47PB0025R0007 Amendment 003.pdf
PDF 6 MB Posted
- Attached to
- LPOE Refresh Orient ME Federal contract opportunity
- Solicitation number
- 47PB0025R0007
About this file
This is Amendment 003 to solicitation 47PB0025R0007 for the LPOE Refresh project at the Orient, ME border station. The amendment extends the proposal due date from January 31, 2025 to February 3, 2025 at 5PM Eastern Time and incorporates responses to contractor questions as well as an asbestos report for the facility.
The amendment includes clarifications through Q&A regarding repointing requirements, building closure during construction (facility will be closed), completion deadline of September 1, 2025 due to funding constraints, and various technical specifications about materials and installation requirements. The included 2012 asbestos survey report identified asbestos-containing materials in gray sink coating (5-10% chrysotile) and brown pebbled sheet flooring/mastic (5-10% chrysotile) in certain areas of the facility. The amendment requires contractors to sign and return the SF30 form with their proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 47PB0025R0007 Amendment 004.pdf | ||
| 47PB0025R0007 Amendment 002.pdf | ||
| 47PB0025R0007 Amendment 001.pdf | ||
| Past Performance Questionnaire.pdf | ||
| 47PB0025R0007 1442.pdf | ||
| Reps and Certs.pdf | ||
| Wage Determination ME20230006.pdf | ||
| GSA527-21.pdf | ||
| 47PB0025R0007 The Solicitation.pdf | ||
| 47PB0025R0007 The Agreement.pdf | ||
| SF24.pdf | ||
| Supplemental Information Form.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
See Attached.
Capital & Customer Projects Contracting Branch 230 S Dearborn St Chicago, IL 60604 USA
See box 6.
47PB0025R0007
01/27/2025
01/27/2025
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
RFP 47PB0025R0007
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Amendment 003 is issued to make the following changes:
• The attached RFIs and Answers are incorporated. Please note that the Answers provided in the attached supersede any inconsistent provisions contained in the solicitation.
• Include the Orient LPOE Asbestos Report.
• Extend the proposal due date from 1/31/25 to 2/3/25 at 5PM Eastern Time.
All other solicitation terms and conditions remain unchanged.
PLEASE NOTE – YOU MUST SIGN THE SF30 INCORPORATING THIS
AMENDMENT IN BOX 15A AND RETURN THE SIGNED FORM ALONG
WITH YOUR PROPOSAL.
RFIs and Responses
RFP No. 47PB0025R0007
LPOE Refresh Orient ME
Questions: Answers:
1.
Can you please verify the Liquidated Damages for this project? The Agreement I.F. Contract Liquidated Damages Rate page 6 show $0.00.
LDs are not part of the project.
2.
On page 6 of the specification (page 1 of 011000 – Summary) Item1.1 D. states: Project Delivery Method: Traditional design/bid/build.
Just want to confirm that we do not have to bring in another designer to finalize or redesign the project. We are just bidding the already completed design and will be required to construct that design.
Correct.
3.
Missing the BC (branch connector) detail on page M-1-101
Manufacturers installation instructions to be followed if Branch Connectors are to be used.
4.
What is the electrical scope for the pointing and patching of the exterior masonry?
Means and methods, if something is deemed needed to be removed to properly pointing and patching then include it.
5.
Will there need to be temp relocations or replacement of the exterior conduits?
Unclear what this is referring to.
6.
Please advise if the building will be closed during construction?
Yes, the port will be closed for the duration of the project. Dates will be established as soon as possible
7.
Does a temporary facility need to be provided during construction?
No
8.
Does any temp power need to be provided? Means and methods, If the contractor can do the work without having to shut down power then no temp power is required
9.
In option 1 is the intent to repoint the whole building?
Repoint and patch where needed, if deemed the whole building needs repointing then propose it.
10.
Please clarify what is meant by “repair”. noun:
the action of fixing or mending something.
11.
Please provide the sign in sheet. The sign-in sheet is posted to SAM in
Amendment 002..
12.
Please provide specifications for structural steel columns and beam.
See ‘Structural Steel Notes’ sheet S-1-111
13.
There are no fire-rated walls. Please confirm requirements for firestopping.
There is no fire-rated wall construction. Provide solid 2x fire blocking at the top of all stud cavities where the wall partition intersects the ceiling.
14.
There is a specification for access doors and panels (08-3100), however, none are shown on drawings. Please confirm the quantity and locations for these access doors and panels.
No access doors are required for the HVAC system design.
15.
There is a specification for 09-6700 Fluid Applied Flooring, however, we do not see this denoted in the drawings. Please confirm if fluid-applied flooring is applicable and if so, provide locations and details for this system.
Specification Section 096700 Resinous Flooring refer to Note P18 on sheet A-1-111
16.
Who is responsible for furnishing and installing the lockers?
Contractors are responsible for furnishing and installing lockers, specs are on prints PG 16 of 52.
17.
On Amendment 002, it denotes under Item 3 Effective Date that this amendment is effective as of "01/07/2025," which is the same as Amendment 001. Please confirm which effective date should be utilized for Amendment 002 on the SF1442.
Please use 1/15/25.
18.
Solicitation reads:
Option 1 includes 100% repointing and Crack repair. But SOW states:
• Base Bid Work includes, but is not limited to the following:
1. Exterior Bid Work (Base Bid): includes the 100% repointing of the joints and any cracks discovered on the building's North, South, East and West Facades. This area covers the entire elevation/facade from the Ground Floor to the Roof:
B. Masonry Restoration: Repoint all brick joints and
Repointing the brick is part of the option. 100 percent repoint / patch building where needed, if the contractor deems doing the entire building is a better means and methods then present that in their proposal.
repair all cracks on the east & west facades
Can you quantify or differentiate whether repointing and crack repair is an option or should be included in the base bid ?
19.
