This pre-solicitation notice seeks construction services for renovations and improvements at three land port of entry facilities located in Vermont. The project includes renovating a portion of the East Richford LPOE facility to create new bathrooms, offices, and work areas, along with security upgrades, lighting, flooring and ceilings. Temporary facilities for staff and public use will also be provided during construction. Replacement of inspection booths is planned at the Richford and West Berkshire LPOE facilities, along with associated HVAC, electrical, lighting, security and site work. The solicitation will be released on October 17, 2019 on FBO.gov and sealed bids are due by November 18, 2019. The construction work is expected to commence in spring 2020. This is a 100% small business set-aside with a contract award anticipated in November 2019. The estimated value is between $1 and $2 million. Security clearances and registration in SAM are required. A pre-bid site visit will be held on October 29, 2019. The contracting agency is the General Services Administration Public Buildings Service Region 1.
East Richford LPOE Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 47PB0020B0001Tab_2_West_Berkshire_Booth_Replacement_SOW_2019_07_02.pdf | ||
| AD-101_Rev_1.pdf | ||
| 285-053-002_Port_Refresh_East_Richford_LPOE_dwgs.pdf | ||
| 47PB0020B0001_Tab_2_Richford_Booth_Replace_SOW_2019_07_02.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
47A York Street Portland, ME 04101
(207) 553-7753
EAST RICHFORD LAND PORT OF ENTRY
Richford, VT
Port Refresh at East Richford LPOE
U.S. General Services Administration
New England Region (Region 1)
North Service Center (1PSK)
A/E Contract No. GS-01P-14-BW-D-0025
Project Number RVT11013 & RWA N1685916
Specifications – Bid Documents Submission
June 12, 2019
Prepared for:
General Services Administration
New England Region
10 Causeway Street
Boston, MA 02222
PROPERTY OF THE UNITED STATES GOVERNMENT.
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS AND/OR DOCUMENTS
WITHOUT THE EXPLICIT PERMISSION OF THE U.S. GENERAL SERVICES ADMINISTRATION IS
PROHIBITED. DISTRIBUTION TO THOSE WITH OTHER THAN A NEED TO KNOW IS STRICTLY
FORBIDDEN.
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PORT REFRESH AT EAST RICHFORD LPOE BID DOCUMENTS SUBMISSION
Division Section Title
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
010400 PROJECT COORDINATION
010450 CUTTING AND PATCHING
010900 DEFINITIONS AND STANDARDS
011000 SUMMARY
013000 SUBMITTALS
013100 SCHEDULES AND REPORTS
014000 QUALITY REQUIREMENTS
015000 TEMPORARY FACILITIES
015050 CONSTRUCTION WASTE MANAGEMENT
015150 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT
015460 SAFETY AND HEALTH
016320 PRODUCTS
016350 REQUESTS FOR INFORMATION
017000 PROJECT CLOSEOUT
017001 EXECUTION REQUIREMENTS
017350 FIRE PREVENTION PRECAUTIONS FOR HOT WORK
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE STRUCTURE DEMOLITION
DIVISION 03 - CONCRETE
033010 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
042113 BRICK MASONRY
DIVISION 05 - METALS
055000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
062013 EXTERIOR FINISH CARPENTRY
062023 INTERIOR FINISH CARPENTRY
064116 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
079200 JOINT SEALANTS
079219 ACOUSTICAL JOINT SEALANTS
DIVISION 08 - OPENINGS
081213 HOLLOW METAL FRAMES
081416 FLUSH WOOD DOORS
083473.16 WOOD SOUND CONTROL DOOR ASSEMBLIES
085200 WOOD WINDOWS
087100 DOOR HARDWARE
088000 GLAZING
DIVISION 09 - FINISHES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
093013 CERAMIC TILING
095123 ACOUSTICAL TILE CEILINGS
099113 EXTERIOR PAINTING
099123 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
102800 TOILET, BATH, AND LAUNDRY ACCESSORIES
104416 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
113013 RESIDENTIAL APPLIANCES
DIVISION 12 - FURNISHINGS
122113 HORIZONTAL LOUVER BLINDS
123661.16 SOLID SURFACING COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
133423.16 FABRICATED CONTROL BOOTHS
Facility Services Subgroup
DIVISION 22 - PLUMBING
220500 COMMON WORK RESULTS FOR PLUMBING
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
221316 SANITARY WASTE AND VENT PIPING
224213.13 COMMERCIAL WATER CLOSETS
224216.13 COMMERCIAL LAVATORIES
224216.16 COMMERCIAL SINKS
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230500 COMMON WORK RESULTS FOR HVAC
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
231126 FACILITY LIQUEFIED-PETROLEUM GAS PIPING
232113 HYDRONIC PIPING
232300 REFRIGERANT PIPING
233113 METAL DUCTS
237200 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
238126 SPLIT-SYSTEM AIR-CONDITIONERS
DIVISION 26 - ELECTRICAL
260500 COMMON WORK RESULTS FOR ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
262100 ELECTRICAL DISTRIBUTION COMPONENTS
262726 WIRING DEVICES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
265100 LIGHTING
DIVISION 27 - COMMUNICATIONS
271500 COMMUNICATIONS HORIZONTAL CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
281600 INTRUSION DETECTION
Site and Infrastructure Subgroup
DIVISION 31 - EARTHWORK
311000 SITE CLEARING
312000 EARTH MOVING
DIVISION 32 - EXTERIOR IMPROVEMENTS
321216 ASPHALT PAVING
329200 TURF AND GRASSES
END OF TABLE OF CONTENTS
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 1
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
SECTION 010400 - PROJECT COORDINATION
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK
A. This section specifies general administrative procedures and performance required, including but not necessarily limited to, the following:
