Solicitation Number 47PE0317R0009 Page 1 of 2 Amendment 0002, 11/28/2017
U.S. GENERAL SERVICES ADMINISTRATION
Public Buildings Service
Capital Projects Region 4 / Southeast Sunbelt Region
Clarification: This is Amendment 0003. FBO.gov may identify this as Amendment 0004, however this is amendment 0003.
Questions & Answers:
1. Mock-ups are referenced in the Design Phase Services ‘Meetings’ section III.C.7, with proposed spaces or layouts as courtrooms or curtain walls. Beyond mock-ups to demonstrate historic treatment methods, please clarify all mock-up requirements, i.e. – courtrooms or curtain walls.
A. Construction of mockups during the design phase are not currently part of this CMc scope of work. If needed, the scope would be added at a later date via contract modification.
2. Please clarify the “unit of issue” for CLIN 0005, 0006, and 0007 of the SF 1442. Should CLIN 0005 be a percentage, CLIN 0006 be per day, and CLIN 0007 be a percentage versus lump sum?
A. CLIN 0005 is a percentage rate. CLIN0006 is a Lump Sum Daily Rate, i.e. “$X per day”, CLIN0007 is a percentage rate.
3. Please provide information or clarify what the ‘Chilled Water Connection Fee Allowance’ line item is in reference to on the price proposal worksheet.
A. Delete Chilled Water Connection Fee Allowance line item from price proposal worksheet
4. Please clarify what “AA” is in reference to on the ‘Sidewalk closure allowance for AA’ line item in the price proposal worksheet.
A. Delete Sidewalk Closure allowance for AA line item from price proposal worksheet
Solicitation Number 47PE0317R0009 Page 2 of 2 Amendment 0002, 11/28/2017