Contract Summary: Helium Reliquefication System

This is a Firm Fixed Price contract (No. 475213) between Brookhaven Science Associates (BSA) and a contractor for the manufacture and commission of a helium reliquefication system (HeRS) at Brookhaven National Laboratory. The contract is issued under BSA's Prime Contract DE-SC0012704 with the U.S. Department of Energy. The overall contract value is to be determined (TBD), with payment structured in three milestone-based installments: upon receipt and acceptance of the final design report, upon receipt and acceptance of Factory Acceptance Test documentation, and upon commissioning and BSA acceptance of the system. Payment terms are Net 30 for large businesses and Net 10 for small businesses. Electronic invoice submission in PDF format is required to apinvoices@bnl.gov, with hard copies directed to BSA's Accounts Payable Department, Contracts Division, Bldg. No. 400D.

The contractor must deliver a complete, integrated helium reliquefication system capable of producing at least 40 liters per day of liquid helium with critical components ASME-certified. Key deliverables include: (1) a Design Report due one month after award with Design Review Meeting and final design approval required before material ordering; (2) Factory Acceptance Test documentation due nine months after award, including test procedures and final reports demonstrating full specification compliance; and (3) system commissioning at the Brookhaven facility due twelve months after award. All technical specifications, assembly drawings, packing requirements, and installation procedures must comply with detailed requirements outlined in the Statement of Work. The contractor must provide a two-year warranty from commissioning and final acceptance, maintain ISO 9001 quality system compliance per BNL-QA-101 requirements, and ensure all electrical equipment meets NFPA 70 standards and is certified by a Nationally Recognized Testing Laboratory. Freight terms are FOB for North American shipments (Freight Prepaid) or DAP for foreign shipments to 98 Rochester Street, Upton, New York.

View the file

Other files

File Type Posted
B.1 Request for Quote.pdf PDF
B.1 Enclosure A Draft Contract.pdf PDF
B.1 Enclosure D Vendor ACH.pdf PDF
B.1 Enclosure E W9.pdf PDF
B.1 Enclosure B AMS Form 50.pdf PDF
B.1 Enclosure C, Quotation Pricing Sheet.docx DOCX document
B.1 Enclosure F W8.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 9, 2025 1 Rev. 10

BSA’s Contractual Representative

Overall Value Amount

Contract Type Contract Number

Jayce M. Blood TBD Firm Fixed Price 475213

BROOKHAVEN NATIONAL LABORATORY

Brookhaven Science Associates

P.O. Box 5000

UPTON, L.I., N.Y. 11973-5000

TBD

CONTRACT

This Contract (the “Contract”) is between the party named above (the “Contractor”), and Brookhaven Science Associates, LLC (“BSA”), the latter acting under a Prime Contract, DE- SC0012704, with the United States of America (the “Government”) represented by the United States Department of Energy (“DOE”).

I. SCOPE OF WORK

The Contractor shall provide all tools, materials, personnel, and equipment to manufacture and commission a helium reliquefication system at Brookhaven National Laboratory. All work shall be conducted in strict accordance with the attached BSA Statement of Work.

A. Reports/Deliverables: The Contractor shall provide the following deliverable(s) to BSA’s Technical Representative (Tech Rep):

Description Due Date

1. Design Report One month after award

2. Factory Acceptance Test Nine months after award

3. Commissioning of the Helium Reliquefication

System

Twelve months after award

II. PERIOD OF PERFORMANCE

This Contract shall be effective as of the date executed by both parties. It shall remain in effect through TBD.

III. FIRM FIXED PRICE AND PAYMENT

A. Firm Fixed Price: In full consideration of the Contractor's performance hereunder, BSA shall pay the Contractor the firm fixed price of TBD U.S. Dollars ($0.00). The said sum shall constitute full compensation for all services and materials furnished hereunder.

April 9, 2025 2 Rev. 10

B. Payment: Payment will be made upon receipt and approval of properly certified invoices. Payment will be in accordance with the following milestone payment schedule:

Milestone Amount

1. BSA receipt and acceptance of the final design report.

2. BSA receipt and acceptance of the Factory Acceptance Test documentation.

3. Commissioning and BSA acceptance of the helium reliquefication system.

Total:

Payment terms are Net XX (for large businesses enter 30, for small businesses enter 10).

Invoices shall be directed to BSA’s Accounts Payable Department via electronic or regular mail.

Electronic invoice submittal is preferred by BSA. The Contractor shall make every effort to have systems in place that allow for electronic invoice transmittal.

Invoices shall be submitted in PDF format, via email, to apinvoices@bnl.gov.

Hard copy invoices, if applicable, shall be directed to BSA's Accounts Payable Department, Contracts Division, Bldg. No. 400D.

The Contractor shall indicate the final invoice by clearly marking such invoice as “FINAL.” A copy of the final invoice must be submitted to BSA’s Contractual Representative.

C. Freight: Freight terms shall be (for North American shipments insert: ) FOB BSA

National Laboratory, 98 Rochester Street, Upton, Long Island, New York. Freight Prepaid,

- OR -

(for foreign shipments insert: ) “DAP” Delivered At Place, BSA National Laboratory, 98 Rochester Street, Upton, Long Island, New York.

D. Labelling, Packing, and Notification Requirements:

More detailed instructions are available at https://www.bnl.gov/shipping/ or by emailing WarehouseOperations@bnl.gov.

Labeling Requirements

All shipments must comply with the following labelling requirements. Failure to mailto:apinvoices@bnl.gov https://www.bnl.gov/shipping/ mailto:WarehouseOperations@bnl.gov

April 9, 2025 3 Rev. 10 do so may result in delayed payments. Labels must be placed on the upper left portion of the container when possible and contain:

Brookhaven National Laboratory Brookhaven’s Contract Number 98 Rochester St.