1. Coordination and meetings.
2. Administrative/supervisory personnel.
3. Surveys and records or reports.
4. Limitations for use of site.
5. Special reports.
6. Tradespeople and workmanship standards.
7. Inspections, tests and reports.
8. General installation provisions.
9. Cutting and patching.
10. Cleaning and protection.
11. Energy Conservation.
12. Environmental Protection.
13. Overtime work, suspension of work.
1.2 COORDINATION AND MEETINGS
A. General: Prepare and distribute to each entity performing work at project site, a written memorandum of instructions on required coordination activities, including required notices, reports and attendance at meetings. Prepare similar memorandum for separate contractors where interfacing of work is required.
B. Coordination drawings: Refer to clause "Shop Drawings, Coordination Drawings, and
Schedules," of "Contract Clauses," for general requirements.
1. Work by Separate Entities: Where work by separate entities requires off-site fabrication of products and materials which must be accurately interfaced and closely intermeshed to produce required results, prepare coordination drawings to indicate how work shown by separate shop drawings will be interfaced, intermeshed, and sequenced for installation. Comply with submittal requirements of Division 01 Section "Submittals."
2. Sleeves and Inserts: Before any sleeves or inserts are set or any mechanical or electrical equipment or foundations or other work is installed, the Contractor shall prepare and submit for approval by the Contracting Officer composite coordination drawings for all equipment rooms, spaces and other areas in which work of two or more trades or subcontractors is to be installed and in which the probability of interference exists, as determined by either the Contractor or the Contracting Officer. Drawings shall show the work of all trades covered, shall be drawn to a scale not smaller than 1/2" = 1'-0", and shall show clearly in both plan and elevation that all work can be installed without interference.
3. Work installed without prior approval: Any work installed prior to approval of
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 2
coordination drawings shall be at the Contractor's risk. Subsequent relocations required to avoid interferences shall be made without additional expense to the Government. In case interference develops, the Contracting Officer will decide which work shall be relocated, regardless of which was installed first.
C. Coordination of Trades: Coordinate work of different trades so that interference between mechanical, electrical, architectural, and structural work, including existing services, will be avoided and within limits indicated the maximum practical space for operation, repair, removal, and testing of equipment is provided. Keep pipes, ducts, conduit, and the like as close as possible to ceiling slab, walls, and columns to take up a minimum amount of space. Locate pipes, ducts, and equipment so that they do not interfere with the intended use of eyebolts and other lifting devices.
D. Preconstruction Meeting: The Government will conduct a meeting to discuss administrative procedures with the contractor which will be scheduled to occur between the Contract Award and the Notice to
Proceed. See Division 01 Section "Safety and Health" for requirements of preconstruction safety meeting.
E. Monthly Coordination Meeting: In addition to specific preinstallation meetings and coordination meetings for each major element of work, and regular project meetings for other purposes (as indicated elsewhere in contract documents), hold monthly general project coordination meetings at regularly scheduled times which are convenient for everyone involved. Request representation (at each meeting) by every entity currently involved in coordination or planning for work of the entire project.
Conduct meetings in a manner which will resolve coordination problems. Record results of meetings and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting.
1.3 ADMINISTRATIVE/SUPERVISORY PERSONNEL
A. General: In addition to a General Superintendent and other administrative and supervisory personnel required for performance of the work, provide specific coordinating personnel as specified herein.
B. Environmental Control Officer: The Contractor shall designate an "Environmental Control
Officer" whose duties shall include the responsibility for enforcing the environmental protection provisions of these specifications including safety and health; the requirements of the Occupational
Safety and Health Act; and other applicable Federal, state and local standards. As outlined in the applicable sections of this specification, submit for approval by the Contracting Officer the proposed traffic flow plan, security plan, program for temporary structures, housecleaning plan, erosion control plan, demolition program, and safety and health plan. After approval by the Contracting Officer, the implementation and enforcement of these programs shall become the responsibility of the
Environmental Control Officer. Any changes in the programs must be requested by the Contractor through the Environmental Control Officer for written concurrence by the Contracting Officer.
C. Energy Conservation Officer: The Contractor shall designate an "Energy Conservation Officer" whose duties shall consist of developing and implementing a program for minimizing the use of energy on the site. He shall develop an energy conservation plan, which is subject to approval of the Contracting
Officer. The Contractor may designate the same person, or different persons, as "Environmental
Control Officer," and "Energy Conservation Officer."
