This document is an Amendment (0002) to Solicitation 47PD0225R0026 for a Multiple Award General Construction Services Indefinite Delivery/Indefinite Quantity (IDIQ) contract with Design Build Capabilities for Pennsylvania, New Jersey, and Delaware. The amendment extends the proposal due date from May 23, 2025, to June 9, 2025, at 5:00 PM Eastern Time, and incorporates numerous Request for Information (RFI) questions and responses into the solicitation. It also includes an updated Wage Determination (PA20250003, Mod 3) dated March 21, 2025.
The solicitation seeks to award between four and eight contracts, with specific set-asides for socioeconomic categories: one contract each for 8(a) participants, Woman-Owned Small Business, HUBZone, and Service-Disabled Veteran-Owned businesses. The contract will cover general construction services including office renovations, MEP repairs, fire sprinkler systems, sitework, exterior construction, demolition, and elevator modernizations. The Maximum Ordering Limit is $75 million, with typical task order values between $50,000 and $3,000,000, though larger projects may be approved case-by-case. The contract period spans from March 2026 to September 2031, with the government evaluating proposals based on technical factors that are significantly more important than price.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0002 – Multiple Award General Construction Services IDIQ Contract with Design Build
Capabilities for PA/NJ/DE
1. The following RFI Questions and Responses are attached and incorporated into the solicitation:
a. RFIs #3, #4, #7, #9, #12, #13, #17, #19 through #100.
b. RFIs #1, #2, #5, #6, #8, #10, #11, #14, #15, #16, #18 were previously provided in
Amendment 0001.
2. Wage Determination PA20250003, Mod 3, dated 03/21/2025 is attached and incorporated into the solicitation. See RFI #4.
3. The proposal due date and time is hereby extended, from 05/23/2025 at 5:00 PM Eastern Time, to 06/09/2025 at 5:00 PM Eastern Time.
4. All other terms and conditions remain unchanged.
RFI # Question Answer Previously Issued in Amendment
0001 (if checked)
For Solicitation 47PD0225R0026 , is there any site visit scheduled for the seed project. If yes, please provide us with the date and time.
There is no site-visit. The "seed project" is actually a ficticious project designed to create an apples-to-apples price comparison for review.
Referring to Solicitation 47PD0225R0026, we were unable to locate the scope of work for the seed project in the solicitation. Could you kindly provide us with the detailed scope of work for the seed project?
There is no scope of work for the ficticious project provided in the RFP. Please see bid sheet for required quantities.
Confirm that part (b) 1 of GAAR 52.216-19 is to read “Any order for a single item in excess of $10,000,000.00
Yes, contractors are not obligated to honor any order for a single item in excess of $10,000,000.00. As stated in the RFP "The anticipated ordering limits are between $50,000.00 and $3,000,000.00, however, projects valued above $3,000,000.00 may be approved on a case-by-case basis by the IDIQ Contracting Officer, and projects valued below $50,000.00 may also utilize this vehicle. The typical task order is expected to be between $50,000.00 and $3,000,000.00." (See The Agreement, document C101, page 3).
FAR 52.217-8 on page 14 of 55 of the Agreement discusses labor rates. What are the labor rates that Offerors are to use in preparing price proposals for the Base Bid, Option 1, Option 2, Option 3 and Option 4 respectively?
Contractors should use the most current Davis Bacon Philadelphia wage rate for the base year, and all subsequent option years on the bid form, with escalations included for option years.
Please note that the sample project should also use the wage determination PA20250003, Mod 3, dated March 21, 2025.
Confirm that partition to be removed in Item 1 may or may not have drywall on both sides of the metal framing.
It would be rare to have drywall on only one side of a partition.
For bidding purposes, assume both sides.
6 Confirm that partition to be removed in Item 2 may or may not have drywall on both sides of the metal framing
It would be rare to have drywall on only one side of a partition.
For bidding purposes, assume both sides.
Page 11 of the Solicitation lists "Dollar Value for Submitted Projects (Factor 1):
Construction projects in occupied buildings (value between $50,000 and $3 million):
i. One (1) submitted project shall be between $50,000 - $250,000.
ii. Two (2) submitted projects shall be between $500,000 - $3,000,000."
Please confirm that this shall be 1 project between $50,000-$250,000 and 2 projects between $250,000 and $3,000,000.
No, the solicitation was not a typo. The RFP requires one (1) project submitted between the values of $50,000.00 and $250,000.00, and two (2) projects submitted between the values of $500,000.00 and $3,000,000.00.
8 Can you provide me wit ha copy of the slide deck you presented , iI am not sure if I was included on the mailing list
There was no slide deck prepared for the Pre Proposal Conference. However, a copy of the Pre Proposal Conference Minutes (which includes the Agenda) will be provided in Amendment 0001 with the first round of RFI responses, for reference.
9 What prevailing wages should we use for pricing the sample project base bid and option.
The wage rate that should be utilized for the Sample Project (page 2 of the Bid Sheet) is Wage Determination PA20250003, Mod 3, dated March 21, 2025 (State: Pennsylvania, County:
Philadelphia). Assume Base for the bid year.
