01 SMTF Project 47PB5126R0007 Amendment 0005.pdf

PDF 240 KB Posted

Attached to
Construction of a Specialized Mission Training Facility (SMTF), Laurel, MD
Solicitation number
47PB5126R0007
Issued by
Not on record

About this file

This is Amendment 0005 to Solicitation 47PB5126R0007 for the Specialized Mission Training Facility (SMTF) in Laurel, Maryland, issued by GSA PBS OAM Capital Project Delivery Division. The amendment is effective September 16, 2026, and was issued on July 8, 2026. The contracting officer is Marsha Howard, reachable at marsha.howard@gsa.gov or 817-505-8543.

Amendment 0005 deletes all references to and requirements of the Project Labor Agreement (PLA) Paired-Proposal Procedure from the solicitation, including Paragraph II.C.(3), the Contract Price Form with mandatory PLA pricing, Paragraph VI.A.(4), the PLA Best Value Tradeoff Procedure in section VI.E, and the PLA provision in section IV. Offerors are no longer required to submit a PLA Price Proposal with their Phase 2 proposal. All offerors must acknowledge receipt of this amendment in accordance with Block 11 instructions on Standard Form 30 prior to the hour and date specified in the solicitation, using one of three methods: completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to receive acknowledgment at the designated receipt location prior to the specified deadline may result in rejection of the offer. All other items in the solicitation remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

Solicitation 47PB5126R0007, Specialized Mission Training Facility (SMTF), Laurel, MD

See description of changes herein.

All offerors must acknowledge the amendment in accordance with the instructions in Block 11.

GSA PBS OAM Capital Project Delivery Division 819 Taylor Street, 11th Floor, Fort Worth, Texas 76102 POC: Marsha Howard, Contracting Officer Email: marsha.howard@gsa.gov

PH: 817-505-8543

47PB5126R0007

1 2

09/16/2026

07/08/2026

SMTF Project, Laurel, MD GSA PBS Capital Delivery Projects Division Solicitation 47PB5126R0007

Specialized Mission Training Facility (SMTF) Laurel, MD

Amendment 0005 amends Solicitation 47PB5126R0007 as follows:

All references to and requirements of the PLA Paired-Proposal Procedure are hereby deleted from the Solicitation. This includes:

● Paragraph II.C.(3): PLA Paired-Proposal Procedure;

● The Contract Price Form with mandatory PLA pricing;

● Paragraph VI.A.(4);

● The PLA Best Value Tradeoff Procedure in section VI.E.

● The Project Labor Agreement (PLA) provision in section IV.

Offerors are not required to submit a PLA Price Proposal with their Phase 2 proposal.

All offerors must acknowledge the amendment in accordance with the instructions in Block 11 on Standard Form 30 for Phase 2.

All other items remain unchanged.

END OF AMENDMENT 0005

SF 30 SMTF Amd 0005
SMTF Amendment 0005 legal

File details come from the government source that posted it. Updated .