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 3
D. Project Coordinator: Provide a full-time Project Coordinator, who is experienced in administration and supervision of building construction including mechanical and electrical work, and who is hereby authorized to act as the general coordinator of interfaces between units of work. For purpose of this provision, "interface" is defined to include the scheduling and sequencing of work, sharing of access to work spaces, installations, protection of each other's work, cutting and patching, tolerances, cleaning, selections for compatibility, preparation of coordination drawings, inspections, tests, and temporary facilities and services.
E. Submittal of Staff Names, Duties: Within 15 days of contract date, submit a listing of Contractor's principal staff assignments and consultants, naming persons and listing their addresses and telephone numbers.
1.4 LIMITATIONS FOR USE OF SITE
A. General: In addition to site utilization limitations and requirements shown on drawings, and indicated by other contract documents, administer allocation of available space equitably among entities needing access and space, so as to produce best overall efficiency in performance of total work of project. Schedule deliveries so as to minimize space and time requirements for storage of materials and equipment on site.
B. Use of Equipment by Government: See clause of same title in the General Conditions.
C. Archaeological Rights: There is a possibility that items of archaeological significance may be found during work at the site. In such event, stop work in the vicinity of the find and notify the Contracting
Officer immediately; subsequent work shall proceed as directed by the Contracting Officer. All items found which are considered to have archaeological significance are the property of the Government.
D. Ceremonies: Subject to mutually satisfactory arrangements between the parties of the contract, the
Government may enter the premises during the term of the contract to conduct ceremonies, such as laying the cornerstone or dedication ceremonies, and to occupy temporarily such portions of the premises as may be necessary.
F. Materials on the Site: Unless otherwise noted or specified, materials and equipment that are removed and not reused under this contract become the property of the Contractor, and salvage value shall be reflected in the bid.
G. Storage or Sale of Equipment on Site: Storage or sale of excess salvageable material on the site is not permitted. Remove from site.
1.5 SPECIAL REPORTS
A. General: Except as otherwise indicated, submit special reports to the Contracting Officer within one day of occurrence requiring special report, with copy to others affected by occurrence.
B. Reporting Accidents: Refer to Division 01 Section "Safety and Health."
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 4
C. Reporting Unusual Events: When an event of unusual and significant nature occurs at site (examples:
visit by news media; extraordinary weather phenomenon), prepare and submit a special report listing chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. When such events are known or predictable in advance, advise the Contracting Officer in advance at earliest possible date.
1.6 TRADESPERSONS AND WORKMANSHIP STANDARDS
A. General: Institute and maintain procedures to ensure that persons performing work at site are skilled and knowledgeable in methods and craftsmanship needed to produce required quality- levels for workmanship in completed work. Remove and replace work which does not comply with workmanship standards as specified and as recognized in the construction industry for applications indicated. Remove and replace other work damaged or deteriorated by faulty workmanship or its replacement.
B. Availability of Tradespersons: At each progress or coordination meeting, review availability of tradespersons and projected needs to accomplish work as scheduled. Require each entity employing personnel to report on events which might affect progress of work. Where possible, consider alternatives and take actions to avoid disputes and delays.
1.7 INSPECTIONS, TESTS AND REPORTS
A. General: Required inspection and testing services are intended to assist in determination of probable compliances of work with requirements, but do not relieve Contractor of responsibility for those compliances, or for general fulfillment of requirements of contract documents. Specified inspections and tests are not intended to limit Contractor's quality control program. Afford reasonable access to agencies performing tests and inspections.
1. Government Tests: Where tests or inspections are indicated as Government's responsibility, Government will engage independent testing agency to perform required services.
B. Qualification of Testing Agencies: Except as otherwise indicated and except where manufacturer's testing facilities are indicated as acceptable, engage independent testing laboratories specializing in required services and acceptable to the Contracting Officer.
C. Reports: Refer to Division 01 Section "Submittals."
1.8 OVERTIME WORK, SUSPENSION OF WORK A.
Overtime Work for Utility Shutdown:
1. Work which requires the shutdown of any utility serving the building shall be performed outside of normal working hours of the building occupants.
2. Schedule shutdown of a utility at least 48 hours in advance with the Contracting Officer or her designated representative.
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 5
PART 2 - PRODUCTS (Not Applicable) PART
3 - EXECUTION
3.1 GENERAL INSTALLATION PROVISIONS
A. Pre-Installation Conferences: Where preinstallation conferences are specified in technical sections, well in advance of installation meet at project site with installers and representatives of manufacturers and fabricators who are involved in or affected by unit of work, and in its coordination or integration with other work which has preceded or will follow. Advice the Contracting Officer of scheduled meeting dates. At each meeting review progress of other work and preparations for particular work under consideration, including requirements of contract documents, options, related change orders, purchases, deliveries, shop drawings, product data; quality control samples, possible conflicts, compatibility problems, time schedules, weather limitations, temporary facilities, space and access limitations, structural limitations, governing regulations, safety, inspection and testing requirements, required performance results, recording requirements, and protection. Record significant discussions of each conference, and record agreements and disagreements, along with final plan of action. Distribute record of meeting promptly to everyone concerned.
1. Do not proceed with the work if associated pre- installation conference cannot be concluded successfully. Instigate actions to resolve impediments to performance of the work, and reconvene conference at earliest date feasible.