10 If GSA decides to select only four contractors, does that mean those without a socioeconomic designation won't have a chance at all?
No. If GSA were to only select 4 firms for award, and one or more of the socio-economic reserve catagories did not have a satisfactory firm to fill them, then those particular reserve categories would not be used, and a Small Business without a socio-economic designation could still recieve an award.
In reference to Attachment 2, PBS Past Performance Questionnaire, Section 3 contractor to mention How is the project relevant to the project submission?
Kindly advise how to relate the solicitation to the past performance project as the solicitation do not have any sample project.
The Scope of Work (SOW) provides a list of project types generall handled by this IDIQ. Furthermore, the RFP lists what types of projects each of the three (3) submissions for Prior Experience must choose from. A PPQ must be submitted for each project presented in Prior Experience in order to satisfy the Past Performance factor. Please see RFP Solicitation Document (C201) pages 11 through 12 for a list of required project types for each submitted project.
12 SAM.gov link is not working to get the information to fill out
All applicable proposal forms should be downloaded and completed prior to submission of proposal.
13 Can I get the regulation that govern the Socioeconomic part of the bidding process
See FAR 52.219-31 Notice of Small Business Reserve (Mar 2020).
14 can I get an application emailed or email the link to where I can go and start the process
There is no online application for this IDIQ. Please review the submission requirements found in the RFP and provide your completed proposal package via email to Jennifer.
Silkensen@gsa.gov AND Erin.Watson@gsa.gov.
15 Are set-asides being considered for the final solicitation?
This solicitation is a Total Small Business Set aside. There are also four (4) reserves being considered, including: one (1) 8(a) concern; one (1) WOSB concern; one (1) SDVOSB concern;
and one (1) HUBZone concern.
16 Will the government require bonding capacity, and if so, at what level See Techincal Factor 6.
17 Can small construction firms partner under a single award or task orders
We are only looking for proposals from Prime Contractors, however, Joint Ventures may apply. For Joint Ventures, see the Solicitation (document C201) Section II.F. Requirements of Joint Venture Offerors.
PPQ Instructions under Factor 4 are confusing:
f. Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission.
g. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. A physical PPQ is required to be submitted for each project.
Are we allowed to submit older PPQ versions used for previous solicitations? If so, can they be emailed as part of the technical proposal or do you want Factor 4 to simply show "please see attached PPQs" and we send the PPQs as individual pdfs separate from the tech proposal? A "physical PPQ is required" implies that we have to physically mail one to your team, please advise.
You may submit previously completed PPQs, as long as those PPQs are for one of the three (3) required projects in the Prior Experience section. "A physical PPQ is required" refers to the submission of an actual PPQ (via email), and not a reference to a previously completed PPQ for another solicitation (i.e.
"please see PPQ previously submitted for Solicitation Y" without actually submitting the PPQ. The Government will not be chasing down PPQs submitted for other projects, and we do not maintain a database of previous PPQs.).
To clarify: You may use a PPQ completed for a previous solicitation as long as that PPQ is in reference to one of your three (3) required projects in Prior Experience, and you must submit the PPQ via email. You may include PPQs as separate attachments OR as part of the assembled PDF for the Technical submission. If PPQs are included as separate attachments, please indicate so in your proposal. If you are unable to obtain a completed PPQ from a client for a project prior to the solicitation closing date, the Offerer should complete and submit the first page of a PPQ which provides contract and client information for the project - please see Technical Factor 4, point "d" (page 15 of The Solicitation document C201), for Technical Package requirements in this instance.
19 Can teaming projects be used for past performance and prior experience? No, see RFI #17.
Please advise if a showcase project can be in the construction dollar amount gray area of $250,000 to $500,000. See RFI Answer #7.
Please advise if you require a Form 527 for three previous years or just the most recent year available along with three yrs of CPA prepared Financial Statements?
You must provide one (1) GSA Form 527, and three (3) years of financial statements as described in the solicitation (document C201), page 10.
22 Please confirm email address(es) for PBS Past Performance Questionnaire's are to be sent to.
PPQs should be submitted to Jennifer.Silkensen@gsa.gov AND Erin.Watson@gsa.gov.
23 Please advise PPPQs are to be sent directly from Client Contact to GSA and not to bidding Contractor.
PPQs may be sent directly from the Client Contact to GSA, or they may also be sent from the Bidding Contractor to GSA.
1. ITEM NO :22 and 23 -Please confirm whether it is drywall partition or drywall ceiling, if it is a ceiling how do you expect us to install 5/8” drywall on both sides and 4” cove base? There should be separate items for drywall partition and ceilings to price accordingly. This item is for drywall partition.
25 2. Item no:22-Please confirm the height of the drywall partition (8 ft,10ft ,12 ft…), we need the height of the ceilings (8ft, 10ft…..). We cannot figure out the cove base without knowing the partition length.
