This document contains a pre-bid request for information (RFI) responses and federal contract opportunity for a HUD renovation project at the Brickell Plaza Federal Building in Miami, Florida. The project includes selective demolition and construction work to reconfigure and renovate HUD office space on the fourth floor to modern office standards and co-locate HUD Audit/Investigative staff. Specific requirements include architectural, electrical, mechanical, fire protection, communications and other improvements. The RFI responses provide clarification on specifications, drawings, licensing requirements, hazardous materials testing, and responsibility for existing controls and furniture. The related federal contract opportunity is solicitation number 47PE0721R0020 amendment 0001 for the HUD renovation and lists the General Services Administration Public Buildings Service Region 4 as the contracting agency.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Drawing/ Spec. Number (RFI) Request for Information. GSA Response / Comments
1 General
Pg 7 of 22 in Solicitation indicates there is a price schedule included in the 1442. Is that referring to the 1 lump sum price?
Yes. CLIN 0001.
2 General Can Superintendent and QC Manager be the same person? Yes.
3 SOW, Pg 2, 1.3.1.2 Indicates that GC License with the State of FL. Is Alabama GC License acceptable? Disregard FL licensing requirement.
4 Specs 087100-7
Door Hardware Set 2: Calls for a card reader, but, there is no lockset shown. What function lockset is required? Shall GC provide an electric strike?
F86. Pushbutton lock per specs 08 71 00 Part 2.7 in lieu of card reader indicated. Keypad is on side of room 400 and 409.
5 Specs 087100-8
Door Hardware Set 5: Calls for a card reader, but, there is no lockset shown. What function lockset is required? Shall GC provide an electric strike?
F87. Pushbutton lock per specs 08 71 00 Part 2.7 in lieu of card reader indicated. Keypad is on both sides of doors indicated.
6 Specs 87100-8
Door Hardware Set 5: Indicates Door 405A is sound rated? Please provide STC rating required? STC=32. Provide seals per specs 08 71 00 Part 2.8, solid core
7 Specs 87100-8
Door Hardware Set 7: Indicates Door 405B is sound rated? Please provide STC rating required? STC=32. Provide seals per specs 08 71 00 Part 2.8, solid core
Terracon Report June 11, 2020 & Drawing A-
This hazardous material survey provided indicates no asbsetos containing materials present in the project area. Drawing A-002, Hazardous Material General Notes 1&2 address asbestos and lead abatmement requirement. Please clarify is there a presence of ACM or lead paint in the scope area? Is additional
HAZMAT testing required? If so, and asbestos/lead paint are dentified will it be removed through a change order?
It is not known for certain whether any hazardous materials are present.
On sheet A-002, replace both notes under the Hazardous Materials General Notes with the following two notes:
1. Building materials discovered during the renovation or demolition activities not identified in the Hazardous Materials Report, which are suspected to be hazardous, shall be sampled by an accredited inspector and analyzed by an accredited laboratory to confirm the presence of hazardous material content prior to disturbing such materials.
2. If the samples are found to contain hazardous material content they shall be abated per
Federal, State, and local requirements.
3.PBS Region 4 FL AMD NOTE: ACM abatement, if any, will be negotiated via change order modification.
9 Drawing A-002 Hazardous Material General Note 1 indicates: Asbestos roof flashing to be abated? Is this a requirement. If so, please identify location & quanity [SIC]. Shall GC price in proposal?
See previous response.
10 Mechanical Please provide who currently is responsible for the HVAC controls in the building? Contact GSA Amanda Henderson for the controls and Mahmoud Barzegar for HVAC.
11 Mechanical Are the new VAVs tying into the existing BAS system? Yes.
12 Mechanical
Will the returns or supplies grills be reused? If replacing, is there a set design or manufacturer required? Provide new supply and return air devices. Refer to the Air Distribution Schedule on Sheet M-
001 for requirements.
Request For Information
HUD Office Renovation Solicitation # 47PE0721R0020 Amendment 0001
Brickell Plaza Fed Bldg, Miami FL
100% Design Narrative
(11 Sept 20)
Pg 16, New Work, 2.5.3.1: Is the use of J-Hooks acceptable? Is GC responsible to just provide conduits, backboxes, pull-strings? Is GC responsible to also provide all Cat 5e Cabling?
Cabling shall be installed in conduit and cable tray only. GC is responsible for all cabling, conduits and terminations in this section.
100% Design Narrative
(11 Sept 20)
Calls for the 4th Floor acoustical tile to match existing tile on the 5th Floor. GC wasn't able to see 5th
Floor during the site visit. Please provide the size & manufacturer of the acoustical tile installed on the
5th Floor.
GC will need to obtain this iformation from GSA and or HUD.
15 Drawings AD-101
Wall type S3N call for expanded metal. Is this standard 3.4 diamond expanded metal lath? Requirements are indicated under General Notes #18 on sheet A-003.
16 General During the site visit GC noticed that the existing space currently has office furniture in it. Is the GC responsible for moving/storing furniture during construction? If so, shall the GC provide pricing in the proposal? If so, is there storage space in the building?
The agency is responsible for furniture moving/storage.
17 General Is onsite parking available? Is so, is it free or paid? If paid, how much per day? See responses below.
18 General Please provide contact information of current Fire Vendor servicing the existing Fire Alarm System See responses below.
19 E-001 Per legend, Sheet E-001, security devices require a 1" conduit with pullstring. Is the 1" conduit a stub-up above ceiling or does the conduit have to extend to and terminate on the cable tray, inside LAN 412 or any other location?
The 1" conduit is to be continuously run from the device to cable tray.
20 E-101 Are there any specifications on the floor box located in Conference Room 411? Floor box is dual-compartement type with one quadruplex receptacle and one 2-port data/comm outlet. Specification 270528 Section 2.4 para E indicates floor box parameters.
21 For the wood doors the spec says particle core but the design narrative says wood stave core. Which should I follow?
Particle Core.
Can you provide who the controls company is for the building? The BAS controller software is an older version of "Niagara" and only controls the air conditioners on the floors. We have no modulating dampers or "VAV" boxes anywhere in the renovation area.
23 Are you going to require duct cleaning of the existing system that we will tying into? No.
24 Who is the fire alarm vendor for this building? BPFB fire alarm system is being replaced at this time by:
Empire Fire Safety
Jose L. Martinez
786-402-9597
Modifications to the system in the next month should be done by the installation contractor, after they complete the project and it is turned over to IEI another service company may manage it, and modifications will need to be coordinated with the maintenance team at the building.
Who is the responsible party for fire alarm, low voltage, and security? The contractor is responsible for contacting Empire Fire Safty for fire alarm work. Low voltage and security cabling by others.
26 Does all conduit for special low voltage systems need to be continuous or are stub ups to accessible ceilings permitted?
All fire alarm wiring must be in conduit. Other low voltage system raceways to be continuous conduit.
27 All of the VAV’s are rated 277V single phase. Are toggle switches permitted for disconnecting means? No, provide disconnect switch per Sheet E-102.
Who disposes of the discarded fixtures? Will they be turned over to the owner/property management group?
Contractor to dispose of all fixtures and demo items, unless otherwise requested by owner.
29 Confirm if this is a Buy American project. Confirmed.
30 Are the power poles supplied by the furniture manufacturer/vendor? No. Contractor shall provide.
31 Will parking be provided for the technicians? No parking is available on-site by government. GC responsible to secure parking.
32 Are there any security background checks to perform and if fees are associated with them, what licenses/permits are required?
Yes, see solicitation SOW for security requirements. GSA does not charge fees for conducting background checks.
33 What area will be set aside for dumpsters/port-o-lets or will workers be allowed to use on premise facilities?
Dumpster/Port-O-Let location to be coordinated with GSA Building Management. Workers may be allowed to use on-premises facilities upon GSA Building Management approval
34 Please clarify which HVAC DDC Controls System is currently in place at the Brickell Plaza Building. (i.e.
Siemens? Johnson Controls?)
The BAS controller software is an older version of "Niagara" and only controls the air conditioners on the floors. We have no modulating dampers or "VAV" boxes anywhere in the renovation area.
35 Door and hardware questions
a. Notes for electrified lockset are battery operated locks NOT hard wired with electric hinge. Would you prefer hard wired or battery operated locks?
See attached cipher lock cut sheet. BOD or equal
b. Interior doors listed to have a card reader. There isn’t a lock scheduled nor electrical hardware listed to
“release” the door. Should the card reader be part of a lockset like the others?
Exterior door to have the PIV card. Yes
c. All locksets to be interchangeable cores. Could you find out the existing key system to tie into? Whole new system to install
Trilogy® T2: DL2700 #1 most popular standalone pushbutton cylindrical lock Durable electronic digital locks available in indoor and outdoor models
Ideal for schools, healthcare, pharmacies, offices, retail and airports.
• Grade 1 Durability. Dependable lockset with rugged clutch mechanism, plus vandal-proof all metal keypad.
• Multi-level user codes: Master, 10 managers, 90 users, 3 service codes
• Up to 100 different user codes (3-5 digits)
• 100% keypad programmable with a fingertip
• Individual, group or total user lockout codes
• Easy passage mode by manager and/or master
• Easy to install in about an hour, retrofits cylindrical knobsets and digital locks using slightly modified ANSI 161 Series Prep
• Standalone battery operated; 5 AA batteries rated at 200,000 cycles
• Non-handed for easy installation and versatility
• 2-wire remote override
• Visual and audible entry indicators
• WP Models for weatherproof performance, water-sealed for use inside and out, with operational temperature range of +151°F to -31°F (+66°C to -35°C)
(Note: all Trilogy models are available in WP weatherproof and non-WP standard models for interior doors.)
