RFP 47PD5326R0041.pdf

PDF 3 MB Posted

Attached to
ND0037ZZ USMS Ballistic Window Installation Bismarck 3408285
Solicitation number
47PD5326R0041
Issued by
Not on record

About this file

This is a Request for Proposal (RFP) for the installation of ballistic-resistant windows at the William Guy Federal Building in Bismarck, North Dakota. The project is identified as RFP 47PD5326R0041 (EQPMBA-26-0298) and was issued by the PBS Office of Acquisition Management on June 18, 2026, with offers due by July 17, 2026 at 10:00 AM CST. The solicitation is negotiated (RFP), not sealed bid, and is managed by Contracting Officer Chanel Bennett.

The primary objective is to replace three existing windows in the Judge's Chambers on the first floor with ballistic-resistant UL Standard 752 Level IV materials. The contractor must provide all labor, materials, equipment, and supervision necessary for the installation. The existing windows have aluminum frames, and either the entire window may be replaced or only the glazing, depending on whether the window can be specially ordered to fit the existing frame. Key requirements include: no windows may be left unattended or overnight during installation; a staging area will be determined by mutual agreement after award; an asbestos pre-alteration assessment is mandatory; and all penetrations must be sealed with fire-rated approved material per the International Building Code. The contract is firm fixed price with a performance period of 120 calendar days from notice to proceed (scheduled September 23, 2026 to January 21, 2027). Performance and payment bonds are required, with bond submission within 10 calendar days of award. Contractors must submit a cost breakdown by CSI divisions including materials, equipment, labor hours, subcontractor quotes, overhead, profit, and bond. A pre-proposal site visit is required, and the contractor must conduct badging and security clearance procedures, allowing a minimum of 30 days for completion. All work must comply with Davis-Bacon prevailing wage requirements and universal GSA scope requirements including safety programs, accessibility standards, green purchasing, construction waste diversion, and indoor air quality management. Final submissions must include red-lined drawings, CAD/BIM as-built drawings, O&M manuals with executed warranties, and maintenance/operation manuals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

47PD5326R0041

PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division West/Contracting Branch C 1800 F Street NW Washington , DC 20405 USA

RFP 47PD5326R0041 EQPMBA-26-0298 ND0037ZZ USMS Ballistic Window Installation Bismarck 3408285. The USMS has initiated a project to install ballistic-resistant windows in the Judge’s Chambers located on the first floor of the William Guy Federal Building. .

EQPMBA-26-0298

PQCC

Chanel Bennett (817) 247-6134

EQPMBA-26-0298

1 36/18/2026

7/17/2026

10:00 AM (CST)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Chanel Bennett; Contracting Officer

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

0001 __________

Contract Type: Firm Fixed Price initiated a project to install ballistic-resistant windows

PSC: Y1AA -- CONSTRUCTION OF OFFICE BUILDINGS

William Guy Federal Building, ND0037ZZ, The USMS has

Deliverable

Ballistic Window Installation

Environmental Work Included, No IGF Requirements.

William Guy Federal Building. POP= 120 Days, No

LS

Place of Performance: 220 E ROSSER AVE BISMARCK, ND 58501-3869

PoP: 09/23/2026 - 01/21/2027 in the Judges Chambers located on the first floor of the

1 | P a g e

CONSTRUCTION SCOPE OF WORK

U.S. GENERAL SERVICES ADMINISTRATION, ROCKY MOUNTAIN REGION 8

Date: 5/27/2026 Revision:

Section 1: Project Title ND0037ZZ USMS Ballistic Window Installation Bismarck 3408285

Section 2: Project Location, Building Name, & Building Number William Guy Federal Building 220 East Rosser Ave Bismarck, ND 58501 Building Number: ND0037ZZ

Section 3: Contact List

Contracting Officer (CO) Name: Chanel Bennett Email: ayrius.bennett@gsa.gov Address: 819 Taylor St.

Fort Worth, TX 76102 Phone (O): 817-247-6134

Development Project Manager Name: Jesse Johnson Email: jesse.johnson@gsa.gov Address: 220 East Rosser Ave Bismarck, ND 58501 Phone (O): 701-557-9649 Phone (C): 701-202-9036

Property Manager Name: Mark Fiechtner Email: mark.fiechtner@gsa.gov Address: 220 East Rosser Ave Bismarck, ND 58501 Phone (O): 701-581-8308

2 | P a g e

Section 4: Project Background & Project Description The USMS has initiated a project to install ballistic-resistant windows in the Judge’s Chambers located on the first floor of the William Guy Federal Building.