Line item 22 shall read: "Furnish and install partition or ceiling 3⅝", 25 gage metal stud 16" O.C., ⅝" drywall on both sides, including tape and spackle finish of drywall with primer or sealer coat of paint and two finish coats of paint. This line item shall also be used to close openings in the wall, where doors, window, etc. are removed. Price shall be determined by the square feet of one side." Cove base shall be priced in a separate line item.
3. Item 21: What is the square footage of each cubicle?
How far is the building storage? Is a freight elevator available for moving the furniture or we have to use the stairs? Item 21 shall be removed and shall not be priced.
27 4. Item 28: Please confirm the vision viewing window size and window frame material is it wood or metal?
Frame is knockdown or welded frame? Wall thickness required
Line Item 28 shall read "Furnish and install vision viewing window in any partition with safety glass tempered, tinted or clear, metal frame, shape to be determined by the Government, including cutting opening into the partition, one coat primer or sealer paint and two finish coats of paint on frame." Assume standard partition thickness; frame may be knockdown or welded; viewing window size will be priced per square foot.
5. Item30: Install Govt furnished door and frame including cutting opening into partition and installing hardware- who is supplying the hardware? Is it an entry door, office door, exit door? door opening size required, Hardware information is required for pricing the line item
Assume for this line item that if the Government is furnishing the door, the Government is also furnishing the hardware. If the Government does not furnish the hardware, that information will be under a separate line item. This line item is for installation of a Government Furnished Office Door - other types of doors (entry/exit) would be priced under a different line item. Assume 3x7' standard door size.
6. Item 30: Including cutting opening into partition- Please confirm is it masonry or drywall partition? The labor for cutting and restoration will vary depending on the type of partition
Assume a drywall partition. Masonry partitions would be priced under a separate line item.
7. Item37: Please confirm the door vision size, we cannot price the vision frame without the opening size.
Is it metal or wood door that is being cut?
Line Item 37 shall read: "Furnish and install door vision into any door with safety glass tempered or fire rated wired, lite tinted or clear glass and wood frame, shape to be determined by the Government. Including cutting opening into the door, one coat primer or sealer paint and two finish coats of paint on frame." Assume door material is wood. Size of door vision varies per task order, should be priced per square foot.
8. We did not find any line item to Furnish Carpet tiles in the RFP as mentioned in bid item #48” Furnishing or purchasing of carpet tile on separate line item”.
Furnish carpet tiles will be a negotiated line item on a case by case basis at the task order level.
9. Item38: Please confirm the size of the air louvers, is it wood or metal frame?
Line Item 38 shall read: "Furnish and install air louver in any door, both sides, metal frame, including cutting opening into the door, one coat primer or sealer paint, and two finish coats of paint on frame. Price shall be determined by square foot of louver." The size of the louvers are determined at the task order level and are priced per square foot. Wood frames shall be priced as a different line item.
10. Item 36: Please confirm the scope of work is exterior or interior caulking, is scaffolding included in the scope of work if it is exterior roof or window opening?
The work is defined in the line item as exteriror. Assume a standard 8 foot ladder is required.
If multiple awards are made to a specific socio economic category, will future task orders still be competed among all contract holders, or would task orders be limited to competition within a specific socio economic category?
Task orders issued under this award could be competed against all contract holders OR may be further set aside for specific socio-economic categories, at the discretion of the task order contracting officer.
35 Will firms awarded contracts be required to use unit pricing submitted for the sample project in future task order proposals?
The sample project pricing (tab 2 of the bid sheet) is to determine an apples-to-apples price comparison between firms. The bid sheet line items (tab 1 of the bid sheet) are the prices to which firms will be held for future task order proposals.
Will GSA allow other agency (USACE, NAVFAC) PPQ forms for projects submitted to demonstrate past experience?
No. Information should be transferred to the GSA Form provided.
Will GSA post the agenda that was presented during the preproposal conference prior to the deadline for submitting RFIs?
The pre-proposal conference agenda provided a high-level overview of the project and was provided for reference in Amendment 0001.
38 Will GSA post the list of preproposal conference attendee list prior to the deadline for submitting RFIs?
The pre-proposal conference list of attendees was provided for reference in Amendment 0001.
Please confirm extent of showcase project to include mechanical and electrical modernization.
i.e - is this a project that is solely just electrical and/or mechanical modernization or can these upgrades to outdated systems be a part of a full project renovation.
For the ficticious project in the excel sheet, please follow the requirements listed in the bid sheet.
For the financial section, you want 3 years of past financial data. Do you want the full financial package with the notes and accountants' opinion letters for all 3 years or only the balance sheet, income statement and statement of cash flows? I Believe I saw both written in different places. On the GSA 527 it states "Prepared Financial Statements "with notes" may be provided in lieu of completing section III. In the solicitation on page 10 b. Volume 2- Price Proposal V states Financial Information for the last 3 years certified by a Public Accountant 1. Balance sheet 2. Profit and Loss Statements 3. Statement of cash flow 4. Signed GSA 527 contractor's qualifications and financial information.
(This section makes no mention of notes.)