1 7/8 in.1 11/16 in.3 1/4 in.3 1/4 in.
2 1/8 in.
8 in.
8 1/4 in.
1 3/4 in.
2 9/16 in.4 3/4 in.
2 1/4 in.
OUTSIDEINSIDEOUTSIDE INSIDE
Lever set in US3
DL2700/3
With IC Core in 26D
DL2700IC/26D
Secure battery compartment on inside door
DL2775/26D
OPERATION: Clutch mechanism permits turning lever without retracting latch and reduces stress on lock bodies and spindle.
Outside lever free turning in locked position. Entering access code, key bypass, or remote bypass will allow lever to retract latch. Inside lever always instant egress.
DOOR THICKNESS: 1 5/8" to 1 7/8." Other thicknesses. Please consult Alarm Lock.
BACKSET: 2 3/4" Standard. 2 3/8" backset also available.
KEYPAD: All metal, 12 button programmable for multi-level access functions including group or individual user codes, master and management codes, passage and emergency or service code, lockout and remote override capability and allowable entry time from 5 to 20 seconds. 4 Different keypad tones and keypad may be silenced.
STANDARD KEY OVERRIDE CYLINDERS: Solid brass 6 pin tumbler cylinder pinned 5, SC1 keyway, furnished in all locks.
Additional tailpieces included: HW580 fits Schlage, Corbin/ Russwin CL, Sargent 480 Series, ASSA65-611. Model HW620 fits Ilco and Lori cylinders.
INTERCHANGEABLE CORE MODELS: Accepts 6 & 7 Pin Cylinders from: Best, Arrow, KSP, Medeco Keymark & Kaba Peaks.
Also available IC Core models for Yale, Medeco, Sargent, Corbin/ Russwin CL and Schlage. Alarm Lock Tailpiece is supplied; IC Core is not included.
LATCHBOLT: UL Listed, fire rated, 3 hours, 1/2” throw, solid brass, deadlocking. Reversible. Adjustable front for flat or beveled doors.
STRIKE: 1 1/8” x 2 3/4” T strike & 1 1/4” x 4 7/8” ASA strike included. With screws for wood or metal jambs.
LATCH FRONT: 1 1/8” x 2 1/4” wrought brass or stainless steel.
HANDING: Non-handed.
FINISHES: US3 polished brass, US26D satin chrome, 10B Duronodic.
POWER: 5 AA alkaline batteries are now rated at 200,000 cycles, supplied. Audible low battery alert, visual and audible entry indicators, unique Flex Drive® motor.
DOOR PREP: Standard ANSI 161 Series Prep, modified by adding additional through-bolt holes.
COMPLIANCES: Grade I, heavy duty cylindrical lockset, UL listed and FCC certified. ADA compliant leversets.
Alarm Lock Systems, LLC (A Divsion of NAPCO Security Technologies, Inc.)
333 Bayview Ave, Amityville, New York 11701 1-800-ALA-LOCK • ++ 631.842.9400 • Fax 631-789-3383 www.alarmlock.com • salesinfo@alarmlock.com
Trilogy, Networx and LocDown are trademarks of NAPCO Security Technologies. Other trademarks listed are those of their respective companies.
Preliminary specifications subject to change without prior notice. © 2016.3 ALA129
Trilogy is available in many additional models, including those for outdoors, and/or Mortise, plus with Prox ID card reader, dual-sided keypads, wireless lock networks and more.
Some other Trilogy Options:
DL2700LD: With LocDown™ Indicator Light Bar & Keyfob DL2800: Economical Audit Trail Security Lock provides keyless entry for up to 200 users DL1200/1300: Models for Narrow Stile Glass Doors DL/PDL5300: Dual-Sided PIN/Prox Lock with audit/trail DL3000, DL3200: Advanced digital electronic door lock with audit trail
See Trilogy Networx™ Locks for wireless network capabilities
Finish:
/3 = US3 Polished Brass /26D = US26D Satin Chrome /10B = Duronodic
Special Order IC Prep:
-Y = Yale -M = Medeco -R = Sargent -C = Corbin/Russwin -S = Schlage
DL 27 00 WP IC /26D -Y
Model & Series:
DL27 = Trilogy T2 Series Trim:
00 = Lever 75 = Regal Trim Lever
Exterior / Interior Use:
WP = Weatherproof for exterior use (Note: No “WP” indicates standard, interior use.)
Cylinder:
IC = Standard Interchangeable Core Prep for Best, Falcon, Arrow, KSP (Note: No “IC” indicates standard K.O. cylinder.)