Section 5: Project Objectives The contractor shall provide labor, materials, equipment, and supervision necessary to perform:

1) The contractor shall replace the existing three (4) windows in the Judges Chambers with Ballistic resistant UL Standard 752, Level IV materials.

2) The existing windows are made of an aluminum frame. The entire window may be replaced or just the glazing depending on if the window can be specially ordered to fit the existing frame.

3) At no time may a window be left open unattended or overnight during the installation process.

4) A staging area will be determined by mutual agreement after contract award.

5) The following information is provided for bidding purposes only. The contractor is advised to conduct a site visit and field-verify the exact information required for use in completing the work and submitting an offer.

6) No asbestos or lead containing materials shall be used.

7) All work shall comply with the latest version of the Publication 64 Regulations.

8) The Contractor is responsible for locating all utilities in project area, both public and private. GSA will make any existing drawing available for reference purposes only, actual locate is still contractor’s responsibility.

9) The contractor is responsible for the protection of all existing building property surfaces from damage due to work performed under this contract. Damages to existing surfaces caused by the performance of this contract shall be repaired as to match the existing surface finish at no additional cost to the Government.

10) The Contractor shall remove all debris generated in the performance of this contract daily.

11) The contractor shall take all necessary precautions to prevent any dust or debris from filtering into other parts of the building including but not limited to mechanical systems. Should dust or debris filter into other parts of the building the contractor shall take immediate steps to clean the area (no equipment or supplies will be furnished by GSA).

12) At the completion of the project, the project area shall be cleaned to building standards as determined by the GSA Property Manager. Should the contractor fail to clean the project limits in a timely manner, GSA will contract for said cleaning and the cost will be deducted from the contract. Ensure that all penetrations are sealed with fire rated approved material as required by the International Building Code.

13) The CO has the right to reject any unsatisfactory or unsuitable material or workmanship.

Section 6: Proposal Pricing & Site Walk

1) Pre-proposal Site Visit Meeting:

a) The site visit shall consist of a meeting to review construction requirements followed by a walk-thru of the project site. The meeting shall be attended by the contractor and GSA project personnel, and appropriate sub-contractors. Contact the Project Manager to schedule a site visit.

b) Review existing conditions of the project area including any field verification.

Review the solicitation/evaluation requirements

2) Cost Proposal Requirements:

a) When submitting a proposal, provide a cost breakdown for each task into the following categories: Materials, equipment, labor hours, subcontractor's quotes, overhead, profit, and bond broken down into separate units. Pricing shall be broken down by Construction Specification Institute (CSI) divisions.

b) Base Bid-

Section 7: Period of Performance

Once award has been issued, the contractor has 120 calendar days to complete the project. The contractor must also promptly begin the badging process at the time of award. Please allow a minimum of 30 days to complete the badging process. Extensions will be granted for unforeseen conditions and other factors outside of the contractor’s control at the Contracting Officer’s discretion.

3 | P a g e

Section 8: Universal Scope Requirements ALL of the requirements in this section are MANDATORY for ALL GSA projects

See the attached Universal Scope Requirements document for the full details outlining each item

Failure to comply with any and all of the requirements will result in the project not being accepted as complete

REQUIREMENTS for ALL Projects (Construction, Design & Design/Build)

a. Safety and Health Program

b. Asbestos Containing Materials. To comply with federal and state regulations as well as GSA policy, an asbestos pre-alteration assessment is required for all construction projects as outlined in Section B of the Universal Scope Requirements.

c. Lead Containing Paint / Lead Based Paint

d. Accessibility

e. Green Purchasing

f. Construction Indoor Air Quality (IAQ) Management Plan

g. Construction Waste Diversion

Section 9: Submittals

1) Contractor shall submit a Method of Procedures (MOP) to the GSA Delivery Project Manager (PM) for approval prior to commencement of work. At a minimum, the MOP shall include:

a) Brief narrative describing method of accomplishment, construction techniques, etc

b) Project schedule (to include critical path, major milestones, long lead time items, mob & de-mob, inspection dates, substantial completion, and occupancy dates)

c) Service/Utility Outages (if necessary)

d) Phasing schedule (if necessary)

e) Any building infrastructure/BAS equipment that may be impacted

2) All new equipment and anything requiring a preventative maintenance plan shall be inputted into Maximo upload template.

Information needed from the contractor will be all: Manufacturer, Model Number, Part Number, Serial Number, Any Manufacturer Warranty Information.

3) Manufacturer's specifications, instructions, and material specification sheets in original form

4) Submittal register/ log for all products specified to establish a standard of quality to include. Submittal register response by the government shall be (14) calendar days or less.

a) For pricing purposed please assume 1 hard copy of submittals and 1 electronic copy to be sent to the project manager.