At Some Mortar locations to 100% repoint will affect the roof and flashing which appears to be adhered to the brick and roof. Should we include in our price the associated repairs for the roof and flashing or assume we will not disturb the Brick's and mortar locations that would create additional work?
If Brick / mason joints need repair in those locations then pull back roofing, point / patch reflash.
20.
For Crack repair - Should we assume removal of cracked bricks and tooth in new to closely match existing?
Yes
Pg5 of "The Agreement - Can you Confirm The building will be unoccupied during this renovation?
See response to question 6.
Are any As-builts or existing framing plans available?
No
Do we know when the building was built? 1937
Is a mortar analysis required? No
Pg 040115-6 Para. 2.4 A. calls for lead T-caps, are lead t-caps required on this project? if so please quantify
If it calls for it then it is needed.
On Drawing A-1-131 plan note P11 is remove and replace existing gutters and Down spouts - During the sight visit the gutters and down spouts appeared to be intact but in some locations the Eaves, Eaves Drip, Facia, Soffit and Frieze Board appeared to be rotted. Can we assume this work if needed to replace the Gutters will be deemed an existing condition and not part of the project or scope?
Price replacing gutter and downspout and during install if deemed necessary to replace facia, and soffit we will address at that time.
Is there currently an existing Access control System and if so whom is the current service tech or provider? HIRSCH IDENTIV?
No existing access control.
Is there currently an existing Security and Monitoring System and if so whom is the current
Currently monitored via video feeds to the Houlton CBP Area Security Center (CASC). No
Service tech or provider? HIRSCH IDENTIV? IDS services/monitoring at this time.
For access controls and security is the facility currently using a vendor with proprietary software?
No existing access control or IDS.
Please provide Hazardous material report per specification 01 73 20 1.5.F
Uploaded with amendment 3
On Sheet A-1-131, Note P11 delineates, "Remove and replace all existing gutters and downspouts. Provide gutters and downspouts to match existing color, size and profile." We do not see a corresponding specification that notes the existing color, size and profile. Please provide this specification.
Provide architectural grade, pre-finished, 0.040 inch thick aluminum K-style gutters, pre-finished 2” x 3” x 0.040 inch thick ribbed aluminum downspouts, with concealed mill finish aluminum gutter hangers and downspout hangers.
Is there an asbestos report available? Please verify no hazmat, asbestos, lead, PCB etc removal required in scope of work
The asbestos report will be uploaded to SAM.gov with the responses to this form.
Please confirm load out path. Is there a location to leave a dumpster and parking location?
LPOE will be shutdown
For the demo/ project will there be any phasing requirements?
LPOE will be shutdown
Will off hours work be required for the demo/noisy work on this project?- I see working hours 7-4 but wasn’t sure about noisy work.
LPOE will be shutdown
Are there any CAD drawings for this project? Not at this time. All available drawings have been posted on SAM.gov.
Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
There are no guarantees of an extension. As noted during the pre-proposal, we need to complete by September 1, 2025 due to funding constraints, so it is critical to order materials asap. We will do what we can to ensure a successful project. Note that the option, if exercised, would not be subject to this same deadline.
What documentation will need to be submitted for closeout approval?
Standard close out procedures
Will the building be occupied during construction?
No
What specific standards or guidelines from the National Register of Historic Places (NRHP) must be adhered to during renovation?
Follow plans and specs
Are there approved vendors or materials for historic preservation work?
No approved vendors, follow plans and specs
Will utility disruptions (e.g., HVAC, plumbing, electrical) be allowed during the renovation, and what is the notification procedure?
The port will be closed, Contractor will be responsible for providing utilities to contractors, means and methods.
Are there any as-built drawings or surveys available for confirming existing structural conditions?
No
What precautions should be taken when working near historically significant elements?
See SECTION 013510 - HISTORIC BUILDING
TREATMENT PROCEDURES.
Are there any environmental considerations (e.g., wildlife, hazardous materials) that could impact construction?
See asbestos report.
the SOW on the repointing and it is calling out that you must have 5 years’ experience ( 1.3 Quality Assurance A )? as it will require bringing in specialists from away.
Perform the work to the trade standard, and meet local and regional building codes.
Is there an existing post to be removed and install new? the post is shown on the Structural foundation plan (S-1-101) but does not indicate removal of existing
See Attached
Vestibule 103 -Will there be flooring to be installed where the foundation and eye wash are to be removed as well as the remove the existing gwb and install new for the entire east wall? The Finish Schedule A-6-104 Note #2 remove finishes and provide new gwb painted and wood base at east weall.
See Attached
Electrical Demo plan Note # D5 & D6 e lighting is to remain i and there are notes for remove all existing lighting in entirety as well as note up to GC to remove all.
See Attached
Where there are 8" oval ducts up and down the walls, (3-1/4" wide ) is 3-5/8" stud enough to clear the duct?
See Attached
Cased opening at the Office 109-North Elevation (5/A-6-101) Please confirm the dimension of the wall and trim to be installed,The left side of the wall is this trim 5" or no trim on the left side of the opening?
See Attached
Door # X01 on the Door schedule refers to Card reader. Please confirm where the card readers are located and on the Electrical plans.
See Attached
Wall type # 2 What type of GWB is to be installed in the Kitchen
See Attached
North wall of Office: Wall Tag note # 5: Please confirm the 2-1/2" stud limits, the wall thickness looks larger then 2-1/2" stud Mechanical has a 8" oval duct running the wall ( 3-1/4" wide )
See Attached
Elevation 14 & 17 /A-6-101- The The millwork is flipped from what is on the plan.
See Attached
North Elevation is not tagged on the plan : 1/A6-
See Attached
( finish schedule A-6-104 note #2) remove finishes and provide with new painted gwb and wood base at the East wall, will there be flooring for the demo of the water fountain and the eye wash?
