REVISED RFP FINAL 04.23.19 AMENDMENT 1 GSA CENTER

View the file

Other files

File Type Posted
Amendment_7--47PC0619R0003--05.16.19.pdf PDF
Amendment_6--47PC0619R0003--05.15.19.pdf PDF
Amendment_5-SF30_GSA_Center_05.10.19.pdf PDF
Amendment_4-SF430_GSA_Center_05.08.19.pdf PDF
Amendment_3--47PC0619R0003_GSA_CENTER.pdf PDF
RFI_Responses_Questions_3-17.pdf PDF
SF30_47PC0619R0003_Amendment_2_GSA_Center.pdf PDF
Davis_Bacon_WD_PR190001.pdf PDF
GSA_Center_Agreement_Revised_04.26.19.pdf PDF
GSA_Center_RFP_Revised_04.26.19_Amendment_2.pdf PDF
Revised_Attachments_A1.A2.A3.A4_04.26.19.pdf PDF
Site_Visit_Sign_In_Sheet_GSA_Center_04.26.19.pdf PDF
Pre-proposal_conference_Sign_In_Sheet_GSA_Center_04.25.19.pdf PDF
Pre-proposal_and_Site_Visit_Google_Maps_Info.pdf PDF
SF30_47PC0619R0003_Amendment_1_GSA_CENTER_04.23.19.pdf PDF
REVISED_47PC0619R0003__GSA_1442FORM_FINAL_04.11.19.pdf PDF
GSA_Center_RFP_FINAL_04.11.19.pdf PDF
Attachments_A1.A2.A3.A4.pdf PDF
47PC0619R0003__GSA_1442FORM_FINAL_04.11.19.pdf PDF
GSA527-15c_Qualifications_and_Financial_Forms.pdf PDF
SF24-Bid_Bond.pdf PDF
GSA_Center_Agreement_FINAL_04.11.19.pdf PDF
GSA_Center_Agreement_Reps_&_Certs_FINAL_04.11.19.pdf PDF
Proposal_Preparation_Instructions_FINAL_04.11.19.pdf PDF
Additional_Information_RFP_47PC0619R0003_FINAL_04.11.19.pdf PDF
Partnering-PR_Hurricane_Recovery_Project_GSA_Center.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Contract for: General Construction Services for the Puerto Rico Hurricane Recovery

Project-GSA Center Guaynabo, PR

Solicitation No. 47PC0619R0003

Table of Contents

I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit – Construction H. Receipt of Offers

II. Proposals

A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors

III. General Provisions

A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Contractor Performance Information H. Safeguarding Documents Designated as Sensitive But Unclassified

IV. FAR/GSAR Solicitation Provisions A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of

Federal Specifications, Standards and Commercial Item Descriptions, FPMR 101-29

B. FAR 52.211-3, Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Items Description

C. FAR 52.216-1 Type Of Contract D. FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of

Work E. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction F. FAR 52.225-10 Notice of Buy American Requirement-Construction

Materials G. Buy American Exceptions H. FAR 52.233-2 Service of Protest I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference J. GSAR 552.102 Incorporating Provisions and Clauses by Reference K. Additional Provisions L. Certified Cost or Pricing Data

V. Instructions to Offerors and Clauses A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition B. FAR 52.219-14 Limitations on Subcontracting C. FAR 52.223-21, FOAMS (Jun 2016) D. FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 E. Security Requirements

F. Additional Clauses

VI. Method Of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Price E. Non Price Factors F. Evaluation of Joint Ventures

552.219-71 Notice to Offerors of Subcontracting Plan Requirements (MAR 2012)

The General Services Administration (GSA) is committed to assuring that maximum practicable opportunity is provided to small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns to participate in the performance of this contract consistent with its efficient performance. GSA expects any subcontracting plan submitted pursuant to FAR 52.219-9, Small Business Subcontracting Plan, to reflect this commitment. Consequently, an offeror, other than a small business concern, before being awarded a contract exceeding $700,000 ($1,500,000 for construction), must demonstrate that its subcontracting plan represents a creative and innovative program for involving small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled vet.

FAR 52.222-23 Notice of Equal Employment Opportunity (EEO) Compliance Plan GSA has partnered with the Department of Labor to ensure compliance with equal employment opportunity requirements that apply to this project. An EEO Compliance Plan is required after the award.