Distribution list including final quantities will be finalized after receipt of the submittal log/ register by GSA project manager.

5) If product samples are not submitted in a timely fashion, any delays caused by the contractor will not warrant a time extension.

After completion of all work, the Contractor shall submit to the project manager the manufacturer's specifications, instructions, and material specification sheets in original form. Additionally, the Contractor shall submit all inventory changes (removals, additions, upgrades, etc., and new condition codes) to the COR.

6) Submittal response by the government shall be (14) calendar days or less.

Section 10: General Requirements

1) Contractor Use of the Premises

a) During the period of the project, the contractor will have access to the site only during business hours of 8:00 am 5:00

pm. No on-site work shall be performed outside these hours or on holidays unless otherwise directed by the Contracting Officer. The contractor will need to coordinate with the Contracting Officer to arrange access to the parking lot. The contractor shall make every effort to cause a minimum of damage to parking lots, any other paved areas, any items that need to be moved during the course of the project, and any areas not included in this scope of work. Any damage caused will be repaired at the contractor’s expense.

2) Progress Meetings

a) Progress meetings are not required for this project. The project manager and building team representative shall make daily inspections of the work progress.

4 | P a g e

3) Equipment The contractor shall provide all equipment associated with the entire project, operate in a safe manner, and adhere to all OSHA and GSA standards.

4) Equipment and Material Storage The contractor shall provide and store all equipment, the materials specified above, and any other materials required completing the project. The materials are required to be kept clean and dry throughout the duration of the project.

Contractor to coordinate with building manager for location of storage sheds.

5) Electricity, Water, and Gas GSA will pay for electricity, water, and gas during the course of this project. The contractor is responsible for making connections to the existing systems. Temporary electrical work shall meet the requirements of NFPA 70-1996 (NEC), Article

305. When temporary connections are removed, restore existing utility services to their original condition.

6) Fire Watch Contractor shall be responsible for providing fire watch if required per attached GSA fire watch guidelines.

7) Fire Alarm Impairment and Hot Work When a fire suppression or alarm system impairment is required, contractor shall provide written outage request to GSA for approval in advance of impairing any systems. Contractor shall be responsible for having a GSA approved NICET certified fire alarm contractor perform all system impairments. During fire alarm/suppression impairments or hot work procedures, contractor shall provide a fire watch per the GSA Regional Fire Watch Guidelines.

8) Protection of Public The building site will continue to be used by tenants. The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry. The contractor shall illuminate barricades and obstructions at night and maintain safe building access and egress for tenants.

9) Housekeeping The project site shall be kept in a neat, orderly, and safe condition at all times. The contractor shall provide enough containers for collecting construction debris and construction materials to be recycled. The contractor shall wet down dry materials and rubbish to prevent blowing dust and keep volatile wastes in covered containers.

10) Transportation and Deliveries The contractor shall arrange deliveries of materials in accordance with construction schedules; coordinate with COR to avoid conflict with other tenants and other work conditions at the site. Contractor must make GSA PM & CO aware of any lead times that may affect the project schedule.

11) Trenching The contractor shall locate all utilities on this project before the work begins. Any water, irrigation, fiber, electrical and communication lines that were hit during this project shall be replaced back to their original state under methods approved by the government.

12) Cleaning Before scheduling the final inspection, the Contractor shall accomplish six items: (1) Remove all tools, equipment, surplus material, and rubbish; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Remove grease, dirt, stains, foreign materials, and labels from finished surfaces; (4) Thoroughly clean building interiors; (5) Pickup all construction debris from the site; and (6) At time of final inspection, project shall be thoroughly cleaned and ready for use.

13) Protection of the Building The construction contractor is responsible for the protection of all existing building property for damage due to work performed under this contract. Any damage caused by the performance of this contract shall be repaired to match like or better condition at no additional cost to the government

14) Disruptive Work All painting, staining, or other activity which may cause noxious or undesirable fumes and/ or any noisy work that may be disruptive to the tenants/ public must be performed after normal working hours. The use of paint or stain that does not generate odors is preferred and may be required if the space will be occupied the following day with prior written approval from GSA.

Section 11: Badging & Security

1) Contractor is responsible to follow GSA’s security and badging requirements as detailed in the attached Badging & Security Requirements (Vendor Fitness Determination Training Manual).

2) The contractor may be subjected to additional background checks by the local agency at any border station projects.

5 | P a g e

3) US Access shared enrollment centers can be found at fedidcard.gov. Travel distances to the nearest center should be accounted for during the badging process.