See Attached
Partition type 2 : sheet A-3-101 the description on the partition type calls out for sound attenuation blanket and is 2x wood framing, the wall type 2 description on the floor plan sheets does not call the insulation and states either wood or metal stud framing
See Attached
Door # 103 -Is the sill to remain existing or install new door
See Attached
Partition type #6 in the LAN 108 has 3/4" A/C plywood from floor to ceiling, Sheet ES1-101 has key note # 1 that has 4'- H x 3/4 thick fire rated plywood horizontally on the entire length of the wall as indicated on the plan Please confirm the Type of plywood and all walls are to receive from floor to ceiling in this room
Wall types: What sides of the wall get the 2 layers of 5/8" GWB
Call out 2/A-2-101.Please confirm this enlarged plan location there is no sheet provided A-2-101 or any other sheets have an enlarged restroom plan.
See Attached
What size farming is to be used this only leaves 3/16" either side for the duct to clear 3-5/8" stud wall framing and the duct?
See Attached
What is the locker enclosure soffit detail See Attached
Nurses Room Counter and Sink: Please confirm the Section 4/A-6-103 tagged on elevation 13/A- 6-102. Is this the correct section the counter depth is only( 1'-9") 1-'10" with back splash The Plan looks to be 2'-1" counter. There is an under counter fridge to be installed, will this need power under the counter?
See Attached
General demolition notes # 3 At first and second floor remove all existing ceilings and light in entirety. On the RCP plan there is a note for second floor: Patch and repair existing ceiling at removed partition and new mechanical and electrical work. At contractors option the existing ceiling may be removed and replaced in its entirety. Please confirm this scope, is this a bid alternate?
See Attached
-Basement- GC to provide coordination drawings showing all mechanical and proposed location and mounting hts for light fixtures?-is this typical
See Attached
Please confirm the lighting fixture schedule vs the description the rcp are different, and to refer to the electrical for fixture model numbers and correct sizes of the fixture Example: Processing
(101) sheet A-1-211 has symbol and description of 1'-04' surface mounted LED light fixture and the electrical has type A which is 8" x 4' Surface mounted linear LED light fixture Kitchen (107) 14" square LED and Type C on the electrical lighting is 1x1 slim mounted fixture for am location The exterior and interior lights are the same size and model # for type "C" but called out different on the architectural Type V on electrical Vanity light is 2' wall mounted linear light and arch rcp has this to be is 4' x 14" wall mounted light.
Door # 109 Hardware set # 3 is listed on the schedule. In the specifications Set 3.0 is not used. Please confirm the hardware set
See Attached
Door # 110 Pair of doors at the closet 110-have to fit door trim then size the opening to fit the doors.
See Attached
Please confirm the location of partition type "3A" See Attached
Door # 110-Would this door need a lock if the owner provided gun safe will be stored in this closet?
See Attached
Door # 203A & 201A - There is a note door with lever and slide latch is noted on the elevation(8 & 4/A-6-102) the hardware set has privacy lock surface closer and 3 hinge.
See Attached
Elev. 12/A-6-101 Lunch Counter Section 7/A-6- 103 has the top of the counter at 3'-"6'
See Attached
Kitchen 107- Elevations-10 & 11/A-6-101- Plastic Laminate soffit closure , The sections 1 &2 /A-6-103- calls out for PL-3 the elevation has
PL-1
See Attached
Office counter Elevations: 6 & 7/A-6-101 .
Please confirm if the counter is SS-3 or plastic Laminate PL-3 as shown in the sections 5 & 6 - A-106
See Attached
Elevation 15/A-6-101 has SS-3 at the counter,There are conflicts in the sections vs the elevations.
See Attached
WC # 201A- (elevation 1-A-6-102) The window existing to remain, the plan vs the elevation show different size windows. Please confirm scope
See Attached
At the lockers : Please confirm the gwb enclosure ht and construction detail. The elevations show two different paints PT-2 then PT-1 is there a step in the enclosure soffit?
Wall Heater North Elevation The WH- is on the west wall per mechanical
See Attached
Section 8 thru 12 /A-6-103 Solid Surface SS-3 is called out on the sections and on the elevation 17/A-6-101- it is called out as SS-1.
See Attached
A-6-102 : INTERIOR ELEVATIONS - BB-1 is missing from the elevation
See Attached
Section 8 thru 12 /A-6-103 Solid Surface SS-3 is called out on the sections and on the elevation 17/A-6-101- it is called out as SS-1.
Detail 4/A-6-103 Please confirm the heights and of the counters is to be 3'-0" ? and the depth of the counter is 1'-9" clear for space? Do these need to be at ada ht of 2'-10" aff and have counter depth of 2'-0" ?
See Attached
The Microwave Stove vent please confirm where this is connected to on the MEP and Roof plans
See Attached
Thermostat controlled cabinet fan. Who furnishes and installs the cabinet fans? Are there specifications and detail for install, Mechanical and Electrical do not have this
See Attached
Section 8/A-6-103 Please confirm the tel data is to run in the cabinet or in the wall? sections 9- 10-11-12 show this behind the base of the cabinet
See Attached
CWT-1 is on the schedule and elevations have WT-1, is there a difference, See Attached
Vestibule 103-Please confirm what walls will get paint, trim and base-The east wall is noted to have new gyp and paint and not shown on the finish schedule, only the West wall ?
See Attached
Women and men's locker room have PT-1 & PT-2 on the North walls only PT-1 is shown in the schedule
See Attached
8" OVAL up located in the north west corner.Please confirm where this goes to
See Attached
Please confirm where the BC-1 & BC-2 are located on the equipment schedules.