Upton, NY 11973 Box Number / Number of Boxes

Packing List Requirements

Every shipping container must include a packing list. The packing list must be clearly identified and affixed to a side of the shipping container. At a minimum, the packing list should contain the following information:

• Ship from company name and address

• Supplier contact name

• Supplier telephone number

• Ship to address as instructed by Buyer/Contracts Specialist

• Brookhaven’s Contract number

• Part number, description, quantity, unit of measure, and corresponding BNL

Contract line number

Special Notification of Delivery

If a shipment is heavier than 3,000 lbs., longer than 8 feet in any direction, or has a high center of gravity, it will require rigging upon receipt and the shipper shall provide a minimum of 3 days’ advance notice of delivery to BNL’s Receiving Department via email to WarehouseOperations@bnl.gov. The shipper must obtain acknowledgement from BNL that delivery notification was received. Failure to contact BNL will result in delays during delivery and any resulting demurrage will be at the shipper’s expense.

Marking of Outer Package

Each shipping container (transport package) with a gross weight equal to or greater than 400 lbs. (180 kilograms) must be marked with the center of gravity location and gross weight on at least one side or end panel. It must also meet the requirements of the latest revision of ASTM Standard D 3951, Standard Practice for Commercial Packaging. This applies to any item shipped (originally packaged or repackaged) to BNL or other locations cited in the Contract.

Protection of Material and Equipment

The Contractor shall employ procedures which ensure adequate protection of material and equipment during shipment and while in storage. Such protection shall include special environmental packaging as necessary. All items shipped https://www.astm.org/Standards/D3951.htm

April 9, 2025 4 Rev. 10

(originally packaged or repackaged) to BNL or other locations cited in the PO or Contract shall comply with the requirements for preservation, packaging, and marking as stated in the latest revision of ASTM Standard D 3951-10, Standard Practice for Commercial Packaging.

Unacceptable Packing Material

Do not use vermiculite as a packaging material inside any shipments to BNL unless required by shipping regulation. “Vermiculite” as defined in this specification means the hydrous, silicate mineral classified as a phyllosilicate that has been expanded by heating. Vermiculite used as a packaging material in shipments must be determined to be free of asbestos (<1% chrysolite, amosite, crocidolite, tremolite, anthophyllite, and actinolite). All shipments containing vermiculite must be accompanied by documentation stating that the vermiculite used is certified asbestos-free. This documentation must be affixed to the outside of the package.

Ocean Shipments

Foreign shipments transported via ocean freight must use the 10+2 REQUIREMENTS Form (PDF). The form must be completed by the Contractor 72 hours before departure of the vessel. Send form to the following:

Interfreight Harmonized Logistics, Inc.

Fax: 516-371-6880 bnl@interfreight.net

Brookhaven National Laboratory WarehouseOperations@bnl.gov

Once the form is submitted to customs, an acceptance number will be provided.

Freight will not be loaded onto a vessel without an acceptance number. Failure to submit the 10+2 form may result in fines. It is the Contractor's responsibility to make sure the 10+2 form is submitted 72 hours prior to the vessel sailing. BSA shall withhold payment from the Contractor's final invoice for any penalties incurred by BSA due to late or incorrect ISF filing by the Contractor.

IV. AUTHORIZED REPRESENTATIVES

A. BSA’s Technical Representative: TBD, telephone no. TBD, TBD (email), is BSA's Technical Representative, and shall act as liaison between BSA and the Contractor in technical matters only.

B. BSA’s Contractual Representative: Jayce Blood, telephone no. (631) 344-

2627, jblood@bnl.gov (email), is BSA's Contractual Representative. Any change or modification in the terms and conditions of this Contract shall require the written approval of BSA's Contractual Representative or designee.

https://www.astm.org/Standards/D3951.htm https://www.bnl.gov/shipping/files/pdf/10-2-security-filing-bnl-interfreight.pdf https://www.bnl.gov/shipping/files/pdf/10-2-security-filing-bnl-interfreight.pdf mailto:bnl@interfreight.net

April 9, 2025 5 Rev. 10

C. Contractor’s Technical Representative: TBD, telephone no. TBD, TBD

(email), is the Contractor’s authorized Technical Representative, and shall act as point of contact between BSA and the Contractor in technical matters only.

D. Contractor’s Contractual Representative: TBD, telephone no. TBD, TBD

(email), is the Contractor’s authorized Contractual Representative and shall act as liaison between BSA and the Contractor.

V. PATENT CERTIFICATION - RESERVED

VI. GOVERNMENT PROPERTY - RESERVED

VII. ADDITIONAL TERMS

The provisions of Brookhaven Science Associates, LLC, General Terms and Conditions for Commercial Items and Services, Rev 24.0, April 2026, are incorporated herein and made a part hereof.

Article 18, entitled “Warranty” is modified to reflect a two (2) year warranty. The contractor shall warranty the equipment against failure and defects for a period of two (2) years from commissioning and final acceptance at BNL.

The provisions of Brookhaven Science Associates, LLC, Supplemental Terms and Conditions for Work by Contractors Onsite at Brookhaven National Laboratory, Rev 24.0, April 2026, are incorporated herein and made a part hereof.

The provisions of Brookhaven Science Associates, LLC, Supplemental Terms and Conditions for the Price-Anderson Act, (Rev 24.0, April 2026) are incorporated herein and made a part hereof.

This Contract is issued pursuant to Brookhaven Science Associates General and/or Supplemental Terms and Conditions listed above, which are incorporated herein by reference. The complete text of these terms and conditions can be viewed at PPM | Terms and Conditions. Should the Contractor have any questions and/or not have access to these terms and conditions, contact the Buyer or Contracts Specialist immediately.