Please provide all documents listed in section b. v. on page 10 of the Solicitation (document C201), including: Financial Information for the last 3 years, certified by a Public Accountant; Balance Sheet; Profit and Loss Statements;
Statement of Cash Flow; signed GSA 527 Contractor’s Qualifications and Financial Information. You must also provide any documentation required by the GSA 527.
Section III of the GSA 527 states that Prepared Financial Statements with notes may be provided in lieu of completing Section III. You must either fill out Section III in its entiery, or provide prepared financial statements with notes.
41 What pay rate are we to use for the bid sample project? See RFI #9 and RFI #4.
42 What is the location are we assuming the bid sample project to be in? See RFI Answer #41.
43 Is there only one Bid sheet required for submission or are we to submit (3) three, that is, one for every State?
Please submit one (1) bidsheet - submitted pricing is for all covered areas of the IDIQ.
Related to above, as the project extends through multiple States and Counties, how do we handle Wage Determinations for different Counties?
Wage Determinations will be included for each task order and will change dependent on the county and state in which the task order project takes place.
Is this a new or expiring IDIQ? If expiring, can you provide details of the last IDIQ (ie. incumbent prime contractors, total contract vehicle amounts, geographical territories, socioeconomic set-asides, etc.)
This is the re-compete of the Multiple Award General Construction Services IDIQ Contract with Design Build Capabilities for PA NJ DE. The previous iteration of the this IDIQ was published on SAM under solicitation number
47PD0319R0020.
We were informed during the teleconference that there was no specific site or project to bid however, the bid pricing sheets references a 5000 Wissahickon Ave (State/City unspecified) on multiple lines. Please clarify as to whether we are to bid based on take-offs of this building? If so, will there be an upcoming site visit?
If the line item calls out 5000 Wissahickon, those line items are specific to that building. Other line items are variable per building and could belong to any building in the overall geographical area. There will be no site visits associated with the procurement of this IDIQ, but pre-proposal site visits for task orders are traditionally conducted.
47 What are some of the most common issues you have experienced with Design/Bid type projects?
GSA cannot provide an answer to this question. Each Design Build project could have different issues that depend on multiple factors.
What direction would you give in relationship to pricing of building materials in light of recent tariff issues and also given the project commences the end of 2025? GSA is seeking competitive pricing.
Why are Northern NJ Counties excluded from the IDIQ?
Will the IDIQ be expanded at any time to include these counties?
Northern NJ counties are not currently part of the territory covered by this IDIQ.
50 What are the specific self-performance requirements, if any?
Please see Document C101 (The Agreement), beginning on page 37, FAR 52.219-14 Limitations on Subcontracting.
51 Do we need to name and provide all subcontractors at the time of proposal submission? No.
52 Is it possible for the due date to be adjusted by a week or two?
Proposal due date has been extended to June 9, 2025, 5:00 PM Eastern Time.
Page 9 of the Solicitation lists the Offeror Information Worksheet as one of the items to include in the Volume 1 proposal. However, page 10 instructions state to include the socioeconomic certifications/verifications in the Volume 2 proposal. Please clarify if the socioeconomic information is to be included in both volumes, or if we should put all info pertaining to socioeconomic information in the Volume 2 proposal.
Page 9 of the solicitation indicates that Factor 5 of Volume 1 (Technical) should include the Offeror Information Worksheet (1 page attachment provided), and that the Representations and Certifications from SAM.gov should be included in Volume 2 (price). Page 10 indicates to include the Representations and Certifications in Volume 2 (price), as referenced on Page 9.
For clarity, please include the one-page Offeror Information Worksheet for Factor 5 of Volume 1, and include a copy of the current Representations and Certifications from SAM in Volume 2.
54 For Volume I, Past Performance, please confirm CPARs are acceptable in lieu of PPQs.
No, CPARS is not acceptable in lieu PPQs. Please see Document C201 (The Solicitation), page 14 Factor 4 Past Performance on Relevant Projects.
55 Can the government please provide the document presented during the pre-proposal conference?
A copy of the pre-proposal conference agenda was included with Amendment 0001.
For Volume I, Key Personnel, please clarify if we are to provide a resume for the Program Manager.
Yes, please identify and provide a resume for the "central point of contact (i.e. Program Manager), tasked with serving as an overall manager of ongoing projects responsible to GSA for scheduling/coordinating all project and contract deliverables" (see document C201 (The Solicitation) page 14, Factor 3, Key Personnel).
57 For Volume I, Management Plan, can the page limit be increased to 3-4 pages? No, the Management Plan is limited to 2 pages.
RFI: Subject: VOL 2-Price Proposal: 47PD0225R0026 New Large Term IDIO Bid Sheets. Regarding the pricing for the sample project, location will be critical.
Could you please clarify which location we should consider, as the same pricing doesn’t apply everywhere, especially given that Davis-Bacon rates vary across Delaware, Pennsylvania, and New Jersey? See RFIs #4 and #9.
Bid sheet item 32 & 34- The metric tiles can be ordered only in 5000 sq ft minimum, please confirm the actual quantity to be considered for bidding since the quantity specified is less than 5000 sq ft for both line item # 32 & 34 for Wissahickon av bldg.
