472-25256.JBB_DTMB0414 Construction Addendum #1_ISSUED_2026.04.17.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ 171 260000000218 4
- Issued by
- Alger County, Westland City, Michigan
About this file
This Construction Addendum No. 1, issued by the Michigan Department of Technology, Management and Budget (DTMB) on April 17, 2026, pertains to a cooler and freezer replacement project at the MDOC Alger Correctional Facility located in Wetmore, Michigan. The project involves removing and replacing the existing walk-in cooler/freezer combination unit with a new separate walk-in cooler and walk-in freezer, providing new LED lighting in both units, and replacing the existing remote refrigeration components located outside with new components and a new roof structure. The specific equipment basis-of-design is a Nor-Lake walk-in cooler/freezer unit (Model NL258843642-B), with contact information provided for Daly + Deroma Group foodservice representatives. The bid opening date was initially April 22, 2026, but was extended to April 29, 2026, at 2:00 p.m. Eastern Time due to information provided in this addendum. A mandatory pre-bid walkthrough was conducted, with the sign-in sheet attached. The contract duration is 120 calendar days from the Notice to Proceed. Bidders must acknowledge receipt of this addendum in the Bid Summary and Bid Form, as failure to do so may result in bid rejection.
Key technical specifications include the installation of a 1-inch thick thermal isolation joint around the cooler/freezer, NL9800 deadbolt key/padlock handles with inside release for doors, removal of existing quarry tile with installation of poured seamless sealed concrete finishes, and the use of R-454C refrigerant for the cooler condensing and evaporator units and R-454A refrigerant for the freezer units. Bidders seeking equipment substitutions must submit written requests by April 21, 2026, at 12:00 p.m. Eastern Time, with any additional costs resulting from substitutions to be covered by the contractor. A performance bond, payment bond, and five percent bid guarantee are required for all bids over $50,000. Additional services included a budget allocation of $7,800 from AUS for programming and connection to the Starlink system for alarm monitoring. The contractor must coordinate with MDOC regarding temporary cooler and freezer downtime, with MDOC requiring 30 days' advance notice to obtain a refrigerated trailer. Addendum No. 2 was scheduled for issuance on Friday, April 24, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
4/17/2026
PROJECT NAME
DTMB Alger Correctional Facility – Cooler/Freezer Replacement
FILE NUMBER
472/25256.JBB
PROFESSIONAL
U.P. Engineers & Architects, Inc.
PROJECT DIRECTOR
Jeff Barsch
BID OPENING DATE:
4/29/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Item #1: Information provided in this addendum has caused the Bid Due Date to be extended to Wednesday, April 29, 2026 by 2:00pm ET. The revised Bid Summary is attached..
Item #2: The sign-in sheet from the pre-bid walkthrough is attached.
Item #3: The walk-in Cooler/Freezer basis-of-design is by Nor-Lake (Norlake NL258843642-B). For more information, contact the following Foodservice Reps from Daly + Deroma Group:
a. Linsy Margelofsky, linsy@dalyderoma.com, (763) 543-8080
b. Howard Mcann, howard@dalyderoma.com, (651) 247-3696
Item #4: Provide a 1” thick thermal isolation joint around cooler/freezer (as shown on C1 / A102).
Item #5: The cooler & freezer door handles shall be NL9800 deadbolt key/padlock handle with inside release.
Item #6: The AUS scope of services contact information, description, and quote for the programming and connection to the Starlink system has been attached to this addendum.
Item #7: Existing quarry tile shall be removed and disposed of during demolition; the Contractor shall provide a poured seamless sealed concrete finish on all proposed concrete floors.
Item #8: MDOC will be responsible for providing alternate measures for a temporary cooler and freezer. The Contractor and MDOC shall be coordinate the duration of the required cooler/freezer downtime. MDOC will need to know 30-days in advance to obtain a refrigerated trailer and duration expected.
Item #9: Sheet A100 & A102 have been revised to clarify that the existing concrete sub-floor shall be removed at the existing cooler & freezer locations. A new concrete sub-floor should be installed at the walk-in cooler.
A new freezer floor is included with the walk-in freezer and shall be installed to align with the existing adjacent floor finish.
Item #10: Detail B1 on A102 has been revised to illustrate the walk-in freezer floor is supplied by the walk-in cooler/freezer manufacturer. It should be installed on proposed insulation such that the adjacent floor is aligned and level. The cooler floor shall have a poured seamless sealed concrete finish on a proposed concrete floor on proposed rigid insulation over an existing concrete sub-floor floor. Epoxy is not an approved floor finish for walk-in coolers & freezers, so a poured seamless sealed concrete or poured synthetic finish shall be used.