The following documents attached hereto and made a part hereof, contain additional provisions of this Contract:

Attachment A Statement of Work Attachment B BNL QA-101

[SPACE LEFT INTENTIONALLY BLANK]

https://www.bnl.gov/ppm/terms-and-conditions.php https://www.bnl.gov/ppm/terms-and-conditions.php

April 9, 2025 6 Rev. 10

This Contract does not bind nor purport to bind the Government of the United States.

ACCEPTED:

By:

BROOKHAVEN SCIENCE

ASSOCIATES, LLC

By:

Name:

Name:

Title:

Title:

Date:

Date:

A copy of the signed Contract shall be returned to BSA’s Contractual Representative. BSA will then sign and provide a fully executed copy for your records.

P.O. Box 5000

Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy

Subject: Scope of work for Coherent Soft X-ray (CSX, 23-ID-1) beamline Helium Reliquefication System (HeRS)

Introduction CSX typically operates for slots of 8 consecutive days while keeping samples at cryogenic temperatures via a Liquid Helium (LHe) flow cryostat. The x-ray measurements are particularly sensitive, so the minimization of external perturbations (including vibration) is of capital importance. The continuous amount of LHe to perform a typical x-ray measurements run is estimated in 10L/day. As such, CSX needs a HeRS capable of operating for at least 8 consecutive days storing warm gas (the equivalent of 80L of LHe) without the need of reliquefying it. After this period, 2 days are available for reliquification of the He gas accumulated during operations, thus a 40L/day reliquification capability is needed. For the same reason, the parts generating most of the vibrations (compressors) should be located as far as possible from the beamline instrument. For this purpose, an area on the synchrotron mezzanine directly facing the CSX beamline has been identified, located at less than 90’ total linear distance from the LHe point of use (instrument and reliquification position). This area should host at least the recovery line compressor. The reliquifier unit can be placed closer to the instrument, as it will be operated only during the 2 days pause of the measurements.

Technical requirements

1. The Contractor shall deliver a complete system with clear documents for assembling and installing it at CSX. Once ready, the Contractor should test the system proving solid performance as per above;

2. All critical components (He dewars, Flex Lines (FL), Pressure Release Valves (PRVs), cylinders and/or tanks) shall be ASME certified (or equivalent);

3. All volumes potentially trapping LHe shall be protected by PRVs;

4. The HeRS gas recovery should minimize the amount of He loss during both measurement and standby conditions (boiloff of the dewars need to be intercepted);

5. In steady reliquefying conditions, the HeRS has to produce at least 40L/day of LHe;

6. The HeRS shall reliquefy in a dewar of at least 150L, the LHe shall be transferred to a

“secondary dewar” of 100L by a dedicated, permanently connected, and (manual needle-) valve-controlled transfer line (if needed, the two LHe dewars have to be completely decoupled during measurements, i.e. while the LHe is provided from the “secondary dewar” to the beamline systems);

7. The “secondary dewar” shall (permanently) receive the transfer from the reliquefication dewar, and should provide LHe through another dedicated transfer (diameter 1/2”, BNL provided) to the measurement cryostat (BNL provided). The latter shall be permanently connected to the main FL of the HeRS recovery line via a PRV and an open port (for LHe transfer);

8. As per above, the “measurement dewar” shall have a 3-port neck (2 transfers, and a ½” dip-stich used as a LHe level meter – BNL provided);

9. The PRV of the He storage should be provided with a suitable adaptation for a connection to a line venting to the outside of the building.

Additional technical specifications

I. Vibration dampening for compressor high pressure lines should be considered;

II. ASME certifications should obey to B31(.5) standard;

III. Some kind of communication (PLC, EPICS, …) for remote checking of operations would be considered an added value.

Project requirements The contractor shall be responsible for the design, assembly, test, cleaning, packaging and delivery of the HeRS. The Contractor shall be responsible for the material and fabrication of the described HeRS as per technical requirements above.

The contractor shall ensure all technical specifications are achieved, safety is respected, the HeRS space and floor constraints for the NSLS-II installation are suitably taken into consideration (see below). Before final installation of the HeRS, two main milestones are required, The Design Review Meeting (DRM) and the Factory Acceptance Test (FAT).

Project timing Within one (1) month after award of contract, the Contractor shall organize a Design Review Meeting (DRM). One (1) week before the DRM, the Contractor shall produce a draft DRM design report. Within one (1) week after the DRM, the Contractor shall deliver a final DRM design report. BSA must approve in writing the final DRM design report before the Contractor shall proceed with ordering material and components. After written approval of the assembly drawings by BSA, the Contractor shall promptly begin manufacturing and assembling the HeRS.

Within nine (9) months after the DRM, the Contractor shall organize a Factory Acceptance Test (FAT) at the Contractor’s facility. Within two (2) weeks before the planned FAT, the Contractor shall provide an Acceptance Test Procedure (ATP) to BSA representatives. Within one (1) week after the FAT, the Contractor shall provide a final FAT report, test certificates, and final drawings. BSA must approve in writing all the documents before the Contractor shall proceed with shipment of equipment to BNL.

Project milestones: DRM and FAT A DRM shall be held in accordance with the schedule above. The draft DRM design report shall include a draft set of assembly drawings, complete of all LVs, PRVs, system parts, and their relative locations and reciprocal distances, connections and controls. The drawings shall be reviewed at the design review meeting to be held in video conference or teleconference format, at the discretion of BSA. The Contractor shall be responsible for incorporating any agreed-to changes into the final drawings and schemes, which shall be submitted to BSA in the form of a final DRM design report as per schedule above. BSA must approve in writing the final DRM design report before the Contractor shall proceed with ordering material and components. Upon written approval of the final DRM design report by BSA the HeRS design is to be considered “frozen”, and no changes are permitted to the layout, materials, processes, methods, and tooling, or to component-level substitutions, without written approval by BSA.

