SF_30_Solicitation_Amendment_47PE0719R0016_0003_2019_06_25.pdf
PDF 619 KB Posted
- Solicitation number
- 47PE0719R0016
About this file
Amendment 0003 Response to questions. Addition of fall protection. Extension of offer due date.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
4PQF
Lori Fischer, BRANCH CHIEF FLORIDA
4PQF
Florida Branch AMD 77 Forsyth Street SW Atlanta, GA 30303-3490
Florida Branch AMD 77 Forsyth Street SW Atlanta, GA 30303-3490
EQ4PPB-18-0007
47PE0719R0016
VFL00028-VFL00029-VFL00031-VFL00032
1 4
6/255/2019
5/16/2019
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose off this amendment is to incorporate responses to questions generated from the pre-propsal site visit conducted on 6/19/19.
1. See attached responses, 2 pgs, which are hereby incorporated by reference into subject solicitation. Responses are intended to clarify project requirements. Responses that have the effect offrevising current project documents with additional requirements are incorporated via the attached SOW addendum,,1 pg.
2. The offer due date in block 13 off theFSF 1442 is hereby extended from 7/3/19 to 7/9/19. The time remains unchanged.
Solicitation # 47PE0719R0016, Amendment 0003, Pre-proposal 2nd Site Visit 6/19/19
Questions/Comments/Recommendations GSA Response
Contractor A
Can the revised RFP due date of Wed 7/3/19 be extended to at least Fri 7/12/19 to allow more time to review/incorporate the RFI responses into our RFP submission?
These responses will impact both the technical and cost components of our proposal.
The offer due date will be extended to 7/9/19.
Window Survey – It was mentioned that the window survey is to be completed once the NTP was given. Is the window survey to be completed 1st solo by itself?
Rigging the building, surveying each individual window and documenting them will be time consuming. It would make much more sense to do the window survey simultaneously with the window cleaning and pressure washing of the building (Bid Item 0002 Buiilding Cleaning - Option) vs doing just the survey then coming back and re-rigging the building to clean the windows and pressure wash. Additionally, is the water testing to be completed individually where re-rigging will be necessary or can the water testing be coordinated with other swingstage setups to avoid additional cost?
CLIN 0002 Building Cleaning - Option, if exercised, will occur at time of award. The contractor is advised to consult with GSA during project schedule development and may schedule project elements at their discretion to obtain efficiencies. The window survey must be completed at least two months prior to the scheduled project completion date to allow GSA time to evaluate whether any deficiencies can be addressed by a contract modification.
Section 079200 – Sealants and Caulking – “Application of sealants at control and expansion joints on exterior vertical and horizontal intersections to provide a water and air tight barrier, as stated below and as noted on drawings”. We interpret this as to replace existing vertical/horizontal control and expansion joints although it is not exactly indicated on the drawings. Please confirm if these are to be removed and replaced or left alone.
Paragraph 1.01A is revised and clarified as follows: "Application of joint sealants at designated locations on the exterior building envelope to provide watertight and airtight barriers." Paragraph 1.01E is revised and clarified as follows: "Contractor to remove and replace and/or install new building sealants where required to effect watertight seals at roof cover replacements and improvements, new EIFS, stucco repairs, new waterproof coatings, all exterior doors and frames, all openings and penetrations at the penthouse and chiller room, tops of pre-cast concrete pilasters, and all other areas where indicated on drawings."
Section 079200 – Sealants and Caulking – Removing and replacing the window perimeter joints are not indicated on the drawings, but a certain sealant type is indicated in the scope of work for the window perimeters. Please confirm if these are to be removed/replaced or left alone. (Section 3.05 below)
The table includes items which might later be added to the project as a contract modification, if and when window repairs are added to the project requirements.
During the 2nd site visit, several comments were made by GSA to provide joint treatments as noted on the Contract Documents. Below is an excerpt from spec section 079200, paragraph 1.04, item B that would indicate otherwise. Please provide clear direction on the treatment of all joints.
Paragraph 1.04B is revised and clarified as follows: "The applicator shall ensure that all sealant work performed under this project is watertight and free from water intrusion."
Per site visit information, there are eight (8) existing AC units that are currently sitting on wood sleepers. Per code, these would need to be reinstalled onto new code approved stands but there is no mention of this work in the bid documents.
Can you please advise if these units are to be installed on new code approved stands for this project?
AC units shall be installed on equipment curbs that meet or exceed NRCA recommendations. Wood sleepers are not acceptable.
Contractor B
Solicitation # 47PE0719R0016, Amendment 0003, Pre-proposal 2nd Site Visit 6/19/19
Specifications 264100 1.3C and 3.1I indicates to have the system inspected by UL and re-certified. Using the calculations for zones of protection as described in the UL96A, NFPA 780, and the LPI-175 code standards, the lower north roof as well as the lower northeast roofs are located outside the zone of protection and currently have no lightning protection installed on them. We can have UL inspect the upper roofs and provide the UL Letter of Findings indicating these areas were installed to comply with the UL96A or the NFPA 780 but to get the entire system certified with a UL Master Label Certificate, these lower roofs will need to have lightning protection installed on them which will require down leads, interconnections from upper roofs, ground rods, and air terminals. Shall we allow for the limited scope (upper roofs) Letter of Findings or add in cost for the additional work required in order to provide the Master Label Certificate?
The required certification does not include providing a UL Master Label certificate.
The contractor is only to certify that reinstallation of existing components has been completed in a manner that meets UL and NFPA requirements. The "UL Master Label Re-certification" requirement at Section 011000, paragraph 1.1B is hereby deleted.
Detail 3 on Drawing A305 indicates to use a 2" wide assembly bracket for the air terminal bases. Please note the base is 2.5" wide while the clips are 5/8" wide so the bracket for the bases may need to be wider. Reading Specifications 264113 2.1B, this indicates the lightning protection installer will provide this bracket? This would require a bracket at all bases as well as cable clips / holders at 36" maximum intervals. What is the bracket made of? In order to keep the system copper, this bracket would need to be made of steel, copper, or stainless steel. If aluminum or galvanized steel is used, then then the lightning protection materials would need to be changed to aluminum to prevent electrolysis. If aluminum lightning protection materials are to be used in this coping area, could the materials be adhered to the top of the coping or screwed to the side of the coping with stainless steel screws to eliminate this bracket?
Lightning protection materials and components shall be in accordance with UL and NFPA requirements. These requirements shall govern where conflicts with the project specifications are discovered. Methods for attachment to roofs shall comply with NRCA and the selected roofing manufacturer's requirements and recommendations.
Solicitation # 47PE0719R0016, Amendment 0003 SOW Addendum to Building Enclosure Repairs & Improvements
ADDITIONS TO OWNER PROJECT REQUIREMENT FOR
BUILDING ENCLOSURE AND REPAIRS AND IMPROVEMENTS
U.S. COURTHOUSE, FORT MYERS, FLORIDA
(25 June 2019)
Fall Protection Install permanent metallic guardrails to prevent falls from the upper roof to the mid-level roof on the west side of the building. The guardrails shall comply with OSHA requirements under 29 CFR 1926.502(b). The guardrail system shall meet all load resistance requirements, including wind loads, without penetrating the roof membrane. The system should be ballasted, wall-mounted, or a combination of the two. Approximately150 linear feet of guardrails are required.
END OF ADDITIONAL REQUIREMENTS
| ADPCA2A.tmp |
| Sheet1 |
| Sol Amend 0002, SOW Addendum, 2019 06 13.pdf |
| CERTIFICATION OF TIE-OFF ANCHORS ON ROOFS |
| Solicitation Amend 0003 FT Myers Roof RFI Responses 2019 06 25.pdf |
| Sheet1 |
| Sol Amend 0003, SOW Addendum, 2019 06 25.pdf |
| ADDITIONS TO OWNER PROJECT REQUIREMENT FOR |