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation is set-aside for Small Businesses in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein.

The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents The Solicitation Documents are comprised of:

(1) The Solicitation

(2) Offeror Representations and Certifications Form

(3) Standard Form (SF) 1442 – Solicitation Offer and Award

(4) The Agreement and Attachments to the Agreement

(5) Other Forms Required For Submission with Proposals:

-Technical Proposal Attachments A1 Experience Summary Table, Attachment A2 Project Fact Sheet, A3 Key Personnel Resume, A4 Past Performance Questionnaire

-GSA Form 527 Contractor’s Qualifications and Financial Information

-SF24-Bid Bond

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

Authorized Representative Information:

Contract Specialist

Name: Natalia Lugo-Viña

Address: Federico Degetau FOB, 150 Carlos Chardon Ave, Rm 359, Hato Rey, PR 00918-1746

Telephone: 347-331-6783

Email: Natalia.Lugo-VinaCruz@gsa.gov

Contracting Officer

Name: Olga Rodriguez

Address: Federico Degetau FOB, 150 Carlos Chardon Ave, Rm 359, Hato Rey, PR 00918-1746

Telephone: 787-766-6169

Email: Olga.Rodriguez@gsa.gov

I.D. Pre-Proposal Conference

Date: Thursday April 25, 2019

Time: 8:30AM-12:00PM (EST)

Location: Compañia de Comercio y Exportación de Puerto Rico, 159 Ave.

Chardon, Conference Room First Floor, New San Juan Building, Hato Rey, PR 00919. Refer to attachment for Google Map information.

Parking: available in surrounding areas of the building.

Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, date and time. In addition, Contractors must register by April 23, 2019 in order to participate. To request a reasonable accommodation due to a disability, contact the Contracting Officer.

I.E. Estimated Price Range The estimated price range for the Project is between $8,000,000 and $10,000,000.

I.F. FAR 52.228-1 Bid Guarantee (Sep 96)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids;

and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) The site visit will be held at the following date and time:

Date: April 25, 2019

Time: 12:30PM (EST)

Location: GSA Center, 651 Federal Drive, Guaynabo, Puerto Rico (across the Federal Metropolitan Detention Center). Refer to attachment for Google Map information.

Parking: At the main entrance of the facility you will see a gate with a security guard. The guard will let you know where to park. Vehicles must have current registration.

http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375

(3) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than two (2) representatives from each Offeror.

Offerors shall submit a Visit Authorization Request (VAR) identifying all attendees from their respective team. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit.

Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the Offerors. Submit the VAR to the point of contact listed below.

Contractors must register by April 23, 2019 in order to participate.

To pre-register for the site visit, please send an email with the name of your company and attendees to the following:

Name: Natalia Lugo-Vina

Telephone: 347-331-6783

Email: Natalia.Lugo-VinaCruz@gsa.gov

I.H. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 4:00 pm local time on the following date and at the following address.

Date: Refer to FBO RFP posting for due date information.

Address: Only electronic proposals will be accepted at natalia.lugo-vinacruz@gov. Paper copies will not be accepted.

Items 2 and 3 listed below do not apply to this RFP. Please disregard. We will only accept electronic proposals.

(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.

(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the government installation designated for receipt of offers on or before the date established for receipt of offers.

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

1. Price Proposal

2. Technical Proposal

3. Representations and Certifications

4. Standard Form 24, Bid Bond

5. GSA Form 527 – Contractor’s Qualification and Financial Information mailto:Natalia.Lugo-VinaCruz@gsa.gov

6. Other Documents as Required---Technical Proposal Attachments A1 Experience Summary Table, Attachment A2 Project Fact Sheet, A3 Key Personnel Resume, A4 Past Performance Questionnaire

II.B. Proposal Format Volume I shall be the offeror’s Technical Proposal, which will provide the response to the technical factors demonstrating the offeror’s technical capabilities. Volume II shall be the offeror’s Price Proposal and it shall contain the pricing information for the base and options. The Technical and Price Proposal shall be sent as (2) two separate email attachments. Proposals should be in pdf format and shall be submitted via email to the Contracting Officer via email at Natalia.Lugo-VinaCruz@gsa.gov. (IF you must send your proposal via multiple emails due to file size, all must be received by the proposal due date and time indicated in the solicitation. Contractor shall include a detailed breakdown for each price element on the pricing form included in Section II of the Agreement. The breakdown shall include all associated direct costs: labor, materials, equipment, subcontracts, etc. per construction discipline; indirect costs; overhead and profit.