B. Installer's Inspection of Conditions: Require Installer of each major unit of work to inspect substrate to receive work, and conditions under which work will be performed, and to report (in writing to Contractor) unsatisfactory conditions. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to Installer.
C. Manufacturer's Instructions: Where installations include manufactured products, comply with manufacturer's applicable instructions and recommendations for installation, to extent these are more explicit or more stringent than requirements indicated in contract documents.
D. Inspect each item of materials or equipment immediately prior to installation, and reject damaged and defective items.
E. Install work during conditions of temperature, humidity, exposure, forecasted weather, and status of project completion which will ensure best possible results for each unit of work, in coordination with entire work. Isolate each unit of work from noncompatible work, as required to prevent deterioration.
F. Coordinate enclosure (closing-in) of work with required inspections and tests, so as to minimize necessity of uncovering work for that purpose.
G. Mounting Heights: Where mounting heights are not indicated, mount individual units of work at industry-recognized standard mounting heights for applications indicated. Refer questionable mounting
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 6
height choices to the Contracting Officer for final decision.
3.2 CUTTING AND PATCHING
A. General: Do not cut-and-patch structural work in a manner resulting in reduction of load-carrying capacity or load/deflection ratio; submit proposed cutting and patching to the Contracting
Officer for structural approval b efore proceeding. Do not cut-and-patch operational elements and safety-related components in a manner resulting in reduction of capacities to perform in manner intended or resulting in decreased operational life, increased maintenance, or decreased safety.
1. Engage original Fabricator/Installer to perform cutting-and-patching of structural work, operational/safety- related components, and visually-exposed work; or, if not available, engage only recognized experts; employ only proven methods.
B. Materials: Except as otherwise indicated or approved by the Contracting Officer, provide materials for cutting-and- patching which will result in equal-or-better work than work being cut-and-patched; in terms of performance characteristics and including visual effect where applicable. Use materials identical with original materials where feasible and where recognized that satisfactory results can be produced thereby.
C. Temporary Support and Protection: Provide adequate temporary support for work to be cut, to prevent failure. Do not endanger other work. Provide adequate protection of other work during cutting-and-patching, to prevent damage; and provide protection of the work from adverse weather exposure.
D. Cut work by methods least likely to damage work to be retained and work adjoining.
E. Patch with methods which are durable and as invisible as possible. Comply with specified tolerances for the work.
F. Restore exposed finishes of patched areas; and, where necessary extend finish restoration onto retained work adjoining, in a manner which will eliminate evidence of patching. Where patch occurs in a smooth painted surface, extend final paint coat over entire unbroken surface containing patch, after patched area has received prime and base coats.
3.3 CLEANING AND PROTECTION
A. General: During handling and installation of work at project site clean and protect work in progress and adjoining work on a basis of perpetual maintenance. Apply suitable protective covering on newly installed work where reasonably required to ensure freedom from damage or deterioration at time of substantial completion; otherwise, clean and perform maintenance on newly installed work as frequently as necessarily through remainder of construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
B. Limiting Exposures of Work: To extent possible through reasonable control and protection methods, supervise performance of work in a manner and by means which will ensure that none of the work, whether completed or in progress, will be subjected to harmful, dangerous, damaging, or otherwise deleterious exposures during construction period. Such exposures include (where
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 7
applicable, but not by way of limitation) static loading, dynamic loading, internal pressures, external pressures, high or low temperatures, thermal shock, high or low humidity, air contamination or pollution, water, ice, solvents, chemicals, light, radiation, puncture, abrasion, heavy traffic, soiling, bacteria, insect infestation, combustion, electrical current, high speed operation, improper lubrication, unusual wear, misuse, incompatible interface, destructive testing, misalignment, excessive weathering, unprotected storage, improper shipping/ handling, theft and vandalism.
3.4 ENVIRONMENTAL PROTECTION
A. Soil Disposal and/or Borrow: Dispose of excess soil and/or obtain borrow only at locations shown on drawings. Conduct all soil disposal and/or borrow work in accordance with requirements of local regulatory authorities.
B. Solid, Liquid, and Gaseous Contaminants: Contractor shall be responsible for the proper disposal of all solid, liquid, and gaseous contaminants in accordance with all local codes and regulations, together with the following requirements:
1. Discharge gaseous contaminants so that they will be sufficiently diluted with fresh air to reduce the toxicity to an acceptable level.
2. Liquid contaminants may, subject to local utility standards, be diluted with water to a level of quality acceptable in the local sewer system, or shall be contained in approved vessels for disposal at approved sites.
C. Disposal of Refuse: Remove refuse resulting from construction operations from the site, except where
State or local requirements permit burning on the site. If State and local requirements permit burning on the site, provide the Contracting Officer a copy of State and/or local permit or license reflecting the State or local approval.
D. Trucking:
1. Load all trucks leaving the site with earthen materials or loose debris in a manner that will prevent dropping of materials on streets. Fasten suitable tarpaulins over the load before they enter surrounding paved streets. Trucks bringing earthen materials over paved streets to the site shall be similarly loaded and covered.