The Contractor shall test the HeRS at the Contractor’s facility during a FAT, before delivering the HeRS to BNL. The FAT shall be executed in the presence of BSA representatives to demonstrate full compliance with the specification. The ATP must be reviewed and subsequently approved by BSA prior to use. At the minimum, the ATP shall include the following tests on the HeRS:

1. Full cooling cycle (performance of LHe reliquification vs time, starting from both room temperature, and in cold steady conditions)

2. Steady operations for at least 4 hours under nominal LHe flow use (6L/day)

3. LHe transfer between the two dewars

4. Reliquification performance during He gas recovery at nominal LHe flow use

Additional tests can be agreed before the final approval of the ATP by BSA. All test data shall be documented, and constitute integral part of the final FAT report. The final FAT report has to be produced as per timing above, and subsequently approved by BSA in writing prior to release of items for shipment.

Following a successful FAT, a safe shipment and reception of material on-site, and re-installation at NSLS-II, the HeRS will be tested at BNL to demonstrate full compliance with all requirements. The tests listed in the ATP will be conducted on the HeRS at BNL by BSA, prior to final acceptance.

Environment, Safety and Health (ES&H) The Contractor shall design and assemble all Equipment in accordance with ES&H requirements, in particular:

Electrical Safety

▪ All electrical equipment must be in accordance to U.S. standards, must comply with NFPA70 and shall be approved by a Nationally Recognized Testing Laboratory (NRTL) or the BSA Authority Having Jurisdiction. Note that CE is not accepted;

▪ All electrical connections ≥50 volts shall be covered to comply with UL 508 so that all uninsulated charged surfaces protect workers from the hazards of electrical shock.

Plexiglas® is not allowed; Lexan® may be used;

Secondary Containment The Contractor shall ensure that any device containing oil is placed on a suitable secondary containment capable of collecting at least all the liquid volume present inside the device.

Drawings and additional documents Within two (2) months after the approval of the final DRM design report, the Contractor shall provide 1 paper copy and 1 digital copy of all the documents, in English, allowing installation, maintenance, future upgrades of the system, communication standards and protocols, interfaces available, and required services with a specific timeline and schedule. BSA requires detailed drawings to allow installation, maintenance and future upgrade of the HeRS, so the Contractor shall keep their drawings up to date, in case changes are needed and agreed as per procedure above.

At the reception of shipment at BNL, the Contractor shall provide a final package of documents containing all certification of conformance, all drawings (see above), all operating, maintenance, and troubleshooting manuals, all test reports and selected settings, all calibrations, and all procedures to clean, disassemble, repair, and adjustment procedures. A copy of permit to use all copyrighted material shall be included as well. All reports and documentation noted in this SOW shall consist at least of one (1) set of paper copies, and one

(1) set on digital media (USB data storage device), unless otherwise noted.

Moreover, formatting has to be IAW ASME Y14.5 or equivalent (requires written approval by BSA); views have to be shown in third-angle projection; dimensions and tolerances have to be metric; separate parts list have to be indicated if not embedded in the drawing; 2D formats has to be AutoCAD 2D drawings (.DWG format); 3D solid model formats has to be IAM, or IPT (preferred) or STP or SAT.

Packaging, Handling, and Shipping After the HeRS system has been cleaned and tested, it shall be packed to ensure that it remains clean and free from damage during both storage and shipping. In preparation for shipping, the HeRS system shall be sealed for protection against weather elements, dust, damage to projections, shock loads, impacts, and rubbing. It shall be properly braced and cushioned within its own packing so that it will not shift during handling and shipment. Protection against contamination and humidity shall be given to electrical connections, and any other sensitive part. Durable materials, such as clean wood, bubble wrap, or similar non-contaminating materials, are to be used to support and protect the components from one another during transit and storage. Peanut-type material shall not be used for packaging. All assemblies or sub-assemblies with moving parts shall be secured to prevent damage due to unwanted motion or vibration. The packaging must be designed to withstand acceleration loads in excess of twice the acceleration due to gravity (>2.0 g). Each packing crate shall be fitted with Shockwatch and Tipwatch sensors or an equivalent approved by BSA. The container shall be appropriately labeled with the listing of contents, destination, gross weight, location of center of gravity, purchase order number, contact information, and number of box over total number shipped.

Installation The Contractor shall provide all necessary labor and parts for installation. All parts shall be new. Repairs shall be performed onsite at BNL. No after hours or weekend work shall be performed unless approved by BSA Work Control Coordinator, 1 day prior to work. The Contractor shall provide their own tools, equipment, and any necessary supplies to complete their job. The Contractor shall provide a Job Hazard Analysis (JHA), identifying hazards and required controls associated with performing the installation/repair, shall be submitted to BSA for approval prior to the start of work. The Contractor shall be responsible for providing PPE based off their equipment. Within one (1) week before the planned installation, the Contractor shall provide a detailed Job Hazard Analysis (JHA), to be approved in writing by BSA.

Warranty The Contractor shall provide a warranty of at least two (2) years after installation and first operation of the equipment.

Signature: _________________ Of Requestor or Technical Rep

Notes:

(1) EEI inspection will be performed prior to powering electric units.

BROOKHAVEN NATIONAL LABORATORY

SELLERS’ QUALITY ASSURANCE REQUIREMENTS

BNL-QA-101

3.9/2d01e011.doc 1 of 6 (07/2013)

PO/Contract No.: 475213

1.0 PURPOSE & SCOPE

1.1 This document establishes quality assurance requirements to which Suppliers to Brookhaven Science Associates (BSA) must conform when specified in the procurement documentation.