Item #11: Flooring removal limits have been identified on sheet A103.
Item #12: Sheet MP501 has been revised to reflect R-454C refrigerant for the cooler condensing and evaporator units, and R-454A refrigerant for the freezer condensing and evaporator units.
Item #13: In order to allow for equipment substitutions, any bidder wishing to use manufacturers or materials other than those specified must submit a written request not later than Tuesday, April 21st, by 12:00pm ET.
Any substitution requests shall meet or exceed the basis-of-design. Any additional costs incurred as a result of the substitution shall be covered by the Contractor. The bid due date has been pushed back to Wednesday, April 29, 2026, to allow for the necessary substitution request review time.
Item #14: Attached are revised electrical drawings.
Item #15: Addendum #2 will be issued on Friday, April 24, 2026 with Bids due on April 29, 2026 by 2:00pm.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Reid Anderson, Project Manager DATE: 4/17/2026
APPROVED BY:
PROJECT DIRECTOR: Jeff Barsch DATE: 4/17/2026
Bidding and Contract Document (R 11/25) Project Name: MDOC/Alger CF Cooler/Freezer Replacement File No. 472/25256.JBB
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
472/25256.JBB
DEPARTMENT/AGENCY
MDOC / Alger Correctional Facility
CONTRACT TIME(S)
120 calendar days from Notice To Proceed
PROJECT NAME
Cooler / Freezer Replacement
LOCATION
Industrial Park Dr, Wetmore, MI 49895
BID OPENING DATE
April 22, 2026 at 2:00 pm ET April 29, 2026 at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE:
Attend the Mandatory Pre-bid Walkthrough SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE
CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
Remove and replace the existing walk-in cooler freezer combination unit with a new walk-in cooler and separate walk-in freezer. Provide new LED lighting in units. Remove and replace the existing cooler & freezer remote refrigeration, located outside, with new remote refrigeration components. Provide a new roof over the refrigeration components.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
www.aus.com
5975 Crossroads Commerce Parkway SW Wyoming, MI 49519
Date: 3-3-2026
Subject: Alger Correctional Cooler & Freezer Project
To:
Scope of work:
• Per drawing E100 provide UltraLink as needed to monitor the Cooler & Freezer Alarms
• Make final connections to the UltraLink inputs.
• Program UltraLink as needed.
• Program Symphony System to report alarms.
• Test
Budget for this work $7,800.00
Notes and exclusions:
• Conduit and cabling are not included and to be provided by others.
• Taxes included
• Prevailing rates included
Sincerely, Chuck Brown Enterprise Account Manager 616-257-1189 616-299-2814
EMERGENCY
GENERATOR
SUBSTATION
STORAGE
LOCKSMITH
STAFF
LOCKER
RM
FOREMAN
SUPERVISOR
SECURE
MAINTENANCE
CRIB
VEHICLE
MAINTENANCE
MAINTENANCE
DETERGENT
ROOM
WAREHOUSE
RESIDENT
STORES
OFFICERS
CLOTHING
OFFICE
STAFF
TOILET
INMATE
TOILET
JANITOR'S
CLOSET
VESTIBULE
EX. FREEZER
EX. FREEZER
EX. COOLER
6 6
1'
- 4
VE
RI
FY
W
AL
K-
IN
F
RE
EZ
ER
6"
17' - 6"
DEMOLITION FLOOR PLAN KEYNOTES -
1 REMOVE EXISTING COOLER / FREEZER UNITS AND ALL APPRUTENANCES. PREPARE FLOOR SURFACE FOR NEW WALK-IN COOLER AND FREEZER UNIT. SALVAGE ANY LOOSE FLOOR TILE DURING DEMOLITION FOR RE-USE.
2 EXISTING FLOOR DRAIN TO REMAIN.
3 REMOVE EXISTING COOLER / FREEZER WALL SHROUD AND PREPARE SURFACE FOR NEW COOLER / FREEZER
ENCLOSURE.
4 REMOVE EXISTING CEILING MOUNTED COOLER / FREEZER EVAPORATOR UNITS.
5 REMOVE EXISTING LIGHT FIXTURES IN COOLER / FREEZER.
GENERAL DEMOLITION NOTES
1. PER SECTION 608 OF THE CLEAN AIR ACT (CAA), THE ENVIRONMENTAL
PROTECTION AGENCY (EPA) HAS ESTABLISHED REGULATIONS THAT ARE
RELEVANT TO THE DISPOSAL OF REFRIGERATION AND A/C EQUIPMENT.
2. THE CONTRACTOR SHALL PROVIDE CERTIFIED TECHNICIAN(S) THAT DISPOSE OF
EQUIPMENT THAT COULD RELEASE OZONE DEPLETING REFRIGERANTS INTO
THE ATMOSPHERE.
3. THE CONTRACTOR SHALL RECOVER AND SEND REFRIGERANT TO AN EPA-
CERTIFIED RECLAIMER AND SHALL PROVIDE THE OWNER & ARCHITECT WITH A
MANIFEST FOR DISPOSAL OF REFRIGERATION EQUIPMENT THAT ARE
DISMANTLED ON-SITE.
4. THE CONTRACTOR SHALL SALVAGE ALL EXISTING FLOOR TILE THAT IS IN GOOD
CONDITION FOR RE-USE. COORDINATE SALVAGE WITH MDOC.
5. THE CONTRACTOR SHALL COORDINATE WITH MDOC FOR THE REMOVAL AND
SALVAGE OF EXISTING SHELVING AND RACKING IN THE EXISTING WALK-IN
COOLER / FREEZER.
6 REMOVE EXISTING DRY SPRINKLER PENDANTS IN COOLER AND FREEZER.
7 EXISTING DOOR SHALL BE TEMPORARILY CLOSED WHILE THE TEMPORARY DUST BARRIER IS IN PLACE.
9 REMOVE AND DISPOSE OF EXISTING FREEZER COMPRESSOR, PIPING, CONTROLS, AND ALL APPURTENANCES.
8 REMOVE AND DISPOSE OF EXISTING REFRIGERATION COMPRESSOR, PIPING, CONTROLS, AND ALL
APPURTENANCES.
10 REMOVE AND DISPOSE OF EXISTING COOLER "SOL" & "FAN" SWITCHES (LOCATED ON TOP OF THE EXISTING
COOLER/FREEZER UNITS.
11 COORDINATE SALVAGE OF EXISTING SHELVING WITH MDOC.
DASHED LINE INDICATES EXTENT OF TEMPORARY ENCLOSED STRUCTURE FOR DUST CONTROL BY PROVIDING A ZIPWALL DUST BARRIER, OR APPROVED EQUAL. ONCE THE TEMPORARY DUST BARRIER IS INSTALLED, IT SHALL
REMAIN INTACT AND WORK SHALL BE CONTINUOUS FROM DEMOLITION THROUGH INSTALLATION.
REMOVE AND SALVAGE EXISTING FLOOR TILE FOR REUSE (IF POSSIBLE). REMOVE EXISTING COOLER / FREEZER FLOOR, INSULATION, VAPOR BARRIER, AND SAND BED FOUND UNDER EXISTING COOLER / FREEZER. EXISTING 6" CONC. SUB-FLOOR TO REMAIN. PREPARE SURFACE FOR NEW CONC. FLOOR AT COOLER, AND NEW FREEZER
(WITH FLOOR INCLUDED). REFER TO PROPOSED PLANS FOR NEW WALK-IN FREEZER SIZE.
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
4/
/2
5:
:2
PM
A100
DEMOLITION
FLOOR PLAN
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
1/8" = 1'-0"A1 OVERALL DEMOLITION FLOOR PLAN - WAREHOUSE BLDG 500
NORTH
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
AD
D
EN
D U
M
/1 5/
PROPOSED
WALK-IN
FREEZER
PROPOSED
WALK-IN
COOLER
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
A.
B.
C.
D.
E.
(1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:
RIGHT HAND MANUAL OPERATION, FLUSH SILL.
ALUMINUM TRACK.
CHROME HARDWARE.
CHROME FRONT LOCK & INSIDE EMERGENCY RELEASE.
STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).
HEAT IN FOUR (4) SIDES OF DOOR & THREE (3) SIDES OF FRAME.
12" x 14" HEATED WINDOW IN FREEZER SLIDING DOOR.
HEATER WIRE.
LED VAPOR PROOF LIGHT, QTY. 2.
24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH
SIDES OF DOOR.
HEATED AIR VENT (STANDARD).
NL508 COMBINATION DIGITAL THERMOMETER & SWITCH w/ PILOT LIGHT.
PROVIDE SPECIAL SECURITY FASTENINGS.
COUNTERSUNK SCREWS FOR KICKPLATES.
(1) OPENING FOR SLIDING DOOR INCLUDES:
BACKING FOR MOUNTING TRACK.
VAPOR PROOF LED LIGHT.
NL508 COMBINATION DIGITAL THERMOMETER.
SWITCH w/ PILOT LIGHT.
SLAM BRACES.
(1) 12" x 14" HEATED VIEWPORT FREEZER.
(495) SQ. FT. OF 3/4" CDS PLYWOOD SUBFLOOR & TUBULAR SUPPORTS FOR FREEZER.
(1) VINYL STRIP AIR CURTAIN.
NO SHELVING REQUIRED.
WALK-IN FREEZER EQUIPMENT:
(1) MODEL # MSLA10ME
10-HP UNIT
460 / 60 / 3-PHASE
R-454A
OUTDOOR SCROLL UNIT ELECTRONIC CONTROLLER
LOW TEMP -10°F
31,524 BTUH SYSTEM CAPACITY
MOUNTED TIMER
SIZED FOR 90°F TEMPERATURE AT CONDENSER
CONNECTIONS - LIQUID: 0.875", SUCTION: 1.375".
HEATED / INSULATED RECEIVER.
WALK-IN FREEZER CONDENSING UNIT: LOCATED OUTSIDE
(2) MODEL # E1LAK160B-ME
208-230 / 60 / 1-PHASE
R-454A ELECRIC DEFROST A2L MITIGATION LOW PROFILE
LogiTemp CONTROLLER
LOW TEMP -10°F
16,200 BTUH EVAPORATOR CAPACITY
AMPS: 1.8
DEFROST AMPS: 11.9
WALK-IN FREEZER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT
TRAINING NOTE:
THE SUPPLIER OF THE PROPOSED COOLER / FREEZER COMBINATION UNIT SHALL
PROVIDE STAFF TRAINING FOR OVERALL OPERATION, MONITORING, ALARM
OPERATION, AND ALL RELATED OPERATIONS. AN OWNER TRAINING VIDEO SHALL
BE PROVIDED TO MDOC / ALGER CORRECTIONAL FACILITY.
A.
B.
C.
D.
E.
F.
G.
H.
I.
A.
A.
B.
C.
D.
E.
(1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:
LEFT HAND MANUAL OPERATION, FLUSH SILL.
ALUMINUM TRACK.
CHROME HARDWARE.
CHROM FRONT LOCK & INSIDE EMERGENCY RELEASE.
STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).
12" x 14" NON-HEATED WINDOW IN COOLER SLIDING DOOR.
LED VAPOR PROOF LIGHT, QTY. 1.
24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH SIDES OF DOOR.
PROVIDE SPECIAL SECURITY FASTENINGS.
(1) MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM.
INSTALLED IN DOOR PANEL w/ DIGITAL READOUT-SOUNDS ON RISE OR FALL OF TEMP.
(1) OPENING FOR SLIDING DOOR INCLUDES:
BACKING FOR MOUNTING TRACK.
VAPOR PROOF LED LIGHT.
NL508 COMBINATION DIGITAL THERMOMETER.
SWITCH w/ PILOT LIGHT.
SLAM BRACES.
(1) VINYL STRIP AIR CURTAIN.
NO SHELVING REQUIRED.
WALK-IN COOLER EQUIPMENT:
(1) MODEL # MSMC030ME
3-HP UNIT
460 / 60 / 3-PHASE
R-454C
OUTDOOR UNIT SCROLL ELECTRONIC CONTROLLER
MEDIUM TEMP 35°F
24,758 BTUH SYSTEM CAPACITY
MOUNTED TIMER
SIZED FOR 90°F TEMPERATURE AT CONDENSER
CONNECTIONS - LIQUID: 0.5", SUCTION: 0.875"
HEATED / INSULATED RECEIVER
WALK-IN COOLER CONDENSING UNIT: LOCATED OUTSIDE
(1) MODEL # E1MCK270A-MA
115 / 60 / 1-PHASE
R-454C
R-454C AIR DEFROST A2L MITIGATION LOW
PROFILE
LogiTemp CONTROLLER
MEDIUM TEMP 35°F
29,400 BTUH EVAPORATOR CAPACITY
FAN AMPS: 2.4
WALK-IN COOLER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT
26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL
(INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING)
26-GA SMOOTH GALVANIZED (CEILING TOPSIDE, FLOOR BOTTOMSIDE)
.100 SMOOTH ALUMINUM - INTERIOR FLOOR
1" VINYL FLOOR SEALER (1) COOLER (35.0°F)
48" HIGH "ALUMINUM DIAMOND TREADPLATE STANDARD WALL PROTECTION"
w/ COUNTERSUNK HOLES AND SCREWS
WALK-IN COOLER / FREEZER FINISHES:
A102 A1
OVERAL COOLER / FREEZER WIDTH
17' - 6" 4"
0"
DO
OR
6'
- 0
1'
- 0
PR
OP
OS
ED
W
AL
K-
IN
F
RE
EZ
ER
0"
PR
OP
OS
ED
W
AL
K-
IN
C
OO
LE
R
0"
1'
- 4
" C
LO
SU
RE
P
AN
EL
COOLER / FREEZER WIDTH
17' - 6" OVERALL
EXISTING FLOOR
DRAIN TO REMAIN
1' - 4"
3'
- 0
DO
OR
6'
- 0
8" TYP
5'
- 0
5'
- 0
5'
- 0
PROPOSED 2-1/2"Ø x
36" HIGH STEEL PIPE
BOLLARD FILLED w/
CONCRETE, TYP.
C1 A102
PROPOSED INSULATED FREEZER
FLOOR SYSTEM BY FREEZER
MANUFACTURER
ON EXISTING 6" CONC. SUB-FLOOR
.080 DIAMOND ALUMINUM
w/ SUPER FLOOR SUPPORT FLOOR
FINISH (BY FREEZER MANUF'R).
PROPOSED 5" CONCRETE SLAB
w/ #4's @ 16" O.C. EACH WAY, ON
3" RIGID INSULATION ON 15-MIL
VAPOR BARRIER ON EXISTING
6" CONC. SUB-FLOOR
PROPOSED POURED SEAMLESS
SEALED CONCRETE FINISH BY
CONTRACTOR
NOTE:
MAXIMUM ALLOWABLE LIVE LOAD ON
NEW FLOOR SLAB AT COOLER /
FREEZER = 500 PSF.
NOTE:
MAXIMUM ALLOWABLE LIVE LOAD ON
NEW FLOOR SLAB AT COOLER /
FREEZER = 500 PSF.
COORDINATE INSTALLATION OF PROPOSED
CONCRETE FLOOR SLAB w/ EXISTING FLOOR
TO REMAIN. PROVIDE A SEAMLESS
TRANSITION BETWEEN NEW / EXISTING
B1 A102
A102
A5
1" THICK THERMAL BREAK, ISOLATION JOINT
AROUND COOLER / FREEZER, TYPICAL.
PROPOSED 5" CONCRETE SLAB w/ #4's @ 16" O.C.
EACH WAY, ON 3" RIGID INSULATION ON 15-MIL
VAPOR BARRIER ON EXISTING 6" CONC. SUB-FLOOR
PROPOSED POURED SEAMLESS SEALED
CONCRETE FINISH BY CONTRACTOR
PROPOSED WALK-IN FREEZER
PROPOSED 48" TALL 22-GA
STAINLESS STEEL WALL PROTECTION
PROPOSED WALK-IN COOLER
PROPOSED 6'W x 7'H
SLIDING DOOR @
COOLER
13' - 0"
SLIDING DOOR
6' - 0" 1' - 0"
PROVIDE A THERMAL BREAK BETWEEN THE
COOLER / FREEZER TO PREVENT FROST
ISSUES AT THE INTERIOR WALL BY CUTTING A
JOINT IN THE CONCRETE FLOOR
DOOR OPENS
TO RIGHT
DOOR OPENS
TO LEFT
3' - 0"
5" 6'
- 0
4'
- 0
5"
CLOSURE PANEL
1' - 4" 21' - 0"
SLIDING DOOR
6' - 0"
PROPOSED 48" TALL 22-GA
STAINLESS STEEL WALL
PROTECTION
PROPOSED 48" TALL
22-GA STAINLESS STEEL
WALL PROTECTION
2-1/2"Ø x 36" HIGH STEEL CRASH
BOLLARD (PAINTED YELLOW)
GROUTED SOLID, BOLTED TO
FLOOR, SEE PLAN FOR LOCATIONS
2-1/2"Ø x 36" HIGH STEEL CRASH BOLLARD
(PAINTED YELLOW) GROUTED SOLID, BOLTED
TO FLOOR, SEE PLAN FOR LOCATIONS
C1 A102
2"
5"
PROPOSED 6'W x 7'H SLIDING
DOOR @ FREEZER
5" 3"
M
IN
4"
EX
IS
T'G
6"
PROPOSED WALK-IN
COOLER / FREEZER UNIT
SEALANT, TYPICAL
EXISTING CONC.
FLOOR
1" THICK SATURATED
ISOLATION JOINT
15-MIL VAPOR BARRIER
1" THICK
SATURATED
ISOLATION JOINT
EXISTING BUILDING
WALL
EXISTING CONC.
FLOOR
PROPOSED WALK-IN
COOLER / FREEZER UNIT
SEALANT, TYPICAL
PROPOSED POURED
SEAMLESS SEALED
CONCRETE FINISH
VERIFY
4"
1"
NOTE:
FREEZER FLOOR SUPPLIED BY WALK-IN
FREEZER MANUFACTURER. COORDINATE
INSTALLATION OF ADJACENT CONC. FLOOR
WITH MANUFACTURED FREEZER FLOOR.
5" CONC. SLAB @ COOLER FLOOR
#4 BARS @ 16" O.C., EACH WAY,
TYPICAL @ COOLER FLOOR
CL
R2"
1.
2.
3.
4.
5.
6.
7.
8.
COOLER / FREEZER FLOOR - GENERAL NOTES:
RIGID INSULATION SHALL BE EXTRUDED POLYSTYRENE CONFORMING TO ASTM C578 TYPE IV WITH A MINIMUM COMPRESSIVE RESISTANCE OF 25 PSI AT YIELD OR 10% DEFORMATION LIMIT, WHICHEVER OCCURS FIRST. A MINIMUM DENSITY OF 1.6 PCF AND A MINIMUM NOMINAL RESISTIVITY (R) OF 5.0 hr-ft2-°F / BTU PER INCH, OR APPROVED.
PROVIDE MINIMUM 28-DAY CONCRETE COMPRESSIVE STRENGTH OF 4,000 PSI (f'c = 4,000 PSI). PROVIDE NORMAL WEIGHT CONCRETE WITH 6% (+/-) 1.5% ENTRAINED AIR (NON- TROWEL FINISHED FLOORS), MAXIMUM W/C RATIO <0.50 AND 4" MAXIMUM SLUMP, WITH A MINIMUM OF 520 LB / CYD CEMENT CONTENT FOR A MAXIMUM 1" COARSE AGGREGATE.
PROVIDE READY-MIX CONCRETE CONFORMING TO ASTM C-94.
CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 117, 301, 305R, 306.1 AND 308.1, LATEST APPLICABLE EDITION.
PROVIDE STEEL REINFORCEMENT CONFORMING TO ASTM A615, GRADE 60. PLACE REINFORCEMENT IN ACCORDANCE WITH CRSI MANUAL OF STANDARD PRACTICE. PROVIDE BOLSTERS,CHAIRS, REBAR SUPPORTS, ETC. WITH BASES THAT WILL NOT DAMAGE VAPOR RETARDER.
FINISHED CONCRETE SLAB SURFACE SHALL BE LEVEL AND FLAT WITHIN 1/4" MAXIMUM IN ANY DIRECTION WHEN MEASURED WITH A 10' STRAIGHTEDGE. PROVIDE A SMOOTH FLOAT FINISH ON SLAB BELOW FREEZER UNIT. COORDINATE FLOOR FINISH IN COOLER WITH REQUIREMENTS FOR QUARRY TILED FLOOR.
CURE CONCRETE WITH A LIQUID MEMBRANE-FORMING CURING COMPOUND FOR 7-DAYS MINIMUM PRIOR TO LOADING SLAB(S). COORDINATE QUARRY TILE INSTALLATION REQUIREMENTS WITH CONCRETE CURING METHODS AND MATERIALS (REMOVAL OF CURING COMPOUND PRIOR TO TILING, ETC.).
MONITOR THE TEMPERATURE OF THE CONCRETE SLAB WHEN REDUCING THE TEMPERATURE IN THE COOLER AND FREEZER. REDUCE THE TEMPERATURE OF THE CONCRETE SLAB AT NO MORE THAN 10 OF PER 24-HR PERIOD FROM AMBIENT TEMPERATURE DOWN TO 35 OF. HOLD AT 35 OF FOR 2-5 DAYS. REDUCE TEMPERATURE OF CONCRETE SLAB BELOW FREEZER FROM 35 OF TO FINAL TEMPERATURE AT NO MORE THAT 10 OF PER 24-HR PERIOD.
3" (MIN) RIGID INSULATION,
UNDER PROPOSED
COOLER AND FREEZER.