Please confirm where EDH-1 is located on the Schedules
See Attached
Diffuser Grill Schedule: please confirm where type B-D-E are located
Second Floor (W.C 201 A)- There is a note for 7" oval duct from basement, On the Basement Mechanical sheet (M1-01) there is a note 8" oval up. Please confirm
See Attached
In closet 202A- Is this light fixture to be new or replace existing? The lighting plan shows type D fixture as new
See Attached
In closet 202A- Is this light fixture to be new or replace existing? The lights are not dashed
See Attached
Basement Demolition Plan What does the hatched area represent? It is difficult to read the text
See Attached
Kitchen 107-Lunch Counter outlet- Should this be installed above the counter? This does not have the dot per the legend
See Attached
Kitchen # 107- at the stove/Oven the circuit is not shown on the plan CKT# 24/26. There is a microwave above please confirm the power locations/type/ckt # for the stove and microwave
See Attached
EX1 led exit sign is this new or existing to be removed and install new at same location? ( Vestibule 103 at door # 103)
See Attached
Kitchen 107 Please confirm the under cabinet lighting, it is shown on elevation 1 11-A-6-101 section 1/A-6-103 and not shown on the electrical lighting plan. Please confirm what cabinets will get the under cabinet lighting there are two cabinets next to the refrigerator
See Attached
Processing 101- Please confirm key note # 6 for Call Button, Is this Call Button at the mill work the Door # 103. Is this to be a DS - Door Release? at the mill work?
See Attached
Please confirm the manufacture an d model # for light fixture "E" SCA-4-0/0-45L3 5K-DCC- DV-1-1-LE2 ( Kennell)
CKT # 8 is shown in The office 105 or Interview holding, the schedule calls this out to be receptacle for agent restroom lighting ?
See Attached
The hatched are is this part of the area shown not in scope?This is not on the legend.
See Attached
Sink in Nursing , are the lines in the wall? the note points to the sink
See Attached
Demo Note 8 refers to “interior wall finish,” but describes the wall being on a masonry wall. Is this a paint finish or more of a framed/gwb system in front of the CMU walls that needs to be demolished? Please confirm.
See Attached
Has the insulation in the wall cavities been tested for vermiculite?
Orient LPOE _RFI REVIEW SUMMARY
Page Label: G-0-101 : GENERAL INFORMATION Page Index: 1 Subject: # of sheets Layer: BID RFI COMMENT
Cover Sheet - Document List:There are 52 provided -shows 53
1 (2)
Page Label: G-0-101 : GENERAL INFORMATION Page Index: 1 Subject: Specification: Elevator:
Layer: BID RFI COMMENT
Specifications: Selective Demolition: Elevator?
Page 112 - 3.5 -B
Page Label: AD-1-101 : BASEMENT DEMOLITION PLAN Page Index: 3 Subject: Existing Post in basement Layer: BID RFI COMMENT
Is there an existing post to be removed and install new? the post is shown on the Structural foundation plan (S-1-101) but does not indicate removal of existing
3 (1)
G-0-101
SEQUENCESHEET TYPE
OF 5301
08.03.21 Cover Sheet - Document List:There are 52 provided -shows 53
Specifications: Selective Demolition: Elevator?
Page 112 - 3.5 -B
Is there an existing post to be removed and install new? the post is shown on the Structural foundation plan (S-1-101) but does not indicate removal of existing
THERE IS NO EXISTING POST TO BE
REMOVED
SHEET 3 OF 53 WAS DELETED
THERE IS NO EXISTING ELEVATOR -
DELETE SPEC SECTION 017320
PARAGRAPH 3.5
Page Label: AD-1-111 : FIRST FLOOR DEMOLITION PLAN Page Index: 4 Subject: Vesibule 103 Scope of Work Finishes Layer: BID RFI COMMENT
Vestibule 103 -Will there be flooring to be installed where the foundation and eye wash are to be removed as well as the remove the existing gwb and install new for the entire east wall? The Finish Schedule A-6-104 Note #2 remove finishes and provide new gwb painted and wood base at east weall.
4 (2)
Page Label: AD-1-111 : FIRST FLOOR DEMOLITION PLAN Page Index: 4 Subject: Removal of Existing Lighting Layer: BID RFI COMMENT
Electrical Demo plan Note # D5 & D6 e lighting is to remain i and there are notes for remove all existing lighting in entirety as well as note up to GC to remove all.
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject:
Layer: BID RFI COMMENT
Where there are 8" oval ducts up and down the walls, (3-1/4" wide ) is 3-5/8" stud enough to clear the duct?
7 (12)
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Cased opening Office 109 Layer: BID RFI COMMENT
Cased opening at the Office 109-North Elevation (5/A-6-101) Please confirm the dimension of the wall and trim to be installed,The left side of the wall is this trim 5" or no trim on the left side of the opening?
RA
MP
U P
Vestibule 103 -Will there be flooring to be installed where the foundation and eye wash are to be removed as well as the remove the existing gwb and install new for the entire east wall? The Finish Schedule A-6-104 Note #2 remove finishes and provide new gwb painted and wood base at east weall.
Electrical Demo plan Note # D5 & D6 e lighting is to remain i and there are notes for remove all existing lighting in entirety as well as note up to GC to remove all.
RA
MP
U P
UP
DN
Where there are 8" oval ducts up and down the walls, (3-1/4" wide ) is 3-5/8" stud enough to clear the duct?
UP
archite
Cased opening at the Office 109-North Elevation (5/A-6-101) Please confirm the dimension of the wall and trim to be installed,The left side of the wall is this trim 5" or no trim on the left side of the opening?
THE EYE WASH STATION AND DRINKING
FOUNTAIN ARE WALL MOUNTED THEIR
REMOVAL DOES NOT AFFECT THE EXISTING
FLOOR FINISH
FOUNTAIN?
YES, IF PROPERLY INSTALLED.
SEE ALSO MECHANICAL RFI
RESPONSE RE: 7" / 8" OVAL
DUCT
SEE ELEVATION 5/ A-6-101 -
THE TRIM ON THE LEFT OF THE
OPENING IS TRIMMED TO FIT
D5 and D6 are Keyed notes. Keyed notes refer to particular room or area as described in the note. This does not affect the general comment of removing fixtures other than that particular area. Please read the note
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Door X01 Card reader Layer: BID RFI COMMENT
Door # X01 on the Door schedule refers to Card reader. Please confirm where the card readers are located and on the Electrical plans.
