47PC5526R0007_Project Minimum Breakdown_5th.pdf

PDF 185 KB Posted

Attached to
REV1 US Courts - 5th Floor Pretrial Kitchenette Renovation
Solicitation number
47PC5526R0007
Issued by
Not on record

About this file

This document is a project cost breakdown template for a kitchenette renovation at the US Courts facility located at 500 Pearl Street in New York, NY. The project (K-30654) involves comprehensive renovation of the 5th floor pretrial kitchenette, including demolition of existing cabinetry and flooring, site protection, site cleaning, painting, and installation of new components. Specific renovation elements include vinyl flooring with 10% attic stock, cove base, partition wall construction, countertop and backsplash, undermounted sink, faucet, cabinet fabrication, door frame and hardware, electrical work (GFCI outlets, dedicated circuits, undercabinet lighting), plumbing modifications (hot and cold water supply, drain line), and fire alarm device relocation. The template provides a structured breakdown for tracking material, labor, and total costs for each project component, with sections for subtotal, overhead and profit, and bonds, though specific monetary values are not filled in.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: US Courts - 5th Floor Pretrial Kitchenette Renovation K-30654 Location: 500 Pearl Street, New York, NY 10007

Description Quantity Unit Material Labor Total Supervision and project management

Required shop drawings and as-built drawings

Demolition including existing cabinetry, existing flooring and cove base, wall and door frame

Site Protection at project area, affected public corridors and elevator areas located in non-construction spaces

Site cleaning

Painting

Furnish and install Vinyl Flooring including 10% attic stock

Furnish and install Cove base including 10% attic stock

Partition wall Construction

Countertop and backsplash

Undermounted Sink

Faucet

Cabinet Fabrication transition Rubber Saddle

Door Frame

Hollow metal door

Door hardware and lockset

Hot water supply for sink

Cold water supply for sink

Drain line for sink

Water testing

Change existing electrical outlets to GFCI

Install new 20 amp dedicated circuit duplex electrical outlets

Furnish and install undercabinet Light

Relocating light switch

Cabling and all necessary electrical components

Fire Alarm Relocation including shop drawing and as-built drawing of the fire alarm device, programming and testing

Subtotal

Overhead and Profit

Bonds

Total

MINIMUM BREAKDOWN