Solicitation_Amendment_47PB0018R0014_0001.pdf

PDF 742 KB Posted

Attached to
Snow and Ice Removal Services in Burlington, St. Albans, & Highgate, VT
Solicitation number
47PB0018R0014
Issued by

About this file

Amendment 0001. Please remember to acknowledge Amendment with your proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Solicitation 47PB0018R0014, Snow and Ice Removal Services at the Burlington P.O.C.H.

(VT0024ZZ) in Burlington, VT, 58 Pearl (VT0035ZZ) in Burlington, VT, Winston Prouty F.B.

(VT0028ZZ) in Essex Junction, VT, St. Albans P.O.C.H. (VT0018ZZ) in St. Albans, VT and Highgate Springs L.P.O.E (VT0057BH) in Highgate Springs, VT is hereby modified as follows:

1. Replace in its entirety, pages 17-20, Statement of Work Snow Services of the RFP with the attached.

2. The proposal due date is NOT extended and remains due on July 17, 2018 by 2:00PM

EST.

3. All other terms and conditions remain unchanged.

4. Offerors are reminded that they must acknowledge receipt of all amendments by one of the methods in Block 11 on page 1.

General Services Administration Public Building Service North Service Center

Vermont

Snow Removal Services

CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS

Statement of Work

SNOW SERVICES

The Contractor shall provide all management, supervision, labor, equipment, materials, tools and supplies necessary to provide snow and ice removal services at the following (7) locations:

Burlington P.O.C.H. (VT0024ZZ) 11 Elmwood Avenue Burlington, VT 05401-4366 Normal Building Operating Hours:

5:30AM-5:30PM M-F

5:30AM-2:30PM Sat

Areas requiring snow and ice removal:

A. Parking areas [46,798] sq ft

B. Sidewalks (including entrances) [0] sq ft C. Entrance Steps [0] sq ft D. Other [0] sq ft E. 10 Year Average Snowfall [86.17 in]

58 Pearl (VT0035ZZ) 58 Pearl Street Burlington, VT 05401-4430 Normal Building Operating Hours: 5:30AM-4:30PM

A. Parking areas [8,394] sq ft

B. Sidewalks (including entrances) [0] sq ft C. Entrance Steps [0] sq ft

Winston Prouty F.O.B. (VT0028ZZ) 11 Lincoln Street Essex Junction, VT 05452-3685 Normal Building Operating Hours: 5:30AM-4:30PM

A. Parking areas [23,565] sq ft

B. Sidewalks (including entrances) [0] sq ft

Amendment 0001

C. Entrance Steps [0] sq ft

St. Albans P.O. & C.H. (VT0018ZZ) 50 South Main Street St. Albans, VT 05478-2111 Normal Building Operating Hours: 5:45AM-4:15PM

A. Parking areas [16,096] sq ft

B. Sidewalks (including entrances) [0] sq ft C. Entrance Steps [0] sq ft

E. 10 Year Average Snowfall [94.42 in]

Highgate Springs L.P.O.E. (VT0057BH) 482 Welcome Center Road High-gate Springs, VT 05460-9901 Normal Building Operating Hours: 24 Hours a Day, 7 Days a Week

A. Parking areas [219,608] sq ft

B. Sidewalks (including entrances) [12,500] sq ft C. Entrance Steps [1240] sq ft

Entrances include:

*Main port lobby of main building.

* Main port Bus Lobby east side of main building.

* Main Port East main building stair exit.

* Cargo Building East and Southeast entrances.

* FDA West entrance and East.

* Aphis Cattle building West entrance.

* Wastewater East and West doors.

* All exterior steps even to booth are included.

D. Other [189,500 ] sq ft Rt I-89 North ¼ Mile from Highgate Springs to Canadian Border & Rt I-89 South ¼ Mile from Canadian Border to Highgate Springs

E. 10 Year Average Snowfall [94.42 in]

Performance shall be a standard conforming to best practices of the industry. All services shall be rendered promptly and efficiently.

1.) SNOW REMOVAL PLAN: The Contractor shall submit a detailed snow removal plan that meets the needs of the GSA. At a minimum, the snow removal plan shall include the following items:

- Coordination measures to ensure appropriate levels of effort for the conditions of the building.

- Equipment

- Personnel

- Snow removal event triggers

- Treatment areas requiring de-icing

- Approved materials and chemicals

- Safety plan

- Notification procedures

- Sub-Contractor for plowing/sanding if applicable]

The Contractor shall furnish to the COR a list of telephone numbers where either he/she or his/her authorized representative may be contacted seven (7) days per week at any hour of the day or night to provide required services. The Contractor must keep this listing current and provide the COR with an updated listing on or before October 1, prior to the start of each snow season. The Contractor shall, within 15 days prior to Contract start, will notify the COR of the snow removal subcontractor that will perform any part of this work if work is to be subcontracted out. Snow removal activities will be reported on the monthly quality control report.