2. At all points where trucks will leave the site and enter surrounding paved streets, maintain a suitable truck wheel washing installation and crew to prevent any mud from being carried onto such adjacent paved streets. All trucks, or other vehicles leaving the site at any time shall be hosed and washed clean of mud and dirt clinging to wheels and exterior body surfaces.
Installation shall be provided with a concrete or macadam slab, arranged to assure adequate drainage to prevent puddling. Keep washdown area clean.
3. The Contractor and all subcontractors on or delivering to the site shall conform to all local regulations regarding load limits.
E. Construction Site Maintenance:
1. Store all supplies and equipment on project site so as to preclude mechanical and climatic damage. Maintain site in a neat and orderly manner.
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
PROJECT COORDINATION 010400- 8
2. Contractor shall be responsible for maintaining the temporary structures and construction enclosure (fence) in good repair and visually pleasant. He shall further provide adequate security to prevent the presence of unauthorized persons on the site, and to keep gates secured when not in actual use to insure the integrity of the barrier as well as for property security.
F. Noise Control:
1. Comply with all applicable state and local laws, ordinances, and regulations relative to noise control.
2. Equipment to be employed on this site shall not produce a noise level exceeding the following limits in Db(A) at a distance of 50 feet from the equipment under test.
3. Equipment:
a. Earthmoving
1) front loader 79
2) truck 91
b. Materials Handling
1) concrete mixer 85
2) concrete pump 82 c.
Stationary
1) pumps 76
2) generators 78
3) compressors 81 d.
Impact
1) pneumatic tools 86 e.
Other
1) saws 78
2) vibrators 76
3.5 ENERGY CONSERVATION
A. The plan developed by the Energy Conservation Officer and approved by the Contracting Officer shall be adhered to in the execution of the work. Post copies of the plan in conspicuous locations so that all personnel employed on the project may be made aware of the need to conserve energy at all times.
END OF SECTION 010400
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
CUTTING AND PATCHING 010450 - 1
SECTION 010450 - CUTTING AND PATCHING
1.1 DESCRIPTION OF REQUIREMENTS
A. Definition: "Cutting and patching" includes cutting into existing construction to provide for the installation or performance of other work and subsequent fitting and patching required to restore surfaces to their original condition.
1. Cutting and patching is performed for coordination of the work, to uncover work for access or inspection, to obtain samples for testing, to permit alterations to be performed or for other similar purposes.
2. Cutting and patching performed during the manufacture of products, or during the initial fabrication, erection or installation processes is not considered to be "cutting and patching" under this definition. Drilling of holes to install fasteners and similar operations are also not considered to be "cutting and patching."
3. "Demolition" and "Selective Demolition" are recognized as related-but-separate categories of work, which may or may not require cutting and patching as defined in this section;
refer to "Selective Demolition" section of Division 02.
B. Refer to other sections of these specifications for specific cutting and patching requirements and limitations applicable to individual units of work.
1. Unless otherwise specified, requirements of this section apply to mechanical and electrical work. Refer to Division 22 - 28 sections for additional requirements and limitations on cutting and patching of mechanical and electrical work.
1.2 QUALITY ASSURANCE
A. Requirements for Structural Work: Do not cut and patch structural work in a manner that would result in a reduction of load-carrying capacity or of 1oad-deflection ratio. Prior to such work, obtain approval of project's structural engineer.
B. Before cutting and patching the following categories of work, obtain the Contracting Officer's approval to proceed.
1. Structural steel.
2. Miscellaneous structural metals, including lintels, equipment supports, stair systems and similar categories of work.
3. Structural concrete.
4. Foundation construction.
C. Visual Requirements: Do not cut and patch work exposed on the building's exterior or in its occupied spaces, in a manner that would, in the Contracting Officer's opinion, result in
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
CUTTING AND PATCHING 010450 - 2
lessening the building's aesthetic qualities. Do not cut and patch work in a manner that would result in substantial visual evidence of cut and patch work. Remove and replace work judged by the
Contracting Officer to be cut and patched in a visually unsatisfactory manner.
1. Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface texture and finish as closely as possible.
1.3 SUBMITTALS
A. Submittals shall comply with the requirements of the Construction Contract Clauses, Division
01 Section "Submittals" and the individual sections specifying the work.
B. Procedural Proposal for Cutting and Patching: Where prior approval of cutting and patching is required, submit proposed procedures for this work well in advance of the time work will be performed and request approval to proceed. Include the following information, as applicable, in the submittal:
1. Describe nature of the work and how it is to be performed, indicating why cutting and patching cannot be avoided. Describe anticipated results of the work in terms of changes to existing work, including structural, operational and visual changes as well as other significant elements.
2. List products to be used and firms including their qualifications that will perform work.
3. Give dates when work is expected to be performed.
4. List utilities that will be disturbed or otherwise be affected by work, including those that will be relocated and those that will be out-of-service temporarily. Indicate how long utility service will be disrupted.
5. When cutting, modifying, and patching of structural work is required to facilitate the installation of work required in this contract, notify the Contracting Officer immediately. Do not cut or modify the structural element without written instructions from the Contracting Officer. The
Contractor shall follow the Contracting Officer’s direction.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Except as otherwise indicated, or as directed by the Contracting Officer, use materials for cutting and patching that are identical to existing materials. If identical materials are not available, or cannot be used, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. Use materials for cutting and patching that will result in equal-or-better performance characteristics.
