About this file

SDM PRICING TEMPLATE

View the file

Other files for this federal contract opportunity

Other files attached to National Contract for Spatial Data Management (SDM) and 3D Imaging, newest first.
File Type Posted
SDM_Combined_Q_&_A.pdf PDF
Amendment__1_SOW_-_SDM_3DI_Services.pdf PDF
SOW_-_SDM_3DI_Services.pdf PDF
Attachment__5-GSA_BIM_Guide_02_Version_2.0.pdf PDF
Attachment__2-PBS_CAD_Standards.pdf PDF
FBO_-_Intructions_to_Offerors.pdf PDF
Attachment__4-GSA_BIM_Guide_Series_03.pdf PDF
Attachment__3-NBSAP.pdf PDF
SECTION_A_-_SF33__47PA0118R0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions:
For evaluation purposes, the number of hours/building size/acres in the estimate pricing sheet below shall be used to develop a total price for the base year, plus the four option years. The following tasks listed on the sheet (Full Validation (2D & 3D), Audit Phase 1, Audit Phase 2, Targeted Rewalk and 3D BIM-Based Audit Phase 1) will be priced on a per square foot (SF) basis. Price the Base Year and all the Option Years using the given building sizes and site sizes on the Pricing Sheet.
Site Validations (2D and 3D) will be priced lump sum per acre range depending on complexity. Price the Base Year and all the Option Years using the given building sizes and site sizes on the Pricing Sheet.
Additional services not listed on spreadsheet that are included in the SOW (such as training) with be priced by hourly rate of labor category.
Definition for the pricing sheets:
Complex Building – For this contract all federal buildings will be considered complex, while some are rectangular in shape and stack, many do not stack and even if they do, they may still have historic or special architectural elements. They will include buildings that are U.S. Courthouses, U.S. Border Stations, or U.S. Post Office Buildings.

Warehouse – Structure with large open areas with minimal finish out, easily accessible through loading docks and large doors, with less then 15% office space.

Moderate Site - Contains one or three buildings, has a greater amount of detail to capture around the building including park areas, and less then 50 parking spaces. The COR can typically provide approximately 75% of the supporting documentation and additional research is needed.

Complex Site - Is irregular in shape, or contains three or more buildings on site, or has more then 50 surface parking spaces. Has a greater security level then a standard or moderate site (i.e. Border Stations, Warehouse Complex, or Court House facilities). Available supporting documenation will be provided, but will vary.

Items for submitting price proposal:
**Use this Pricing Sheet for Base Year and Options Years. Do not change formulas or use your own spreadsheet.
Using your Labor Categories and Rates estimate cost of measuring buildings. Convert this cost into a SF cost or for sites into a lump sum (LS) cost and populate spreadsheet. Do this for Base Year and the 4 (four) Option Years and populate spreadsheet.
Travel will be paid using the provisions of the contract and Travel Regulations; therefore, it is not necessary to include an amount or estimate costs.
Provide fully loaded hourly rates for the Labor Catagories identified for the Base year and the subsequent option years. If you do not have identical categories, please provide the labor rate for your cloests equivalent using the tasks/expectations described in the Statement of Work. Provide any necessary footnotes.

NOTE: THE TOTAL EVALUATED PRICE IS SOLELY FOR EVALUATION PURPOSES OF THE CONTRACTOR’S OFFER AND DOES NOT CORRELATE WITH THE TOTAL CONTRACT VALUE AND DOES NOT GUARENTEE A SPECIFIC AMOUNT OF SERVICES TO BE PURCHASED BY THE GOVERNMENT. LIKEWISE, THE ESTIMATED HOURS OR BUILDING QUANTITIES ARE FOR EVALUATION PURPOSES ONLY.

&12Spatial Data Management Services Contract Drawings and Maintenance Services - Attachment 1 Solicitation No.

Base Year

Base Year1 - 8,000 sfAvg SFNumber of Bldgs per Category8,001 - 20,000 sfAvg SFNumber of Bldgs per Category20,001 - 50,000 sfAvg SFNumber of Bldgs per Category50,001-100,000 sfAvg SFNumber of Bldgs per Category100,001-200,000 sfAvg SFNumber of Bldgs per Category200,001-500,000 sfAvg SFNumber of Bldgs per CategoryOver 500,001 sfAvg SFNumber of Bldgs per CategoryTotal
Full Validation (2D) - SOW Para C5.1a and C5.1b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 1 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 2 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Targeted Rewalk (2D) - SOW Para C5.3 (Targeted Rentable plus STP, UFO, OTB (Voids))
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (2D) - SOW C5.1c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Full Validation (3D) - SOW Para C5.4a and C5.4b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
3D BIM-Based Audit, Phase 1- SOW Para C5.6
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (3D) - SOW C5.4c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Sub-total$ - 0
$ - 0
Hourly Pricing (Loaded Rates)
Program Manager (1001)
Project Engineer (1002)
CAD/CAFM Engineer (1003)
CAD/CAFM Technician (1004)
Trainer (1005)
Scanning/Imaging Technician (1006)
BIM Modeler (1007)SDM SuptTotal$ - 0

Solicitation No.