1.2 This document contains two main sections. Section 3.0 covers the general requirements that are applicable to all Suppliers.

Section 4.0 contains special quality requirements that are applicable only when specifically invoked in the procurement documentation.

2.0 DEFINITIONS

2.1 The term Procurement documentation means the purchase order

(PO), contract, subcontract, Request for Proposal (RFP), Request for Quotation (RFQ) or other written agreement with the Supplier (seller) in which the requirements of BSA are incorporated.

2.2 The term Buyer means BSA operating Brookhaven National

Laboratory, acting by and through its Procurement & Property Management Division (PPM) issuing the PO/contract.

2.3 The term Supplier (seller) means the legal entity, which is the contracting party, with the Buyer with respect to the procurement documentation.

2.4 The term article or item means a product and/or a service.

3.0 GENERAL REQUIREMENTS

Unless otherwise specified in the procurement documentation, the following General Requirements apply:

3.1 Supplier’s Quality System and Quality Requirements

The Supplier must have and maintain an effective quality system that will, as a minimum, comply with all of the requirements as designated by the following:

3.1.1 A quality system certified/registered to the ISO

9001 standard: (latest revision as of the date of issuing the procurement documentation).

3.1.2 A quality system that meets the requirements of the

ISO 9001 standard: “Quality Management Systems – Requirements” (latest revision as of the date of issuing the procurement documentation).

3.1.3 Conformance to Supplier’s/Manufacturer’s quality

program or system.

3.1.4 Other: Refer to procurement documentation, (e.g. PO, Statement of Work [SOW], specifications, drawings) for quality requirements.

NOTE: Clauses 3.2 through 3.22 apply to all POs and will be included collectively in other procurement documentation when required/specified.

3.2 Assessment by Buyer

The Supplier’s quality system is subject to assessments by the Buyer’s Representative(s) for conformance with the requirements of the PO. Supplier or Distributor must allow BSA representatives, BSA customers, and regulatory agencies right of entry into the Supplier’s facilities to determine and verify product, processes, records, personnel, material, procedures, and systems.

3.3 Change Approval

No change(s) are permitted to be made to any Buyer requirements, (e.g. part number, model number, etc.) without the prior written approval of the Buyer.

3.4 Responsibility for Subcontractors

It is the responsibility of the Supplier to impose applicable requirements from this document upon their subcontractors.

Additionally, the Buyer reserves the right to disapprove, in writing, any subcontractor. For nuclear facility requirements per NQA-1, the Supplier must incorporate NQA-1 requirements in sub-tier procurement documents.

3.5 Responsibility for Conformance

The Supplier is responsible to provide items that conform to the requirements of the PO regardless of any assessments, surveillances, inspections and/or tests by the Buyer or its representatives at either the Supplier’ or Buyer’s facility. The Buyer reserves the right to request failure analysis and corrective action for non-conforming articles or items submitted or supplied to the Buyer. The Supplier is responsible for notifying the Buyer of any recalls or alerts associated with this

PO.

When NQA-1 requirements are imposed, prior to shipment, the Supplier must report any nonconformance that cannot be corrected to full conformance and obtain approval from BNL for possible Use-As-Is or Repair dispositions. Additionally, for commercial grade services, a service performance record must be provided that documents the adequacy of the service performed to the identified critical characteristics documented in the PO/contract.

3.6 Protection of Material and Equipment

The Supplier must employ procedures that assure adequate protection of material and equipment during shipment and while in storage. Such protection must include special environmental packaging, as necessary. All items shipped (originally packaged or repackaged) to BNL or other locations cited in the PO or contract, must comply with the requirements for preservation, packaging and marking as stated in the latest revision of ASTM Standard D 3951 Standard Practice for Commercial Packaging.

3.7 Measuring and Test Equipment (M&TE) Calibration

The Supplier must calibrate any M&TE used in the fulfillment of the PO requirements against certified standards that are traceable to the National Institute of Standards and Technology (NIST), or some other recognized national or international standard, or physical constant. The Supplier must notify the Buyer of any condition found during the calibration, servicing or repair of measuring and test equipment that can affect the end item requirements.

3.8 Suspect Counterfeit Parts

The Supplier shall verify the procurement source and associated documentation certifying authenticity.

SUPPLIER QUALITY ASSURANCE REQUIREMENTS BNL-QA-101

5.2/2d01e011.docx Page 2 of 6 (04/2025)

Appropriate incoming inspection and / or test methods shall be used to detect potential suspect counterfeit items.

The Supplier shall flow this requirement down to all sub-tier suppliers to prevent the inadvertent use of suspect counterfeit items.

Distributors shall not modify, rework or repair any items shipped on this order.

For reference only, a list of authorized/franchised distributors for electronic components can be found at:

https://www.trustedparts.com/

* For more information refer to the following Department of Energy website: https://www.energy.gov/ehss/corporate-reporting-analysis/databases/suspectcounterfeit-and-defective-items

3.9 Electrostatic Discharge Control

Items that are susceptible/sensitive to electrostatic discharge (ESDS) must be handled and packaged to protect them from damage. Items and/or packages must be labeled to indicate the susceptibility to electrostatic discharge.

3.10 Electrical or Fire Protection Equipment, Material, and

Systems All electrical or fire protection equipment, material, and systems delivered to BNL must be certified, listed, or labeled by a Nationally Recognized Testing Laboratory (NRTL). The CE mark is NOT a recognized NRTL certification mark. (For a listing of OSHA-recognized NRTLs, refer to http://www.osha.gov/)

For electrical or fire protection equipment, material, and systems which no NRTL accepts, certifies, lists, labels, or otherwise determined to be safe, the Supplier must determine the equipment to be safe for its intended use. The determination must be made on the basis of test data. The determination and test data documents must be made available to BSA prior to or upon delivery for review and acceptance by the applicable BSA Authority Having Jurisdiction

(AHJ).