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Wall Type 2 Layer: BID RFI COMMENT
Wall type # 2 What type of GWB is to be installed in the Kitchen, Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Wall Type #5 at Office 109 North Wall
North wall of Office:
Wall Tag note # 5:
Please confirm the 2-1/2" stud limits, the wall thickness looks larger then 2-1/2" stud Mechanical has a 8" oval duct running the wall ( 3-1/4" wide )
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Elevations at Processing Millwork Layer: BID RFI COMMENT
Elevation 14 & 17 /A-6-101- The The millwork is flipped from what is on the plan.
Door # X01 on the Door schedule refers to Card reader. Please confirm where the card readers are located and on the Electrical plans.
pes:
Wall type # 2 What type of GWB is to be installed in the Kitchen, UP
NS
North wall of Office:
Wall Tag note # 5:
Please confirm the 2-1/2" stud limits, the wall thickness looks larger then 2-1/2" stud Mechanical has a 8" oval duct running the wall ( 3-1/4" wide )
RA
MP
U P
Elevation 14 & 17 /A-6-101- The The millwork is flipped from what is on the plan.
STANDARD GYPSUM BOARD -
SEE SPEC SECTION 095200
PARAGRAPH 3.3
REFER TO FLOOR PLAN AND WALL TYPE 5 -
FACE OF WALL IS FLUSH WITH EXISTING
WALL AT LAN ROOM 108
THE PLAN AND ELEVATIONS ARE
SHOWN CORRECTLY
All new access control devices with the exception the call button and electric strike inbathroom vestibule of the was removed from project during a revision.
Subject: Exterior Elevation Tag Layer: BID RFI COMMENT
North Elevation is not tagged on the plan : 1/A6-101
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: HK NOTE Layer: HK QUESTION
( finish schedule A-6-104 note #2) remove finishes and provide with new painted gwb and wood base at the East wall, will there be flooring for the demo of the water fountain and the eye wash?
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Partition Type 2 Layer: BID RFI COMMENT
Partition type 2 : sheet A-3-101 the description on the partition type calls out for sound attenuation blanket and is 2x wood framing, the wall type 2 description on the floor plan sheets does not call the insulation and states either wood or metal stud framing.
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: RFI COMMENT-BID Layer: BID RFI COMMENT
Door # 103 Is the sill to remain existing or install new door
North Elevation is not tagged on the plan : 1/A6-101
( finish schedule A-6-104 note #2) remove finishes and provide with new painted gwb and wood base at the East wall, will there be flooring for the demo of the water fountain and the eye wash?
Partition type 2 : sheet A-3-101 the description on the partition type calls out for sound attenuation blanket and is 2x wood framing, the wall type 2 description on the floor plan sheets does not call the insulation and states either wood or metal stud framing.
RA
MP
U P
Door # 103 Is the sill to remain existing or install new door
OK
SEE PREVIOUS RESPONSE
PARTITION TYPE 2 IS TO MATCH EXISTING WALL THICKNESS
AS SHOWN IN PLAN AND IN THE PARTITON TYPES. WOOD OR
METAL FRAMING IS AT CONTRACTOR'S OPTION TO ACHEIVE
THE APPROPRIATE WALL THICKNESS. PROVIDE SOUND
ATTENTUATION AS NOTED
PROVIDE NEW DOOR AND SILL
AS INDICATED ON THE DOOR
SCHEDULE
Subject: RFI COMMENT-BID Layer: BID RFI COMMENT
Partition type #6 in the LAN 108 has 3/4" A/C plywood from floor to ceiling, Sheet ES1-101 has key note # 1 that has 4'- H x 3/4 thick fire rated plywood horizontally on the entire length of the wall as indicated on the plan
Please confirm the Type of plywood and all walls are to receive from floor to ceiling in this room
Page Label: A-1-111 : FIRST FLOOR PLAN Page Index: 7 Subject: Wall Type: Layers of GWB Side Layer: BID RFI COMMENT
Wall types: What sides of the wall get the 2 layers of 5/8" GWB
Page Label: A-1-121 : SECOND FLOOR PLAN Page Index: 8 Subject: Recessed Paper Towel holder
HK Note Recessed paper towel dispenser in exterior wall
8 (6)
Page Label: A-1-121 : SECOND FLOOR PLAN Page Index: 8 Subject: Recessed paper towel holder in exterior wall
HK Note Recessed paper towel dispenser in exterior wall
Partition type #6 in the LAN 108 has 3/4" A/C plywood from floor to ceiling, Sheet ES1-101 has key note # 1 that has 4'- H x 3/4 thick fire rated plywood horizontally on the entire length of the wall as indicated on the plan
Please confirm the Type of plywood and all walls are to receive from floor to ceiling in this room
Wall types: What sides of the wall get the 2 layers of 5/8" GWB
HK Note Recessed paper towel dispenser in exterior wall
HK Note Recessed paper towel dispenser in exterior wall
PROVIDE 3/4" PLYWOOD FROM FLOOR TO CEILING AS
REQUIRED BY THE PARTITION TYPES. PLYWOOD TYPE AS
REQUIRED BY SPEC SETION 061053 PARAGRAPH 2.5
CONTRACTOR'S OPTION
YES, DOES NOT FIT
ON INTERIOR WALLS
YES, DOES NOT FIT
ON INTERIOR WALLS
Page Label: A-1-121 : SECOND FLOOR PLAN Page Index: 8 Subject: Sheet A-2-101 Layer: BID RFI COMMENT
Call out 2/A-2-101.Please confirm this enlarged plan location there is no sheet provided A-2-101 or any other sheets have an enlarged restroom plan.
Page Label: A-1-121 : SECOND FLOOR PLAN Page Index: 8 Subject: Framing vs Duct in wall
HK QUESTION:
what size farming is to be used this only leaves 3/16" either side for the duct to clear 3-5/8" stud wall framing and the duct?