II.C. Price Proposal

(1) Contents

The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror.

(2) Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

(3) Additional Proposal Requirements

Price proposals will be evaluated on a total value basis. This includes the base and option pricing. Refer to the offer pricing sheet form.

II.D. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

FACTOR 1: EXPERIENCE ON RELEVANT PROJECTS (50%)

FACTOR 2: PAST PERFORMANCE ON RELEVANT PROJECTS (20%)

FACTOR 3: QUALIFICATIONS OF KEY PERSONNEL (30%)

Percentages are included to clarify the relative importance of each factor and will not be used in a calculation or algorithm to determine the best value to the government.

PRICE: Cost or price will not be assigned a numerical weight, point score, or adjectival rating. The SSEB and Contracting Officer will use cost and price analysis to evaluate the price proposal, not only to determine whether it is reasonable, as determined by comparison to Government estimates generated by GSA and/or the technical advisors, but also to determine the Offeror’s understanding of the work and ability to perform the contract. The price proposals will only be considered after all technical evaluations have been done. The cost and price evaluation will be clearly documented by the SSEB and Contracting Officer.

1) FACTOR 1: EXPERIENCE ON RELEVANT PROJECTS

The offeror must submit the required information on the Experience Summary Table (Attachment A1) as well as Project Fact Sheets (Attachment A2) for three (3) projects. One of the three projects must have a minimum construction cost of five million dollars ($5,000,000). All must have been successfully and substantially completed within the past ten (10) years. The Offeror must have served as the Prime GC or CMc on the submitted projects. Demonstrated experience on projects similar to this contract will lead to a higher rating for this factor. A project will be considered similar based on independent judgement and consensus judgment of the Source Selection Evaluation Board (SSEB) members that the project has enough characteristics in common with the subject project that it can be determined relevant experience. Projects determined to be not relevant or only partially relevant will receive no or lesser weight, resulting in a lower rating for this factor.

Similar projects shall have one or more of the below components (scope) of office buildings, courthouses, civic buildings or other acceptable institutional buildings*:

● Construction within an occupied and operational site, campus or multi-story building

● New or replacement site work over 3 acres.

● Installation of Generator Systems over 500 kilowatts.

*Examples of acceptable institutional buildings are: schools, colleges, universities, hospitals, laboratories and airports. Residential, retail, warehouses and industrial buildings will not be considered institutional buildings.

A single project identical in all aspects to this project may not exist, and therefore the Government will consider the combination of experience demonstrated by the three (3) submitted projects. Significantly more weight will be given to individual projects meeting all or most of the key elements.

Negligible relevant experience in one or more key elements may result in an unacceptable rating for this factor.

Having relevant construction experience helps demonstrate capability to perform the work required under this contract. In assessing the experience level and assigning a rating for this factor, the Government will consider the similarity of the experience to the work required under this contract, including scope, complexity and magnitude.

Complexity includes schedule constraints, management and administrative requirements, security requirements, applicable design criteria, coordination requirements, local conditions, as well as technical complexity.

Offerors shall complete all blocks on each form. Lack of response on any field may be interpreted by the Government as a non-responsive proposal or the uncertainty and associated risk may result in a lower rating for this factor. The burden of providing complete and accurate information lies with the Offeror;

however this does not preclude the Government from obtaining information from any other source.

Limit each Project Fact Sheet, Attachment A2, to no more than three (3) 8 ½” x 11” pages. Each page shall be one sided, single spaced, with a minimum 11 point Times New Roman font. If the information submitted exceeds the page limitations, only the first three (3) pages will be evaluated.

Note for Joint-Venture Offerors: The Joint Venture Offeror must have served as the Prime GC or CMc on the submitted projects. If relying on past experience and performance of the individual firms, at least one (1) project must be presented for each Joint-Venture partner. Greater weight will be given to projects that demonstrate prior teaming of the Joint-Venture partners.

