472-25324-ABG Chippewa Surge Tank - Attachment 1.pdf
PDF 1 MB Posted
- Solicitation number
- RFQ 171 250000000561 2
- Issued by
- Chippewa County, Michigan
About this file
This is an attachment document related to a state and local contract opportunity for Chippewa Correctional Facility, detailing the steam surge tank replacement project identified as File No. 472/25324.ABG. The document provides visual representations and technical callouts for the powerplant steam surge tank replacement project. The project scope includes the removal and replacement of an existing steam purge tank, with the existing skid to remain in place. The work also requires the removal and reinstallation of the existing exterior insulated metal panel wall system to facilitate access for tank removal and installation of the new tank.
The attachment serves as a technical reference document showing the current facility configuration and identifying the specific equipment and structural elements involved in the replacement project. No specific pricing, timeline, quantities, or contract terms are detailed within this attachment document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
goschkaa Text Box Chippewa Correctional Facility Powerplant Steam Surge Tank Replacement File No. 472/25324.ABG goschkaa Text Box
ATTACHMENT 1
goschkaa Callout Existing steam purge tank to be replaced goschkaa Callout Existing skid to remain
Chippewa Correctional Facility Powerplant Steam Surge Tank Replacement File No. 472/25324.ABG goschkaa Callout Existing steam purge tank to be replaced goschkaa
Existing skid to remain
Chippewa Correctional Facility Powerplant Steam Surge Tank Replacement File No. 472/25324.ABG goschkaa Callout Existing steam purge tank to be replaced goschkaa Callout Existing skid to remain goschkaa
Existing exterior insulated metal panel wall system that will likely have to be removed and reinstalled for removal of the existing tank and installation of the new tank
Chippewa Correctional Facility Powerplant Steam Surge Tank Replacement File No. 472/25324.ABG goschkaa Callout Existing steam purge tank to be replaced goschkaa
Existing exterior insulated metal panel wall system that will likely have to be removed and reinstalled for removal of the existing tank and installation of the new tank
Chippewa Correctional Facility Powerplant Steam Surge Tank Replacement File No. 472/25324.ABG goschkaa Callout Existing steam purge tank to be replaced goschkaa Callout Existing skid to remain goschkaa
Existing exterior insulated metal panel wall system that will likely have to be removed and reinstalled for removal of the existing tank and installation of the new tank
File details come from the government source that posted it. Updated .