Items 32 and 34 are in relation to doors. The government believes that this question is in reference to items 58 and 60.
The Government does not dictate means and methods, and notes that further specifics including quantity would be provided at the task order level.
60 Bid Sheet item # 22 -Please confirm the max height of the ceiling to be considered for this quantity. Please assume a maximum ceiling height of 10 feet.
61 Bid Sheet item # 21-What is the average square footage of cubicles to be considered Square footage will vary per order.
62 Bid Sheet line item # 28-Please confirm the vision window size See RFI #27.
Bid Sheet item # 30-who is supplying the hardware, is it a entry door, office door, exit door? door opening size and hardware information is required. Is it single double door? See RFI #28. Assume a single door.
Bid sheet Line item # 30-Please confirm whether it is drywall or masonry wall to include cutting and restoration which will vary depending on the type of partition. See RFI #29.
65 Bid sheet item 38-Please confirm the size of the air Louvers. See RFI #32.
Bid sheet # 36- Please confirm whether it is exterior or interior caulking? is scaffolding/Lifts are included in the scope of work? we need to know whether it is exterior roof or window .need more details See RFI #33.
67 We need prevailing wages applicable for this project for pricing each line items See RFI #4 and #9.
68 Please provide breakdown of work in each state PA,NJ and DE that is to be expected, since wages are different for each state.
A determination of work required for each state within the geographic territory covered by this IDIQ cannot be currently determined. For David Bacon wage determination, see RFI #4 and RFI #9.
69 Bid Sheet line item 74 -Re-laminate door -is it for on side or both sides? are we supposed to include edges?
Cost could inde one or both sides, and may or may not include edges. Cost is per square foot.
Is it acceptable to submit a Past Performance Questionnaire (PPQ) previously completed for a similar solicitation with another federal agency, to fulfill one of the PPQ requirements for this solicitation? Does the PPQ form have to be exactly the same as the one included in this solicitation or will a similar form be acceptable. See RFI #36.
If the individuals who completed Past Performance Questionnaires (PPQs) for a GSA project previously are no longer employed by GSA or another government agency, can the previously completed PPQs still be submitted and accepted as valid documentation for this solicitation?
If the employee who previously completed the PPQ for another agency is no longer with that agency, please transfer the information from the previously completed PPQ to the GSA PPQ form, and attach the original PPQ to the end of the GSA PPQ for reference. If the employee was a GSA employee and the PPQ is from GSA, please submit the previously completed
PPQ.
Please confirm that contractor has to fill out all the 120-line items of the bid sample project and submit it as part of the price proposal and the total base bid cost will be considered as the bid amount along with the option nos.
1,2,3 and 4. Also confirm that the base and option amounts are to be listed on the solicitation form 1442.
Yes, contractors must fill out all line items of the bid sample project and submit it with the proposal. The total base bid cost will be considered as the bid amount in combination with options 1, 2, 3, and 4. Please include the base and options amounts on the SF1442.
Please provide prevailing wage rates for all the various areas/ states where this contract work has to be performed. See RFI #4 and #9.
Please advise if a bid bond is required along with the bid submission.
No bid bond is required for a specific project, however, per Factor 6, you must provide proof of the ability to bond at the minimum per-project amount required by the Solicitation. See document C201 (The Solicitation), page 17, Factor 6 Project Bonding Capacity.
75 Is the sample project tax exempt? No.
76 If prior experience project exceeds $3,000,000.00 will it be considered irrelevant? Yes. Please see RFI #7.
(Solicitation - Page 10 - Volume 2 - Price Proposal - V.
Financial Information for the last 3 years, certified by a Public Accountant) What years are you looking for 2024
- 2022 or 2023 - 2021?
Please provide financial information for tax years 2024, 2023, and 2022. Should your tax information for tax year 2024 not yet be ready, please include financial statements for tax years 2023, 2022, and 2021.
MAGC bid form Item Number 12 and 13 What is the height of the ceiling to be removed? Please assume a maximum ceiling height of 10 feet.
Would it be possible to access the transcription, a copy of the presentation or the recording of the preproposal conference?
A copy of the pre-proposal conference agenda was included in Amendment 0001.
For the past performance requirement, would it be acceptable to provide a PPQ in a format different from the one provided in the solicitation package or CPARS?
No. See RFI #36. Please note that CPARS reports are not an acceptable method of fulfilling the requirements of the Past Performance factor.
For Factor 6, if the power of attorney is included in the bid bond letter to certify the credentials of the document's signatory, would it be considered as part of the 1-page limitation, would that exceed the page limitation?
No, power of attorney letters will not count against your page limitation and will be considered as ancillary documents.
Please keep ancillary documentation to the smallest possible length. The one page limitation applies to the letter provided by your bonding surity which outlines your firms ability to provide a per-project bid bond of at least $3,000,000.00 (see technical factor 6).
82 Bid sheet Line item Tab has Base-Option 1 -option 2-option 3 & option 4, are we suppose to fill in just unit prices for this columns?
Unit pricing shall be inclusive of all costs associated with that item, including markups (i.e. profit, overhead), but should exclude bonding and insurance costs (which will be included at the task order level).
Please confirm that contractor has to fill out all the 120-line items of the bid sample project and submit it as part of the price proposal and the total base bid cost will be considered as the bid amount along with the option nos.
1,2,3 and 4. Also confirm that the base and option amounts are to be listed on the solicitation form 1442. See RFI #72.
Please provide prevailing wage rates for all the various areas/ states where this contract work has to be performed. Please see RFI #4 and RFI #9.
85 Please advise if a bid bond is required along with the bid submission. Please see RFI #74 and #81.
86 1. Past Performance Submission Guidance Should we provide our past performance aligned with each identified project range (e.g., <$100k, $100k–$1M, >$1M)?
PPQs should be provided for each of the required projects for Factor 1 Prior Experience on Relevant Projects. Please see RFI #7 for dollar values of required projects for Prior Experience, and page 11 of the Solicitation document. In order to satisfy the requirements of Factor 4 Past Performance, you must submit a PPQ that aligns with the projects submitted for Factor 1 Prior Expeirience.
2. Program Management Structure Across Regions Will there be a designated Project Manager assigned to each individual region, or will GSA be appointing a centralized Project Manager responsible for oversight across all task orders nationwide?
GSA's staffing for administration of this IDIQ is currently "TBD" (to be decided). Note that individual task orders will have varying staff assigned by GSA (CO, CS, COR, PM, etc.). Task order level direction will be handled by the task order level GSA staff; overall administration matters related to the IDIQ will be handled by the "TBD" GSA team handling administration of the overarching IDIQ.
Could you please confirm whether the referenced file is required to be submitted with the proposal? If so, kindly advise under which proposal module it should be included — Technical or Price? (Reference:
47PD0225R0026+Agreement+101_SBSA_GC_MAR+2 025)
A copy of The Agreement is not required to be included in the proposal submission.
Could you please confirm whether the referenced file is required to be submitted under Technical Volume or Price Volume? (Reference: Offeror Information Worksheet)
Offeror Information Worksheet is required to be submitted in Volume 1 Technical Proposal, for Technical Factor 5. See document C201, page 9.
Could you please confirm whether the referenced file is required to be submitted under Technical Volume or Price Volume? (Reference: Document C301 Representation & Certification)
Representations & Certifications are required to be submitted in Volume 2 Price Proposal. See document C201, page 10.
Could you please confirm whether the referenced file is required to be submitted under Technical Volume or Price Volume? (Reference: Factor 6: Bonding Capacity Letter)
Bonding Capacity Letter is required to be submitted in Volume 1 Technical Proposal, for Technical Factor 6. See document C201, page 10.
Could you please confirm whether Past Performance Questionnaires (PPQs) that were previously submitted under a different IDIQ may be used to meet the Technical Proposal Criteria for this current IDIQ?
(Reference: PPQ)
Yes, you may reuse previously completed PPQs from prior submitted projects. See RFI #18, and #36.
Is there any wage scale to consider when completing Bid Sheet? If yes, Please provide sample wage scale.
(Reference: 47PD0225R0026 New Large Term IDIQ Bid Sheets) See RFI #9.
Does company Overhead, profit, Bond & Insurance cost to be included in the line Item? Please clerify what to be included in the line item. (Reference: 47PD0225R0026 New Large Term IDIQ Bid Sheets)
Line items should include all costs, but exclude bonds and insurance. See RFI #82 for further information.
Should company overhead, profit, bond, and insurance costs be included in the line item? Please clarify what should be included in the line item. (Reference:
47PD0225R0026 New Large Term IDIQ Bid Sheets)
Line items should include all costs, but exclude bonds and insurance. See RFI #82 for further information.
Please confirm line item does not include cost of Superintendent, PM, QC, Safety etc. (Reference:
47PD0225R0026 New Large Term IDIQ Bid Sheets)
Line items should include all costs, See RFI #82 for further information.
Reference: II.D. Technical Proposal; Dollar Value of Submitted Projects (Factor 1): "Two (2) submitted projects shall be between $500,000 - $3,000,000". Will the Government consider relevant Projects greater than $3,000,000?
No. Two (2) projects shall be submitted between the values of $500,000 and $3,000,000. Projects submitted over $3,000,000 will not be considered.
Reference: II.D. Technical Proposal; Dollar Value of Submitted Projects (Factor 1): “One (1) submitted project shall be between $50,000 - $250,000.” Will the Government consider relevant Projects greater than $250,000?
No. One (1) project shall be submitted between the values of $50,000 and $250,000. Contractors shall submit one (1) project between $50,000 and $250,000 and two (2) projects between $500,000 and $3,000,000. Projects outside of these requirements and ranges will not be considered.
We see that there is both the bid sheet line item and the bid sample project. Do you want us using the quantities given in the sample project for the line item pricing on the first sheet? In order to provide pricing on the line item sheet, we would need some kind of quantity to go from. Please advise want quantity we should use for each line item price.