Page Label: A-1-121 : SECOND FLOOR PLAN Page Index: 8 Subject: LOCKER SOFFIT DETAIL
HK Question: What is the locker enclosure soffit detail
Page Label: A-1-121 : SECOND FLOOR PLAN Page Index: 8 Subject: Nurses Counter /Sink/ Ref.
Layer: BID RFI COMMENT
Nurses Room Counter and Sink: Please confirm the Section 4/A-6-103 tagged on elevation 13/A-6-102. Is this the correct section the counter depth is only( 1'-9") 1-'10" with back splash The Plan looks to be 2'-1" counter.
There is an under counter fridge to be installed, will this need power under the counter?
Call out 2/A-2-101.Please confirm this enlarged plan location there is no sheet provided A-2-101 or any other sheets have an enlarged restroom plan.
HK QUESTION:
what size farming is to be used this only leaves 3/16" either side for the duct to clear 3-5/8" stud wall framing and the duct?
HK Question:
What is the locker enclosure soffit detail
Nurses Room Counter and Sink: Please confirm the Section 4/A-6-103 tagged on elevation 13/A-6-102. Is this the correct section the counter depth is only( 1'-9") 1-'10" with back splash The Plan looks to be 2'-1" counter.
There is an under counter fridge to be installed, will this need power under the counter?
PLEASE DELETE CALL OUT
2/A-2-101
THIS IS THE SAME
CONDITION AS 1ST FLOOR -
PLEASE SEE PREVIOUS
RESPONSE
P
PT
PT-1
SEE ELEVATION 1 & 7/ A-6-102.
GYPSUM BOARD ON FRAMING
NURSING
THE DIMENSIONS ON DETAIL 4/ A-6-103 ARE CORRECT.
THE UCR IS PROVIDED BY OWNER AS SHOWN ON
ELEVATION 13/ A-6-103. THE POWER FOR THE UCR IS
SHOWN ON SHEET EP-1-102
EXISTING SLOPING CEILING
Page Label: A-1-201 : BASEMENT REFLECTED CEILING
PLAN
Page Index: 10 Subject: 2nd floor Clg Removal and install Layer: BID RFI COMMENT
General demolition notes # 3 At first and second floor remove all existing ceilings and light in entirety. On the RCP plan there is a note for second floor:
Patch and repair existing ceiling at removed partition and new mechanical and electrical work. At contractors option the existing ceiling may be removed and replaced in its entirety. Please confirm this scope, is this a bid alternate?
10 (3)
Page Label: A-1-201 : BASEMENT REFLECTED CEILING
PLAN
Page Index: 10 Subject: GC TO PROVIDE MOUNTING HT AND LOCATIONS
HK QUESTION? scope of work note: Note # -Basement- GC to provide coordination drawings showing all mechanical and proposed location and mounting hts for light fixtures?-is this typical
Page Label: A-1-201 : BASEMENT REFLECTED CEILING
PLAN
Page Index: 10 Subject: Lighting Fixtures` Layer: BID RFI COMMENT
Please confirm the lighting fixture schedule vs the description the rcp are different, and to refer to the electrical for fixture model numbers and correct sizes of the fixture Example: Processing (101) sheet A-1-211 has symbol and description of 1'-04' surface mounted LED light fixture and the electrical has type A which is 8" x 4' Surface mounted linear LED light fixture
Kitchen (107) 14" square LED and Type C on the electrical lighting is 1x1 slim mounted fixture for am location The exterior and interior lights are the same size and model # for type "C" but called out different on the architectural
Type V on electrical Vanity light is 2' wall mounted linear light and arch rcp has this to be is 4' x 14" wall mounted ligh
General demolition notes # 3 At first and second floor remove all existing ceilings and light in entirety. On the RCP plan there is a note for second floor: Patch and repair existing ceiling at removed partition and new mechanical and electrical work. At contractors option the existing ceiling may be removed and replaced in its entirety. Please confirm this scope, is this a bid alternate?
HK QUESTION? scope of work note: Note # -Basement- GC to provide coordination drawings showing all mechanical and proposed location and mounting hts for light fixtures?-is this typical
Please confirm the lighting fixture schedule vs the description the rcp are different, and to refer to the electrical for fixture model numbers and correct sizes of the fixture Example: Processing (101) sheet A-1-211 has symbol and description of 1'-04' surface mounted LED light fixture and the electrical has type A which is 8" x 4' Surface mounted linear LED light fixture
Kitchen (107) 14" square LED and Type C on the electrical lighting is 1x1 slim mounted fixture for am location The exterior and interior lights are the same size and model # for type "C" but called out different on the architectural
Type V on electrical Vanity light is 2' wall mounted linear light and arch rcp has this to be is 4' x 14" wall mounted ligh
THIS NOT A BID ALTERNATE. EXTENT OF
REMOVAL IS AT THE CONTRACTOR'S
DISCRETION FOR EFFICIENCY OF WORK
REFLECTED CEILING PLAN NOTES
INDICATE THAT THIS IS FOR THE
BASEMENT ONLY
PROVIDE FIXTURES AS SHOWN /
REQUIRED BY ELECTRICAL DRAWINGS
Page Label: A-3-101 : DOOR SCHEDULE, WALL TYPES &
MISC. DETAILS
Page Index: 13 Subject: Door Schedule: Door # 109 Hardware Layer: BID RFI COMMENT
Door # 109 Hardware set # 3 is listed on the schedule. In the specifications Set 3.0 is not used. Please confirm the hardware set
13 (5)
Page Label: A-3-101 : DOOR SCHEDULE, WALL TYPES &
MISC. DETAILS
Page Index: 13 Subject: door size 110
(HK Question) Door # 110 Pair of doors at the closet 110- have to fit door trim then size the opening to fit the doors.