4) All contract employees working onsite shall have a favorable Tier 1 or SAC background investigation.

ii. Personnel who have not received a favorable determination will not be permitted to work on this project.

iii. Escorting of employees that have not received a favorable determination through GSA’s security requirements or local agencies background check is not permitted.

iv. The contractor may be subjected to additional background checks by the local agency for any border station projects or services.

v. At the discretion of the Port Director and GSA Facility Manager, background checks for escorted personnel may be conducted by Customs and Border Protection.

Section 12: Payments

1) Information regarding payment requests and payment is in the solicitation/ contract. Please contact the CO if you have any questions regarding payments.

Section 13: Substantial Completion & Final Inspection

1) When project, or designated portion of project is complete, request a final inspection. Upon receipt of request that project is substantially complete, the Contracting Officer will proceed with the inspection within ten days of receipt of request or will advise the contractor of items that prevent the project from being designated substantially complete.

2) Red-lined drawings and CAD and/or BIM as-built drawings, and field training for Operations and Maintenance (O&M) personnel shall be provided at completion of project. Maintain one complete set of contract drawings. Clearly mark changes, deletions, and additions using GSA CAD Standards to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blueprint. Provide to GSA within timeframe negotiated at time of award.

3) The contractor shall provide O&M manuals. The O&M manuals shall contain the following:

o Executed Warranties (at project completion) o Maintenance and operation manuals

Section 14: PBS Interim Core Building Standards: See attached Appendix A: PBS Interim Core Building Standards

1) The PBS Interim Core Building Standards lists laws, Executive Orders, codes, regulations, and standards for use by contracting officers, projects teams, and others involved with developing contract documents for design, construction, renovation, or maintenance projects. These standards are for reference only and do not intend to portray a fully complete list of all applicable laws and regulations that may need to be incorporated into the contract documents. They summarize key aspects of laws and regulations that are of particular relevance to these types of projects. Compliance with applicable laws and standards is the responsibility of the contractor. hen project, or designated portion of project is complete, request a final inspection. Upon receipt of request that project is substantially complete, the Contracting Officer will proceed with the inspection within ten days of receipt of request or will advise the contractor of items that prevent the project from being designated substantially complete.

2) Project teams must use the latest published edition of these authorities and references in effect at the time of project solicitation, along with any subsequent executive orders in effect as of the project’s solicitation date. Please discuss any questions or concerns with the regional project management team. Items listed in Section 1: General apply to all aspects of the project. Other sections denote specific requirements related to that section.

3) Designs must be developed under the direction of, and bear the seal of, a licensed design professional in the State, District, or Territory of the project location.

Section 15: Attachments

1) Universal Scope requirements

2) Badging & Security requirements (Vendor Fitness Determination & Training Manual)

3) Appendix A: PBS Interim Core Building Standards

4) Window Information

6 | P a g e

7 | P a g e

8 | P a g e

9 | P a g e

Section 1: GENERAL

Name Notes

Energy Policy Act of 2005 (EPAct) 103 requires Advanced Metering to the maximum extent practicable 104 (amending 42 USC 8259(b)) Federal Procurement of Energy Efficient Products: Specify Energy Star-certified or FEMP-designated energy-consuming products, except where unavailable or not life cycle cost-effective.

109 Federal Building Performance Standards: If life-cycle cost-effective, new Federal buildings must be designed to achieve energy consumption levels at least 30% below ASHRAE 90.1.

National Energy Conservation Policy Act 42 USC 8253: Energy and water management requirements

Clean Air Act (42 USC 7401 et seq.) Provides emissions standards for sources including HVAC and generators.

42 USC Chapter 85, Subchapter VI 7671l - Federal Procurement 42 USC Chapter 85, Subchapter VI §7671k - Safe Alternatives 40 CFR Part 82 Protection Of Stratospheric Ozone

Toxic Substances Control Act (TSCA) 15 USC 2601 et seq. Addresses hazardous substances including asbestos, lead, and PCBs

American Innovation and Manufacturing Act

42 USC 7676 Requirements for HVAC / refrigerant procurement

Buy American Act 48 CFR 25.2 Use only domestic construction materials in construction contracts

Trade Agreements Act of 1979 and FAR part 25 implementing regulations

Implements numerous multilateral and bilateral international trade agreements and other trade initiatives.

Randolph-Sheppard Act 20 USC 107a The Randolph-Sheppard Act provides qualified blind persons the opportunity to operate businesses on federal, state, or other property.

The design team must coordinate design with the state licensing agency.

Resource Conservation and Recovery Act of 1976 (RCRA)

6962 (42 USC 6962): procure applicable materials composed of the highest percentage of recovered materials practicable, where reasonably available within a reasonable period of time at a reasonable price, and meeting applicable performance specifications.