No, please use the quantity of pricing per 1 square foot on the line item pricing for the first page.
The proposal requirements indicate that pages be numbered. Some documents that are included within the price proposal (such as CPA financial statements or a JV agreement) are documents that already have page numbers. Should inserted pages such as these be renumbered, or have an additional set of numbers added?
You do not have to remove additional page numbers.
However, please add an additional set of page numbers for continuity purposes.
"General Decision Number: PA20250003 03/21/2025
Superseded General Decision Number: PA20240003
State: Pennsylvania
Construction Type: Building
County: Philadelphia County in Pennsylvania.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2025 1 02/21/2025
2 03/07/2025 3 03/21/2025
ASBE0014-001 05/01/2024
Rates Fringes
Asbestos Workers/Insulator Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 59.37 45.78
* BOIL0013-001 01/01/2025
Rates Fringes
BOILERMAKER......................$ 55.00 35.48
BRPA0001-006 05/01/2024
Rates Fringes
BRICKLAYER.......................$ 48.70 31.61
BRPA0001-008 05/01/2024
Rates Fringes
TILE SETTER......................$ 51.36 30.02
BRPA0001-011 05/01/2024
Rates Fringes
MASON - STONE....................$ 48.40 31.95
BRPA0001-015 05/01/2024
Rates Fringes
Pointer, caulker and cleaner.....$ 50.00 30.70
CARP0158-001 05/01/2024
Rates Fringes
Carpenter/Lather.................$ 54.13 29.78
CARP0219-005 05/01/2024
Rates Fringes
MILLWRIGHT.......................$ 53.54 36.94
CARP0251-001 05/01/2024
Rates Fringes
FLOOR LAYER: Carpet.............$ 55.07 31.33
CARP0474-004 05/01/2024
Rates Fringes
PILEDRIVERMAN....................$ 47.50 43.42
ELEC0098-003 05/02/2022
Rates Fringes
ELECTRICIAN......................$ 65.76 61%+1.98
ELEC0098-014 05/02/2022
Rates Fringes
ELECTRICIAN (Sound and Communication Technician) (Installation of Voice Data, IT Network, Wifi))...............$ 63.97 30.40
ELEV0005-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC................$ 71.85 38.435+a+b
FOOTNOTES FOR ELEVATOR MECHANICS:
A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
* ENGI0542-002 05/01/2024
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 53.36 33.65+A
GROUP 1a....................$ 56.37 34.53+A
GROUP 2.....................$ 53.11 33.58+A
GROUP 2a....................$ 56.13 34.45+A
GROUP 3.....................$ 49.03 32.37+A
GROUP 4.....................$ 48.73 32.28+A
GROUP 5.....................$ 47.00 31.78+A
GROUP 6.....................$ 46.02 31.48+A
FOOTNOTE: A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day and Christmas Day
***TOXIC/HARARDOUS WASTE REMOVAL***
Add 20 per cent to basic hourly rate for all classifications
BOOM LENGTH PAY:
On all machines with booms, jibs, masts and leads, including tower cranes, 100 ft. from ground up, fifty cents ($.50) per hour additional will be paid for each increment of 25
ft. over 100 ft. On cranes with booms (including jibs, masts and leads) 200 ft. and over, two (2) operators will be required. When two (2) operators are employed, no Oiler will be required. Booms to be measured from the ground up.
Tower cranes calculated from ground up and out for purpose of boom pay.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Handling steel and stone in connection with erection, cranes doing hook work, any machine handling machinery, helicopters, concrete pumps building machines similar to the above, including remote, robotic or laser control equipment.
GROUP 1a: Machines handling steel, or the functional equivalent, and stone in connection with erection 15 ton and over factory rating; Cranes doing hook work 15 ton and over factory rating; Any machines handling machinery; HIgh Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 ton and over factory rating;
Concrete Pumps (Building) 120 feet of Boom length or less (200 yard pour or less); Machines similar to above, including remote, robotic or laser control equipment;
Equipment in this Wage Group that does not require an oiler.
GROUP 2: All types of cranes, All types of backhoes, Cableways, Draglines, Keystones, all types of shovels, Derricks, Pavers 21E and over, Trenching machines, Trench shovel, Gradalls, Front-End loaders, Boat Captain, Pippin type backhoes, Tandems scrapers, Towers type crane operation erecting, Dismantling, Jumping or Jacking, Drills (self-containes), (drillmaster type) forklift (20 ft. and over), Moter patrols (fine grade), Batch plant with mixer, Carryalls, Scraper, Trounapulls, Roller (Hith Grade Finishing), Spreaders (asphalt), Bulldozers and Tractors, Mechanic welder, Conveyor loaders (euclid-type wheel), Concrete pump, Milling Machines, Hoist with two towers, Building hoist double drum (unless used as a single drum), Mucking machines in tunnel, All auto grade and concrete finishing machines, Bundle pullers/extractors (tublar), bobcat. side broom, directional boring machines, vermeer saw type machines(other than than hand held tractor mounted hydro axe, chipper with boom, all) machine similar to the above including remote, robotic or laser control equipment.