2.) Clearing/Preventing Snow/Ice from roadways, parking lots. Clearing snow/ice, shoveling, snow removal and treatment (sanding & deicing services) for snow/ice on all surfaces (i.e., roadways, parking lots, shall be accomplished by the Contractor.

Environmentally friendly de-icing products that will not damage concrete or metal and will help protect the environment, must be used on all roadways, parking lots, concrete entrances, walkways and steps, to prevent ice build-ups. This also applies to any sand/de-icing mixtures. Chemicals and/or sand shall be used to reduce safety hazards due to ice and snow. All chemicals used shall at a minimum comply with State environmental regulations and local codes. The Contractor shall ensure there is an adequate supply of chemicals and sand on site or readily available to cover unexpected snow and ice occurrences. All chemicals used in the performance of this contract shall be approved by the COR prior to the first inclement weather event.

Note: The only acceptable product for the Highgate sidewalks is calcium chloride; the Parking deck at St.

Albans requires calcium chloride.

If ice is present, a mixture of sand and ice melt shall be required. The contractor shall ensure there is an adequate supply of chemicals and sand on site or readily available to cover unexpected snow and ice events.

For locations covered in this solicitation which are open 24/7, all surfaces shall be kept clear of snow and ice at all times.

All stations covered in this solicitation have building operational equipment that must be kept clear of snow, including but not limited to: Vehicle Radiation Portal Monitoring Equipment, LPR license plate readers and cameras installed in vehicle lanes; Fire Hydrants; Electrical Transformers; Emergency generators; Fuel Tanks;

Chillers; Air Handling Units; and Dry Coolers. Contractor is responsible for plowing through and around this equipment, including any necessary hand shoveling/snow blowing. Contractors should price snow plowing and removal costs accordingly.

3.) Snow Plowing. Snow plowing shall commence when local accumulation reaches [two (2) inches]. Snow plowing shall be accomplished by the Contractor to maintain safe passage for access into buildings, parking areas, roadways, approaches, vehicular courts, ramps, etc. In the event of icy rain or snow, sanding shall commence to maintain a safe passage on all paved roadways, parking lots, driveways, ramps and walkways.

Contractor is required to be onsite within 45 minutes of the prediction of (2) inches of accumulation. Since plowing during a storm is done around vehicles the snow plow contractor shall coordinate with Government tenant personal on cleanup of parking lot so all the GOV vehicles can be moved for the final clean-up after each storm.

The Contractor shall use caution when snow removal is in progress to prevent any damage to the buildings, grounds, vegetation, landscape areas, sidewalks, roads, fire hydrants, shrubs, signs, and other protrusions. The Contractor shall be held liable for any damage incurred to Government property during the performance of work. All locally prescribed safety regulations, laws, and practices shall be carefully observed in performance of the work.

The Contractor shall be responsible for annual sweeping of all concrete and paved inspection lanes, parking areas and walkways; removal of sand from adjacent grounds; and reseeding and repair of damage to affected areas at the end of each winter season. This work must be completed prior to the Memorial Day weekend each year. Winter damage repairs shall be completed by June 18th for Highgate. All other locations by June 30th.

4.) Snow Removal: Snow must be removed from the site when the accumulation exceeds that which can be pushed off of the roads, parking areas, ramps and walkways without blocking traffic, parking spaces and pedestrian thoroughfares; or impedes the visibility of vehicular operators, pedestrians or tenant agency operations. Stockpiling of snow is not allowed at the Burlington P.O.C.H, the 58 Pearl, the Winston Prouty FB., the St. Albans P.O. & C.H.

Snow must be pushed off of the roads, parking areas, ramps and walkways without blocking traffic, parking spaces and pedestrian thoroughfares or impeding the visibility of vehicular operators, pedestrians or tenant agency operations. Snow shall be stockpiled only in 3 areas approved by the COR at Highgate Springs L.P.O.E.

Once this area is filled to capacity; and is larger than 30’ wide and 20’ high it is the Contractor’s responsibility to haul the snow from the facility.

Snow removal from site is to be included as part of the base bid price, not billable as an extra service.

topmostSubform[0]:
Page1[0]:
Code[0]: 1PQB
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: 1PQB
NameandTitleOfficer[0]: Sotheavy Khon, Contracting Officer
Is[0]: 1
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 3
AmendmentNo[0]: 0001
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ1PSK-18-0038
Dated9B[0]: 6/21/2018
C13[0]:
Description[0]: Please see attached
NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PB0018R0014
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]: 1
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 6/27/2018
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

NameandTitleSigner[0]:

File details come from the government source that posted it.