472-25256.JBB_DTMB0414 Construction Addendum #1_ISSUED_2026.04.17.pdf

PDF 2 MB Posted

Attached to
472/25256. JBB; Alger C. F. Cooler/Freezer Replacement
Solicitation number
RFQ 171 260000000218 4
Issued by
Alger County, Westland City, Michigan

About this file

This Construction Addendum No. 1, issued by the Michigan Department of Technology, Management and Budget (DTMB) on April 17, 2026, pertains to a cooler and freezer replacement project at the MDOC Alger Correctional Facility located in Wetmore, Michigan. The project involves removing and replacing the existing walk-in cooler/freezer combination unit with a new separate walk-in cooler and walk-in freezer, providing new LED lighting in both units, and replacing the existing remote refrigeration components located outside with new components and a new roof structure. The specific equipment basis-of-design is a Nor-Lake walk-in cooler/freezer unit (Model NL258843642-B), with contact information provided for Daly + Deroma Group foodservice representatives. The bid opening date was initially April 22, 2026, but was extended to April 29, 2026, at 2:00 p.m. Eastern Time due to information provided in this addendum. A mandatory pre-bid walkthrough was conducted, with the sign-in sheet attached. The contract duration is 120 calendar days from the Notice to Proceed. Bidders must acknowledge receipt of this addendum in the Bid Summary and Bid Form, as failure to do so may result in bid rejection.

Key technical specifications include the installation of a 1-inch thick thermal isolation joint around the cooler/freezer, NL9800 deadbolt key/padlock handles with inside release for doors, removal of existing quarry tile with installation of poured seamless sealed concrete finishes, and the use of R-454C refrigerant for the cooler condensing and evaporator units and R-454A refrigerant for the freezer units. Bidders seeking equipment substitutions must submit written requests by April 21, 2026, at 12:00 p.m. Eastern Time, with any additional costs resulting from substitutions to be covered by the contractor. A performance bond, payment bond, and five percent bid guarantee are required for all bids over $50,000. Additional services included a budget allocation of $7,800 from AUS for programming and connection to the Starlink system for alarm monitoring. The contractor must coordinate with MDOC regarding temporary cooler and freezer downtime, with MDOC requiring 30 days' advance notice to obtain a refrigerated trailer. Addendum No. 2 was scheduled for issuance on Friday, April 24, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

4/17/2026

PROJECT NAME

DTMB Alger Correctional Facility – Cooler/Freezer Replacement

FILE NUMBER

472/25256.JBB

PROFESSIONAL

U.P. Engineers & Architects, Inc.

PROJECT DIRECTOR

Jeff Barsch

BID OPENING DATE:

4/29/2026

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Item #1: Information provided in this addendum has caused the Bid Due Date to be extended to Wednesday, April 29, 2026 by 2:00pm ET. The revised Bid Summary is attached..

Item #2: The sign-in sheet from the pre-bid walkthrough is attached.

Item #3: The walk-in Cooler/Freezer basis-of-design is by Nor-Lake (Norlake NL258843642-B). For more information, contact the following Foodservice Reps from Daly + Deroma Group:

a. Linsy Margelofsky, linsy@dalyderoma.com, (763) 543-8080

b. Howard Mcann, howard@dalyderoma.com, (651) 247-3696

Item #4: Provide a 1” thick thermal isolation joint around cooler/freezer (as shown on C1 / A102).

Item #5: The cooler & freezer door handles shall be NL9800 deadbolt key/padlock handle with inside release.

Item #6: The AUS scope of services contact information, description, and quote for the programming and connection to the Starlink system has been attached to this addendum.

Item #7: Existing quarry tile shall be removed and disposed of during demolition; the Contractor shall provide a poured seamless sealed concrete finish on all proposed concrete floors.

Item #8: MDOC will be responsible for providing alternate measures for a temporary cooler and freezer. The Contractor and MDOC shall be coordinate the duration of the required cooler/freezer downtime. MDOC will need to know 30-days in advance to obtain a refrigerated trailer and duration expected.

Item #9: Sheet A100 & A102 have been revised to clarify that the existing concrete sub-floor shall be removed at the existing cooler & freezer locations. A new concrete sub-floor should be installed at the walk-in cooler.

A new freezer floor is included with the walk-in freezer and shall be installed to align with the existing adjacent floor finish.

Item #10: Detail B1 on A102 has been revised to illustrate the walk-in freezer floor is supplied by the walk-in cooler/freezer manufacturer. It should be installed on proposed insulation such that the adjacent floor is aligned and level. The cooler floor shall have a poured seamless sealed concrete finish on a proposed concrete floor on proposed rigid insulation over an existing concrete sub-floor floor. Epoxy is not an approved floor finish for walk-in coolers & freezers, so a poured seamless sealed concrete or poured synthetic finish shall be used.

Item #11: Flooring removal limits have been identified on sheet A103.

Item #12: Sheet MP501 has been revised to reflect R-454C refrigerant for the cooler condensing and evaporator units, and R-454A refrigerant for the freezer condensing and evaporator units.

Item #13: In order to allow for equipment substitutions, any bidder wishing to use manufacturers or materials other than those specified must submit a written request not later than Tuesday, April 21st, by 12:00pm ET.

Any substitution requests shall meet or exceed the basis-of-design. Any additional costs incurred as a result of the substitution shall be covered by the Contractor. The bid due date has been pushed back to Wednesday, April 29, 2026, to allow for the necessary substitution request review time.

Item #14: Attached are revised electrical drawings.

Item #15: Addendum #2 will be issued on Friday, April 24, 2026 with Bids due on April 29, 2026 by 2:00pm.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Reid Anderson, Project Manager DATE: 4/17/2026

APPROVED BY:

PROJECT DIRECTOR: Jeff Barsch DATE: 4/17/2026

Bidding and Contract Document (R 11/25) Project Name: MDOC/Alger CF Cooler/Freezer Replacement File No. 472/25256.JBB

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

472/25256.JBB

DEPARTMENT/AGENCY

MDOC / Alger Correctional Facility

CONTRACT TIME(S)

120 calendar days from Notice To Proceed

PROJECT NAME

Cooler / Freezer Replacement

LOCATION

Industrial Park Dr, Wetmore, MI 49895

BID OPENING DATE

April 22, 2026 at 2:00 pm ET April 29, 2026 at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE:

Attend the Mandatory Pre-bid Walkthrough SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

____________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE

CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

Remove and replace the existing walk-in cooler freezer combination unit with a new walk-in cooler and separate walk-in freezer. Provide new LED lighting in units. Remove and replace the existing cooler & freezer remote refrigeration, located outside, with new remote refrigeration components. Provide a new roof over the refrigeration components.

The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:

www.aus.com

5975 Crossroads Commerce Parkway SW Wyoming, MI 49519

Date: 3-3-2026

Subject: Alger Correctional Cooler & Freezer Project

To:

Scope of work:

• Per drawing E100 provide UltraLink as needed to monitor the Cooler & Freezer Alarms

• Make final connections to the UltraLink inputs.

• Program UltraLink as needed.

• Program Symphony System to report alarms.

• Test

Budget for this work $7,800.00

Notes and exclusions:

• Conduit and cabling are not included and to be provided by others.