In accordance with 29 CFR 1910.147(c)(2)(iii) whenever new machines or equipment are provided with energy isolating devices, those devices must be designed to accept a lockout device.

3.11 Hoisting & Rigging Equipment

All hoisting & rigging equipment used at BNL must meet the requirements of the latest applicable OSHA Regulations and ASME B30 Series standards for design, construction, markings, and proof load testing.

When proof load testing is required by the standards, a certificate must be provided upon delivery documenting the proof test.

3.12 Deleted – requirements were added to each Purchase Order as the “Advance Notification of Delivery.”

3.13 Powered Machine Shop Equipment

All powered machine shop equipment (e.g., lathe) delivered to BNL must meet the requirements of the latest applicable OSHA 1910 Regulations (e.g., part subpart O). Equipment purchased must include an integrated NFPA 79 compliant emergency stop and an anti-restart device.

3.14 Vehicle-Mounted Elevating and Rotating Aerial Devices

All vehicle-mounted and rotating aerial devices equipment used at BNL must meet the requirements of ANSI A92.2.

3.15 Self-propelled Elevating Work Platform Equipment

All self-propelled elevating work platform equipment (e.g., scissor lift) used at BNL must meet the requirements of ANSI A92.6.

3.16 Manually Propelled Elevating Aerial Platform Equipment

All manually propelled elevating aerial platform equipment used at BNL must meet the requirements of ANSI 92.3.

3.17 Boom Supported Elevating Work Platform Equipment

All boom supported elevating work platform equipment used at BNL must meet the requirements of ANSI 92.5.

3.18 Powered Industrial Trucks and Attachments

Powered industrial trucks (e.g. forklifts, hi-lows) must meet the requirements of the ANSI/ITSDF B56 series for design, construction, markings, and test loading. Industrial truck attachments must be approved by the truck manufacturer and supplied with an attachment data plate indicating the new truck capacities.

3.19 Used Industrial Equipment

For used industrial equipment (e.g. scissor lifts, forklifts, etc.), a Certificate of Conformance as defined in clause 4.16 must be provided as objective evidence and must additionally state that all maintenance and manufacturing alerts have been screened and all required repairs and improvements have been completed. The Supplier must provide records of the last year of maintenance.

3.20 Global Harmonized System Compliance

The supplier of chemicals must deliver the chemical in full compliance with the Department of Labor, Occupational Safety & Health Administration (OSHA)’s Globally Harmonized System (GHS) Hazard Communication Standard (29CFR1910.1200), available at:

https://www.osha.gov/dsg/hazcom/HCSFinalRegTxt.html

All hazardous chemicals delivered to BNL must be accompanied by an GHS Safety Data Sheets (SDS) with the format and content specified in 29CFR1910.1200. For information on the GHS SDS see OSHA Brief- Hazard Communication Standard: Safety Data Sheets Publication 3514 available at:

https://www.osha.gov/Publications/OSHA3514.pdf

All hazardous chemicals delivered to BNL after 12/01/2015 must have a label with the elements specified in 29CFR1910.1200 [product identifier; pictograms; signal words; hazard statement(s);

precautionary statement(s); and manufacturer, importer, or distributor’s name, address, and telephone number]. For information on the GHS label, see OSHA Brief- Hazard Communication Standard: Labels and Pictograms Publication 3636 available at:

https://www.osha.gov/Publications/OSHA3636.pdf

3.21 Age/Shelf Life and Storage Control

The Supplier must have an effective storage and age control system for items where acceptability is limited by the age or manner of storage of the item. The system must include a method of identifying the expiration date on the containers in which material is delivered to the Buyer. Special handling conditions must be recorded on certifications and shipping documents covering the material delivered to the Buyer. At the time of receipt, the material must not have less than three-quarters of its shelf life remaining, without prior written approval from the Buyer for each shipment.

3.22 Product Recalls/Product Bulletins/Safety Alerts

Any and all product recall alerts, product bulletins, or safety alerts must be communicated by email directly to ProductRecallAlert@BNL.gov. Provide the Purchase Order Number(s) and names of purchasers with notification to assist BNL in locating and identifying the subject material.

https://www.energy.gov/ehss/corporate-reporting-analysis/databases/suspectcounterfeit-and-defective-items https://www.energy.gov/ehss/corporate-reporting-analysis/databases/suspectcounterfeit-and-defective-items http://www.osha.gov/ https://www.osha.gov/dsg/hazcom/HCSFinalRegTxt.html https://www.osha.gov/Publications/OSHA3514.pdf https://www.osha.gov/Publications/OSHA3636.pdf mailto:ProductRecallAlert@BNL.gov

5.2/2d01e011.docx Page 3 of 6 (04/2025)

4.0 SPECIAL REQUIREMENTS

The following Special Requirements are applicable only when specified in the procurement documentation or as indicated by check mark hereon. These Requirements can be modified as required.

INSTRUCTIONS: Since sub-clauses (e.g., 4.4.1) are tied to the main clause (e.g., 4.4), the requirements of the main clause will apply by default whenever any sub-clause is selected (regardless of whether the main clause was selected/checked).

4.1 Quality Assurance Program or Manual

The Supplier must submit a copy of their Quality Assurance Program or Manual with their proposal for review and evaluation.

Suppliers providing A1/A2 but without a quality system compliant with NQA-1, i.e., Commercial Grade Supplier, must follow applicable Commercial Grade Dedication Instructions as defined in the SOW.

OR

Supplier must utilize the QA Program audited and approved by BNL.