6966(b)(2) (as amended by EPAct 2005 section 108): “give priority to achieving greater use of recovered mineral component [e.g. recovered or diverted waste material or byproduct such as slag or fly ash] in cement or concrete projects for which recovered mineral components historically have not been used or have been used only minimally”.

2018 Agricultural Act § 9002 (Public Law No. 115-334)

Use Comprehensive Procurement Guidelines (CPG) to take a system approach to reducing life cycle material use and impacts.

Biobased markets program 7 USC 8102 Use the BioPreferred program to specify biobased products.

Trade Facilitation and Trade Enforcement Act of 2015 (TFTEA)

19 U.S.C. §§ 4301-4454. Prohibits products created with forced or child labor.

Uyghur Forced Labor Prevention Act (Pub. L. 117-78, 135 Stat. 1525)

The design team must specify products that do not use forced or child labor.

The National Historic Preservation Act (NHPA) of 1966 as amended, Pub. L.

89-665, 80 Stat. 915

54 U.S.C. § 300101 et seq. Federal agencies shall strive to rehabilitate historic properties in a manner that preserves their architectural character, in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties (36 CFR 68).

GSA Order ADM 1020.3A: Procedures for Historic Properties.

Disaster Resiliency Planning Act of 2022

(PL 117-220)

Incorporate natural disaster risk assessments provided by the agency or its contractors into real property investments.

The Architectural Barriers Act Accessibility Standard (ABAAS) (42 U.S.C. § 4152)

36 CFR §1191: ABA Chapters 1-10 and Appendices C and D ensure that federal facilities are accessible to persons with physical disabilities

GSA’s National Accessibility Program Standards Policies and Procedures fulfill the requirements of ABAAS F103 Modifications and Waivers by describing accessibility expectations and the process for administering waivers/modifications.

FMR Part 102-76, Subpart C, 41 CFR § 102-76.60 et seq.

Executive Orders

EO 14154: Unleashing American Energy §7(b): When procuring goods and services, making decisions about leases, and making other arrangements that result in disbursements of Federal funds, agencies shall prioritize cost-effectiveness, American workers and businesses, and the sensible use of taxpayer money, to the greatest extent.

EO 14148 - Recissions of Harmful Executive Orders and Actions

§2: Revoked EOs related to Federal Sustainability, Public Health and the Environment, Worker Health and Safety, and implementing the Infrastructure Investment and Jobs and Inflation Reduction Acts.

Codes, Regulations, and Standards

40 USC § 3312 - Compliance with nationally recognized codes

To the maximum extent feasible, use model building codes and other applicable nationally recognized codes. Cooperation With State and Local Officials

42 USC 6834 Energy Conservation and Resource Renewal

Federal building energy efficiency standards, renewable energy for water heating, water conservation technologies.

10 CFR Part 436 - Federal Energy Management and Planning Programs

Subpart A - Use Methodology and Procedures for Life Cycle Cost Analyses (436.10 – 436.24) to evaluate the cost-effectiveness of systems that impact energy or water use (e.g. HVAC, water heating, controls, lighting, enclosure).

Consider up-front, operating, and salvage costs over the life of equipment to identify the least costly alternatives.

See also National Institute of Standards and Technology (NIST) Life Cycle Costing Manual (NIST Handbook 135) Subpart B - Methods and Procedures for Energy Savings Performance Contracting Subpart C - Agency Procurement of Energy Efficient Products

National Institute of Building Sciences

(NIBS)

United States National CAD Standard

Construction Specification Institute (CSI) MasterFormat - Division/Section/Page Format

Specifications must follow this format

International Code Council (ICC) I-Codes The latest published edition of the ICC I-Codes in effect at the time of project solicitation must be used throughout design and construction.

Per 40 U.S. Code § 3312, GSA has adopted the technical requirements of the International Building Code (IBC), International Fire Code (IFC), International Plumbing Code (IPC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), International Existing Building Code (IEBC), International Property Maintenance Code, International Private Sewage Disposal Code (IPSDC), International Zoning Code (IZC), International Wildland-Urban Interface Code (IWUIC), International Residential Code (IRC), and International Code Council Performance Code (ICCPC).

National Fire Protection Association (NFPA) Codes

Per 40 U.S. Code § 3312, GSA has adopted the technical electrical requirements of the NFPA’s National Electrical Code (NFPA 70).

Per 40 U.S. Code § 3312, GSA has adopted the NFPA 101, Life Safety Code in lieu of the technical egress requirements of the IBC.

29 CFR 1926 Safety and Health Regulations for Construction

The design team must ensure that facilities can be constructed in a compliant manner.

