This document is an amendment to a solicitation for the replacement of the fire alarm system in the Peachtree Summit Federal Building in Atlanta, Georgia. The General Services Administration Public Buildings Service Region 4 is seeking proposals for a design-build project to remove the existing fire alarm system and install a new fully addressable non-proprietary and open source fire protection system. The project value is estimated between $1 million to $5 million. Responses are due to Joseph Ardoin III, contracting officer, by the date specified. The successful bidder will be required to provide bid and performance bonds of 20% of the proposal cost and $5 million, respectively. The solicitation is set aside for small businesses only.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGESAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
5/6/2022
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
EQ4PPG-21-0029 VGA00077
4P1QE 7. ADMINISTERED BY (If other than Item 6) CODE 4P1QE
Capital/AE Branch Capital/Architecture Engineering (AE) Branch 77 Forsyth Street SW Atlanta, GA 30303-3490
6. ISSUED BY CODE
Capital/AE Branch Capital/Architecture Engineering (AE) Branch 77 Forsyth Street SW Atlanta, GA 30303-3490
(X)8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
47PE0321R0006
9B. DATED (SEE ITEM 11)
3/2/2022
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
|x| The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers | | is extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
|X | is not extended.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor Q is not | | is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment to the solicitation to change the NAICS Code to 236220 Commercial and Institutional Building Construction;
NAICS code 238210 -- Electrical Contractors and Other Wiring Installation Contractors will be associated with tasks for the major replacement of the Fire Alarm System.
Amendment also uploads an modification to the wage determination GA20220134 02/25/ 2022.
All other documents remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Joseph Ardoin, Contracting Officer 15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)(Signature of person authorized to sign)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
JosephArdoin Typewriter May 06, 2022
INSTRUCTIONS (Back Page)'.
Instructions for items other than those that are self-explanatory, are as follows:
(a) Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
(2) Accounting classification Net decrease $
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
(g) Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
(b) Item 3 (Effective date).
(1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
(2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
(3) For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
(4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
(5) For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(h) Item 14 (Description of Amendment/Modification).
(1) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
(2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
(3) State reason for modification.
(4) When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(5) When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(c) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
(d) Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
(e) Items 9. (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(f) Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(6) Include subject matter or short title of solicitation/contract where feasible.
(i) Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
File details come from the government source that posted it. Updated .