4.2 Configuration Control System

The Supplier must establish and maintain a system to assure that all end items (including spares) are of the proper configuration, and that all approved configuration changes are incorporated at the specified effectivity points. Records must be maintained to verify the configuration of each item.

4.3 Process Sheets, Travelers, etc.

The Supplier must maintain a system of process sheets, shop travelers, or equivalent means to define the sequence of manufacturing, inspection, installation and test activities to be performed. Flow sheets, or equivalent, must be provided for sign-off by designated inspection personnel at specified inspection and test points, including, as required, re-inspection and re-test points, to assure completion as well as proper sequencing of required operations.

4.4 Manufacturing/Inspection/Test Plan

Sixty (60) calendar days prior to performance of work, the Supplier must submit for the Buyer’s approval a Manufacturing/Inspection/ Test Plan for the item(s) to be produced. Once approved, changes/ revisions must be approved by the Buyer prior to implementation.

The Plan must satisfy one or more of the following as selected:

4.4.1 Identification of parts and subassemblies showing

integrated flow into end item(s).

4.4.2 Identification of critical manufacturing operations, as well as inspection and test checkpoints.

4.4.3 The Plan may be a single document, or may make use

of existing “travelers,” or other suitable planning and control documents.

4.5 “Witness” Points

The Buyer reserves the right to designate selected manufacturing, inspection, and/or test operations as “witness” points. The Supplier must provide the Buyer with five (5) working days’ notice in advance of reaching such witness points during the manufacturing and test cycle of each item. For nuclear facility applications (NQA-1), witness points are required when Source Inspection is invoked. (see Clause 4.14)

4.6 Test and Inspection Procedures

Test and inspection procedures required to demonstrate satisfactory completion of requirements must be prepared by the Supplier and submitted to the Buyer for approval sixty (60) calendar days prior to use of such procedures. Once approved, changes/revisions must be approved in writing by the Buyer prior to implementation.

4.7 Special Processes

Processes (e.g., welding, brazing, bonding, plating, chemical machining, chemical coating, chemical cleaning, precision cleaning, heat treating, or waste processing) that either cannot be verified non-destructively or require a unique (special) non-destructive test/inspection (e.g., radiographic inspection, ultrasonic testing, pressure leak testing) must be performed in accordance with detailed written procedures. These procedures must specifically describe the exact manner in which the processes are to be performed.

Additionally, the following requirements apply as selected:

4.7.1 Copies of special process procedures must be made

available on request for review by the Buyer’s representative.

4.7.2 At least sixty (60) calendar days prior to use on items deliverable to the Buyer, the Supplier must submit to the Buyer copies of all applicable process procedures for review and approval. Revisions or changes to Buyer-approved special process procedures must be submitted to the Buyer for review and approval prior to implementation.

4.7.3 Qualification of Procedures, Facilities, Equipment

and Personnel The Supplier must, prior to use, qualify the procedures/specifications, facilities, equipment and personnel that will be used for the performance of special processes. Only those personnel who have been qualified to perform a specific special process must be used to perform that process. Records of such qualification must be available to the Buyer’s representative upon request.

4.8 Qualification of Procedures, Facilities, Equipment

Superseded by Sub-clause 4.7.3

4.9 Qualification of Special Process Personnel

Superseded by Sub-clause 4.7.3

4.10 End-Item Documentation Package

The Supplier must provide a documentation package for each shipment of the item(s) supplied, which consists of objective evidence of compliance with PO requirements. This documentation package must be complete, legible, indexed, and traceable to the item supplied. Additionally, the following requirements apply as selected:

4.10.1 Copies of reports of all required or necessary

inspections, examinations and tests, properly validated by the Supplier’s authorized personnel.

4.10.2 A listing of the as-built configuration of

each delivered item; this may be defined by the use of drawing numbers and revisions, unique parts lists or other such means of positive identification.

4.10.3 Copies of nonconformance reports dispositioned as

“rework/repair” or “use-as-is”, and all BSA approved deviation/waivers.

4.10.4 Copies of material test certificates for specified

materials, showing physical and chemical properties.

5.2/2d01e011.docx Page 4 of 6 (04/2025)

4.10.5 – Superseded by Clause 4.16

4.11 Release for Shipment

The documentation package required in Clause 4.10 must be approved by the Buyer’s representative prior to release of the item for shipment.

4.12 Shipment of Documentation Package to Buyer

Three (3) copies of the documentation package required in Clause

4.10 must be shipped to the Buyer with or prior to each shipment of the purchased items.

4.13 Failure Reporting, Analysis and Corrective Action

The Supplier must maintain a failure reporting, analysis and corrective action system that must, at a minimum, evaluate, analyze and correct failures occurring during qualification, first article and end-item acceptance testing and inspection. The results of all failure evaluations and analyses must be documented and available for review by the Buyer.

4.14 Source Inspection/Verification

Items to be delivered require inspection, tests or surveillance by the Buyer’s representative at the Supplier’s facility. Five (5) working days advance notice, for acceptance inspections and tests, must be provided by the Supplier to the Buyer to permit scheduling of source inspection. For nuclear facility applications (NQA-1), source verification must be conducted in accordance with a Verification Plan to inspect, test, or examine at predetermined/Witness points (see Clause 4.5). Documented evidence of acceptance must be provided upon completion of all verifications.

4.15 Chemical and Physical Test Report

One copy of the actual chemical and physical test report(s) for each heat, batch or lot must accompany each shipment. Test reports must list the actual parameters tested, the acceptable limits for each parameter, and must contain the actual readings taken during test.