29 CFR 1910 Occupational Safety and Health Standards

The design must ensure facility operations and maintenance can be performed in compliance with this section. The design must not subject building occupants to conditions in violation of these safety and health standards. (e.g. § 1910.146(b), Confined Space)

ANSI/ASSP Z10 - OSH Management Mitigate safety/ health risks in order of precedence: hazard elimination;

engineering controls; warning devices; and procedures and training.

29 CFR §1926.62 and 40 CFR §260 Addresses lead-based paint testing, management, abatement, and disposal, including in childcare centers.

29 CFR §1926.1101d Per OSHA Construction Standard, presume that surfacing and thermal systems insulation in buildings constructed before 1981 contains asbestos unless proven otherwise. GSA considers materials replaced by non-asbestos alternatives in 1981 or later and properly documented as exempt from this OSHA requirement.

National Emission Standard for Asbestos (40 CFR §61 Subpart M)

Pre-alteration assessments are required before construction or alteration to determine if asbestos will be impacted by the work. EPA Compliance Advisory

Interagency Security Committee Standard: Risk Management Process

Defines the criteria and processes facility security professionals should use to determine a facility's security level

Real Property Facility Design and Management 41 CFR Part 102-80

Safety And Environmental Management

Section 2: COMMUNITY PLANNING AND LANDSCAPING

Accommodating Federal Agencies 40 USC 3306 - Encourage Public Access

Clean Water Act, 33 USC §1251 et seq.

National Pollution Discharge Elimination System (NPDES) permit requirements related to Erosion and Sediment Control, Stormwater Pollution Prevention Plan, dewatering at construction sites, and stormwater / wastewater discharges.

§404 requires permits for development impacting wetlands. Regulates discharge of fill material into other waters of the U.S. Encourages avoidance, minimization, and mitigation of wetland impacts.

American National Standards Institute (ANSI) standards

A300 American National Standard for Arboricultural Operations - covers best practices for tree planting, soil management, and risk assessment.

Z60.1 American Standard for Nursery Stock and plant specification.

C136 American National Standard for Roadway and Area Lighting Equipment -performance and safety standards for streetlights and pedestrian areas.

ASABE S623 Determining Landscape Plant Water Demands/ irrigation sizing.

ASABE S627 Weather-Based Landscape Irrigation Control Systems.

American Society for Testing and Materials (ASTM) standards

D4972 - test method for pH of soils.

D5268 - standard specification for topsoil used for landscaping purposes.

Endangered Species Act 1973 (16 U.S.C. §§ 1531-1544)

Protects endangered and threatened species and their habitats, which can impact design

Section 3: ARCHITECTURE AND INTERIORS

Promoting Beautiful Federal Civic Architecture Memorandum

Federal public buildings should be visually identifiable as civic buildings and respect regional, traditional, and classical architectural heritage.

Wildland-Urban Interface (WUI) Federal Risk Mitigation (Executive Order 13728)

For new Federal buildings, and alterations to existing Federal buildings greater than 5,000 square feet, within the WUI and at moderate or greater risk to wildfire, Federal agencies must apply the wildfire-resistant design provisions outlined in the most current edition of the International Wildland-Urban Interface Code (IWUIC) promulgated by the International Code Council (ICC), or an equivalent nationally recognized code.

Section 2 of Governance and Integration of Federal Mission Resilience, 2020 (Executive Order 13961), National Security Memorandum-22 on Critical Infrastructure Security and Resilience

Incorporate resilience measures into real property investments that ensure Presidential Policy Directive 40 (PPD-40), National Continuity Policy, and the provisions of the Federal Continuity Directive (FCD) enumerated in 5 United States Code (U.S.C.) 101.

29 CFR §1926.501 Fall Protection

National Elevator Industry, Inc. (NEII) Elevator cab sizes per NEII-1 Building Transportation Standards & Guidelines

40 USC § 3318 Lactation room requirements

40 USC § 3314 Baby changing facilities

Building Enclosures

American Society for Testing and Materials (ASTM) Standards

E2813, Table A2.1 Standard Practice for Building Enclosure Commissioning;

including mitigation against air, water infiltration (moisture, mold) and anchor pull strength of facade elements; supporting human health and safety

E2947 Standard Guide for Building Enclosure Commissioning, in conjunction with E2813

D7877 Standard Guide for Electronic Methods of Detecting and Locating Leaks in Waterproofing Membranes

D8231 Standard Practice for the Use of Low Voltage Electronic Scanning System Detecting and Locating Breaches in Roofing and Waterproofing Membranes

National Roofing Contractors Association

(NRCA)

Roofing Manual Waterproofing Manual

Section 4: STRUCTURE

American Society of Civil Engineers (ASCE) / Structural Engineering Institute (SEI) Standards