Page Label: A-3-101 : DOOR SCHEDULE, WALL TYPES &
MISC. DETAILS
Page Index: 13 Subject: Partition type 3A Layer: BID RFI COMMENT
Please confirm the location of partition type "3A"
Page Label: A-3-101 : DOOR SCHEDULE, WALL TYPES &
MISC. DETAILS
Page Index: 13 Subject: Door Schedule Door # 110 Layer: BID RFI COMMENT
Door # 110-Would this door need a lock if the owner provided gun safe will be stored in this closet?
Door # 109 Hardware set # 3 is listed on the schedule. In the specifications Set 3.0 is not used.
Please confirm the hardware set
(HK Question) Door # 110 Pair of doors at the closet 110-have to fit door trim then size the opening to fit the doors.
3A Please confirm the location of partition type "3A"
Door # 110-Would this door need a lock if the owner provided gun safe will be stored in this closet?
YES, PROVIDE 5" TRIM EACH SIDE
AND THEN FIT REMAINING OPENING
AS SHOWN ON ELEVATION 8/ 6-101
3A
WALL TYPE 3A OCCURS
AT OFFICE 105. SEE ALSO
DETAIL 2/ A-3-101
DOOR LOCK NOT REQUIRED, THE GUN
SAFE WILL BE LOCKED.
PLEASE REVISE DOOR 109 TO HARDWARE
SET 2.0
Page Label: A-3-101 : DOOR SCHEDULE, WALL TYPES &
MISC. DETAILS
Page Index: 13 Subject: Door Schedule: Door # 203A & 201A Layer: BID RFI COMMENT
Door # 203A & 201A - There is a note door with lever and slide latch is noted on the elevation(8 & 4/A-6-102) the hardware set has privacy lock surface closer and 3 hinge.
Page Label: A-6-101 : INTERIOR ELEVATIONS Page Index: 15 Subject: Lunch Counter Ht Layer: BID RFI COMMENT
Elev. 12/A-6-101 Lunch Counter Section 7/A-6-103 has the top of the counter at 3'-"6'
15 (4)
Page Label: A-6-101 : INTERIOR ELEVATIONS Page Index: 15 Subject: Kitchen 107 Laminate Layer: BID RFI COMMENT
Kitchen 107- Elevations-10 & 11/A-6-101-Plastic Laminate soffit closure , The sections 1 &2 /A-6-103- calls out for PL-3 the elevation has PL-1
Page Label: A-6-101 : INTERIOR ELEVATIONS Page Index: 15 Subject: Offfice Counter Finish Layer: BID RFI COMMENT
Office counter Elevations: 6 & 7/A-6-101 . Please confirm if the counter is SS-3 or plastic Laminate PL-3 as shown in the sections 5 & 6 -A-106
Door # 203A & 201A - There is a note door with lever and slide latch is noted on the elevation(8 & 4/A-6-102) the hardware set has privacy lock surface closer and 3 hinge.
T-4
T-4
KE
Y
PL
AN
Elev.
12/A-6-101 Lunch Counter Section 7/A-6-103 has the top of the counter at 3'-"6'
PL-1
PL-1
SS-1
PL-1
1/4" = 1'-0" office- south elevation7
Kitchen 107- Elevations-10 & 11/A-6-101-Plastic Laminate soffit closure , The sections 1 &2 /A-6-103- calls out for PL-3 the elevation has PL-1
PT-1
SS-3
WB-1
PR-1
PT-1A
SS-3
PT-1A
Office counter Elevations: 6 & 7/A-6-101 . Please confirm if the counter is SS-3 or plastic Laminate PL-3 as shown in the sections 5 & 6 -A-106
PLEASE PROVIDE HARDWARE AS
INDICATED ON ELEVATIONS 4&8/
A-6-102
PLEASE PROVIDE TOP OF
COUNTER AT 3'-6"
THE ELEVATIONS ARE CORRECT - PLEASE
PROVIDE LAMINATE TYPE PL-1
THE SECTIONS ARE CORRECT - PLEASE
PROVIDE PL-3
Page Label: A-6-101 : INTERIOR ELEVATIONS Page Index: 15 Subject: Solid Surface Layer: BID RFI COMMENT
Elevation 15/A-6-101 has SS-3 at the counter,There are conflicts in the sections vs the elevations.
Page Label: A-6-102 : INTERIOR ELEVATIONS Page Index: 16 Subject: Existing Window Layer: BID RFI COMMENT
WC # 201A- (elevation 1-A-6-102) The window existing to remain, the plan vs the elevation show different size windows. Please confirm scope
16 (4)
Page Label: A-6-102 : INTERIOR ELEVATIONS Page Index: 16 Subject: Locker Soffit Layer: BID RFI COMMENT
At the lockers : Please confirm the gwb enclosure ht and construction detail.
The elevations show two different paints PT-2 then PT-1 is there a step in the enclosure soffit?
Page Label: A-6-102 : INTERIOR ELEVATIONS Page Index: 16 Subject: Wall Heater location Layer: BID RFI COMMENT
Wall Heater North Elevation The WH- is on the west wall per mechanical
SS-3
PT-1
PT-1A
Elevation 15/A-6-101 has SS-3 at the counter,There are conflicts in the sections vs the elevations.
PT-1
PT-1A
WC # 201A- (elevation 1-A-6-102) The window existing to remain, the plan vs the elevation show different size windows. Please confirm scope
At the lockers : Please confirm the gwb enclosure ht and construction detail. The elevations show two different paints PT-2 then PT-1 is there a step in the enclosure soffit?
PT-1
PT-1
WB-1
r room- north elevation
Wall Heater North Elevation The WH- is on the west wall per mechanical
THE SECTIONS ON A-6-103 ARE CORRECT.
PLEASE PROVIDE SS-3
THE SCOPE OF WORK IS TO PAINT THE
EXISTING WINDOW AND FRAME AS
INDICATED IN THE ELEVATIONS
PT-1
PT-2
PT-1
PT-1 REFERS TO THE GYP. BD.