4.16 Certificate of Conformance (C of C)

With each shipment, per the procurement documentation, the Supplier must submit a Certificate of Conformance (C of C). In case of drop shipment, a copy of the certificate must be submitted to the Buyer at the time of shipment. The certificate must identify the purchased item/material/equipment by PO number and quantity, include the title of and be signed by an authorized representative of the company, and must constitute a representation by the Supplier that:

A. Materials used are those which have been specified by the Buyer, and that the items delivered were produced from materials for which the Supplier has on file, reports of chemical or physical analysis, or any other equivalent evidence of conformance of such items to applicable specifications;

B. Processes used in the fabrication of items delivered were in compliance with applicable specifications included as part of the PO/contract, or Buyer-approved procedures or specifications;

C. The items as delivered comply with all applicable drawings, specifications, deviations/waivers and other requirements of the procurement documentation; and-

D. When specified, cleaning and cleanliness requirements have been completely satisfied. The C of C must reference the Supplier’s applicable cleaning procedures.

4.16.1 Additional C of C Requirements for Nuclear

(NQA-1) Purchases

A. The certificate must be signed by the person responsible for the quality function and whose function and position is described by the supplier’s QA program/system.

B. The Supplier’s Certification system must be described in their QA Program/system documentation and include the process for completing the C of C along with the review and Approval of the C of C prior to delivery.

C. The Buyer reserves the right to verify the validity of Supplier’s certificates and the effectiveness of the Supplier’s certification system. This verification will be commensurate with the Supplier’s quality performance/history.

4.17 Report with Each Shipment

Superseded by Clause 4.10

4.18 First Article Acceptance

Buyer acceptance of first article(s) is required prior to the production run. The first article(s) must be identified as such, including the PO number/contract, part number, and part name. The Supplier is required to:

4.18.1 Submit the first article(s) to the Buyer’s

representative for test/inspection to be conducted at the Supplier’s facility by the Buyer’s representative.

4.18.2 Submit the first article(s) to the Buyer for test /

inspection by the Buyer at the Buyer’s facility.

4.18.3 Submit the first article(s) to the Buyer together

with documents showing data representing results of the Supplier’s first article(s) test/inspection, including the actual dimension or value for each specified characteristic.

4.18.4 After Buyer acceptance of first article(s), all of the remaining units required by the PO/contract must be produced by the Supplier and the Supplier’s suppliers using the same design, materials, processes, methods and tooling that were used to manufacture the approved first article(s). Any changes must have prior written approval from the Buyer.

4.19 Notification of Change to Design, Methods, or Processes

The Supplier must immediately notify the Buyer of any significant changes (those that may affect form, fit, function, reliability, safety, or interchangeability) in product design, fabrication methods, materials, or processing from those used by the Supplier at time of Supplier’s quotation or offer to the Buyer, which resulted in the PO.

4.20 Age/Shelf Life and Storage Control

Superseded by Clause 3.21

4.21 Serial Numbers

The Supplier must assign/mark a separate and distinct serial number to each end-item in accordance with the procurement documentation.

A record of the serial number, for each part number, must be maintained by the Supplier.

4.22 Lot or Batch Numbers

For items furnished in accordance with the procurement documentation, the manufacturing lot or batch number must be indicated on the packing list, certifications and other applicable documents. Where impractical to mark individual parts due to size or shape, the lot or batch number must be marked on identifying tags or the smallest unit package.

5.2/2d01e011.docx Page 5 of 6 (04/2025)

4.23 Material Traceability

Materials used must be identified by material type, applicable specification and revision number, and be traceable to their lot and/or heat number(s). Traceability records must be available for review by the Buyer’s representative.

4.24 Shipment Destination Other than BNL

The material ordered is to be shipped to other than the Buyer’s facilities. Copies of the data required in accordance with the procurement documentation must accompany the shipment; in addition, one copy of such data must be mailed to the Buyer on the same day that shipment is made.

4.25 Heat Treat Bars

Superseded by Clause 4.7

4.26 Burn-in

Burn-in must be performed on each completed item, per the procurement specification or Supplier’s Burn-In process approved by the Buyer. Records of burn-in testing, repairs and test results must be maintained and must be available to the Buyer’s representative upon request.

4.27 Welding Procedures

Superseded by Clause 4.7

4.28 Weld/Braze Inspection Report

A report(s) must be submitted that indicates the complete inspection of welds or brazes from the initial fit-up stage through final inspection. Inspection reports must be accompanied by all radiographic films, filler metal reports etc. The reports must contain the signature or stamp, and title of an authorized Supplier representative.

4.29 Radiographic Quality Requirements

Items requiring radiographic inspection must be radiographed and processed in accordance with the Supplier’s special process procedures that satisfy design specifications, standards or other procurement documentation requirements. Personnel reading and interpreting film must have been examined and certified.

Responsibility for this certification must rest with the Supplier, whether the Supplier does the work or subcontracts to a specialized laboratory. A report of the findings must include the name of the reader and the signature and title of a responsible representative. The radiographic film and a reproducible copy of the report must accompany each shipment. An adequate method of identifying and cross-referencing each film exposure, report, and item must be provided. When parts are serialized, serial numbers must appear on the report and the film.

4.30 Nondestructive Test Reports

All nondestructive testing must be conducted in compliance with the Supplier’s special process procedures that satisfy the applicable provisions of the design specifications, or other procurement documentation requirements. Personnel and equipment utilized in performance of such tests must be qualified for the type of test performed. The Supplier must furnish with, or prior to, each shipment reports of such nondestructive examination of material or items furnished. These reports must be identifiable to the respective item or material including the specific section, joints or views of the item furnished. These reports must contain the signature and title of an authorized Supplier representative. When items are serialized, the serial numbers must appear on the reports.

4.31 Pressure or Leak Test Reports

Test reports must be prepared for all pressure and leak tests.