ASCE/SEI 7-22: Minimum Design Loads and Associated Criteria for Buildings and Other Structures including Supplements 1, 2 and 3

ASCE/SEI 41-23: Seismic Evaluation and Retrofit of Existing Buildings

National Institute of Standards & Technology (NIST)

Standards of Seismic Safety for Existing Federally Owned and Leased Buildings; ICSSC Recommended Practice 10 (RP 10-22)

American Institute of Steel Construction

(AISC)

Design Guide 11: Vibrations of Steel-Framed Structural Systems Due to Human Activity (Second Ed. 2016) Revisions and Errata 2/16/2023

International Organization of Standards

(ISO)

ISO 2631-2:2003: Mechanical vibration and shock - Evaluation of human exposure to whole-body vibration, Part 2: Vibration in buildings (1Hz to 80Hz)

GSA Facility Security Requirements for Explosive Devices Applicable to Facility Security Levels III & IV

GSA’s Interpretation of the ISC Risk Management Process

GSA Alternate Path Analysis and Design Guidelines for Progressive Collapse Resistance

Section 5: MECHANICAL ENGINEERING

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)

All ASHRAE standards, guidelines and handbooks cited in the International Mechanical Code (IMC) shall be complied with in addition to the following:

Standards 52.2; 55; 62.1; 111; 113; 135; 140

Guidelines 0; 4; 12; 29; 44

ANSI Z223.1, National Fuel Gas Code

American Society of Plumbing Engineers

(ASPE)

Fundamentals of Plumbing Engineering, Plumbing Systems, Special Plumbing Systems, Plumbing Components and Equipment

Federal Data Enhancement Act Standards for Data Centers fall under the purview of GSA's IT Modernization Division, within OGP, as directed in the Federal Data Enhancement Act.

Sheet Metal and Air Conditioning Contractors’ National Association, Inc., (SMACNA)

All SMACNA standards cited in the International Mechanical Code (IMC) shall be complied with, in addition to:

HVAC Air Duct Leakage Test Manual; HVAC Systems Testing, Adjusting & Balancing; HVAC Systems Testing, Adjusting & Balancing; Fire, Smoke and Radiation Damper Installation Guide for HVAC Systems; Seismic Restraint

Section 5: MECHANICAL ENGINEERING

Manual Guidelines for Mechanical Systems; HVAC Systems Sound and Vibration Procedural Guide

Section 6: ELECTRICAL ENGINEERING

ASHRAE Standards 90.1: Lighting power density, automatic lighting control, automatic receptacle control, transformer efficiencies, and electrical energy monitoring (advanced metering)

IEEE (Institute of Electrical and Electronics Engineers)

IEEE 1584, Guide for Performing Arc-Flash Hazard Calculations IEEE C2, National Electrical Safety Code

UL (Underwriters Laboratories) UL96, Lightning Protection Components UL96A, Installation of Lightning Protection Systems

ANSI/IES (Illuminating Engineering Society)

IES Lighting Library IES G-1, Guideline for Security Lighting for People, Property, and Critical Infrastructure IES RP-1, Lighting Offices Spaces IES RP-10, Lighting Common Applications IES RP-43, Recommended Practice for Lighting Exterior Applications

Building Industry Consulting Services International (BICSI) Telecommunications Distribution Methods Manual (TDMM)

Standard for design and installation of information and communications technology

NFPA (National Fire Protection Association) Codes and Standards

70, National Electrical Code 70E, Standard for Electrical Safety in the Workplace 101, Life Safety Code (Emergency & Egress Lighting) 110, Standard for Emergency and Standby Power Systems 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems 780, Standard for Installation of Lightning Protection Systems 855, Standard for the Installation of Stationary Energy Storage Systems

Section 7: FIRE PROTECTION

National Fire Protection Association (NFPA) Codes and Standards

4, Standard for Integrated Fire Protection and Life Safety System Testing 13, Standard for the Installation of Sprinkler Systems

Section 7: FIRE PROTECTION

14,Standard for the Installation of Standpipe and Hose Systems 20, Standard for the Installation of Standpipe Pumps for Fire Protection 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances 30, Flammable and Combustible Liquids Code 45, Standard on Fire Protection for Laboratories Using Chemicals 72, National Fire Alarm and Signaling Code 75, Standard for the Fire Protection of Information Technology Equipment 88A, Standard for Parking Garages 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems 232, Protection of Records 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations

Federal Fire Safety Act of 1992 15 USC § 2227

Section 8: CIVIL

EO 11988: Floodplain Management Regulates federally-funded activities in or affecting the floodplain. This encompasses ALL permanent construction and other activities, including debris, roads, bridges, culverts, etc. The regulatory floodplain is defined by areas inundated by a 100-year or 500-year storm event. For most projects, any activities occurring in the 100-year floodplain will require analysis. For any activities associated with a critical action facility, such as a hospital or U.S.