PART 3 - EXECUTION
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
CUTTING AND PATCHING 010450 - 3
3.1 INSPECTION
A. Before cutting, examine the surfaces to be cut and patched and the conditions under which the work is to be performed. If unsafe or otherwise unsatisfactory conditions are encountered, notify the
Contracting Officer. Corrective action shall be taken before proceeding with the work.
3.2 PREPARATION
A. Temporary Support: To prevent failure provide temporary support of work to be cut.
B. Protection: Protect other work during cutting and patching to prevent damage. Provide protection from adverse weather conditions of that part of the project that may be exposed during cutting and patching operations.
1. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
C. Take precaution not to cut existing pipe, conduit or duct serving the building but scheduled to be relocated until provisions have been made to bypass them.
3.3 PERFORMANCE
A. General: Employ skilled workmen to perform cutting and patching work. Except as otherwise indicated or as approved by the Contracting Officer, proceed with cutting and patching at the earliest feasible time and complete work without delay.
B. Cutting: Cut the work using methods that are least likely to damage work to be retained or adjoining work. Where possible review proposed procedures with the original installer; comply with original installer's recommendations.
1. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut through concrete and masonry using a cutting machine such as a carborundum saw or core drill to insure a neat hole.
2. Cut holes and slots neatly to size required with minimum disturbance of adjacent work.
To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces. Temporarily cover openings when not in use.
3. Comply with requirements of other applicable sections where cutting and patching requires excavating and backfilling.
4. Comply with OSHA LOTO requirements prior to removal, modification or replacement of existing utility services such as pipe or conduit. By-pass utility services such as pipe and conduit, before cutting, where such utility services are shown or required to be removed, relocated or abandoned. ASSURE THAT CONDUITS HAVE BEEN DE- ENERGIZED
PRIOR TO CUTTING. ASSURE THAT GAS, WATER AND OTHER UTITILITY
SERVICES HAVE LIKEWISE BEEN SHUT OFF PRIOR TO CUTTING SUCH SERVICES.
Cut-off conduit and pipe in walls or partitions to be removed. After by-pass and cutting, cap, valve or plug and seal tight remaining portion of pipe and conduit to prevent entrance of moisture or other foreign matter.
C. Patching: Patch with seams which are durable and as invisible as possible. Comply with
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
CUTTING AND PATCHING 010450 - 4
specified tolerances for the work.
1. Where feasible, inspect and test patched areas to demonstrate integrity of work.
2. Restore exposed finishes of patched areas and where necessary extend finish restoration into retained adjoining work in a manner which will eliminate evidence of patching and refinishing.
3. Where removal of walls or partitions extends from one finished area into another finished area, patch and repair floor and wall surfaces in the new space to provide an even surface of uniform color and appearance. If necessary to achieve uniform color and appearance, remove existing floor and wall coverings and replace with new materials.
a. Where patch occurs in a smooth painted surface, extend final paint coat over entire unbroken surface containing patch, after patched area has received prime and base coat.
4. Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance.
5. Concrete slab patching, where utilities are indicated below interior and exterior on-grade concrete slabs, shall be accomplished by saw-cutting the existing slab, excavate to necessary depth, fill with compacted granular fill, and provide new concrete slab of the same thickness as the existing slab. Finish the new slab to match the existing adjacent surface.
3.4 CLEANING
A. Thoroughly clean areas and spaces where work is performed or used as access to work.
Completely remove paint, mortar, oils, putty and items of similar nature which are not part of the final patch or refinished surface. Thoroughly clean piping, conduit and similar features before painting or other finishing is applied in accordance with other trade sections. Restore damaged pipe covering to its original condition. DO NOT DISTURB ASBESTOS- CONTAINING PIPE COVERING OR
OTHER ASSUMED ASBESTOS-CONTAINING MATERIALS. Notify the Contracting Officer of the condition.
END OF SECTION 010450
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 1
SECTION 010900 - DEFINITIONS AND STANDARDS
1.1 DEFINITIONS:
A. General Explanation: A substantial amount of specification language consists of definitions of terms found in other contract documents, including drawings. (Drawings are recognized as being diagrammatic in nature and not completely descriptive of requirements indicated thereon).
Certain terms used in contract documents are defined in this article. Definitions and explanations contained in this section are not necessarily either complete or exclusive, but are general for the work to the extent that they are not stated more explicitly in another element of contract documents.
B. Special Conditions: Wherever the term "Special Conditions" or "Section, Special Conditions" is used in the specifications, it refers collectively to all of the sections in Division 1, General
Requirements and the Contract Clauses.
C. Indicated: The term "Indicated" is a cross-reference to graphic representations, notes or schedules on drawings, to other paragraphs or schedules in the specifications, and to similar means of recording requirements in contract documents. Where terms such as "shown", "noted", "scheduled", and "specified" are used in lieu of "indicated", it is for purpose of helping reader locate cross-reference, and no limitation of location is intended except as specifically noted.
