This notice describes a construction project for renovations and upgrades at three land ports of entry along the United States-Canada border. The project involves renovating space at the East Richford LPOE for Customs and Border Protection, including new bathrooms, offices, work areas, and security upgrades. Temporary facilities are also required during construction. Replacement of an inspection booth is outlined for the Richford and West Berkshire LPOEs, involving HVAC, electrical, lighting, security systems, and associated site work.
The General Services Administration will award a 100% small business set-aside contract for an estimated value between $1,000,000 and $2,000,000 in November 2019. A pre-bid site visit will be held on October 29th, with bids due on November 18th. The selected contractor must obtain security clearances and provide payment and performance bonds. Interested parties must register in the System for Award Management and monitor the Federal Business Opportunities website for solicitation documents and any amendments.
Richford Booth Replacement Scope of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AD-101_Rev_1.pdf | ||
| Port_Refresh_East_Richford_LPOE_Specifications.pdf | ||
| 47PB0020B0001Tab_2_West_Berkshire_Booth_Replacement_SOW_2019_07_02.pdf | ||
| 285-053-002_Port_Refresh_East_Richford_LPOE_dwgs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RICHFORD – BOOTH REPLACEMENT PROJECT
FFR 17-1344
LANE 1 - POV LANE 2 – POV
NOT USEDCOMMERCIAL PULLS UP
IN OUTSIDE LANE NOT
REALLY SHOWN.
FIELD MEASUREMENTS
38’-8”
6’ -0
NOTES
• COLUMNS ARE 8” X 8”
• CURB IS 1”-2” ABOVE ROADWAY
• BOOTH STEP IS 3”-3-1/2” ABOVE CURB.
• EXISTING BOOTH IS 4’X8’. 12
’-0
’-0
LANE 1 - POV
LANE 2/ used to park pursuit vehicle
COMMERCIAL
11’-9”
HVAC/ELECTRICAL/DATA CHASE
• HVAC UNIT located on roof of booth under canopy.
• Provide electrical outlet on roof for equipment usage by repair personnel.
• Continue chase horizontally under windows and counter.
• Add vertical chase to ceiling for data and electrical to CCTV in location shown. No exposed conduit.
LIGHTING
• Interior: 2 2X2 LED lights over counter.
• Exterior: LED light over doors and one mounted on side without door. See elevation drawings for locations.
HEATING
• Quick recovery unit.
• Heated Floor Mat sized to the booth floor.
WINDOWS and DOORS
• Level 3, BR Rated glass with tinting.
• Add shades for each window.
COUNTER
• Solid surface material
• Blocking under counter for CPU hanger.
• Minimum of three (3) 2” grommet holes for wire management.
BOOTH ENVELOPE
• Level 3, BR rated material. All exterior piping and connections to be sealed.
CAMERAS AND MICROPHONES
• Install two (2) cameras with microphone capability, or install separate microphone under camera, on booth as shown. They are to be mounted at approximately 60” to 66” – actual height to be determined at time of installation to insure viewing inside vehicle is correct.
STATEMENT OF WORK
EQUIPMENT RE-INSTALLATION AND NEW
• Install panel to house the RPM annunciators (2), the switch to the siren, duress button and switch for lane lights. Wire all items into this panel and label accordingly.
• Add a radio console in booth.
• Replace existing siren with a new siren.
• Add two (2) Cameras and Microphones, can be combined unit or separate.- see note under
“Cameras and Microphones.”
• Add CCTV Monitor (23”) and bracket suspended from ceiling.
SIGNAGE – Refer to drawing for locations.
• Relocate POV sign to a 2” sign post (MINIMUM 8’ above ground) in between the RPM bollards in LANE 1.
• Install three (3) 2” sign posts (MINIMUM 5’ above ground) along LANE 1 prior to the RPM where vehicle is stopped and waiting to be brought forward.
• Install two (2) 2” sign posts (MINIMUM 8’ above ground) along Commercial Lane prior to the RPM where vehicle is stopped and waiting to be brought forward.
RICHFORD – BOOTH REPLACEMENT PROJECT
FFR 17-1344
6’-0”
8’-0”
HVAC/DATA
CHASE
CEILING HATCH
LIGHTING
LIGHTING
COUNTER
RIGHT SIDE
LEFT SIDE
BUILDING
OUTBOUND LANE
CAMERA AND MIC
CAMERA AND MIC
PLAN VIEW
6’-0”
8’-0”
HVAC/ELEC/
DATA CHASE
HVAC/ELECTRICAL/DATA CHASE
• UTILIZE CHASE FOR WIRING
RUNS AND OUTLETS, PANELS
AND DATA BOXES.
COUNTER
1N DATA & 1 DUPLEX
AT CEILING FOR CCTV.
1 DUPLEX BELOW
COUNTER.
3N/1R DATA & 1 QUAD
BELOW COUNTER.
3N/1T DATA & 1 QUAD
BELOW COUNTER.
1 DUPLEX BELOW
COUNTER.
RIGHT SIDE
LEFT SIDE
CPU HANGER
LOCATION.
PANEL BOX TO HOUSE:
• SIREN BUTTON
• RPM ANNUNCIATORS
• DURESS BUTTON
• SWITCH FOR LANE LIGHTS
DATA – 3N/1R AND 3N/1T
DATA – 1N
DUPLEX
QUAD
KEY AND NOTES
PLAN VIEW - ELECTRICAL/DATA
BUILDING
LANE 2
ANGLED WALL
SOLID SURFACE
COUNTER
DATA/ELECTRICAL CHASE
MOUNTING BRACKET FOR CCTV
DATA & ELECTRICAL FOR CCTV
PANEL BOX TO HOUSE:
• SIREN BUTTON
• RPM ANNUNCIATORS
• DURESS BUTTON
• SWITCH FOR LANE LIGHTS
SINGLE DATA FOR CCTV
3N/1R DATA
3N/1T DATA
DUPLEX
QUAD
HEATED FLOOR
MAT
ELECTRICAL FOR
HEATED FLOOR MAT
CPU HANGER
ELEVATION – Interior facing Canada
KEY
ROLLER SHADES
7”
8”
HEIGHT OF CANOPY IS 13’-8”
38’-8”
11’-9”
NEW BOOTH ELEVATION
DIRECTION OF TRAVEL ENTERING THE USA VIA LANE 1
EXTERIOR LIGHTING
BACK DOOR
CAMERA W/MIC
8’-0”
7”
8”
HEIGHT OF CANOPY IS 13’-8”
41’-4”
11’-8”
NEW BOOTH ELEVATION
DIRECTION OF TRAVEL IN OUTBOUND LANE TO CANADA
CAMERA W/MIC
EXTERIOR DUPLEX
HVAC UNIT
EXTERIOR LIGHTING
Install two (2) 2” sign posts (MINIMUM 8’ above ground) along Commercial Lane prior to the RPM where vehicle is stopped and waiting to be brought forward.
SIGNAGE
Relocate POV sign to a 2” sign post (MINIMUM 8’ above ground) in between the RPM bollards in LANE 1.
Install three (3) 2” sign posts (MINIMUM 5’ above ground) along LANE 1 prior to the RPM where vehicle is stopped and waiting to be brought forward.
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
File details come from the government source that posted it. Updated .