FASCIA, PT-2 IS REFERRING TO
THE SLOPED CEILING.
CONSTRUCTION IS A PREVIOUSLY
INDICATED
WH-6 TO BE LOCATED AS
SHOWN THE ARCHITECTURAL
DRAWINGS ELEVATION
8/A-6-102
SLOPING
CEILING
Page Label: A-6-102 : INTERIOR ELEVATIONS Page Index: 16 Subject: BB-1 Location Layer: BID RFI COMMENT
BB-1 is missing from the elevation
Page Label: A-6-103 : MILLWORK DETAILS Page Index: 17 Subject: SS-3 vs SS-1 Solid Surface Layer: BID RFI COMMENT
Section 8 thru 12 /A-6-103 Solid Surface SS-3 is called out on the sections and on the elevation 17/A-6-101- it is called out as SS-1.
17 (5)
Page Label: A-6-103 : MILLWORK DETAILS Page Index: 17 Subject: Counter Ht Layer: BID RFI COMMENT
Detail 4/A-6-103 Please confirm the hts and of the counters is to be 3'-0" ? and the depth of the counter is 1'-9" clear for space?
Do these need to be at ada ht of 2'-10" aff and have counter depth of 2'-0" ?
Page Label: A-6-103 : MILLWORK DETAILS Page Index: 17 Subject: Microwave vent Layer: BID RFI COMMENT
The Microwave Stove vent please confirm where this is connected to on the MEP and Roof plans
WB-1
PT-1
room- north elevation
BB-1 is missing from the elevation
1 1/2" = 1'-0" millwork detail- processing desk8
Section 8 thru 12 /A-6-103 Solid Surface SS-3 is called out on the sections and on the elevation 17/A-6-101- it is called out as SS-1.
tail- locker room sink
Detail 4/A-6-103 Please confirm the hts and of the counters is to be 3'-0" ? and the depth of the counter is 1'-9" clear for space?
Do these need to be at ada ht of 2'-10" aff and have counter depth of 2'-0" ?
The Microwave Stove vent please confirm where this is connected to on the MEP and Roof plans
BB-1 & BB-2 NOT SHOWN ON
ARCHITECTURAL DRAWINGS FOR
CLARITY OF WALL BASE
REQUIREMENTS
SEE PREVIOUS COMMENTS -
THE SECTION IS CORRECT
INDICATING SS-3
THE DIMENSIONS SHOWN ON
THE DRAWINGS ARE CORRECT
CONTRACTOR TO FIELD
DETERMINE HOOD VENTING
Page Label: A-6-103 : MILLWORK DETAILS Page Index: 17 Subject: RFI COMMENT-BID Layer: BID RFI COMMENT
Thermostat controlled cabinet fan. Who furnishes and installs the cabinet fans? Are there specifications and detail for install, Mechanical and Electrical do not have this
Page Label: A-6-103 : MILLWORK DETAILS Page Index: 17 Subject: tel data location in millwork Layer: BID RFI COMMENT
Section 8/A-6-103 Please confirm the tel data is to run in the cabinet or in the wall? sections 9-10-11-12 show this behind the base of the cabinet
Page Label: A-6-104 : ROOM FINISH SCHEDULE Page Index: 18 Subject: CWT vs WT finish Layer: BID RFI COMMENT
CWT-1 is on the schedule and elevations have WT-1, is there a difference, 18 (3)
Page Label: A-6-104 : ROOM FINISH SCHEDULE Page Index: 18 Subject: Vestibule 103 Finish Scope Layer: BID RFI COMMENT
Vestibule 103-Please confirm what walls will get paint, trim and base-The east wall is noted to have new gyp and paint and not shown on the finish schedule, only West wall ?
millwork detail- processing d8
Thermostat controlled cabinet fan. Who furnishes and installs the cabinet fans? Are there specifications and detail for install, Mechanical and Electrical do not have this
-0" ork detail- processing desk
Section 8/A-6-103 Please confirm the tel data is to run in the cabinet or in the wall?
sections 9-10-11-12 show this behind the base of the cabinet
CWT-1 is on the schedule and elevations have WT-1, is there a difference, finis
Vestibule 103-Please confirm what walls will get paint, trim and base-The east wall is noted to have new gyp and paint and not shown on the finish schedule, only West wall ?
THERE ARE A NUMBER OF MANUFACTURERS FOR THESE
FANS - THE MILLWORK CONTRACTOR SHOULD PROVIDE
A FAN APPROPRIATE FOR THE CABINET CONSTRUCTION.
(INTERNET SEARCH - 'THERMOSTATIC COMPUTER
CABINET FANS')
TEL/DATA IS RUN IN WALLS AS SHOWN ON
THE ELECTRICAL DRAWINGS AND FED THRU
DESK WIREWAY AS REQUIRED TO FEED
DEVICES/COMPUTERS
CWT AND WT ARE THE SAME
PLEASE REVISE THE FINISH SCHEDULE
TO PROVIDE PAINT AND BASE ON THE
EAST WALL.
THE NORTH, SOUTH AND WEST WALLS
ARE REMAIN AS EXISTING
EAST
WALL
Page Label: A-6-104 : ROOM FINISH SCHEDULE Page Index: 18 Subject: Womens and Mens Locker Room Paint Layer: BID RFI COMMENT
Women and mens locker room have PT-1 & PT-2 on the North walls only PT-1 is shown in the schedule
Page Label: M-1-101 : BASEMENT HVAC INSTALLATION
PLAN
Page Index: 27 Subject: 8" oval duct Layer: BID RFI COMMENT
8" OVAL up located in the north west corner.Please confirm where this goes to
27 (3)
Please confirm where the BC-1 & BC-2 are located on the equipment scheudles.
Please confirm where EDH-1 is located on the Schedules
Women and mens locker room have PT-1 & PT-2 on the North walls…