D. Directed, Requested, etc.: Where not otherwise explained, terms such as "directed", "requested", "authorized", "selected", "approved", "required", "accepted", and "permitted" mean "directed by the Contracting Officer", "requested by the Contracting Officer", and similar phrases.
However, no such implied meaning will be interpreted to extend the Contracting Officer's responsibility into Contractor's area of construction supervision.
E. Approve: Only the Contracting Officer, or an individual designated by her in writing, can approve or disapprove contract actions. Even if the specifications indicate that an individual other than the Contracting Officer (such as the "Approval Authorities" or "Contracting
Officer’s Representative") will approve or disapprove an action, it is understood that only the
Contracting Officer has this authority unless the individual is so designated by her in writing.
Even when an individual is so designated, the Contractor may appeal the action to the
Contracting Officer and the Contracting Officer's decision shall be final. In no case will
"approval" by the Contracting Officer be interpreted as a release of the Contractor from responsibility to fulfill requirements of contract documents.
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 2
F. Government Representative: A government employee, or contracted consultant, assigned to manage activities for the government during the course of the construction of the project, i.e., the Contracting Officer's representative on the site.
G. Project Site: The space available to Contractor for performance of the work, either exclusively or in conjunction with others performing other work as part of the project. The extent of project site is shown on drawings, and may or may not be identical with description of land upon which project is to be built.
H. Furnish: Except as otherwise defined in greater detail, term "furnish" is used to mean supply and deliver to project site, ready for unloading, unpacking, assembly, installation, etc., as applicable in each instance.
I. Install: Except as otherwise defined in greater detail, term "install" is used to describe operations at project site including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations, as applicable in each instance.
J. Provide: Except as otherwise defined in greater detail, term "provide" means furnish and install, complete and ready for intended use, as applicable in each instance.
K. Installer: The term "Installer" is defined as the entity (person or firm) engaged by the Contractor or its subcontractor or sub-subcontractor for performance of a particular unit of work at the project site, including installation, erection, application and similar required operations.
Installers shall be skilled in the work they are to perform.
L. Specialist: The term "Specialist" means an individual or firm of established reputation (or, if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which maintains a regular force of workmen skilled in either
(as applicable) manufacturing or fabricating items required by the contract, installing items required by the contract, or otherwise performing work required by the contract. Where the contract specification requires installation by a specialist, that term shall also be deemed to mean either the manufacturer of the item, an individual or firm licensed by the manufacturer, or an individual or firm who will perform the work under the manufacturer's direct supervision.
M. Testing Laboratory: The terms "testing laboratory" or "independent laboratory" are interchangeable, and are defined as an independent entity engaged by the Contractor to perform specific inspections or tests of the work, either at project site or elsewhere; and to report results of those inspections or tests.
N. Nationally Recognized Testing Laboratories: The term "nationally recognized testing laboratory
(NRTL)" shall mean a firm or organization which is recognized by OSHA in accordance with
29 CFR Part 1910.7 to test and approve (i.e., certify, label or list) equipment or materials as being safe for the intended use. Labeling and/or listing of products by NRTL's is acceptable wherever a reference to the UL or FMRC label is made in the specifications.
O. Label: The label must be provided by a nationally recognized testing laboratory. The contractor shall provide a statement from the testing laboratory attesting that the laboratory has
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 3
been approved by OSHA to certify the category of product(s) being submitted for approval.
1.2 OVERLAPPING AND CONFLICTING ASSIGNMENTS:
A. Specifications and Drawings: Where there appear to be overlapping or conflicting requirements in the drawings and specifications, the order of precedence established by the clauses
"Specifications and Drawings for Construction" and "Specifications and Drawings" of the
Contract Clauses shall govern.
B. Industry Standards: Where compliance with 2 or more industry standards or sets of requirements is specified, and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality, the most stringent requirement shall govern.
D. Contractor's Options: Except for overlapping or conflicting requirements, where more than one set of requirements are specified for a particular unit of work, option is intended to be
Contractor's regardless of whether or not it is specifically indicated as such.
1.3 MINIMUM QUALITY/QUANTITY:
A. In every instance, the quality level or quantity shown or specified is intended to be the minimum for the work to be performed or provided. Except as otherwise specifically indicated, the actual work may either comply exactly with that minimum (within specified tolerances), or may exceed that minimum within reasonable limits. In complying with requirements, indicated numeric values are either minimums or maximums as noted or as appropriate for context of requirements. Refer instances of uncertainty to the Contracting Officer for decision before proceeding.
1.4 ASSIGNMENT OF SPECIALISTS:
A. In certain instances, specification text requires that specific work is to be assigned to specialists who must be engaged for performance of that work. Such assignments are special requirements over which the Contractor has no choice or option. These requirements should not be interpreted so as to conflict with applicable regulations, union jurisdiction settlements and similar conventions. Such assignments are intended to establish which party or entity involved in a specific unit of work is recognized as "expert" for the indicated construction processes or operations. Nevertheless, the final responsibility for fulfillment of the entire set of requirements remains with the Contractor.