Evaluation Standards for Factor No. 1

This factor considers the extent of the offeror’s recent and relevant construction experience on similar projects. The offeror’s response will be evaluated to determine the depth and breadth of the offeror’s past experience in successfully completing similar projects.

Excellent The experience submitted is extensive, substantially relevant, and demonstrates significant similarities to the work required under this contract. Experience completing projects comparable or greater in scope, magnitude, and/or complexity is demonstrated. Weaknesses, if any, are minor and are far outweighed by significant strengths. There is a very low level of risk.

Good The experience submitted is substantially relevant and demonstrates significant similarities to the work required under this contract. Weaknesses, if any, are not significant and are outweighed by strengths. There is a low level of risk.

Acceptable The experience submitted is relevant and demonstrates similarities to the work required under this contract. Although all elements of experience may be present, this contract generally has a higher level of scope, magnitude, and/or complexity than the individual submitted projects. Weaknesses are generally balanced by strengths. There is a moderate level of risk.

Unacceptable The experience submitted is minimally or not relevant. The scope, magnitude and/or complexity of this contract far exceeds that of the submitted projects. Key element(s) of experience are lacking. Although strengths may exist, the proposal contains a significant weakness or deficiency. There is an unacceptable level of risk.

2) FACTOR 2: PAST PERFORMANCE ON CONSTRUCTION PROJECTS

The purpose of this factor is to review the offeror’s record of past performance on relevant construction projects.

The Offeror shall submit Past Performance Questionnaires (PPQs) included in the solicitation as (Attachment A4), completed by the applicable client, for each project included in its proposal for FACTOR 1: EXPERIENCE ON RELEVANT PROJECTS.

Completed PPQs should be submitted with the proposal. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror shall complete the first page of the PPQ as well as the Client Point of Contact Information and shall submit it with a statement of what attempt was made by the Offeror (e.g. “Sent to Mr. Smith by email on 06/15/2019”). If the client requests, the client may submit a questionnaire directly to the Government's Contracting Officer, Olga Rodriguez via email at Olga.Rodriguez@gsa.gov and Government’s Contract Specialist, Natalia Lugo-Vina via email at Natalia.Lugo-VinaCruz@gsa.gov prior to proposal closing date. Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

You may also include performance recognition documents received within the last six

(6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror.

While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain a database of completed PPQs submitted by Offerors.

Evaluation Standards for Factor No. 2

The Government will evaluate the offeror’s record of recent and relevant past performance on construction projects. Using the past performance information, the mailto:Olga.Rodriguez@gsa.gov mailto:Natalia.Lugo-VinaCruz@gsa.gov

Government will perform a performance confidence assessment of the probability of successfully completing this contract. The Government will assess the past performance on projects submitted under FACTOR 1 and reserves the right to conduct telephone interviews with points of contact identified in the proposal, and/or to review other recent project ratings in PPIRS or other agency performance databases, review and/or contact offeror furnished references, or to review personal knowledge.

The Government will first assess the relevancy of the projects as compared to the scope of this contract. Performance on projects which are more similar to this contract is more heavily weighted than performance on work that involved little or none of the scope, magnitude of effort, and complexities this contract requires.

The Government will next consider how well the offeror performed on the contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance.

If any firm has multiple functions or divisions, the Government in mainly interested in past performance of the division or unit submitting the offer. Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work subcontractor management, including timely payment to subs or suppliers, safety, relations between owner or designer and contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting construction errors, warranty work, etc. The Government places a higher value on projects which document successful outcomes and are supported by outside source confirmation, for example, but not limited to telephone interviews with points of contact identified in the proposal, CPARS, PPIRS, or other agency performance databases, offeror furnished references, or personal knowledge. The Government also places a higher value on projects that provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully.

The rating for this factor will be expressed as a degree of confidence in the offeror’s ability to successfully accomplish the contract requirements. The rating system used for the performance confidence assessment is described below.

If the offeror includes multiple firms, each entity (firm) will be rated on its own performance or that of its predecessor, if relevant. An entity may not establish past performance based on the past performance of its proposed key personnel, apart from that of the entity. If the Government does not obtain past performance information for relevant projects identified by the offeror and cannot establish a meaningful past performance record for the Offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence”.