• Taxes included

• Prevailing rates included

Sincerely, Chuck Brown Enterprise Account Manager 616-257-1189 616-299-2814

EMERGENCY

GENERATOR

SUBSTATION

STORAGE

LOCKSMITH

STAFF

LOCKER

RM

FOREMAN

SUPERVISOR

SECURE

MAINTENANCE

CRIB

VEHICLE

MAINTENANCE

MAINTENANCE

DETERGENT

ROOM

WAREHOUSE

RESIDENT

STORES

OFFICERS

CLOTHING

OFFICE

STAFF

TOILET

INMATE

TOILET

JANITOR'S

CLOSET

VESTIBULE

EX. FREEZER

EX. FREEZER

EX. COOLER

6 6

1'

- 4

VE

RI

FY

W

AL

K-

IN

F

RE

EZ

ER

6"

17' - 6"

DEMOLITION FLOOR PLAN KEYNOTES -

1 REMOVE EXISTING COOLER / FREEZER UNITS AND ALL APPRUTENANCES. PREPARE FLOOR SURFACE FOR NEW WALK-IN COOLER AND FREEZER UNIT. SALVAGE ANY LOOSE FLOOR TILE DURING DEMOLITION FOR RE-USE.

2 EXISTING FLOOR DRAIN TO REMAIN.

3 REMOVE EXISTING COOLER / FREEZER WALL SHROUD AND PREPARE SURFACE FOR NEW COOLER / FREEZER

ENCLOSURE.

4 REMOVE EXISTING CEILING MOUNTED COOLER / FREEZER EVAPORATOR UNITS.

5 REMOVE EXISTING LIGHT FIXTURES IN COOLER / FREEZER.

GENERAL DEMOLITION NOTES

1. PER SECTION 608 OF THE CLEAN AIR ACT (CAA), THE ENVIRONMENTAL

PROTECTION AGENCY (EPA) HAS ESTABLISHED REGULATIONS THAT ARE

RELEVANT TO THE DISPOSAL OF REFRIGERATION AND A/C EQUIPMENT.

2. THE CONTRACTOR SHALL PROVIDE CERTIFIED TECHNICIAN(S) THAT DISPOSE OF

EQUIPMENT THAT COULD RELEASE OZONE DEPLETING REFRIGERANTS INTO

THE ATMOSPHERE.

3. THE CONTRACTOR SHALL RECOVER AND SEND REFRIGERANT TO AN EPA-

CERTIFIED RECLAIMER AND SHALL PROVIDE THE OWNER & ARCHITECT WITH A

MANIFEST FOR DISPOSAL OF REFRIGERATION EQUIPMENT THAT ARE

DISMANTLED ON-SITE.

4. THE CONTRACTOR SHALL SALVAGE ALL EXISTING FLOOR TILE THAT IS IN GOOD

CONDITION FOR RE-USE. COORDINATE SALVAGE WITH MDOC.

5. THE CONTRACTOR SHALL COORDINATE WITH MDOC FOR THE REMOVAL AND

SALVAGE OF EXISTING SHELVING AND RACKING IN THE EXISTING WALK-IN

COOLER / FREEZER.

6 REMOVE EXISTING DRY SPRINKLER PENDANTS IN COOLER AND FREEZER.

7 EXISTING DOOR SHALL BE TEMPORARILY CLOSED WHILE THE TEMPORARY DUST BARRIER IS IN PLACE.

9 REMOVE AND DISPOSE OF EXISTING FREEZER COMPRESSOR, PIPING, CONTROLS, AND ALL APPURTENANCES.

8 REMOVE AND DISPOSE OF EXISTING REFRIGERATION COMPRESSOR, PIPING, CONTROLS, AND ALL

APPURTENANCES.

10 REMOVE AND DISPOSE OF EXISTING COOLER "SOL" & "FAN" SWITCHES (LOCATED ON TOP OF THE EXISTING

COOLER/FREEZER UNITS.

11 COORDINATE SALVAGE OF EXISTING SHELVING WITH MDOC.

DASHED LINE INDICATES EXTENT OF TEMPORARY ENCLOSED STRUCTURE FOR DUST CONTROL BY PROVIDING A ZIPWALL DUST BARRIER, OR APPROVED EQUAL. ONCE THE TEMPORARY DUST BARRIER IS INSTALLED, IT SHALL

REMAIN INTACT AND WORK SHALL BE CONTINUOUS FROM DEMOLITION THROUGH INSTALLATION.

REMOVE AND SALVAGE EXISTING FLOOR TILE FOR REUSE (IF POSSIBLE). REMOVE EXISTING COOLER / FREEZER FLOOR, INSULATION, VAPOR BARRIER, AND SAND BED FOUND UNDER EXISTING COOLER / FREEZER. EXISTING 6" CONC. SUB-FLOOR TO REMAIN. PREPARE SURFACE FOR NEW CONC. FLOOR AT COOLER, AND NEW FREEZER

(WITH FLOOR INCLUDED). REFER TO PROPOSED PLANS FOR NEW WALK-IN FREEZER SIZE.

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

4/

/2

5:

:2

PM

A100

DEMOLITION

FLOOR PLAN

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

1/8" = 1'-0"A1 OVERALL DEMOLITION FLOOR PLAN - WAREHOUSE BLDG 500

NORTH

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

AD

D

EN

D U

M

/1 5/

PROPOSED

WALK-IN

FREEZER

PROPOSED

WALK-IN

COOLER

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

A.

B.

C.

D.

E.

(1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:

RIGHT HAND MANUAL OPERATION, FLUSH SILL.

ALUMINUM TRACK.

CHROME HARDWARE.

CHROME FRONT LOCK & INSIDE EMERGENCY RELEASE.

STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).

HEAT IN FOUR (4) SIDES OF DOOR & THREE (3) SIDES OF FRAME.

12" x 14" HEATED WINDOW IN FREEZER SLIDING DOOR.

HEATER WIRE.

LED VAPOR PROOF LIGHT, QTY. 2.

24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH

SIDES OF DOOR.

HEATED AIR VENT (STANDARD).

NL508 COMBINATION DIGITAL THERMOMETER & SWITCH w/ PILOT LIGHT.

PROVIDE SPECIAL SECURITY FASTENINGS.

COUNTERSUNK SCREWS FOR KICKPLATES.

(1) OPENING FOR SLIDING DOOR INCLUDES:

BACKING FOR MOUNTING TRACK.

VAPOR PROOF LED LIGHT.

NL508 COMBINATION DIGITAL THERMOMETER.

SWITCH w/ PILOT LIGHT.

SLAM BRACES.

(1) 12" x 14" HEATED VIEWPORT FREEZER.

(495) SQ. FT. OF 3/4" CDS PLYWOOD SUBFLOOR & TUBULAR SUPPORTS FOR FREEZER.

(1) VINYL STRIP AIR CURTAIN.

NO SHELVING REQUIRED.

WALK-IN FREEZER EQUIPMENT:

(1) MODEL # MSLA10ME

10-HP UNIT

460 / 60 / 3-PHASE

R-454A

OUTDOOR SCROLL UNIT ELECTRONIC CONTROLLER

LOW TEMP -10°F

31,524 BTUH SYSTEM CAPACITY

MOUNTED TIMER

SIZED FOR 90°F TEMPERATURE AT CONDENSER

CONNECTIONS - LIQUID: 0.875", SUCTION: 1.375".

HEATED / INSULATED RECEIVER.

WALK-IN FREEZER CONDENSING UNIT: LOCATED OUTSIDE

(2) MODEL # E1LAK160B-ME

208-230 / 60 / 1-PHASE

R-454A ELECRIC DEFROST A2L MITIGATION LOW PROFILE

LogiTemp CONTROLLER

LOW TEMP -10°F

16,200 BTUH EVAPORATOR CAPACITY

AMPS: 1.8

DEFROST AMPS: 11.9

WALK-IN FREEZER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT

TRAINING NOTE:

THE SUPPLIER OF THE PROPOSED COOLER / FREEZER COMBINATION UNIT SHALL

PROVIDE STAFF TRAINING FOR OVERALL OPERATION, MONITORING, ALARM

OPERATION, AND ALL RELATED OPERATIONS. AN OWNER TRAINING VIDEO SHALL

BE PROVIDED TO MDOC / ALGER CORRECTIONAL FACILITY.

