00 | x | 1 | x | 1 | $250.00 |
| EXPENSES SUBTOTAL | | | | | | $1,450.00 | EXPENSES SUBTOTAL | | | | | | $1,450.00 | EXPENSES SUBTOTAL | | | | | | $1,450.00 |
| LOCATION 4 TOTAL | | | | | | $53,650.00 | LOCATION 4 TOTAL | | | | | | $53,650.00 | LOCATION 4 TOTAL | | | | | | $53,650.00 |
| Location 5 AJ Celebrezze OH0192 | | | | | | | | | 1,462,628 | Location 5 AJ Celebrezze OH0192 | | | | | | | | | 1,462,628 | Location 5 AJ Celebrezze OH0192 | | | | | | | | | 1,462,628 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 120 | (+) | 240 | $47,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 120 | (+) | 240 | $47,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 120 | (+) | 240 | $47,000.00 |
| Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 80 | $10,500.00 | | Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 80 | $10,500.00 | | Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 80 | $10,500.00 |
| Lead Technician | $125.00 | x | 16 | (+) | 120 | (+) | 240 | $47,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 120 | (+) | 240 | $47,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 120 | (+) | 240 | $47,000.00 |
| Project Manager | $175.00 | x | 12 | (+) | 0 | (+) | 48 | $10,500.00 | | Project Manager | $175.00 | x | 12 | (+) | 0 | (+) | 48 | $10,500.00 | | Project Manager | $175.00 | x | 12 | (+) | 0 | (+) | 48 | $10,500.00 |
| CADD Operator | $100.00 | x | 40 | (+) | 0 | (+) | 320 | $36,000.00 | | CADD Operator | $100.00 | x | 40 | (+) | 0 | (+) | 320 | $36,000.00 | | CADD Operator | $100.00 | x | 40 | (+) | 0 | (+) | 320 | $36,000.00 |
| LABOR SUBTOTAL | | | 88 | | 240 | | 928 | $151,000.00 | | LABOR SUBTOTAL | | | 88 | | 240 | | 928 | $151,000.00 | | LABOR SUBTOTAL | | | 88 | | 240 | | 928 | $151,000.00 |
| Each | Number of samples | SUBTOTAL | | Each | Number of samples | SUBTOTAL | | Each | Number of samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | 400 | $4,000.00 | Sample Analysis by PLM | $10.00 | 400 | $4,000.00 | Sample Analysis by PLM | $10.00 | 400 | $4,000.00 |
| Lead Chip Analysis | $10.00 | 100 | $1,000.00 | Lead Chip Analysis | $10.00 | 100 | $1,000.00 | Lead Chip Analysis | $10.00 | 100 | $1,000.00 |
| LAB SUBTOTAL | | 400 | $5,000.00 | LAB SUBTOTAL | | 400 | $5,000.00 | LAB SUBTOTAL | | 400 | $5,000.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | x | 2 | x | 15 | $1,500.00 | Travel Expenses | $50.00 | x | 2 | x | 15 | $1,500.00 | Travel Expenses | $50.00 | x | 2 | x | 15 | $1,500.00 |
| Lodging & Per diem | $100.00 | x | 2 | x | 15 | $3,000.00 | Lodging & Per diem | $100.00 | x | 2 | x | 15 | $3,000.00 | Lodging & Per diem | $100.00 | x | 2 | x | 15 | $3,000.00 |
| Other | $250.00 | x | 2 | x | 1 | $500.00 | Other | $250.00 | x | 2 | x | 1 | $500.00 | Other | $250.00 | x | 2 | x | 1 | $500.00 |
| EXPENSES SUBTOTAL | | | | | | $5,000.00 | EXPENSES SUBTOTAL | | | | | | $5,000.00 | EXPENSES SUBTOTAL | | | | | | $5,000.00 |
| LOCATION 5 TOTAL | | | | | | $161,000.00 | LOCATION 5 TOTAL | | | | | | $161,000.00 | LOCATION 5 TOTAL | | | | | | $161,000.00 |
| Location 6 Minneapolis FOB (MN0036ZZ) | | | | | | | | | 155,000 | Location 6 Minneapolis FOB (MN0036ZZ) | | | | | | | | | 155,000 | Location 6 Minneapolis FOB (MN0036ZZ) | | | | | | | | | 155,000 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 8 | (+) | 24 | (+) | 40 | $9,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 8 | (+) | 24 | (+) | 40 | $9,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 8 | (+) | 24 | (+) | 40 | $9,000.00 |
| Licensed Management Planner | $125.00 | x | 0 | (+) | 0 | (+) | 12 | $1,500.00 | | Licensed Management Planner | $125.00 | x | 0 | (+) | 0 | (+) | 12 | $1,500.00 | | Licensed Management Planner | $125.00 | x | 0 | (+) | 0 | (+) | 12 | $1,500.00 |
| Lead Technician | $125.00 | x | 8 | (+) | 24 | (+) | 40 | $9,000.00 | | Lead Technician | $125.00 | x | 8 | (+) | 24 | (+) | 40 | $9,000.00 | | Lead Technician | $125.00 | x | 8 | (+) | 24 | (+) | 40 | $9,000.00 |
| Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 10 | $2,450.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 10 | $2,450.00 | | Project Manager | $175.00 | x | 4 | (+) | 0 | (+) | 10 | $2,450.00 |
| CADD Operator | $100.00 | x | 0 | (+) | 0 | (+) | 80 | $8,000.00 | | CADD Operator | $100.00 | x | 0 | (+) | 0 | (+) | 80 | $8,000.00 | | CADD Operator | $100.00 | x | 0 | (+) | 0 | (+) | 80 | $8,000.00 |
| LABOR SUBTOTAL | | | 20 | | 48 | | 182 | $29,950.00 | | LABOR SUBTOTAL | | | 20 | | 48 | | 182 | $29,950.00 | | LABOR SUBTOTAL | | | 20 | | 48 | | 182 | $29,950.00 |
| Each | Number of Samples | SUBTOTAL | | Each | Number of Samples | SUBTOTAL | | Each | Number of Samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | 60 | $600.00 | Sample Analysis by PLM | $10.00 | 60 | $600.00 | Sample Analysis by PLM | $10.00 | 60 | $600.00 |
| Lead Chip Sample Analysis | $10.00 | 25 | $250.00 | Lead Chip Sample Analysis | $10.00 | 25 | $250.00 | Lead Chip Sample Analysis | $10.00 | 25 | $250.00 |
| LAB SUBTOTAL | | | $850.00 | LAB SUBTOTAL | | | $850.00 | LAB SUBTOTAL | | | $850.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | x | 2 | x | 3 | $300.00 | Travel Expenses | $50.00 | x | 2 | x | 3 | $300.00 | Travel Expenses | $50.00 | x | 2 | x | 3 | $300.00 |
| Lodging & Per diem | $100.00 | x | 2 | x | 3 | $600.00 | Lodging & Per diem | $100.00 | x | 2 | x | 3 | $600.00 | Lodging & Per diem | $100.00 | x | 2 | x | 3 | $600.00 |
| Other | $250.00 | x | 1 | x | 1 | $250.00 | Other | $250.00 | x | 1 | x | 1 | $250.00 | Other | $250.00 | x | 1 | x | 1 | $250.00 |
| EXPENSES SUBTOTAL | | | | | | $1,150.00 | EXPENSES SUBTOTAL | | | | | | $1,150.00 | EXPENSES SUBTOTAL | | | | | | $1,150.00 |
| LOCATION 6 TOTAL | | | | | | $31,950.00 | LOCATION 6 TOTAL | | | | | | $31,950.00 | LOCATION 6 TOTAL | | | | | | $31,950.00 |
| Location 7 HDI Federal Center, Battle Creek, 21 Buildings | | | | | | | | | 855,381 | Location 7 HDI Federal Center, Battle Creek, 21 Buildings | | | | | | | | | 855,381 | Location 7 HDI Federal Center, Battle Creek, 21 Buildings | | | | | | | | | 855,381 |
| | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL | | | Cost per Hour | | Number of Hours Preparation | | Number of Hours On-Site | | Number of Hours Report | SUBTOTAL |
| Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 80 | (+) | 160 | $32,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 80 | (+) | 160 | $32,000.00 | | Licensed Asbestos Inspector | $125.00 | x | 16 | (+) | 80 | (+) | 160 | $32,000.00 |
| Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 64 | $8,500.00 | | Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 64 | $8,500.00 | | Licensed Management Planner | $125.00 | x | 4 | (+) | 0 | (+) | 64 | $8,500.00 |
| Lead Technician | $125.00 | x | 16 | (+) | 80 | (+) | 160 | $32,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 80 | (+) | 160 | $32,000.00 | | Lead Technician | $125.00 | x | 16 | (+) | 80 | (+) | 160 | $32,000.00 |
| Project Manager | $175.00 | x | 8 | (+) | 0 | (+) | 40 | $8,400.00 | | Project Manager | $175.00 | x | 8 | (+) | 0 | (+) | 40 | $8,400.00 | | Project Manager | $175.00 | x | 8 | (+) | 0 | (+) | 40 | $8,400.00 |
| CADD Operator | $100.00 | x | 24 | (+) | 0 | (+) | 320 | $34,400.00 | | CADD Operator | $100.00 | x | 24 | (+) | 0 | (+) | 320 | $34,400.00 | | CADD Operator | $100.00 | x | 24 | (+) | 0 | (+) | 320 | $34,400.00 |
| LABOR SUBTOTAL | | | 68 | | 160 | | 744 | $115,300.00 | | LABOR SUBTOTAL | | | 68 | | 160 | | 744 | $115,300.00 | | LABOR SUBTOTAL | | | 68 | | 160 | | 744 | $115,300.00 |
| Each | Number of samples | SUBTOTAL | | Each | Number of samples | SUBTOTAL | | Each | Number of samples | SUBTOTAL |
| Sample Analysis by PLM | $10.00 | 400 | $4,000.00 | Sample Analysis by PLM | $10.00 | 400 | $4,000.00 | Sample Analysis by PLM | $10.00 | 400 | $4,000.00 |
| Lead Chip Sample Analysis | $10.00 | 100 | $1,000.00 | Lead Chip Sample Analysis | $10.00 | 100 | $1,000.00 | Lead Chip Sample Analysis | $10.00 | 100 | $1,000.00 |
| LAB SUBTOTAL | | 400 | $5,000.00 | LAB SUBTOTAL | | 400 | $5,000.00 | LAB SUBTOTAL | | 400 | $5,000.00 |
| Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL | | Per Person | | Number of People | | Number of Days | SUBTOTAL |
| Travel Expenses | $50.00 | x | 2 | x | 10 | $1,000.00 | Travel Expenses | $50.00 | x | 2 | x | 10 | $1,000.00 | Travel Expenses | $50.00 | x | 2 | x | 10 | $1,000.00 |
| Lodging & Per diem | $100.00 | x | 2 | x | 10 | $2,000.00 | Lodging & Per diem | $100.00 | x | 2 | x | 10 | $2,000.00 | Lodging & Per diem | $100.00 | x | 2 | x | 10 | $2,000.00 |
| Other | $250.00 | x | 2 | x | 1 | $500.00 | Other | $250.00 | x | 2 | x | 1 | $500.00 | Other | $250.00 | x | 2 | x | 1 | $500.00 |
| EXPENSES SUBTOTAL | | | | | | $3,500.00 | EXPENSES SUBTOTAL | | | | | | $3,500.00 | EXPENSES SUBTOTAL | | | | | | $3,500.00 |
| LOCATION 7 TOTAL | | | | | | $123,800.00 | LOCATION 7 TOTAL | | | | | | $123,800.00 | LOCATION 7 TOTAL | | | | | | $123,800.00 |
| | | GEC | | | | | GEC | | | | | GEC | |
| | | Dirksen | $182,500.00 | | | | Dirksen | $182,500.00 | | | | Dirksen | $182,500.00 |
| Technical Approach (0-50) | | | Ford | $53,650.00 | Technical Approach (0-50) | | | Ford | $53,650.00 | Technical Approach (0-50) | | | Ford | $53,650.00 |
| Professional Qualifications (0-30) | | | Whipple | $68,550.00 | Professional Qualifications (0-30) | | | Whipple | $68,550.00 | Professional Qualifications (0-30) | | | Whipple | $68,550.00 |
| Past performance (0-20) | | | Burger | $53,650.00 | Past performance (0-20) | | | Burger | $53,650.00 | Past performance (0-20) | | | Burger | $53,650.00 |
| TOTAL | 0 | Total Hours | Celebrezze | $161,000.00 | TOTAL | 0 | Total Hours | Celebrezze | $161,000.00 | TOTAL | 0 | Total Hours | Celebrezze | $161,000.00 |
| | | Minne FOB | $31,950.00 | | | | Minne FOB | $31,950.00 | | | | Minne FOB | $31,950.00 |
| | | HDI | $123,800.00 | | | | HDI | $123,800.00 | | | | HDI | $123,800.00 |
| | 1019 | TOTAL | $675,100.00 | | | 1019 | TOTAL | $675,100.00 | | | 1019 | TOTAL | $675,100.00 |
Per Diem
| Per Diem - E. St. Louis Lodging = 133 (St. Claire), Lodging outside of E. St. Louis = $94 & ME&I = in E. St. Louis = $49.50 / $66 & outside = $41.25 / $55.00 (full day)-Mileage=0.54.5 |
| Total Sq. Ft. = 352,522 |