Unknown Confidence (Neutral) No recent/relevant performance record is available or the record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Substantial Confidence The offeror’s past performance record on relevant projects demonstrates a pattern of successful performance and high level of client satisfaction. Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

Previous clients are generally satisfied. Any marginal or unsatisfactory remarks in any aspect of performance are balanced by excellent, or very good remarks. There is no significant unfavorable performance information. This rating may also be assigned if there is a pattern of excellent performance, but the projects are not highly relevant.

Limited Confidence The offeror’s recent/relevant performance record includes one or more unfavorable (marginal or unsatisfactory) remarks that are not offset by sufficient examples of positive performance. The record may indicate eventual satisfactory performance that required significant government or owner oversight in order to achieve.

Unacceptably Low Confidence The offeror’s recent/relevant performance record includes one or more significantly unfavorable (marginal or unsatisfactory) remarks that are not offset by sufficient examples of positive performance. The response lacks essential information to substantiate the data presented. The record instills little to no confidence in the Government that the offeror will successfully perform the required work.

FACTOR 3: QUALIFICATIONS OF KEY PERSONNEL

This factor assesses the qualifications of the proposed key personnel in terms of their academic/professional qualifications and their related work experience. The individuals presented must be the individuals who will be assigned to the project.

The offeror shall submit resumes for each of the key personnel proposed for this project for the positions identified below. Resumes shall include all pertinent information that clearly exhibits the qualifications of the proposed personnel. Resumes for each individual shall summarize the qualifications, professional designation, experience, education, skills and professional background information. Resumes must list the key personnel’s roles/responsibilities for the projects listed. An example resume format is provided as Attachment A3. Submit resumes for the following positions:

• Project Manager

• Project Coordinator (Construction Superintendent)

Expected Qualifications for Key Personnel:

• Project Manager: The Project Manager for this contract shall have a college degree (Bachelors) in an Architecture, Engineering, or Construction discipline.

The Project Manager should have at least ten (10) years of construction project management experience having managed projects relevant to this contract. The Project Manager should have experience with electronic project management (ePM) tools. A more favorable evaluation will be given to offerors who submit a Project Manager who exceeds the minimum requirements and has experience with ePM.

• Project Coordinator (Construction Superintendent): The Project Coordinator shall have a minimum of ten (10) years of construction experience as a superintendent on projects relevant to this contract. The Project Coordinator should have experience with electronic project management (ePM) tools. A more favorable evaluation will be given to offerors who submit a Project Coordinator who exceeds the minimum requirements and has experience with ePM.

Evaluation Standards for Factor No. 3

The Government will evaluate the required information to determine how well the offeror demonstrates that its key personnel meet or exceed the expectations and minimum qualifications, which include previous satisfactory experience in similar type work, to manage, control and perform construction. Performance of key personnel proposed for this project may be taken into account when it comes to the attention of the Government.

Excellent Key personnel exceed expected qualifications and demonstrate substantial experience on projects similar or greater in scope, magnitude and complexity to this contract. Weaknesses, if any, are minor and are far outweighed by significant strengths. There is a very low level of risk.

Good Key personnel meets expected qualifications and demonstrate some experience on projects similar in scope, magnitude and complexity to this contract. Weaknesses, if any, are not significant and are outweighed by strengths. There is a low level of risk.

Acceptable Prior experience of key personnel may not be fully relevant in some cases, although key personnel substantially meet minimum expectations. Weaknesses are generally balanced by strengths. For example a lower education level (Associate's Degree where Bachelors is expected) may be balanced by additional years of relevant professional experience. There is a moderate level of risk.

Unacceptable

The experience, skill and qualifications of one or more of the key personnel proposed do not meet the requirements. The response lacks essential information to substantiate the data presented to the extent that the criteria/requirements can be satisfied. The requirements may only be met with major changes to the proposal.

Although strengths may exist, the proposal contains a significant weakness or deficiency. There is an unacceptable level of risk.

ATTACHMENT A1 – EXPERIENCE SUMMARY TABLE

FORM A1 – Experience Summary Table Name of

Offeror:_________________

Project 1 Project 2 Project 3 Example Project (for Illustrative purposes only, not a real project)

Project Name X Building

Location (City, State, Country) San Juan, Puerto Rico

Contract Amount ($ USD) $10,000,000

Final Contract Amount ($USD) $10,500,000

Completion Date (Substantial Completion) 01 January 2019

Which elements of Experience does the project demonstrate?

