SF30_47PC0619R0003_Amendment_2_GSA_Center.pdf
PDF 182 KB Posted
- Attached to
- General Construction Services for the Puerto Rico Hurricane Recovery Project GSA Center Guaynabo
- Solicitation number
- 47PC0619R0003
About this file
SF30 47PC0619R0003 Amendment 2 GSA Center
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2PQAC
Olga M. Rodriguez
Please see attached.
CARIBBEAN ACQUISITION UNIT
GSA, PUBLIC BUILDINGS SERVICE
150 CARLOS E. CHARDON AVENUE, ROOM 359
HATO REY, PR 00918
CARIBBEAN ACQUISITION UNIT
GSA, PUBLIC BUILDINGS SERVICE
150 CARLOS E. CHARDON AVENUE, ROOM 359
HATO REY, PR 00918
47PC0619R0003
1 4
04/26/2019
04/26/2019
04/26/19
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
PUERTO RICO HURRICANE RECOVERY PROJECT
SAN JUAN, PR
SOLICITATION NO. 47PC0619R0003
AMENDMENT NO. 2
GSA-PBS, REGION 2
Amendment No. 2 is hereby issued as follows:
1. The Davis Bacon Minimum Wage Determination PR190001 dated 01/04/2019 is incorporated as an attachment.
2. Attachment A1 Experience Summary Table has been revised to correct the questions.
Please refer to the latest attached A1 Experience Summary Table for the updated version of the document. The revised attachment A1 is also included in the latest RFP revision under section II.D Technical Proposal.
3. The following drawing is to be removed from the Civil and Landscape Section in the drawings package:
• CU303 STORM SEWER SYSTEM PLAN PROFILES PAGE 38
4. The following drawing is to be added to the Civil and Landscape Section in the drawings package:
• L-501 PLANTING SCHEDULES, NOTES AND DETAILS PAGE 42
5. The following drawings have been updated in the Civil and Landscape Section in the drawings package:
• C-001 CIVIL GENERAL LEGEND AND MASTER PLAN PAGE 5
• CD001 CIVIL SITE DEMOLITION LEGEND AND NOTES PAGE 6
• CD101 CIVIL SITE DEMOLITION PAGE 7
• CS101 GEOMETRIC LAYOUT PLAN-A PAGE 8
• CS102 GEOMETRIC LAYOUT PLAN-B PAGE 9
• CS103 GEOMETRIC LAYOUT PLAN-C PAGE 10
• CS104 GEOMETRIC LAYOUT PLAN-D PAGE 11
• CS105 CONCRETE PAVEMENT BLOW-UPS AND DETAILS PAGE 12
• CS501 TYPICAL SECTIONS AND DETAILS PAGE 13
• CS601 GEOMETRIC TABLES PAGE 15
• CI101 PAVEMENT MARKINGS AND SIGNS PLAN PAGE 16
• CG101 GRADING PLAN-A PAGE 18
• CG102 GRADING PLAN-B PAGE 19
• CG103 GRADING PLAN-C PAGE 20
• CG104 GRADING PLAN-D PAGE 21
• CG105 PROPOSED AND EXISTING SPOT ELEVATIONS PLAN PAGE 22
• CG111 DRAINAGE AREAS PAGE 23
• CG303 STREET PROFILE PAGE 26
• CG311 GRADING SECTIONS PAGE 28
• CG312 GRADING SECTIONS PAGE 29
• CG313 GRADING SECTIONS PAGE 30
• CU101 STORM SEWER SYSTEM PLAN-A PAGE 31
• CU102 STORM SEWER SYSTEM PLAN-B PAGE 32
• CU103 STORM SEWER SYSTEM PLAN-C PAGE 33
PUERTO RICO HURRICANE RECOVERY PROJECT
SAN JUAN, PR
SOLICITATION NO. 47PC0619R0003
AMENDMENT NO. 2
GSA-PBS, REGION 2
• CU104 STORM SEWER SYSTEM PLAN-D PAGE 34
• CU111 UTILITIES ELEVATIONS ADJUSTMENT PLAN PAGE 35
• CU301 STORM SEWER SYSTEM PLAN PROFILES PAGE 36
• CU302 STORM SEWER SYSTEM PLAN PROFILES PAGE 37
• CU501 STORM SEWER SYSTEM PLAN DETAILS PAGE 38
• CU502 STORM SEWER SYSTEM PLAN DETAILS PAGE 39
• CU511 UTILITY STRUCTURES MODIFICATION DETAILS PAGE 40
• CU601 STORM SEWER SYSTEM SCHEDULES PAGE 41
6. Section I.H of the “GSA CENTER AGREEMENT” document shall be replaced with the following (changes in red):
I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments The following documents are incorporated by reference into this Contract.
(1) Statement of Work for GSA Contract No. TBD, Dated XX
(2) Specifications for GSA Contract No. TBD, Dated XX
(3) Construction Drawings for GSA Contract No. TBD, Dated XX
(4) Davis Bacon Minimum Wage Determination PR190001
The date and time for receipt of proposals remains unchanged.
END OF AMENDMENT
NO. 2
| SF30 |
| Amendment 2 47PC0619R0003 |
| END OF AMENDMENT NO. 2 |
| 2019-04-26T12:20:52-0400 | |
| OLGA RODRIGUEZ |
File details come from the government source that posted it.