Option Year 1

Option Year 11 - 8,000 sfAvg SFNumber of Bldgs per Category8,001 - 20,000 sfAvg SFNumber of Bldgs per Category20,001 - 50,000 sfAvg SFNumber of Bldgs per Category50,001-100,000 sfAvg SFNumber of Bldgs per Category100,001-200,000 sfAvg SFNumber of Bldgs per Category200,001-500,000 sfAvg SFNumber of Bldgs per CategoryOver 500,001 sfAvg SFNumber of Bldgs per CategoryTotal
Full Validation (2D) - SOW Para C5.1a and C5.1b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 1 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 2 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Targeted Rewalk (2D) - SOW Para C5.3 (Targeted Rentable plus STP, UFO, OTB (Voids))
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (2D) - SOW C5.1c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Full Validation (3D) - SOW Para C5.4a and C5.4b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
3D BIM-Based Audit, Phase 1- SOW Para C5.6
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (3D) - SOW C5.4c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Sub-total$ - 0
$ - 0
Hourly Pricing (Loaded Rates)
Program Manager (2001)
Project Engineer (2002)
CAD/CAFM Engineer (2003)
CAD/CAFM Technician (2004)
Trainer (2005)
Scanning/Imaging Technician (2006)
BIM Modeler (2007)SDM SuptTotal$ - 0

Solicitation No.

Option Year 2

Option Year 21 - 8,000 sfAvg SFNumber of Bldgs per Category8,001 - 20,000 sfAvg SFNumber of Bldgs per Category20,001 - 50,000 sfAvg SFNumber of Bldgs per Category50,001-100,000 sfAvg SFNumber of Bldgs per Category100,001-200,000 sfAvg SFNumber of Bldgs per Category200,001-500,000 sfAvg SFNumber of Bldgs per CategoryOver 500,001 sfAvg SFNumber of Bldgs per CategoryTotal
Full Validation (2D) - SOW Para C5.1a and C5.1b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 1 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 2 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Targeted Rewalk (2D) - SOW Para C5.3 (Targeted Rentable plus STP, UFO, OTB (Voids))
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (2D) - SOW C5.1c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Full Validation (3D) - SOW Para C5.4a and C5.4b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
3D BIM-Based Audit, Phase 1- SOW Para C5.6
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (3D) - SOW C5.4c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Sub-total$ - 0
$ - 0
Hourly Pricing (Loaded Rates)
Program Manager (3001)
Project Engineer (3002)
CAD/CAFM Engineer (3003)
CAD/CAFM Technician (3004)
Trainer (3005)
Scanning/Imaging Technician (3006)
BIM Modeler (3007)SDM SuptTotal$ - 0

Solicitation No.

Option Yr3

Option Year 31 - 8,000 sfAvg SFNumber of Bldgs per Category8,001 - 20,000 sfAvg SFNumber of Bldgs per Category20,001 - 50,000 sfAvg SFNumber of Bldgs per Category50,001-100,000 sfAvg SFNumber of Bldgs per Category100,001-200,000 sfAvg SFNumber of Bldgs per Category200,001-500,000 sfAvg SFNumber of Bldgs per CategoryOver 500,001 sfAvg SFNumber of Bldgs per CategoryTotal
Full Validation (2D) - SOW Para C5.1a and C5.1b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 1 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 2 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Targeted Rewalk (2D) - SOW Para C5.3 (Targeted Rentable plus STP, UFO, OTB (Voids))
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (2D) - SOW C5.1c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Full Validation (3D) - SOW Para C5.4a and C5.4b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
3D BIM-Based Audit, Phase 1- SOW Para C5.6
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (3D) - SOW C5.4c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Sub-total$ - 0
$ - 0
Hourly Pricing (Loaded Rates)
Program Manager 4001)
Project Engineer (4002)
CAD/CAFM Engineer (4003)
CAD/CAFM Technician (1004)
Trainer (4005)
Scanning/Imaging Technician (4006)
BIM Modeler (4007)SDM SuptTotal$ - 0

Option Yr4

Option Year 41 - 8,000 sfAvg SFNumber of Bldgs per Category8,001 - 20,000 sfAvg SFNumber of Bldgs per Category20,001 - 50,000 sfAvg SFNumber of Bldgs per Category50,001-100,000 sfAvg SFNumber of Bldgs per Category100,001-200,000 sfAvg SFNumber of Bldgs per Category200,001-500,000 sfAvg SFNumber of Bldgs per CategoryOver 500,001 sfAvg SFNumber of Bldgs per CategoryTotal
Full Validation (2D) - SOW Para C5.1a and C5.1b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 1 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Audit (2D), Phase 2 - SOW Para C5.2 (Rentable, STP, UFO sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Targeted Rewalk (2D) - SOW Para C5.3 (Targeted Rentable plus STP, UFO, OTB (Voids))
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (2D) - SOW C5.1c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Full Validation (3D) - SOW Para C5.4a and C5.4b (Gross sf)
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
3D BIM-Based Audit, Phase 1- SOW Para C5.6
Complex Building50001100001300001750001150000130000016000001$ - 0
Warehouse50001100001300001750001150000130000016000001$ - 0
Site Validation (3D) - SOW C5.4c (Acreage)0 - 1 ac.Avg acres# of sites1.1 - 3 ac.Avg acres# of sites3.1 - 7 ac.Avg acres# of sites7.1-12 ac.Avg acres# of sites12.1 - 20 ac.Avg acres# of sites20.1 - 40 ac.Avg acres# of sites>40.1 ac.Avg acres# of sites
Moderate Site0.7512151101171251501$ - 0
Complex Site0.7512151101171251501$ - 0
Sub-total$ - 0
$ - 0
Hourly Pricing (Loaded Rates)
Program Manager (5001)
Project Engineer (5002)
CAD/CAFM Engineer (5003)
CAD/CAFM Technician (5004)
Trainer (5005)
Scanning/Imaging Technician (5006)
BIM Modeler (5007)SDM SuptTotal$ - 0