SEE NOTE 1
15-MIL VAPOR
BARRIER
1"
ALIGN
CO
NC
SU
BF
LO
OR
COOLER UNIT INSULATED
WALL PANEL
PROVIDE SEALANT @ THERMAL BREAK
1/2" ASPHALT SATURATED
ISOLATION JOINT
EX
IS
TI
NG
6" 4"
VE
RI
FY
5"
EXISTING 1"Ø DRAIN HOLES,
WHERE OCCURS
EXISTING CONC. FLOOR
#4 BARS @ 16"
O.C., EACH WAY
3" (MIN) RIGID INSULATION, SEE
GENERAL NOTE 1 ON DETAIL C1,
THIS SHEET.
15-MIL VAPOR BARRIER
FREEZER COOLER
FREEZER UNIT INSULATED WALL PANEL
FREEZER FLOOR PROVIDED BY WALK-IN
FREEZER MANUFACTURER, INSTALL PER
MANUF'R RECOMMENDATIONS
PROPOSED POURED SEAMLESS SEALED
CONCRETE FINISH ON COOLER FLOOR BY
CONTRACTOR, SEE GENERAL NOTES 2 THRU 8
ON DETAIL C1, THIS SHEET FOR MORE INFO.
NOTE:
CONTRACTOR SHALL CLEAN
EXISTING CONC. SUBFLOOR
PRIOR TO WALK-IN FREEZER
FLOOR INSTALLATION, SEE
GENERAL NOTE 6 ON DETAIL
C1, THIS SHEET.
WALK-IN COOLER / FREEZER
17' - 6"
CLOSURE PANEL
4"
MIN
6"
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r-F re ez er a nd
R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er
\M
-0
_A lg er
C F
C oo le r-F re ez er _R
.rv t
4/
/2
9:
:1
AM
A102
ENLARGED
COOLER/FREEZER
PLAN & DETAILS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
C O
O
LE
R
FR
EE
ZE
R
R
EP
LA
C
EM
EN
T
M D
O C
A
LG
ER
C O
R R
EC
TI
O N
A L
FA
C
IL
IT
Y
3/16" = 1'-0"B3 ENLARGED COOLER/FREEZER PLAN
3/8" = 1'-0"A1 ELEV. @ COOLER / FREEZER
O W
N
ER
R
EV
IE
W
/2
4/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
AD
D
EN
D
U M
/1
5/
1 1/2" = 1'-0"C1 SECTION @ COOLER / FREEZER FLOOR
1 1/2" = 1'-0"B1 SECTION @ COOLER-FREEZER WALL
3/8" = 1'-0"A5 SIDE ELEV. @ COOLER / FREEZER
A103A2
A103
C2
EXISTING
2' - 6"
EXISTING
3' - 1"
EX
IS
TI
NG
3'
- 1
0"
EX
IS
TI
NG
4"
1/
2" 6'
- 1
1/ 4"
1/
2" 6'
- 1
1/ 4"
1/
2"
FREEZER
CONDENSING
UNIT
COOLER
CONDENSING
UNIT
PR
OP
OS
ED
4'
- 3
EX
IS
TI
NG
2'
- 4
PR
OP
OS
ED
4'
- 1
1"
EX
IS
TI
NG
2'
- 3 1/
2"
PROVIDE GAP BETWEEN SHED ROOF AND EXISTING
BUILDING WALL FOR CONDENSING UNIT CONDUIT(S)
3" / 1'-0"
STANDING SEAM METAL ROOF ATTACHED
TO TUBE STEEL FRAMING
STANDING SEAM METAL ROOF
ATTACHED TO TUBE STEEL FRAMING
5' - 6"2" GAP (+/-)
A103 C4
7'
- 1
1/
2"
6'
- 7
EX
IS
TI
NG
2'
- 3
1/ 2"
5'
- 6
6" 1'
- 7
1/
2"
EXIST'G
10" 6' - 2 3/4"
EXIST'G
10" 6' - 2 3/4"
EXIST'G
10"
EXISTING 10"Ø
CONCRETE COOKIE
EXISTING 2-1/2" x 2-1/2" SQ.