A.

B.

C.

D.

E.

F.

G.

H.

I.

A.

A.

B.

C.

D.

E.

(1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:

LEFT HAND MANUAL OPERATION, FLUSH SILL.

ALUMINUM TRACK.

CHROME HARDWARE.

CHROM FRONT LOCK & INSIDE EMERGENCY RELEASE.

STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).

12" x 14" NON-HEATED WINDOW IN COOLER SLIDING DOOR.

LED VAPOR PROOF LIGHT, QTY. 1.

24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH SIDES OF DOOR.

PROVIDE SPECIAL SECURITY FASTENINGS.

(1) MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM.

INSTALLED IN DOOR PANEL w/ DIGITAL READOUT-SOUNDS ON RISE OR FALL OF TEMP.

(1) OPENING FOR SLIDING DOOR INCLUDES:

BACKING FOR MOUNTING TRACK.

VAPOR PROOF LED LIGHT.

NL508 COMBINATION DIGITAL THERMOMETER.

SWITCH w/ PILOT LIGHT.

SLAM BRACES.

(1) VINYL STRIP AIR CURTAIN.

NO SHELVING REQUIRED.

WALK-IN COOLER EQUIPMENT:

(1) MODEL # MSMC030ME

3-HP UNIT

460 / 60 / 3-PHASE

R-454C

OUTDOOR UNIT SCROLL ELECTRONIC CONTROLLER

MEDIUM TEMP 35°F

24,758 BTUH SYSTEM CAPACITY

MOUNTED TIMER

SIZED FOR 90°F TEMPERATURE AT CONDENSER

CONNECTIONS - LIQUID: 0.5", SUCTION: 0.875"

HEATED / INSULATED RECEIVER

WALK-IN COOLER CONDENSING UNIT: LOCATED OUTSIDE

(1) MODEL # E1MCK270A-MA

115 / 60 / 1-PHASE

R-454C

R-454C AIR DEFROST A2L MITIGATION LOW

PROFILE

LogiTemp CONTROLLER

MEDIUM TEMP 35°F

29,400 BTUH EVAPORATOR CAPACITY

FAN AMPS: 2.4

WALK-IN COOLER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT

26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL

(INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING)

26-GA SMOOTH GALVANIZED (CEILING TOPSIDE, FLOOR BOTTOMSIDE)

.100 SMOOTH ALUMINUM - INTERIOR FLOOR

1" VINYL FLOOR SEALER (1) COOLER (35.0°F)

48" HIGH "ALUMINUM DIAMOND TREADPLATE STANDARD WALL PROTECTION"

w/ COUNTERSUNK HOLES AND SCREWS

WALK-IN COOLER / FREEZER FINISHES:

A102 A1

OVERAL COOLER / FREEZER WIDTH

17' - 6" 4"

0"

DO

OR

6'

- 0

1'

- 0

PR

OP

OS

ED

W

AL

K-

IN

F

RE

EZ

ER

0"

PR

OP

OS

ED

W

AL

K-

IN

C

OO

LE

R

0"

1'

- 4

" C

LO

SU

RE

P

AN

EL

COOLER / FREEZER WIDTH

17' - 6" OVERALL

EXISTING FLOOR

DRAIN TO REMAIN

1' - 4"

3'

- 0

DO

OR

6'

- 0

8" TYP

5'

- 0

5'

- 0

5'

- 0

PROPOSED 2-1/2"Ø x

36" HIGH STEEL PIPE

BOLLARD FILLED w/

CONCRETE, TYP.

C1 A102

PROPOSED INSULATED FREEZER

FLOOR SYSTEM BY FREEZER

MANUFACTURER

ON EXISTING 6" CONC. SUB-FLOOR

.080 DIAMOND ALUMINUM

w/ SUPER FLOOR SUPPORT FLOOR

FINISH (BY FREEZER MANUF'R).

PROPOSED 5" CONCRETE SLAB

w/ #4's @ 16" O.C. EACH WAY, ON

3" RIGID INSULATION ON 15-MIL

VAPOR BARRIER ON EXISTING

6" CONC. SUB-FLOOR

PROPOSED POURED SEAMLESS

SEALED CONCRETE FINISH BY

CONTRACTOR

NOTE:

MAXIMUM ALLOWABLE LIVE LOAD ON

NEW FLOOR SLAB AT COOLER /

FREEZER = 500 PSF.

NOTE:

MAXIMUM ALLOWABLE LIVE LOAD ON

NEW FLOOR SLAB AT COOLER /

FREEZER = 500 PSF.

COORDINATE INSTALLATION OF PROPOSED

CONCRETE FLOOR SLAB w/ EXISTING FLOOR

TO REMAIN. PROVIDE A SEAMLESS

TRANSITION BETWEEN NEW / EXISTING

B1 A102

A102

A5

1" THICK THERMAL BREAK, ISOLATION JOINT

AROUND COOLER / FREEZER, TYPICAL.

PROPOSED 5" CONCRETE SLAB w/ #4's @ 16" O.C.

EACH WAY, ON 3" RIGID INSULATION ON 15-MIL

VAPOR BARRIER ON EXISTING 6" CONC. SUB-FLOOR

PROPOSED POURED SEAMLESS SEALED

CONCRETE FINISH BY CONTRACTOR

PROPOSED WALK-IN FREEZER

PROPOSED 48" TALL 22-GA

STAINLESS STEEL WALL PROTECTION

PROPOSED WALK-IN COOLER

PROPOSED 6'W x 7'H

SLIDING DOOR @

COOLER

13' - 0"

SLIDING DOOR

6' - 0" 1' - 0"

PROVIDE A THERMAL BREAK BETWEEN THE

COOLER / FREEZER TO PREVENT FROST

ISSUES AT THE INTERIOR WALL BY CUTTING A

JOINT IN THE CONCRETE FLOOR

DOOR OPENS

TO RIGHT

DOOR OPENS

TO LEFT

3' - 0"

5" 6'

- 0

4'

- 0

5"

CLOSURE PANEL

1' - 4" 21' - 0"

SLIDING DOOR

6' - 0"

PROPOSED 48" TALL 22-GA

STAINLESS STEEL WALL

PROTECTION

PROPOSED 48" TALL

22-GA STAINLESS STEEL

WALL PROTECTION

2-1/2"Ø x 36" HIGH STEEL CRASH

BOLLARD (PAINTED YELLOW)

GROUTED SOLID, BOLTED TO

FLOOR, SEE PLAN FOR LOCATIONS

2-1/2"Ø x 36" HIGH STEEL CRASH BOLLARD

(PAINTED YELLOW) GROUTED SOLID, BOLTED

TO FLOOR, SEE PLAN FOR LOCATIONS

C1 A102

2"

5"

PROPOSED 6'W x 7'H SLIDING

DOOR @ FREEZER

5" 3"

M

IN

4"

EX

IS

T'G

6"

PROPOSED WALK-IN

COOLER / FREEZER UNIT

SEALANT, TYPICAL

EXISTING CONC.

FLOOR

1" THICK SATURATED

ISOLATION JOINT

15-MIL VAPOR BARRIER

1" THICK

SATURATED

ISOLATION JOINT

EXISTING BUILDING

WALL

EXISTING CONC.

FLOOR

PROPOSED WALK-IN

COOLER / FREEZER UNIT

SEALANT, TYPICAL

PROPOSED POURED

SEAMLESS SEALED

CONCRETE FINISH

VERIFY

4"

1"

NOTE:

FREEZER FLOOR SUPPLIED BY WALK-IN

FREEZER MANUFACTURER. COORDINATE

INSTALLATION OF ADJACENT CONC. FLOOR

WITH MANUFACTURED FREEZER FLOOR.

5" CONC. SLAB @ COOLER FLOOR

#4 BARS @ 16" O.C., EACH WAY,

TYPICAL @ COOLER FLOOR

CL

R2"

1.

2.

3.

4.

5.

6.

7.

8.

COOLER / FREEZER FLOOR - GENERAL NOTES:

RIGID INSULATION SHALL BE EXTRUDED POLYSTYRENE CONFORMING TO ASTM C578 TYPE IV WITH A MINIMUM COMPRESSIVE RESISTANCE OF 25 PSI AT YIELD OR 10% DEFORMATION LIMIT, WHICHEVER OCCURS FIRST. A MINIMUM DENSITY OF 1.6 PCF AND A MINIMUM NOMINAL RESISTIVITY (R) OF 5.0 hr-ft2-°F / BTU PER INCH, OR APPROVED.

PROVIDE MINIMUM 28-DAY CONCRETE COMPRESSIVE STRENGTH OF 4,000 PSI (f'c = 4,000 PSI). PROVIDE NORMAL WEIGHT CONCRETE WITH 6% (+/-) 1.5% ENTRAINED AIR (NON- TROWEL FINISHED FLOORS), MAXIMUM W/C RATIO <0.50 AND 4" MAXIMUM SLUMP, WITH A MINIMUM OF 520 LB / CYD CEMENT CONTENT FOR A MAXIMUM 1" COARSE AGGREGATE.

PROVIDE READY-MIX CONCRETE CONFORMING TO ASTM C-94.

CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 117, 301, 305R, 306.1 AND 308.1, LATEST APPLICABLE EDITION.

PROVIDE STEEL REINFORCEMENT CONFORMING TO ASTM A615, GRADE 60. PLACE REINFORCEMENT IN ACCORDANCE WITH CRSI MANUAL OF STANDARD PRACTICE. PROVIDE BOLSTERS,CHAIRS, REBAR SUPPORTS, ETC. WITH BASES THAT WILL NOT DAMAGE VAPOR RETARDER.

FINISHED CONCRETE SLAB SURFACE SHALL BE LEVEL AND FLAT WITHIN 1/4" MAXIMUM IN ANY DIRECTION WHEN MEASURED WITH A 10' STRAIGHTEDGE. PROVIDE A SMOOTH FLOAT FINISH ON SLAB BELOW FREEZER UNIT. COORDINATE FLOOR FINISH IN COOLER WITH REQUIREMENTS FOR QUARRY TILED FLOOR.

CURE CONCRETE WITH A LIQUID MEMBRANE-FORMING CURING COMPOUND FOR 7-DAYS MINIMUM PRIOR TO LOADING SLAB(S). COORDINATE QUARRY TILE INSTALLATION REQUIREMENTS WITH CONCRETE CURING METHODS AND MATERIALS (REMOVAL OF CURING COMPOUND PRIOR TO TILING, ETC.).

MONITOR THE TEMPERATURE OF THE CONCRETE SLAB WHEN REDUCING THE TEMPERATURE IN THE COOLER AND FREEZER. REDUCE THE TEMPERATURE OF THE CONCRETE SLAB AT NO MORE THAN 10 OF PER 24-HR PERIOD FROM AMBIENT TEMPERATURE DOWN TO 35 OF. HOLD AT 35 OF FOR 2-5 DAYS. REDUCE TEMPERATURE OF CONCRETE SLAB BELOW FREEZER FROM 35 OF TO FINAL TEMPERATURE AT NO MORE THAT 10 OF PER 24-HR PERIOD.

3" (MIN) RIGID INSULATION,

UNDER PROPOSED

COOLER AND FREEZER.

SEE NOTE 1

15-MIL VAPOR

BARRIER

1"

ALIGN

CO

NC

SU

BF

LO

OR

COOLER UNIT INSULATED

WALL PANEL

PROVIDE SEALANT @ THERMAL BREAK

1/2" ASPHALT SATURATED

ISOLATION JOINT

EX

IS

TI

NG

6" 4"

VE

RI

FY

5"

EXISTING 1"Ø DRAIN HOLES,

WHERE OCCURS

EXISTING CONC. FLOOR

#4 BARS @ 16"

O.C., EACH WAY

3" (MIN) RIGID INSULATION, SEE

GENERAL NOTE 1 ON DETAIL C1,

THIS SHEET.

15-MIL VAPOR BARRIER

FREEZER COOLER

FREEZER UNIT INSULATED WALL PANEL

FREEZER FLOOR PROVIDED BY WALK-IN

FREEZER MANUFACTURER, INSTALL PER

MANUF'R RECOMMENDATIONS

PROPOSED POURED SEAMLESS SEALED

CONCRETE FINISH ON COOLER FLOOR BY

CONTRACTOR, SEE GENERAL NOTES 2 THRU 8

ON DETAIL C1, THIS SHEET FOR MORE INFO.

NOTE:

CONTRACTOR SHALL CLEAN

EXISTING CONC. SUBFLOOR

PRIOR TO WALK-IN FREEZER

FLOOR INSTALLATION, SEE

GENERAL NOTE 6 ON DETAIL

C1, THIS SHEET.

WALK-IN COOLER / FREEZER

17' - 6"

CLOSURE PANEL

4"

MIN

6"

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r-F re ez er a nd

R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er

\M

-0

_A lg er

C F

C oo le r-F re ez er _R

.rv t

4/

/2

9:

:1

AM

A102

ENLARGED

COOLER/FREEZER

PLAN & DETAILS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

C O

O

LE

R

FR

EE

ZE

R

R

EP

LA

C

EM

EN

T

M D

O C

A

LG

ER

C O

R R

EC

TI

O N

A L

FA

C

IL

IT

Y

3/16" = 1'-0"B3 ENLARGED COOLER/FREEZER PLAN

3/8" = 1'-0"A1 ELEV. @ COOLER / FREEZER

O W

N

ER

R

EV

IE

W

/2

4/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

AD

D

EN

D

U M

/1

5/

1 1/2" = 1'-0"C1 SECTION @ COOLER / FREEZER FLOOR

1 1/2" = 1'-0"B1 SECTION @ COOLER-FREEZER WALL

3/8" = 1'-0"A5 SIDE ELEV. @ COOLER / FREEZER

A103A2

A103

C2

EXISTING

2' - 6"

EXISTING

3' - 1"

EX

IS

TI

NG

3'

- 1

0"

EX

IS

TI

NG

4"

1/

2" 6'

- 1

1/ 4"

1/

2" 6'

- 1

1/ 4"

1/

2"

FREEZER

CONDENSING

UNIT

COOLER

CONDENSING

UNIT

PR

OP

OS

ED

4'

- 3

EX

IS

TI

NG

2'

- 4

PR

OP

OS

ED

4'

- 1

1"

EX

IS

TI

NG

2'

- 3 1/

2"

PROVIDE GAP BETWEEN SHED ROOF AND EXISTING

BUILDING WALL FOR CONDENSING UNIT CONDUIT(S)

3" / 1'-0"

STANDING SEAM METAL ROOF ATTACHED

TO TUBE STEEL FRAMING

STANDING SEAM METAL ROOF

ATTACHED TO TUBE STEEL FRAMING

5' - 6"2" GAP (+/-)

A103 C4

7'

- 1

1/

2"

6'

- 7

EX

IS

TI

NG

2'

- 3

1/ 2"

5'

- 6

6" 1'

- 7

1/

2"

EXIST'G

10" 6' - 2 3/4"

EXIST'G

10" 6' - 2 3/4"

EXIST'G

10"

EXISTING 10"Ø

CONCRETE COOKIE

EXISTING 2-1/2" x 2-1/2" SQ.

TUBE STEEL FRAME

PROPOSED EQUIPMENT

MOUNTING BRACKET

PROPOSED FREEZER

CONDENSING UNIT

PROPOSED COOLER

CONDENSING UNIT

WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL POST TO EXISTING FRAME w/

1/8" FILLET WELD ALL AROUND ALL

WELDED STEEL JOINTS

PROPOSED 22GA METAL ROOFING

ATTACHED TO TUBE STEEL w/ HILTI #10

HWH SCREWS @ 6" O.C. (MAX SPACING),

3" PER FOOT SLOPE

PROPOSED 2-1/2" x 2-1/2"

STEEL FRAME

PROPOSED 2-1/2" x 2-1/2" x 3/16"

STEEL FRAME & CROSS BRACING

(SIMILAR TO LOWER FRAME)

2" TO 3"

OVERHANG, TYP.

EXISTING 2-1/2" x 2-1/2" SQ.

TUBE STEEL CROSS BRACING

7'

- 9

1/ 2"

MOUNT EQUIPMENT OVER EXISTING 2-1/2" x 2-1/2" STEEL TUBE.

PROVIDE NEW 2-1/2" x 2-1/2" STEEL TUBE SUPPORT AT OTHER END

(TYPICAL AT ALL EQUIPMENT)

A103A2

EXISTING

2' - 6" 3' - 1"

2-1/2" x 2-1/2" x 3/16" TUBE STEEL

POSTS WELDED TO EXISTING

FRAME

2-1/2" x 2-1/2" x 3/16" TUBE STEEL

PERIMETER FRAME

2" x 2" x 3/16" TUBE STEEL

INTERIOR FRAMING

4"

1/

2" 6'

- 1

1/ 4"

1/

2" 6'

- 1

1/ 4"

1/

2"

1/2" +/- 2' - 5 1/2"

2 1/2" 2' - 8"

2 1/2"

MA

X

" O

.C

2" TO 3"

OVERHANG, TYP.

METAL ROOF PANELS

ATTACHED TO STEEL FRAME

WITH GASKETED FASTENERS

1/8" FILLET WELD ALL AROUND

ALL WELDED STEEL JOINTS

4" x 6" x 1/4" STEEL ANGLE BOLTED TO EXISTING WALL, PROVIDE GAP(S) TO ALLOW FOR CONDENSING UNIT

CONDUIT TO RUN UP EXISTING WALL

WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL BEAM TO STEEL FRAME w/ 1/8"

FILLET WELD ALL AROUND ALL

WELDED STEEL JOINTS

2-1/2" x 2-1/2" x 3/16" STEEL BEAM

2-1/2" x 2-1/2" x 3/16" STEEL FRAMING

22GA STANDING SEAM METAL ROOFING

ATTACHED TO TUBE STEEL w/ HILTI #10 HWH

SCREWS @ 6" O.C. (MAX SPACING)

PROPOSED 5" x 5" x 5/16" STEEL

ANGLE, PERFORATED FOR DRAINAGE

EXISTING WALL

PROPOSED CONDENSING

UNIT CONDUIT(S) BEYOND

VERIFY

2" GAP (+/-)

1/2" HILTI WKIK BOLT

TZ2-SS304 @ 12" O.C.

1/82 - 6

PROPOSED POURED SEAMLESS

SEALED CONCRETE FINISH ON

PROPOSED 5" CONC. FLOOR ON

PROPOSED 4" RIGID INSULATION OVER

EXISTING CONCRETE SUB-FLOOR

PROPOSED WALK-IN FREEZER FLOOR

(SUPPLIED BY WALK-IN FREEZER

MANUFACTURER)

INSTALLED ON PROPOSED 4" RIGID

INSULATION (VERIFY) OVER

EXISTING CONCRETE SUB-FLOOR

8'

- 8

W

AL

K-

IN

C

OO

LE

R

0"

W

AL

K-

IN

F

RE

EZ

ER

0" 1'

- 4

18' - 0"

2" 17' - 10"

.080 DIAMOND ALUMINUM w/ SUPER FLOOR

SUPPORT FLOOR FINISH (BY FREEZER MANUF'R).

POURED SEAMLESS

SEALED CONCRETE FINISH

BY CONTRACTOR

PROPOSED POURED SEAMLESS

SEALED CONCRETE FINISH ON

PROPOSED 5" CONC. FLOOR ON

PROPOSED 4" RIGID INSULATION OVER

EXISTING CONCRETE SUB-FLOOR

PROPOSED POURED SEAMLESS

SEALED CONCRETE FINISH ON

PROPOSED 5" CONC. FLOOR ON

PROPOSED 4" RIGID INSULATION OVER

EXISTING CONCRETE SUB-FLOOR

POURED SEAMLESS

SEALED CONCRETE FINISH

BY CONTRACTOR

ALIGN FLOOR FINISH

SURFACE, TYP.

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

4/

/2

8:

:0

AM

A103

DETAILS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

3/8" = 1'-0"A5 PLAN @ CONDENSING UNITS

1/2" = 1'-0"C2 ELEV @ CONDENSING UNITS - SIDE

1/2" = 1'-0"A2 ELEV @ CONDENSING UNITS - FRONT

3/8" = 1'-0"C5 ROOF @ CONDENSING UNITS

1 1/2" = 1'-0"C4 ROOF DETAIL @ EXISTING WALL

O W

N

ER

R

EV

IE

W

/0

6/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

AD

D

EN

D

U M

/1

5/

3/16" = 1'-0"A1 PROPOSED FLOOR FINISH PLAN

NORTHNORTH

PIPING INSULATION SCHEDULE

SYSTEM TYPE

PLUMBING

DOMESTIC HOT WATER SUPPLY AND RECIRCULATION

DOMESTIC COLD WATER

COOLING

CONDENSATE PIPING FROM COOLING COILS

TYPE PIPE SIZE

P-5

1-1/4" AND SMALLER

INSULATION THICKNESS

1/2"

P-5

1-1/4" AND SMALLER 1"

P-5 ALL SIZES 1/2"

1-1/2" AND LARGER 1-1/2"

1-1/2" AND LARGER 1"

REFRIGERANT SUCTION P-5 ALL SIZES 1/2"

PIPING INSULATION TYPES

TYPE

P-5

DESCRIPTION

ASTM C534, TYPE I, FLEXIBLE, CLOSED CELL ELASTOMERIC INSULATION, TUBULAR, OPERATING TEMPERATURE RANGE:

MINUS 70 TO 180 DEG F.

MSMD030MC CONDENSING UNIT SCHEDULE (COOLER)

GENERAL

REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL

R-454C 208-230 / 60 / 3 SCROLL ZS21KAE-TF5

HP AWEF LISTINGS

3 5.61 UL / CUL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)

-30

-20

-10

25,324

27,826

30,467

33,250

36,092

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)

-30

-20

-10

23,298

25,600

28,030

30,590

36,092

DIMENSIONAL DATA

L

OVERALL (TO NEAREST INCH)

WT (lbs)W H BASE SIZE BASE / HOOD

30 25031 26 M3 031M

INSTALLATION

REFRIGERANT

R-448A / R-449A 7/815.2 1/2 37,134

RECEIVER TANK (lbs) 90% / 90°F

CONNECTIONS

LIQUID SUCTION

ESTIMATED TOTAL

HEAT REJECTION (BTUH)

ELECTRICAL

MCA

MOP

COMP VOLTS

208-230

COMP PHASE

COMP HZ

COMP RLA

13.7

COMP LRA

OTHER LOAD

DATA

FAN PHASE FAN HZ FAN FLA FAN HP

FAN

QUANTITY

MAX EVAP

FAN AMPS

MAX EVAP DEF

HEATER AMPS

1 60 1.6 1 / 4 1 12 25.0

VOLTS 208-230

PHASE 1

AMPS 0.5

MSLA100ME CONDENSING UNIT SCHEDULE (FREEZER)

GENERAL

REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL

R-454A 460 / 60 / 3 SCROLL YF26KAE-TFD

HP AWEF LISTINGS

01 3.15 UL / CUL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)

-30

27,802

-20

35,420

-10

44,436

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)

-30

23,910

-20

31,524

-10

39,548

DIMENSIONAL DATA

L

OVERALL (TO NEAREST INCH)

WT (lbs)W H BASE SIZE BASE / HOOD

64 54044 40 M6 062M

INSTALLATION

REFRIGERANT

R-454A 1 5/846.0 7/8 59,116

RECEIVER TANK (lbs) 90% / 90°F

CONNECTIONS

LIQUID SUCTION

ESTIMATED TOTAL

HEAT REJECTION (BTUH)

ELECTRICAL

MCA

34.7

MOP

COMP VOLTS

COMP PHASE

COMP HZ

COMP RLA

17.9

COMP LRA

OTHER LOAD

DATA

FAN PHASE FAN HZ FAN FLA FAN HP

FAN

QUANTITY

MAX EVAP

FAN AMPS

MAX EVAP DEF

HEATER AMPS

1 60 2.9 1 / 3 2 6 15.0

VOLTS 460

PHASE 1

AMPS 0.5

E1MCK270A-MA EVAPORATOR UNIT SCHEDULE (COOLER)

GENERAL

REFRIGERANT VOLTAGE EVAPORATOR MODEL DEFROST SCHEME

R-454C 115 / 60 / 1 KLP427MA-S1E AIR

CONTROLLER LISTINGS

LogiTemp™ UL / CUL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)

-30

-20

-10

27,000

27,433

27,865

28,733

DIMENSIONAL DATA

L

OVERALL (INCHES)

WT (lbs)W H SUCTION

78.25 13516.5 17.25 1 1/8

ELECTRICAL

EVAPORATOR ELECTRICAL DATA EXPANSION VALVE

FAN

QUANTITY

FAN

AMPS

DEFROST AMPS

3 PHASE

4 4.0 N/A N/A

INSTALLATION

REFRIGERANT

TYPE

R-448A / R-449A

CONNECTIONS

LIQUID

1/2

DISTRIBUTOR NOZZLE / ORIFICE

1 PHASE

TXV / EEV

MODEL #

19-14658 SER-6

PART # TYPE

PART #

AWEF

E1LAK160B-ME EVAPORATOR UNIT SCHEDULE (FREEZER)

GENERAL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)

-30

14,900

-20

16,200

-10

16,808

DIMENSIONAL DATA

L

OVERALL (INCHES)

WT (lbs)W H SUCTION

62.25 11516.5 17.25 1 1/8

ELECTRICAL

EVAPORATOR ELECTRICAL DATA EXPANSION VALVE

FAN

QUANTITY

FAN

AMPS

DEFROST AMPS

3 PHASE

3 1.8 11.9 N/A

INSTALLATION

REFRIGERANT

TYPE

R-454A

CONNECTIONS

LIQUID

3/8

DISTRIBUTOR NOZZLE / ORIFICE

1 PHASE

TXV / EEV

MODEL #

19-14658 SER-6

PART # TYPE

PART #

REFRIGERANT VOLTAGE EVAPORATOR MODEL DEFROST SCHEME

R-454A

CONTROLLER LISTINGS

LogiTemp™ UL / CUL

AWEF

4.15ELECTRICKLP316LE-S2E208-230 / 60 / 1

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

4/

/2

8:

:5

AM

MP501

MECHANICAL AND

PLUMBING

SCHEDULES &

DETAILS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

O

W N

ER

R

EV

IE

W

/2 4/

O W

N

ER

R

EV

IE

W

/0

6/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

AD

D

EN

D

U M

/1

5/

EMERGENCY

GENERATOR

SUBSTATION

STORAGE

LOCKSMITH

STAFF

LOCKER

RM

FOREMAN

SUPERVISOR

SECURE

MAINTENANCE

CRIB

VEHICLE

MAINTENANCE

MAINTENANCE

SHOP

MAINTENANCE

DETERGENT

ROOM

WAREHOUSE

RESIDENT

STORES

OFFICERS

CLOTHING

OFFICE

STAFF

TOILET

INMATE

TOILET

JANITOR'S

CLOSET

VESTIBULE

PROPOSED

WALK-IN

FREEZER

PROPOSED

WALK-IN

COOLER

(FUTURE)

OPEN

OFFICE

PANEL "RP-B"

PANEL "PDP-502"

E101

A1DEMO POWER

E101

A4PROPOSED POWER

E102

A1DEMO LIGHTING

E102

A4PROPOSED LIGHTING

PANEL "SEP-500"

PANEL "RP-X"

PANEL "LP-XX"PANEL "SEDP SEC 2"

I.T . R

AC

K

(S ym ph on y)

ROUTE CONDUIT & WIRING TO EXISTING

SUBSTATION ROOM FROM WALK-IN

COOLER / FREEZER, COORDINATE

CONDUIT LOCATION(S) WITH MDOC

1. ROUTE CONDUIT & WIRING FROM EXISTING SYMPHONY I.T. RACK CONTROL

CENTER, LOCATED IN THE SUBSTATION ROOM (FIELD VERIFY LOCATION).

2. CONNECT NEW COOLER / FREEZER CONTROL PANEL ALARM CONTACTS TO

EXISTING ULTRALINK DIRECTLY. THE EXISTING ULTRALINK IS CONNECTED TO THE

EXISTING SECURITY NETWORK SWITCH.

3. CONNECT TO SECURITY I.T. RACK CONTROL SYSTEM WITH PURPLE CAT-6 CABLE(S)

AS REQUIRED TO CONNECT TO THE SYMPHONY SYSTEM. CONTRACTOR TO HIRE

AND COORDINATE CONNECTION TO SECURITY I.T. RACK CONTROL CENTER WITH

CHUCK BROWN, ENTERPRISE ACCOUNT MANAGER, FROM ALLIED UNIVERSAL

TECHNOLOGY SERVICES (PHONE 616-299-2814 or 616-299-2814).

4. ALONG WITH PROGRAMMING OF THE SYMPHONY, THE FOLLOWING SHALL BE

PROVIDED TO MONITOR THE COOLER / FREEZER EQUIPMENT:

IN SUBSTATION: INSTALL CAT-6 CABLE FROM COOLER / FREEZER CONTROL

PANEL TO CAMERA I.T. RACK.

IN SUBSTATION: INSTALL SENSTAR ULTRALINK TRANSEIVER AND CONNECT

TO FIBER PANEL IN I.T. RACK.

AT CENTRAL CONTROL: INSTALL SENSTAR ULTRALINK TRANSCEIVER AND

CONNECT TO FIBER PANEL IN I.T. RACK (IF NEEDED).

AT CENTRAL CONTROL: CONFIGURE THE SYMPHONY SYSTEM TO NOTE THE

ULTRA LINKS AND SETUP FAULTS ON THE SYSTEM.

FOR THE SYSTEM TO MONITOR FAULTS WITH COOLER / FREEZER SYSTEM

AND ANNUNCIATE IN THE SUBSTATION.

SYMPHONY MONITORING SYSTEM:

178' - 2"

2"

77' - 9" 100' - 5"

A102

A5

ALTERNATE #1:

REMOVE EXISTING 40A/3P BREAKER SERVING PANEL LP-XX AND

REPLACE WITH NEW 60A/3P BREAKER TO FEED NEW REPLACEMENT

PANEL LP--XX. SEE ALSO PARTIAL POWER RISER DIAGRAM FOR

ADDITIONAL WORK. COORDINATE REQUIRED OUTAGE WITH MDOC.

EXISTING PANEL SEDP IS WESTINGHOUSE POW-R-LINEC TYPE PRL4B

PANELBOARD, 800A MLO, 480Y/277V, 3 PHASE, 4 WIRE.

ALTERNATE #1:

REMOVE AND REPLACE EXISTING PANELS LP-XX AND

AND RP-X AND TRANSFORMER T-X. SEE ALSO

PARTIAL POWER RISER DIAGRAM AND PANEL

SCHEDULES FOR ADDITIONAL WORK. COORDINATE

REQUIRED OUTAGE WITH MDOC. PROVIDE WALL

MOUNTING BRACKET FOR TRANSFORMER T-X TO BE

MOUNTED ABOVE PANELS.

X'FMR "T-X"

ALTERNATE #1:

REMOVE EXISTING FUSES SERVING PANEL LP-XX AND REPLACE WITH

(3) NEW 60A FUSES TO FEED NEW REPLACEMENT PANEL LP--XX. SEE

ALSO PARTIAL POWER RISER DIAGRAM FOR ADDITIONAL WORK.

COORDINATE REQUIRED OUTAGE WITH MDOC. EXISTING PANEL

SEP-500 IS SQUARE 'D' QMB TYPE E1 PANELBOARD, 600A MLO,

480Y/277V, 3 PHASE, 4 WIRE.

ATS

REPLACEMENT PANEL (LP-XX)VOLTAGE: 277 / 480

AMPERAGE: 60 A

PHASE: 3

WIRE: 4

MAIN: MCB

MOUNTING: SURFACE

MODEL: SQUARE 'D'

SERVICE / FEEDER: 1"C 3 #6 & 1 #10 GND

LOAD

DESCRIPTION

BRKR

NO.

BRKR

NO.

LOAD

DESCRIPTION

COOLER COMPRESSOR

SPARE

LTS, NITE LT. & EM LITE IN E (E)

NIGHT LIGHTS & EXIT LITES (E)

PHASE

A

B

C

A

B

C

A

B

C

A

CKT

LOAD

BRKR

POLES

BRKR

SIZE

CKT

LOAD

BRKR

POLES

BRKR

SIZE

-320

-120

- 1 20

- 1 20

- B

C

A

B

C

FREEZER COMPRESSOR3 55

30 KVA TRANSFORMER PNL RP-X 145 -

3 30 TVSS (SPD)

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

ALTERNATE #1

REPLACEMENT PANEL (RP-X)VOLTAGE: 120 / 208

AMPERAGE: 100 A

PHASE: 3

WIRE: 4

MAIN: MCB

MOUNTING: SURFACE

MODEL: SQUARE 'D'

SERVICE / FEEDER: 1 1/4"C 3 #3 & 1 #6 GND

LOAD

DESCRIPTION

BRKR

NO.

BRKR

NO.

LOAD

DESCRIPTION

DATA GATHERING (E)

MAINT SUP. OFFICE CAM-PC (E)

OUT. DIESEL TANK GAUGE SYS (E)

FREEZER EVAPORATOR

DIESEL PUMP (E)

CSAH-1 (E)

PHASE

A

B

C

A

B

C

A

B

C

A

CKT

LOAD

BRKR

POLES

BRKR

SIZE

CKT

LOAD

BRKR

POLES

BRKR

SIZE

-120

-120

-120

- 1 20

- 1 20

- 1 20

- 1 20

COOLER EVAPORATOR B

C

A

B

C

3 30

- 1 20

1 20

PA (E)1 20

LEAK MONITORING SYS PNL (E) 120 -

1 30 MTR. DG DAY TANK FUEL PUMP (E)

HEAT TAPE FREEZER E

HEAT TAPE FREEZER W

SPARE

SPARE

COOLER/FREEZER LIGHTS

FREEZER DOOR HEATER

TVSS (SPD)

RTU-1 (E) 120

FIRE ALARM (E) 120

SPARE (E) 120

TELEPHONE (E) 120

MTR. OUSIDE GAS PUMP (E)1 20

JOHNSON CONTROLS (E)1 20

MOTION DETECTOR (E)1 20

BATTERY CHARGER (E)1 20

ALTERNATE #1

FREEZER EVAPORATOR 220

PANEL

LP-XX

PANEL

RP-X

X'FMR

T-X

480V PRI

120/208V

SEC.

30 KVA

PANEL

SEDP

(ETR)

PARTIAL RISER DIAGRAM (ALTERNATE #1)D4

PANEL

SEDP

(ETR)

ATS

(ETR)

1"C 4#6 & 1 #10 GND

1"C 4#6 & 1 #10 GND

3/4"C 3#8 & 1 #10 GND

1 1/4"C 4 #8 & 1 #6 GND

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

1 2 3 4 5

FI

LE

N O.

: 4

/25

-0

D

TM

B- Al ge r C

F C oo le r-F re ez er a nd

R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er

\M

-0

_A lg er

C F

C oo le r-F re ez er _R

.rv t

4/

/2

9:

:4

AM

E100

OVERALL

ELECTRICAL

PLAN

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

KP

S

SC

P

SC

P

AJ

M

C O

O

LE

R

FR

EE

ZE

R

R

EP

LA

C

EM

EN

T

M D

O C

A

LG

ER

C O

R R

EC

TI

O N

A L

FA

C

IL

IT

Y

1/8" = 1'-0"A1 OVERALL ELECTRICAL FLOOR PLAN - WAREHOUSE BLDG 500

NORTH

O W

N

ER

R

EV

IE

W

/2

4/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

AD

D

EN

D

U M

/1

5/

DEMOLITION ELECTRICAL POWER KEYNOTES -

1 DISCONNECT EXISTING POWER CONNECTION SERVING EXISTING EVAPORATOR UNIT BEING REMOVED.

2 REMOVE EXISTING STEPDOWN TRANSFOMER. EXISTING BRANCH CIRCUITRY FROM PANEL PDP-502 TO

REMAIN AND BE REUSED TO FEED NEW OUTDOOR CONDENSING UNITS.

3 EXISTING COOLER REFRIGERANT AND FAN SWITCHES TO BE REMOVED.

4 EXISTING SECURITY CAMERA TO BE REMOVED AND REINSTALLED AT NEW LOCATOIN SHOWN.

PROPOSED ELECTRICAL POWER KEYNOTES -

1 PROVIDE ELECTRICAL CONNECTION TO PROPOSED COOLER EVAPORATOR UNIT FROM EXISTING

PANEL RP-B.

2 PROVIDE ELECTRICAL CONNECTION TO PROPOSED FREEZER EVAPORATOR UNIT FROM EXISTING

PANEL RP-B.

3 PROVIDE WEATHERPROOF (TOGGLE STYLE) DISCONNECT SWITCH FOR PROPOSED COOLER

EVAPORATOR UNIT.

4 PROVIDE WEATHERPROOF (TOGGLE STYLE) DISCONNECT SWITCH FOR PROPOSED FREEZER

EVAPORATOR UNIT.

5 REINSTALL EXISTING SECURITY CAMERA.

6 PROVIDE POWER WIRING TO NEW COOLER/FREEZER LIGHT FIXTUES AND PILOT LIGHT SWITCH.

7 PROVIDE POWER WIRING TO NEW HEAT TRACE/FREEZER DEFROST

PROVIDE SURFACE MOUNTED EMT CONDUIT ALONG CEILING TO CONNECT COOLER / FREEZER

MONITORING POINTS TO I.T. RACK LOCATED IN THE EXSTING SUBSTATION ROOM OF THE

WAREHOUSE BUILDING.

9 PROVIDE POWER WIRING TO NEW FREEZER DOOR HEATER.

10 PROVIDE POWER WIRING TO NEW WEATHERPROOF, GFCI TYPE RECEPTACLE LOCATED AT

CONDENSING UNITS. POWER FROM EXISTING CORD DROP REEL CIRCUIT.