GROUP 2a: Crawler backhoes and Crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; All types of cranes 15 ton and over factory rating; Cherry picker type machinery and equipment 15 ton and over factory rating; Concrete Pumps (Heavy/Highway); Machines similar to above, including remote, robotic or laser control equipment; Equipment in this Wage Group that does not require an oiler.
GROUP 3: Asphalt plant engineers, Well drillers, Ditch witch (small trencher), Motor patrols, Fine grade machines, Ten-ton roller (grade fill stone base), Concrete breaking machines, Guilloline only, Stump grinder, Conveyors (except building conveyors), Fork lift trucks of all types, High pressure boliers Elevator Operator (New Construction) Machine similar to the above,including remote, robotic or laser control equipment
GROUP 4: Seaman, Pulverzer form line grader, Farm tractors, road finishing, Concrete spreader, Power broom (self-contained), Seed spreader, Grease truck, toxic/hazardous wate removal rate 20 per cent added to all classifications and machiines similar to the above including remote, robotic or laser control equipment.
GROUP 5: Compressors pumps, Well point pumps, Welding machines Tireman, Power equipment, Maintenance engineer (power boats),Elevator Operators (Renovations) and machine similar to the above including remote, robotic or laser control equipment.
GROUP 6: Fireman, Oilers and deck hands (personnel boats), grease truck. Machines similar to the above including remote, robotic or laser control equipment.
IRON0401-002 07/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 53.20 44.60
IRON0405-002 07/01/2024
Rates Fringes
IRONWORKER, REINFORCING..........$ 50.29 34.17
The following holidays shall be observed and when work is performed thereon it shall be paid for at twice the base rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Employees shall be off Christmas Eve Day and receive four hours pay.
Employees who have to work on Christmas Eve Day shall work four hours and be paid for eight hours pay for the holiday.
Any time worked beyond fours hours shall be paid at the double time rate plus the four hours holiday pay. To receive holiday pay, the employee must work the day before Christmas Eve and the first working day after Christmas Day.
IRON0405-004 07/01/2024
Rates Fringes
IRONWORKER (Rigger and Machinery Mover).................$ 46.73 34.17
The following holidays shall be observed and when work is performed thereon it shall be paid for at twice the base rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Employees shall be off Christmas Eve Day and receive four hours pay.
Employees who have to work on Christmas Eve Day shall work four hours and be paid for eight hours pay for the holiday.
Any time worked beyond fours hours shall be paid at the double time rate plus the four hours holiday pay. To receive holiday pay, the employee must work the day before Christmas Eve and the first working day after Christmas Day.
LABO0332-001 05/01/2024
LABORER
GROUP 1....................$ 37.70 26.54
GROUP 2....................$ 37.80 26.54
GROUP 3....................$ 37.85 26.54
GROUP 4....................$ 38.00 26.54
GROUP 5....................$ 38.05 26.54
GROUP 6....................$ 37.84 26.54
GROUP 7....................$ 38.98 26.54
GROUP 8....................$ 39.13 26.54
GROUP 9....................$ 39.28 26.54
GROUP 10....................$ 39.53 26.54
GROUP 11....................$ 38.10 26.54
LABORERS CLASSIFICATIONS
GROUP 1: Building site work; Stripping and dismantling concrete form work; loading, unloading, carrying and handling of all reinforced steel and steel mesh; handling lumber and other building materials; operating jackhammers, paving breakers and all other pneumatic tools; building scaffolds; raking, shoveling and tamping of asphalt;
spading and concrete pit work; grading; form pinning;
shoring; demolition except burners; laying conduits and ducts; sheathing; lagging; laying non-metallic pipe and caulking; all other types of laborers; pouring concrete;
operating vibrator; free air tunnels: miners.
GROUP 2: Power buggies; burners on demolition
GROUP 3: Wagon drill operator (single)
GROUP 4: Powdermen; wagon drill operator (multiple);
circular caisson excavation; underpinning excavation
GROUP 5: Caisson bottom man
GROUP 6: Yard workers
GROUP 7: Trackmen; brakemen; groutmen; bottom shaft men;
all other men in free air tunnels
GROUP 8: Form setters
GROUP 9: Miners bore driver; blasters; drillers; pneumatic shield operators
GROUP 10: Welders and burners
GROUP 11: Mason Tender
LABO0332-002 05/01/2024
Rates Fringes
LABORER (Asbestos Abatement, Toxic and Hazardous Waste Removal, Lead Based Paint Removal).........................$ 39.40 26.89
LABO0413-004 05/01/2024
Landscape Laborer Farm Tractor Driver, Hydroseeder Nozzleman and Mulcher Nozzleman...........$ 30.28 23.62+A
FOOTNOTE:
A. PAID HOLIDAYS: Independence Day, Labor Day, and Thanksgiving Day.
MARB0001-003 05/01/2021
Rates Fringes
MARBLE FINISHER..................$ 25.10 20.75
TERRAZZO FINISHER................$ 27.03 20.58
TILE FINISHER...........