New Elevator Installation or Major Elevator Modernization (Yes or No) Yes

Performed phase construction within an occupied and operational site, campus or multi-story building (Yes or No)

Yes

New or Replacement Roof Work over 10,000 square feet (Yes or No)

Yes

High End Interior Finishes, including Interior Premium Millwork (Yes or No)

Yes

Installation of Generator Systems over 500 kilowatts (Yes or No) Yes

Installation of Water Wells and Water Treatment Systems (Yes or No)

Yes

Performed phased construction on a construction project with a minimum value of $10,000,000.

(Yes or No)

Yes

Construction within an occupied multistory building (Yes or No) Yes

Construction Project Completed within the past ten (10) years (Yes or No)

Yes

Attachment A2 – Project Fact Sheet

Instructions: Complete all blocks. Limit the length to a maximum of three (3) pages per project, any information beyond the first three (3) pages will not be considered.

1. Name of Company that Performed this Work (this should be the name of your company, the Offeror)

Role (Prime GC, CMc, Subcontractor, Joint-Venture Partner, etc.):

2. Name of Project

3. Location of Project

4. Project Owner Information

4a. Agency or Company Name

4b. Point of Contact (Name, Phone, and Email)

5. Date Started

6. Date Completed (Substantial Completion)

7. Contract Amount ($ USD)

8. Description of Project and Work Actually Performed by your Company

8a. Size of project (gross square feet)

8b. Project Photos (provide at least two (2))

8d. Narrative description of the work including the major disciplines and trades involved. Make sure you identify the work you performed, the work that you subcontracted, and whether any work was performed by others.

ATTACHMENT A3 – KEY PERSONNEL RESUME

GSA Solicitation No.47PC0619R0003

Document: C201-SB GC/MARCH 2019 (The Solicitation)

ATTACHMENT A4 - PAST PERFORMANCE QUESTIONNAIRE

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number: DUNs Number:

Contact Name Email Address: : Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: ☐ P rim e C ontractor ☐ S ub C ontractor ☐ Joint V enture ☐ O ther

(Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed P rice ☐ C ost R eim bursem ent ☐ O ther (P lease explain) Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: ☐ H igh ☐ M ed ☐ R outine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good

Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Performance meets minimum contractual requirements. The

A Satisfactory rating is appropriate when there were

Satisfactory contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactor y

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

CLIENT INFORMATION

Client Point of Contact Information

Name:

Title:

Phone Number:

Email Address:

Project Information

Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of technical data/report preparation efforts. ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to meet quality standards specified for technical performance.

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project?

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

(d) Overall customer satisfaction. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

(b) Ability to hire, apply, and retain a qualified workforce to this effort.

4. MANAGEMENT/ PERSONNEL/LABOR -

Continued

E VG S M U N

(c) Government Property Control. ☐ ☐ ☐ ☐ ☐ ☐

(d) Knowledge/expertise demonstrated by contractor personnel.

(e) Utilization of Small Business concerns. ☐ ☐ ☐ ☐ ☐ ☐

(f) Ability to simultaneously manage multiple projects with multiple disciplines.

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)?

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)

☐ Yes ☐ N o

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

☐ Yes ☐ N o

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)

☐ Yes ☐ N o

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements ☐ ☐ ☐ ☐ ☐ ☐ for the project and personnel security requirements.

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below

(c) In summary, provide an overall rating for the work performed by this contractor.

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)

☐ Yes ☐ N o

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.)

☐ Yes ☐ N o

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

http://www.wbdg.org/resources/gbs.php#rcas http://www.wbdg.org/resources/gbs.php#rcas

II.E. Other Information to Submit with Proposal

(1) Representations and Certifications

Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301-SAT).

52.204-8 Annual Representations and Certifications.

Annual Representations and Certifications (Oct 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $36.5 million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

(i) □ Paragraph (d) applies.

(ii) □ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–

(A) The acquisition is to be made under the simplified acquisition procedures in part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

https://www.sam.gov/

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations- Representation.

(vii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.

(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals- Representation. This provision applies to solicitations that include the clause at 52.204- 7.)

(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xx) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade…