Uniformat Summary
| Building Name: | 0 | ||||
| Project Name: | 0 | ||||
| Date of Estimate: | 12/31/99 | ||||
| Anticipated Construction Start: | 12/31/99 | ||||
| UNIFORMAT ESTIMATE FORMAT | |||||
| BUILDING SQUARE FOOTAGE | 0 | ||||
| CONCEPTUAL BUDGET SUMMARY | COST / | % OF | |||
| BUDGET¹ | S. F. | TOTAL² | |||
| A | SUBSTRUCTURE | SUBTOTAL SUBSTRUCTURE | 0 | 0 | 0% |
| B | SHELL | SUBTOTAL SHELL | 0 | 0 | 0% |
| C | INTERIORS | SUBTOTAL INTERIORS | 0 | 0 | 0% |
| D | SERVICES | ||||
| D1 | Conveying System | 0 | 0 | 0% | |
| D2 | Plumbing | 0 | 0 | 0% | |
| D3 | Heating, Ventilation And Air Conditioning | 0 | 0 | 0% | |
| D4 | Fire Protection | 0 | 0 | 0% | |
| D5 | Electrical | 0 | 0 | 0% | |
| D | SERVICES | SUBTOTAL SERVICES | 0 | 0 | 0% |
| E | EQUIPMENT & FURNISHINGS | SUBTOTAL EQUIPMENT & FURNISHINGS | 0 | 0 | 0% |
| F | SPECIAL CONSTRUCTION & DEMOLITION | SUBTOTAL SPECIAL CONST. & DEMO | 0 | 0 | 0% |
| G | BUILDING SITE WORK | SUBTOTAL BUILDING SITE WORK | 0 | 0 | 0% |
| TOTAL PRELIMINARY BUDGET | 0 | 0 | 0% | ||
| Y | MISC. | ||||
| DESIGN CONTINGENCY | 0 | 0 | |||
| ESCALATION | 0 | 0 | |||
| TOTAL ESTIMATED TRADE COSTS | 0 | 0 | 0% | ||
| CM / GC GENERAL CONDITIONS | 0 | 0 | |||
| PRECONSTRUCTION SERVICES | 0 | 0 | |||
| CM / GC PERSONNEL | 0 | 0 | |||
| CM FEE / GC PROFIT | 0 | 0 | |||
| SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION | 0 | 0 | 0% | ||
| PROJECT SUBTOTAL | 0 | 0 | |||
| CM CONTINGENCY | 0 | 0 | |||
| SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION | 0 | 0 | 0% | ||
| PROJECT SUBTOTAL | 0 | 0 | |||
| CHILLED WATER CONNECTION FEE ALLOWANCE | 0 | ||||
| SIDEWALK CLOSURE ALLOWANCE FOR AA | 0 | 0 | |||
| SUBTOTAL ALLOWANCES | 0 | 0 | 0% | ||
| PROJECT SUBTOTAL | 0 | 0 | |||
| Z | ALTERNATES | ||||
| ALTERNATE #1 | |||||
| DESCRIPTION #1 | 0 | 0 | |||
| DESCRIPTION #2 | 0 | 0 | |||
| CONTINGENCY | 0 | 0 | |||
| SUBTOTAL ALTERNATE #1 | 0 | 0 | 0% | ||
| PROJECT SUBTOTAL | 0 | 0 | |||
| ALTERNATE #2 | |||||
| DESCRIPTION #1 | 0 | 0 | |||
| DESCRIPTION #2 | 0 | 0 | |||
| CONTINGENCY | 0 | 0 | |||
| SUBTOTAL ALTERNATE #2 | 0 | 0 | 0% | ||
| PROJECT SUBTOTAL | 0 | 0 | |||
| PROJECT TOTAL | 0 | 0 | 0% | ||
| This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted. | |||||
| ¹ Budget = Cost/SF x Building Square Footage | |||||
| ² % of Total = Budget/Total Preliminary Budget |
&L&8&Z&F
Uniformat
| Building Name: | ||||||
| Project Name: | ||||||
| Building Square Footage: | ||||||
| Date of Estimate: | ||||||
| Anticipated Construction Start: | ||||||
| Anticipated Construction Finish: | ||||||
| UNIFORMAT ESTIMATE | ||||||
| COST / | % OF | |||||
| LEVEL 1 INFORMATION | LEVEL 2 INFORMATION | LEVEL 3 INFORMATION | BUDGET¹ | S. F. | TOTAL² | |
| A | SUBSTRUCTURE | A10 - FOUNDATIONS | A1010 - STANDARD FOUNDATIONS | 0 | 0% | |
| A1020 - SPECIAL FOUNDATIONS | 0 | 0% | ||||
| A1030 - SLAB ON GRADE | 0 | 0% | ||||