1.5 DRAWING SYMBOLS
A. General: Except as otherwise indicated, graphic symbols used on drawings are those symbols recognized in the construction industry for purposes indicated. Where not otherwise noted, symbols are defined by "Architectural Graphic Standards", published by John Wiley & Sons, Inc., seventh edition.
B. Mechanical/Electrical Drawings: Graphic symbols used on mechanical/electrical drawings are
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 4
generally aligned with symbols recommended by ASHRAE. Where appropriate, those symbols are supplemented by more specific symbols where appropriate as recommended by other recognized technical associations including ASME, ASPE, IEEE and similar organizations.
Refer instances of uncertainty to the Contracting Officer for clarification before proceeding.
1.6 INDUSTRY STANDARDS:
A. General Applicability of Standards: Except where more explicit or more stringent requirements are written directly into the contract documents, applicable standards of construction industry have same force and effect (and are made a part of contract documents by reference) as if copied directly into contract documents, or as if published copies were bound herewith, subject to the order of precedence previously stated.
B. Publication Dates: Refer to clause "Standard References" of Construction Contract Clauses.
Except as otherwise indicated, where compliance with an industry standard is required, comply with standard in effect as of Invitation for Bids.
1. Updated Standards: Submit a change order proposal where an applicable industry standard has been revised and reissued after the date of the contract documents and before the performance of the work affected. The Contracting Officer will decide whether to issue a change order to proceed with the updated standard.
C. Copies of Standards: Maintain copy of referenced standards, including those referenced in the referenced standards and where required manufacturer's instructions, where work is being performed, and make available to the Construction Engineer or inspector on request.
D. Abbreviations and Names: The following acronyms or abbreviations as referenced in contract documents are defined to mean the associated names. Both names and addresses are subject to change, and are believed to be, but are not assured to be, accurate and up-to-date as of date of contract documents:
AA Aluminum Association
818 Connecticut Ave. NW
Washington DC 20006
AABC Associated Air Balance Council
1518 K Street, NW, Suite 503
Washington, DC 20005
AAMA American Architectural Manufacturer's Association
2700 River Road, Suite 118
Des Plaines, IL 60018
AATCC American Association of Textile Chemists and Colorists
P.O. Box 12215
Research Triangle Park, NC 27709
ACI American Concrete Institute
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 5
P.O. Box 19150
Detroit, MI 48219
ACIL American Council of Independent Laboratories
1725 K Street, NW
Washington, DC 20006
ACS Acoustical Society of America
335 East 45th Street
New York, NY 10017
ADC Air Diffusion Council
230 N. Michigan Ave., Suite 1200
Chicago, IL 60611
AGA American Gas Association
1515 Wilson Blvd.
Arlington, VA 22209
AIA American Institute of Architects
1735 New York Ave., NW
A.I.A American Insurance Association
85 John Street
New York, NY 10038
AIHA American Industrial Hygiene Association
475 Wolf Ledges Parkway
Akron, OH 44311
AISC American Institute of Steel Construction
400 N. Michigan Ave., 8th Floor
Chicago, IL 60611
AISI American Iron and Steel Institute
1000 - 16th Street, NW
Washington, DC 20036
ALI Associated Laboratories, Inc.
Eight Brush Street
Pontiac, MI 48053
ALSC American Lumber Standards Committee
P. 0. Box 210
Germantown, MD 20874
AMCA Air Movement and Control Association
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 6
30 W. University Drive
Arlington Heights, IL 60004
ANSI American National Standards Institute
655 Fifteenth Street, NW, Suite 300
Washington, DC 20015
APA American Plywood Association
P.O. Box 11700
Tacoma, WA 98411
API American Petroleum Institute
1220 L Street, NW
ARI Air Conditioning and Refrigeration Institute
1501 Wilson Blvd.
ASC Adhesive and Sealant Council
1600 Wilson Blvd., Suite 910
ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers
1791 Tullie Circle, NE
Atlanta, GA 30329
ASME American Society of Mechanical Engineers
345 East 47th Street
New York, NY 10017
ASPE American Society of Plumbing Engineers
15233 Ventura Blvd., Suite 811
Sherman Oaks, CA 91403
ASSE American Society of Sanitary Engineering
P.O. Box 40362
Bay Village, OH 44140
ASTM ASTM
1916 Race Street
Philadelphia, PA 19103
AWI Architectural Woodwork Institute
2310 S. Walter Reed Drive
Arlington, VA 22206
AWPA American Wood Preservers' Association
EAST RICHFORD LAND PORT OF ENTRY JUNE 12, 2019
DEFINITIONS AND STANDARDS 010900- 7
P. 0. Box 849
Stevensville, MD 21666
AWPB American Wood Preservers Bureau
P.O. Box 6085
2772 S. Randolph Street
Arlington, VA 22206
AWS American Welding Society
P.O. Box 351040
550 Le Jeune Road, NW
Miami, FL 33135
AWWA American Water Works Association
6666 W. Quincy Ave.
Denver, CO 80235
BHMA Builders' Hardware Manufacturers Association
60 East 42nd St., Room 511
New York, NY 10165
CAUS Color Association of the United States
343 Lexington Avenue
New York, NY 10016
CAGI Compressed Air and Gas Institute c/o Thomas Associates, Inc.
1230 Keith Building