Price Proposal Worksheet

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Uniformat Summary

Building Name:0
Project Name:0
Date of Estimate:12/31/99
Anticipated Construction Start:12/31/99
UNIFORMAT ESTIMATE FORMAT
BUILDING SQUARE FOOTAGE0
CONCEPTUAL BUDGET SUMMARYCOST /% OF
BUDGET¹S. F.TOTAL²
ASUBSTRUCTURESUBTOTAL SUBSTRUCTURE000%
BSHELLSUBTOTAL SHELL000%
CINTERIORSSUBTOTAL INTERIORS000%
DSERVICES
D1Conveying System000%
D2Plumbing000%
D3Heating, Ventilation And Air Conditioning000%
D4Fire Protection000%
D5Electrical000%
DSERVICESSUBTOTAL SERVICES000%
EEQUIPMENT & FURNISHINGSSUBTOTAL EQUIPMENT & FURNISHINGS000%
FSPECIAL CONSTRUCTION & DEMOLITIONSUBTOTAL SPECIAL CONST. & DEMO000%
GBUILDING SITE WORKSUBTOTAL BUILDING SITE WORK000%
TOTAL PRELIMINARY BUDGET000%
YMISC.
DESIGN CONTINGENCY00
ESCALATION00
TOTAL ESTIMATED TRADE COSTS000%
CM / GC GENERAL CONDITIONS00
PRECONSTRUCTION SERVICES00
CM / GC PERSONNEL00
CM FEE / GC PROFIT00
SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION000%
PROJECT SUBTOTAL00
CM CONTINGENCY00
SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION000%
PROJECT SUBTOTAL00
CHILLED WATER CONNECTION FEE ALLOWANCE0
SIDEWALK CLOSURE ALLOWANCE FOR AA00
SUBTOTAL ALLOWANCES000%
PROJECT SUBTOTAL00
ZALTERNATES
ALTERNATE #1
DESCRIPTION #100
DESCRIPTION #200
CONTINGENCY00
SUBTOTAL ALTERNATE #1000%
PROJECT SUBTOTAL00
ALTERNATE #2
DESCRIPTION #100
DESCRIPTION #200
CONTINGENCY00
SUBTOTAL ALTERNATE #2000%
PROJECT SUBTOTAL00
PROJECT TOTAL000%
This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted.
¹ Budget = Cost/SF x Building Square Footage
² % of Total = Budget/Total Preliminary Budget

&L&8&Z&F

Uniformat

Building Name:
Project Name:
Building Square Footage:
Date of Estimate:
Anticipated Construction Start:
Anticipated Construction Finish:
UNIFORMAT ESTIMATE
COST /% OF
LEVEL 1 INFORMATIONLEVEL 2 INFORMATIONLEVEL 3 INFORMATIONBUDGET¹S. F.TOTAL²
ASUBSTRUCTUREA10 - FOUNDATIONSA1010 - STANDARD FOUNDATIONS00%
A1020 - SPECIAL FOUNDATIONS00%
A1030 - SLAB ON GRADE00%
A20 - BASEMENT CONSTRUCTIONA2010 - BASEMENT EXCAVATION00%
A2020 - BASEMENT WALLS00%
SUBTOTAL SUBSTRUCTURE000%
BSHELLB10 - SUPERSTRUCTUREB1010 - FLOOR CONSTRUCTION00%
B1020 - ROOF CONSTRUCTION00%
B20 - EXTERIOR CLOSUREB2010 - EXTERIOR WALLS00%
B2020 - EXTERIOR WINDOWS00%
& EXTERIOR DOORS00%
B30 - ROOFINGB3010 - ROOF COVERING & OPENINGS00%
0%
SUBTOTAL SHELL000%
CINTERIORSC10 - INTERIOR CONSTRUCTIONC1010 - PARTITIONS00%
C1020 - INTERIOR DOORS00%
C1030 - FITTINGS / SPECIALTIES00%
C20 - STAIRCASESC2010 - STAIR CONSTRUCTION00%
C2020 - STAIR FINISHES00%
C30 - INTERIOR FINISHESC3010 - WALL FINISHES00%
C3020 - FLOOR FINISHES00%
C3030 - CEILING FINISHES00%
SUBTOTAL INTERIORS000%
DSERVICESD10 - CONVEYING SYSTEMSD1010 - ELEVATORS & LIFTS00%
D1020 - ESCALATORS & MOVING WALKS00%
D1030 - OTHER CONVEYING SYSTEMS00%
D20 - PLUMBINGD2010 - PLUMBING FIXTURES00%
D2020 - DOMESTIC WATER DISTRIBUTION00%
D2030 - SANITARY WASTE00%
D2040 - RAIN WATER DRAINAGE00%
D2090 - SPECIAL PLUMBING SYSTEMS00%
D30 - HVACD3010 - ENERGY SUPPLY00%
D3020 - HEAT GENERATING SYSTEMS00%
D3030 - REFRIGERATION00%
D3040 - HVAC DISTRIBUTION SYSTEMS00%
D3050 - TERMINAL & PACKAGE UNITS00%
D3060 - HVAC CONTROLS & INSTRUMENTATION00%
D3070 - TESTING, ADJUSTING & BALANCING00%
D3090 - OTHER SPECIAL HVAC SYS. & EQUIPT.00%
D40 - FIRE PROTECTIOND4010 - FIRE PROTECTION SPRINKLER SYSTEM00%
D4020 - STAND-PIPE & HOSE SYSTEMS00%
D4030 - FIRE PROTECTION SPECIALTIES00%
D4090 - OTHER FIRE PROTECTION SYSTEMS00%
D50 - ELECTRICALD5010 - ELECTRICAL SERVICE & DISTRIBUTION00%
D5020 - LIGHTING & BRANCH WIRING00%
D5030 - COMMUNICATION & SECURITY SYSTEMS00%
D5090 - OTHER ELECTRICAL SYSTEMS00%
SUBTOTAL SERVICES000%
EEQUIPMENT & FURNISHINGSE10 - EQUIPMENTE1010 - COMMERCIAL EQUIPMENT00%
E1020 - INSTITUTIONAL EQUIPMENT00%
E1030 - VEHICULAR EQUIPMENT00%
E1090 - OTHER EQUIPMENT00%
E20 - FURNISHINGSE2010 - FIXED FURNISHINGS00%
E2020 - MOVABLE FURNISHINGS00%
SUBTOTAL EQUIPMENT & FURNISHINGS000%
FSPECIAL CONSTRUCTIONF10 - SPECIAL CONSTRUCTIONF1010 - SPECIAL STRUCTURES00%
& DEMOLITIONF1020 - INTEGRATED CONSTRUCTION00%
F1030 - SPECIAL CONSTRUCTION SYSTEMS00%
F1040 - SPECIAL FACILITIES00%
F1050 - SPECIAL CONTROLS & INSTRUMENTATION00%
F20 - SELECTIVE BUILDINGF2010 - BUILDING ELEMENTS DEMOLITION00%
DEMOLITIONF2020 - HAZARDOUS COMPONENTS ABATEMENT00%
SUBTOTAL SPECIAL CONST. & DEMO000%
GBUILDING SITE WORKG10 - SITE PREPARATIONG1010 - SITE CLEARING00%
G1020 - SITE DEMOLITION & RELOCATIONS00%
G1030 - SITE EARTHWORK00%
G1040 - HAZARDOUS WASTE REMEDIATION00%
G20 - SITE IMPROVEMENTSG2010 - ROADWAYS00%
G2020 - PARKING LOTS00%
G3030 - PEDESTRIAN PAVING00%
G2040 - SITE DEVELOPMENT00%
G2050 - LANDSCAPING00%
G30 - SITE CIVIL / MECHANICAL UTILITIESG3010 - WATER SUPPLY & DISTRIBUTION SYSTEMS00%
G3020 - SANITARY SEWER SYSTEMS00%
G3030 - STORM SEWER SYSTEMS00%
G3040 - HEATING DISTRIBUTION00%
G3050 - COOLING DISTRIBUTION00%
G3060 - FUEL DISTRIBUTION00%
G3090 - OTHER CIVIL / MECHANICAL UTILITIES00%
G40 - ELECTRICAL UTILITIESG4010 - ELECTRICAL DISTRIBUTION00%
G4020 - EXTERIOR LIGHTING00%
G4030 - EXTERIOR COMMUNICATION & SECURITY00%
G4090 - OTHER SITE ELECTRICAL UTILITIES00%
G90 - OTHER SITE CONSTRUCTIONG9010 - SERVICE TUNNELS00%
G9090 - OTHER SITE SYSTEMS & EQUIPMENT00%
SUBTOTAL BUILDING SITE WORK000%
0%
TOTAL PRELIMINARY BUDGET000%
YMISC.
DESIGN CONTINGENCY0
ESCALATION0
TOTAL ESTIMATED TRADE COSTS00
CM/GC GENERAL CONDITIONS0
PRECONSTRUCTION SERVICES0
CM/GC PERSONNEL0
CM FEE/GC PROFIT0
SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION00
PROJECT SUBTOTAL00
CM CONTINGENCY0
SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION00
PROJECT SUBTOTAL00
CHILLED WATER CONNECTION FEE ALLOWANCE
SIDEWALK CLOSURE ALLOWANCE FOR AA0
SUBTOTAL ALLOWANCES00
PROJECT SUBTOTAL00
ZALTERNATESALTERNATE #1
DESCRIPTION #10
DESCRIPTION #20
CONTINGENCY0
SUBTOTAL ALTERNATE #100
PROJECT SUBTOTAL00
ALTERNATE #2
DESCRIPTION #10
DESCRIPTION #20
CONTINGENCY0
SUBTOTAL ALTERNATE #200
PROJECT SUBTOTAL00
PROJECT TOTAL000%
This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted.
¹ Budget = Cost/SF x Building Square Footage
² % of Total = Budget/Total Preliminary Budget

&L&8&Z&F&R&8form date: September 2005