EXISTING PANEL (RP-B)VOLTAGE: 120 / 208

AMPERAGE: 90 A

PHASE: 3

WIRE: 4

MAIN: MCB

MOUNTING: SURFACE

MODEL: SQUARE 'D' NQOD

SERVICE / FEEDER: 1 1/4"C 4 #3 & 1 #6 GND

LOAD

DESCRIPTION

BRKR

NO.

BRKR

NO.

DOCK LIGHTS & RECEPTACLE

LOAD

DESCRIPTION

RECEP-WAREHOUSE TOILETS

HEAT TAPE FREEZER E

HEAT TAPE FREEZER W

SPARE

EBH-3

EBH-1 & EBH-2

HAND DRYER, RECEP J.C. GFI

HAND DRYER

PHASE

A

B

C

A

B

C

A

B

C

A

CKT

LOAD

BRKR

POLES

BRKR

SIZE

CKT

LOAD

BRKR

POLES

BRKR

SIZE

-120

-120

-120

-120

-120

-120

-120

- 1 20

- 1 20

- 1 20

-120

- 1 20

EBH-4

EF-1

DRYER

DRYER

DRYER

DRYER

DOCK DOOR LEFT

TRUCK POWER REEL

B

C

A

B

C

A

B

C

A

-120

-120

2 30

1 20

- 1 20

- 1 20

EVAPORATOR COOLER- 1 20

41 O.H. DOOR OPENER

DOOR HTR FREEZER (NEW BKR)

DROP PLUGS

DROP PLUGS B

C

-120

-120

- 1 20

- 1 20

DOOR HEATER FREEZER1 20

DOCK DOOR RIGHT-

LIGHTS-COOLER & FREEZER1 20

1 20

RECEP-WAREHOUSE1 20

1 20

WASHER 220

WASHER 220

SPARE 120

RECEP-WAREHOUSE, OFFICE, EF-3 RECEP-WAREHOUSE

GAS BURNER-WAREHOUSE

GAS BURNER-WAREHOUSE

GAS BURNER-WAREHOUSE

GAS BURNER-DOCK

EWC-WAREHOUSE

2 20

2 20 EVAPORATOR FREEZER

(NEW BREAKER)

EX. FREEZER (EAST)

EX. FREEZER (WEST)

EX. REFRIGERATOR

T

RP-B/24

RP-B/12,14

RP-B/20,22

RP-B/40

RP-B/16

RP-B/18

RP-B/10

RP-B/10

RP-B/41

EXISTING PANEL (PDP-502)VOLTAGE: 480 / 277V

AMPERAGE: 225 A

PHASE: 3

WIRE: 4

MAIN: MCB

MOUNTING: SURFACE

MODEL: SQUARE 'D' I-LINE

SERVICE / FEEDER: 2"C 4 #4/0 & 1 #4 GND

LOAD

DESCRIPTION

BRKR

NO.

BRKR

NO.

LOAD

DESCRIPTION

SPARE

PHASE

A

B

C

A

B

C

A

B

C

A

CKT

LOAD

BRKR

POLES

BRKR

SIZE

CKT

LOAD

BRKR

POLES

BRKR

SIZE

- 3 30

3 45

3 45SPARE 345

REFRIGERATOR COMPRESSOR 320

ECUH-1 315

SPARE 315

LP-5A

- 3 20

RP-B

- 3 15

BALER

- 3 15

SPARE

SPARE

WASHER

SPACE

B

C

B

C

B

C

A

A

A

B

C

SPACE --

FREEZER COMPRESSOR

(NEW BREAKER)

SPARE

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

1 2 3 4 5

FI

LE

N O.

: 4

/25

-0

D

TM

B- Al ge r C

F C oo le r-F re ez er a nd

R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er

\M

-0

_A lg er

C F

C oo le r-F re ez er _R

.rv t

4/

/2

9:

:0

AM

E101

ELECTRICAL

POWER PLANS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

KP

S

SC

P

SC

P

AJ

M

C O

O

LE

R

FR

EE

ZE

R

R

EP

LA

C

EM

EN

T

M D

O C

A

LG

ER

C O

R R

EC

TI

O N

A L

FA

C

IL

IT

Y

1/4" = 1'-0"A1 ELECTRICAL DEMO POWER PLAN

1/4" = 1'-0"A4 ELECTRICAL PROPOSED POWER PLAN

NORTHNORTH

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

AD

D

EN

D U

M

/1 5/

PROPOSED ELECTRICAL LIGHTING KEYNOTES -

1 EXISTING DISCONNECT SWITCH FOR SINGLE POINT CONNECTION TO OUTDOOR CONDENSING UNIT TO REMAIN, FUSE PER UNIT

NAME PLATE. SEE ALSO PANELBOARD SCHEDULES.

2 CONTRACTOR TO INSTALL CONTROL WIRING BETWEEN THE EVAPORATOR COIL AND THE CONDENSING UNIT.

3 PROPOSED 48" LED VAPOR PROOF ALL TEMPERATURE LIGHT FIXTURES (TWO PER UNIT), PROVIDED BY EQUIPMENT SUPPLIER, INSTALLED BY CONTRACTOR. PROVIDE BRANCH CIRCUITRY FROM EXISTING PANEL RP-B.

4 MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM (INSTALLED IN COOLER DOOR PANEL).

PROVIDE NEW LIGHING FIXTURE EQUAL TO METALUX #SPHB-1224SE-M-UNV-L84050-CD-SP1-U CONNECT TO EXISTING WAREHOUSE LIGHING BRANCH CIRCUITY SERVING SIMILAR FIXTURES IN VICNITY. NEW FIXTURES SHALL BE CONTORLED WITH EXISTING

FIXTURES.

DEMOLITION ELECTRICAL LIGHTING KEYNOTES -

1 REMOVE EXISTING SINGLE POINT CONNECTION TO EXISTING CONDENSING UNIT'S DISCONNECT SWITCH. EXISTING

DISCONNECT SWITCH TO REMAIN AND BE REUSED.

2 REMOVE EXISTING SINGLE POINT CONNECTION TO EXISTING CONDENSING UNIT'S DISCONNECT SWITCH. EXISTING

DISCONNECT SWITCH TO REMAIN AND BE LABLED AS SPARE.

REMOVE EXISTING LIGHTING FIXTURES AND SWITCHES IN COOLER/FREEZER. EXISTING BRANCH CIRCUITRY SHALL BE REUSED TO FEED NEW LIGHING AND EQUIPMENT, SEE PANELBOARD SCHEDULE FOR NEW WORK

REQUIREMENTS.

EX. FREEZER

EX. FREEZER

EX. REFRIGERATOR

B1 A102

3 3

3 3

3 3

PROPOSED

WALK-IN

FREEZER

PROPOSED

WALK-IN

COOLER

3 3

3 3

B1 A102

5 5

5 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

1 2 3 4 5

FI

LE

N O.

: 4

/25

-0

D

TM

B- Al ge r C

F C oo le r-F re ez er a nd

R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er

\M

-0

_A lg er

C F

C oo le r-F re ez er _R

.rv t

4/

/2

9:

:3

AM

E102

ELECTRICAL

LIGHTING PLANS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

KP

S

SC

P

SC

P

AJ

M

C O

O

LE

R

FR

EE

ZE

R

R

EP

LA

C

EM

EN

T

M D

O C

A

LG

ER

C O

R R

EC

TI

O N

A L

FA

C

IL

IT

Y

1/4" = 1'-0"A1 ELECTRICAL LIGHTING DEMOLITION PLAN

1/4" = 1'-0"A4 ELECTRICAL LIGHTING PROPOSED PLAN

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

AD

D

EN

D U

M

/1 5/

5975 Crossroads Commerce Parkway SW
Wyoming, MI 49519

File details come from the government source that posted it. Updated .