Court, the 500-year floodplain triggers this EO.

American Society of Civil Engineers

(ASCE)

ASCE 24-24: Flood Resistant Design and Construction Standards

ASCE 38-02: Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data

EISA 2007 Sec. 438: All major capital projects with a scope of site work exceeding 5,000 shall manage the 95th percentile stormwater event onsite and reduce runoff.

Reference: "Compliance with Section 438 (Stormwater) Requirements of the Energy Independence and Security Act of 2007"

American Association of State Highway and Transportation Officials

(AASHTO)

Policy on Geometric Design Highways and Streets (Green Book)

Section 9: SPECIALTY SPACES

U.S. Courts Design Guide (USCDG) Functional program requirements; Court and court-related adjacency relationships; accessibility; finish materials; performance criteria for acoustics; environmental systems (including special HVAC and lighting requirements); security; telecommunications; and audio-visual design.

MOA for Court Security 2019

U.S. Courts Courtroom Technology Manual

Reference is made to these systems only regarding the electrical service requirements in the areas where they are being installed.

Requirements and Specifications for Special Purpose and Support Space Manual (USMS Publication 64)

Criteria for USMS functional program requirements, spatial relationships, electronic and physical security, and hardware standards and special HVAC requirements within the U.S. Courts and court-related spaces.

NASA Facilities Design Standard

United States Land Port of Entry Design Standard

GSA Federal Courthouse Physical Security Best Practices Desk Guide 2023

GSA Mail Center Security Guide 5th Edition

GSA Indoor Firing Range Policy and Criteria

GSA Indoor Firing Range Cyclical Maintenance and Repairs Memorandum

Interagency Security Committee Appendix C: Child Care Level of Protection Template (FOUO)

Also use Child Care Center Design Guide (PBS-P140)

52.211‐6 Brand Name or Equal.

As prescribed in 11.107(a), insert the following provision:

Brand Name or Equal (Aug 1999)

(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.

(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must—

(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;

(2) Clearly identify the item by—

(i) Brand name, if any; and

(ii) Make or model number;

(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and

(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.

(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.

(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.

(End of provision)

"General Decision Number: ND20260012 05/18/2026

State: North Dakota

Construction Types: Building

Counties: North Dakota Counties of Burleigh

Modification Number Publication Date 1 01/30/2026 2 05/18/2026

BOIL0647-006 01/01/2025

Rates Fringes

BOILERMAKER.........................................$ 48.00 31.14

ELEC0714-013 06/30/2025

Rates Fringes

ELECTRICIAN.........................................$ 40.94 18.22

IRON0512-006 05/01/2022

Rates Fringes

IRONWORKER, STRUCTURAL..............................$ 35.95 33.11

PLUM0300-017 06/01/2025

Rates Fringes

PLUMBER.............................................$ 40.53 20.60

PLUM0300-020 06/02/2025

Rates Fringes

PIPEFITTER..........................................$ 43.94 20.46

SFND0669-002 04/01/2025

Rates Fringes

SPRINKLER FITTER (FIRE SPRINKLERS)..................$ 41.64 24.58

SHEE9010-001 06/02/2025

Rates Fringes

SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)....$ 33.64 23.60

SUND2012-001 08/18/2014

Rates Fringes

TRUCK DRIVER: DUMP TRUCK...........................$ 19.81 5.42

SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.14 0.00

ROOFER..............................................$ 17.17 2.66

PAINTER (BRUSH AND ROLLER)..........................$ 21.86 8.41

6/18/26, 12:11 PM SAM.gov https://sam.gov/wage-determination/ND20260012/2 1/4

OPERATOR: LOADER...................................$ 25.98 0.00

OPERATOR: FORKLIFT.................................$ 23.06 15.47

OPERATOR: CRANE....................................$ 26.18 9.39

OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 23.06 4.00

LABORER: MASON TENDER - CEMENT/CONCRETE............$ 14.23 4.50

LABORER: MASON TENDER - BRICK......................$ 15.32 0.00

LABORER: COMMON OR GENERAL.........................$ 13.64 0.00

INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL

SYSTEM INSULATION)..................................$ 16.73 2.94

HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY)......$ 24.46 5.47

CEMENT MASON/CONCRETE FINISHER......................$ 17.73 4.24

CARPENTER...........................................$ 15.78 0.00

BRICKLAYER..........................................$ 24.46 13.96

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

https://sam.gov/wage-determination/ND20260012/2 2/4

Union Rate Identifiers

A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .