This is a Price Proposal Form template in Excel format for a design-bid-build construction solicitation. The form is intended for use by offerors responding to the Department of Energy National Nuclear Security Administration Joint Cyber Facility Construction Solicitation (47PB5427R0003), which seeks construction services for approximately 23,688 square feet of combined office and support space at Building 810, Denver Federal Center in Lakewood, Colorado, with an estimated price range between $10 and $20 million. The project encompasses demolition, architectural, mechanical, electrical, plumbing, fire protection, telecommunications, audio-visual system infrastructure, security infrastructure, and system furniture installation within an occupied facility, with all work subject to strict accreditation requirements and standards.
As a template document, this price proposal form establishes the required format and structure for contractors to submit their pricing and cost information in response to the solicitation. The form serves as the standardized submission vehicle through which competing offerors will present their financial proposals for the Joint Cyber Facility construction project. Contractors must complete this form in conjunction with other required solicitation documents and adhere to all submission requirements and deadlines specified in the solicitation package.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
| INSTRUCTIONS | |
| Fill in each line for all Shell and TI items in the corresponding Tenant Improvement Cost Summary (TICS) tab on white or green cells. All other cells are locked to prevent miscalculations. |
Tenant Improvements (TI)
Contract Type: Firm-Fixed-Price (FFP)
Pricing Basis: Lump Sum
Scope Description: This section constitutes the above-standard, mission-specific tenant agency improvements funded via Reimbursable Work Authorization (RWA) under Budget Activity 80. The Contractor shall provide all labor, material, equipment, and supervision required to complete the specialized tenant build-outs, custom architectural finishes, and dedicated IT/security infrastructure as specified in the Bid Documents.
Payment Milestone Basis: This fixed-price block must be tracked under a separate billing identifier. It is tied to a specific RWA funding number and cannot be cross-subsidized by BA54 funds.
TI Includes: Finishes, fixtures, additions, or alterations that convert an open shell condition into a finished, usable workspace tailored to a customer agency's specific needs.
1) Fill each division tab 1-33 as needed for the construction to be performed under the TI costs as indicated above.
Shell
Contract Type: Firm-Fixed-Price (FFP)
Pricing Basis: Lump Sum
Scope Description: This section constitutes the core, fixed-price requirement funded by GSA under Budget Activity 54. The Contractor shall provide all labor, material, equipment, and supervision required to complete the baseline building repairs, code compliance, and structural/MEP modifications as specified in the Bid Documents. This price is inclusive of all overhead, profit, and risk associated with the core building scope.
Payment Milestone Basis: Progress payments will be invoiced against a fixed Schedule of Values (SOV) tied exclusively to BA54 physical completion percentages.
Shell Includes: The building's basic structure, core, and common areas, provided as an open layout with basic building systems per GSA Pricing Desk Guide.
1) Fill each division tab 1-33 as needed for the construction to be preformed under the SHELL cost as indicated by the project specific instructions.
Shell: Project Specific Instructions
Due to the space being substantially built out, shell cost categories have been established to identify the scope of work that GSA will fund in order to bring the space to the minimum standards defined in the GSA Pricing Desk Guide. All other project elements shall be classified and priced as Tenant Improvements (TI).
1. Flooring and Associated Demolition: Demolition and removal where noted on drawings of existing raised access flooring, handrails, ramps, and associated doors necessary to prepare the space for occupancy.
2 Insulation: Insulation required to meet minimum building standards, specifically insulation at the underside of the mezzanine deck.
3 HVAC: All work associated with heating modifications required to support the conversion of the existing data center space into occupied office space, including all related heating hydronic distribution and equipment systems, controls, and associated work.
4 Lighting and Controls: The Contractor shall classify and price all F13/F13E - 4' Strip Light Fixtures and associated controls shown in the Contract Documents as Shell Costs. All remaining fixture types, specialty lighting, and associated controls shall be classified and priced as Tenant Improvements (TI).
TICS
| TENANT IMPROVEMENTS COST SUMMARY (TICS) | |||||
| Project Title: | DOE NNSA Joint Cyber Facility | Building Name: | Building 0810 | ||
| Project Number (Kahua): | 28469 | Building Number: | CO0624 | ||
| Project Location: | Lakewood, Colorado | Building Owner: | GSA | ||
| Project Area (Useable Square Feet): | 23688 | Date of Estimate: | |||
| Company Name: | Estimator Name: | ||||
| Master Format CSI | System Elements | SHELL | TI | ||
| Division 1 | General Requirements | ||||
| Division 2 | Existing Conditions | ||||
| Division 3 | Concrete | ||||
| Division 4 | Masonry | ||||
| Division 5 | Metals | ||||
| Division 6 | Wood, Plastics, Composites | ||||
| Division 7 | Thermal and Moisture Protection | ||||
| Division 8.1 | Openings: Doors, Frames, and Hardware | ||||
| Division 8.2 | Openings: Glazing and Glazing Film | ||||
| Division 9.1 | Finishes: Wall | ||||
| Division 9.2 | Finishes: Floor | ||||
| Division 9.3 | Finishes: Ceiling | ||||
| Division 10 | Specialties | ||||
| Division 11 | Equipment | ||||
| Division 12 | Furnishings | ||||
| Division 13 | Special Construction | ||||
| Division 14 | Conveying Equipment | ||||
| Division 21 | Fire Suppression | ||||
| Division 22 | Plumbing | ||||
| Division 23 | Heating, Ventilating, and Air Conditioning (HVAC) | ||||
| Division 26.1 | Electrical: Service and Distribution | ||||
| Division 26.2 | Electrical: UPS Battery System | ||||
| Division 26.3 | Electrical: Lighting and Controls | ||||
| Division 26.4 | Electrical: Generator | ||||
| Division 26.5 | Electrical: Telecommunications | ||||
| Division 27 | Communications: AV | ||||
| Division 28.1 | Electronic Safety | ||||
| Division 28.2 | Electronic Security | ||||
| Division 31 | Earthwork | ||||
| Division 32 | Exterior Improvements | ||||
| Division 33 | Utilities | ||||
| A | Subtotal Direct Construction Costs | $ - 0 | $ - 0 | ||
| 1 | Payment & Performance Bonding | ||||
| 2 | Field Overhead | ||||
| B | Subtotal Field Cost | $ - 0 | $ - 0 | ||
| 1 | GL Insurance | ||||
| 2 | Home Office Overhead | ||||
| C | Subtotal Cost Before Profit | $ - 0 | $ - 0 | ||
| 1 | Profit | ||||
| D | Total Construction Bid Cost | $ - 0 | $ - 0 | ||
| Total Construction Bid Cost (Shell+TI) | $ - 0 |