| A20 - BASEMENT CONSTRUCTION | A2010 - BASEMENT EXCAVATION | 0 | 0% | |||
| A2020 - BASEMENT WALLS | 0 | 0% | ||||
| SUBTOTAL SUBSTRUCTURE | 0 | 0 | 0% | |||
| B | SHELL | B10 - SUPERSTRUCTURE | B1010 - FLOOR CONSTRUCTION | 0 | 0% | |
| B1020 - ROOF CONSTRUCTION | 0 | 0% | ||||
| B20 - EXTERIOR CLOSURE | B2010 - EXTERIOR WALLS | 0 | 0% | |||
| B2020 - EXTERIOR WINDOWS | 0 | 0% | ||||
| & EXTERIOR DOORS | 0 | 0% | ||||
| B30 - ROOFING | B3010 - ROOF COVERING & OPENINGS | 0 | 0% | |||
| 0% | ||||||
| SUBTOTAL SHELL | 0 | 0 | 0% | |||
| C | INTERIORS | C10 - INTERIOR CONSTRUCTION | C1010 - PARTITIONS | 0 | 0% | |
| C1020 - INTERIOR DOORS | 0 | 0% | ||||
| C1030 - FITTINGS / SPECIALTIES | 0 | 0% | ||||
| C20 - STAIRCASES | C2010 - STAIR CONSTRUCTION | 0 | 0% | |||
| C2020 - STAIR FINISHES | 0 | 0% | ||||
| C30 - INTERIOR FINISHES | C3010 - WALL FINISHES | 0 | 0% | |||
| C3020 - FLOOR FINISHES | 0 | 0% | ||||
| C3030 - CEILING FINISHES | 0 | 0% | ||||
| SUBTOTAL INTERIORS | 0 | 0 | 0% | |||
| D | SERVICES | D10 - CONVEYING SYSTEMS | D1010 - ELEVATORS & LIFTS | 0 | 0% | |
| D1020 - ESCALATORS & MOVING WALKS | 0 | 0% | ||||
| D1030 - OTHER CONVEYING SYSTEMS | 0 | 0% | ||||
| D20 - PLUMBING | D2010 - PLUMBING FIXTURES | 0 | 0% | |||
| D2020 - DOMESTIC WATER DISTRIBUTION | 0 | 0% | ||||
| D2030 - SANITARY WASTE | 0 | 0% | ||||
| D2040 - RAIN WATER DRAINAGE | 0 | 0% | ||||
| D2090 - SPECIAL PLUMBING SYSTEMS | 0 | 0% | ||||
| D30 - HVAC | D3010 - ENERGY SUPPLY | 0 | 0% | |||
| D3020 - HEAT GENERATING SYSTEMS | 0 | 0% | ||||
| D3030 - REFRIGERATION | 0 | 0% | ||||
| D3040 - HVAC DISTRIBUTION SYSTEMS | 0 | 0% | ||||
| D3050 - TERMINAL & PACKAGE UNITS | 0 | 0% | ||||
| D3060 - HVAC CONTROLS & INSTRUMENTATION | 0 | 0% | ||||
| D3070 - TESTING, ADJUSTING & BALANCING | 0 | 0% | ||||
| D3090 - OTHER SPECIAL HVAC SYS. & EQUIPT. | 0 | 0% | ||||
| D40 - FIRE PROTECTION | D4010 - FIRE PROTECTION SPRINKLER SYSTEM | 0 | 0% | |||
| D4020 - STAND-PIPE & HOSE SYSTEMS | 0 | 0% | ||||
| D4030 - FIRE PROTECTION SPECIALTIES | 0 | 0% | ||||
| D4090 - OTHER FIRE PROTECTION SYSTEMS | 0 | 0% | ||||
| D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE & DISTRIBUTION | 0 | 0% | |||
| D5020 - LIGHTING & BRANCH WIRING | 0 | 0% | ||||
| D5030 - COMMUNICATION & SECURITY SYSTEMS | 0 | 0% | ||||
| D5090 - OTHER ELECTRICAL SYSTEMS | 0 | 0% | ||||
| SUBTOTAL SERVICES | 0 | 0 | 0% | |||
| E | EQUIPMENT & FURNISHINGS | E10 - EQUIPMENT | E1010 - COMMERCIAL EQUIPMENT | 0 | 0% | |
| E1020 - INSTITUTIONAL EQUIPMENT | 0 | 0% | ||||
| E1030 - VEHICULAR EQUIPMENT | 0 | 0% | ||||
| E1090 - OTHER EQUIPMENT | 0 | 0% | ||||
| E20 - FURNISHINGS | E2010 - FIXED FURNISHINGS | 0 | 0% | |||
| E2020 - MOVABLE FURNISHINGS | 0 | 0% | ||||
| SUBTOTAL EQUIPMENT & FURNISHINGS | 0 | 0 | 0% | |||
| F | SPECIAL CONSTRUCTION | F10 - SPECIAL CONSTRUCTION | F1010 - SPECIAL STRUCTURES | 0 | 0% | |
| & DEMOLITION | F1020 - INTEGRATED CONSTRUCTION | 0 | 0% | |||
| F1030 - SPECIAL CONSTRUCTION SYSTEMS | 0 | 0% | ||||
| F1040 - SPECIAL FACILITIES | 0 | 0% | ||||
| F1050 - SPECIAL CONTROLS & INSTRUMENTATION | 0 | 0% | ||||
| F20 - SELECTIVE BUILDING | F2010 - BUILDING ELEMENTS DEMOLITION | 0 | 0% | |||
| DEMOLITION | F2020 - HAZARDOUS COMPONENTS ABATEMENT | 0 | 0% | |||
| SUBTOTAL SPECIAL CONST. & DEMO | 0 | 0 | 0% | |||
| G | BUILDING SITE WORK | G10 - SITE PREPARATION | G1010 - SITE CLEARING | 0 | 0% | |
| G1020 - SITE DEMOLITION & RELOCATIONS | 0 | 0% | ||||
| G1030 - SITE EARTHWORK | 0 | 0% | ||||
| G1040 - HAZARDOUS WASTE REMEDIATION | 0 | 0% | ||||
| G20 - SITE IMPROVEMENTS | G2010 - ROADWAYS | 0 | 0% | |||
| G2020 - PARKING LOTS | 0 | 0% | ||||
| G3030 - PEDESTRIAN PAVING | 0 | 0% | ||||
| G2040 - SITE DEVELOPMENT | 0 | 0% | ||||
| G2050 - LANDSCAPING | 0 | 0% | ||||
| G30 - SITE CIVIL / MECHANICAL UTILITIES | G3010 - WATER SUPPLY & DISTRIBUTION SYSTEMS | 0 | 0% | |||
| G3020 - SANITARY SEWER SYSTEMS | 0 | 0% | ||||
| G3030 - STORM SEWER SYSTEMS | 0 | 0% | ||||
| G3040 - HEATING DISTRIBUTION | 0 | 0% | ||||
| G3050 - COOLING DISTRIBUTION | 0 | 0% | ||||
| G3060 - FUEL DISTRIBUTION | 0 | 0% | ||||
| G3090 - OTHER CIVIL / MECHANICAL UTILITIES | 0 | 0% | ||||
| G40 - ELECTRICAL UTILITIES | G4010 - ELECTRICAL DISTRIBUTION | 0 | 0% | |||
| G4020 - EXTERIOR LIGHTING | 0 | 0% | ||||
| G4030 - EXTERIOR COMMUNICATION & SECURITY | 0 | 0% | ||||
| G4090 - OTHER SITE ELECTRICAL UTILITIES | 0 | 0% | ||||
| G90 - OTHER SITE CONSTRUCTION | G9010 - SERVICE TUNNELS | 0 | 0% | |||
| G9090 - OTHER SITE SYSTEMS & EQUIPMENT | 0 | 0% | ||||
| SUBTOTAL BUILDING SITE WORK | 0 | 0 | 0% | |||
| 0% | ||||||
| TOTAL PRELIMINARY BUDGET | 0 | 0 | 0% | |||
| Y | MISC. | |||||
| DESIGN CONTINGENCY | 0 | |||||
| ESCALATION | 0 | |||||
| TOTAL ESTIMATED TRADE COSTS | 0 | 0 | ||||
| CM/GC GENERAL CONDITIONS | 0 | |||||
| PRECONSTRUCTION SERVICES | 0 | |||||
| CM/GC PERSONNEL | 0 | |||||
| CM FEE/GC PROFIT | 0 | |||||
| SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION | 0 | 0 | ||||
| PROJECT SUBTOTAL | 0 | 0 | ||||
| CM CONTINGENCY | 0 | |||||
| SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION | 0 | 0 | ||||
| PROJECT SUBTOTAL | 0 | 0 | ||||
| CHILLED WATER CONNECTION FEE ALLOWANCE | ||||||
| SIDEWALK CLOSURE ALLOWANCE FOR AA | 0 | |||||
| SUBTOTAL ALLOWANCES | 0 | 0 | ||||
| PROJECT SUBTOTAL | 0 | 0 | ||||
| Z | ALTERNATES | ALTERNATE #1 | ||||
| DESCRIPTION #1 | 0 | |||||
| DESCRIPTION #2 | 0 | |||||
| CONTINGENCY | 0 | |||||
| SUBTOTAL ALTERNATE #1 | 0 | 0 | ||||
| PROJECT SUBTOTAL | 0 | 0 | ||||
| ALTERNATE #2 | ||||||
| DESCRIPTION #1 | 0 | |||||
| DESCRIPTION #2 | 0 | |||||
| CONTINGENCY | 0 | |||||
| SUBTOTAL ALTERNATE #2 | 0 | 0 | ||||
| PROJECT SUBTOTAL | 0 | 0 | ||||
| PROJECT TOTAL | 0 | 0 | 0% | |||
| This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted. | ||||||
| ¹ Budget = Cost/SF x Building Square Footage | ||||||
| ² % of Total = Budget/Total Preliminary Budget |