TUBE STEEL FRAME
PROPOSED EQUIPMENT
MOUNTING BRACKET
PROPOSED FREEZER
CONDENSING UNIT
PROPOSED COOLER
CONDENSING UNIT
WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL POST TO EXISTING FRAME w/
1/8" FILLET WELD ALL AROUND ALL
WELDED STEEL JOINTS
PROPOSED 22GA METAL ROOFING
ATTACHED TO TUBE STEEL w/ HILTI #10
HWH SCREWS @ 6" O.C. (MAX SPACING),
3" PER FOOT SLOPE
PROPOSED 2-1/2" x 2-1/2"
STEEL FRAME
PROPOSED 2-1/2" x 2-1/2" x 3/16"
STEEL FRAME & CROSS BRACING
(SIMILAR TO LOWER FRAME)
2" TO 3"
OVERHANG, TYP.
EXISTING 2-1/2" x 2-1/2" SQ.
TUBE STEEL CROSS BRACING
7'
- 9
1/ 2"
MOUNT EQUIPMENT OVER EXISTING 2-1/2" x 2-1/2" STEEL TUBE.
PROVIDE NEW 2-1/2" x 2-1/2" STEEL TUBE SUPPORT AT OTHER END
(TYPICAL AT ALL EQUIPMENT)
A103A2
EXISTING
2' - 6" 3' - 1"
2-1/2" x 2-1/2" x 3/16" TUBE STEEL
POSTS WELDED TO EXISTING
FRAME
2-1/2" x 2-1/2" x 3/16" TUBE STEEL
PERIMETER FRAME
2" x 2" x 3/16" TUBE STEEL
INTERIOR FRAMING
4"
1/
2" 6'
- 1
1/ 4"
1/
2" 6'
- 1
1/ 4"
1/
2"
1/2" +/- 2' - 5 1/2"
2 1/2" 2' - 8"
2 1/2"
MA
X
" O
.C
2" TO 3"
OVERHANG, TYP.
METAL ROOF PANELS
ATTACHED TO STEEL FRAME
WITH GASKETED FASTENERS
1/8" FILLET WELD ALL AROUND
ALL WELDED STEEL JOINTS
4" x 6" x 1/4" STEEL ANGLE BOLTED TO EXISTING WALL, PROVIDE GAP(S) TO ALLOW FOR CONDENSING UNIT
CONDUIT TO RUN UP EXISTING WALL
WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL BEAM TO STEEL FRAME w/ 1/8"
FILLET WELD ALL AROUND ALL
WELDED STEEL JOINTS
2-1/2" x 2-1/2" x 3/16" STEEL BEAM
2-1/2" x 2-1/2" x 3/16" STEEL FRAMING
22GA STANDING SEAM METAL ROOFING
ATTACHED TO TUBE STEEL w/ HILTI #10 HWH
SCREWS @ 6" O.C. (MAX SPACING)
PROPOSED 5" x 5" x 5/16" STEEL
ANGLE, PERFORATED FOR DRAINAGE
EXISTING WALL
PROPOSED CONDENSING
UNIT CONDUIT(S) BEYOND
VERIFY
2" GAP (+/-)
1/2" HILTI WKIK BOLT
TZ2-SS304 @ 12" O.C.
1/82 - 6
PROPOSED POURED SEAMLESS
SEALED CONCRETE FINISH ON
PROPOSED 5" CONC. FLOOR ON
PROPOSED 4" RIGID INSULATION OVER
EXISTING CONCRETE SUB-FLOOR
PROPOSED WALK-IN FREEZER FLOOR
(SUPPLIED BY WALK-IN FREEZER
MANUFACTURER)
INSTALLED ON PROPOSED 4" RIGID
INSULATION (VERIFY) OVER
EXISTING CONCRETE SUB-FLOOR
8'
- 8
W
AL
K-
IN
C
OO
LE
R
0"
W
AL
K-
IN
F
RE
EZ
ER
0" 1'
- 4
18' - 0"
2" 17' - 10"
.080 DIAMOND ALUMINUM w/ SUPER FLOOR
SUPPORT FLOOR FINISH (BY FREEZER MANUF'R).
POURED SEAMLESS
SEALED CONCRETE FINISH
BY CONTRACTOR
PROPOSED POURED SEAMLESS
SEALED CONCRETE FINISH ON
PROPOSED 5" CONC. FLOOR ON
PROPOSED 4" RIGID INSULATION OVER
EXISTING CONCRETE SUB-FLOOR
PROPOSED POURED SEAMLESS
SEALED CONCRETE FINISH ON
PROPOSED 5" CONC. FLOOR ON
PROPOSED 4" RIGID INSULATION OVER
EXISTING CONCRETE SUB-FLOOR
POURED SEAMLESS
SEALED CONCRETE FINISH
BY CONTRACTOR
ALIGN FLOOR FINISH
SURFACE, TYP.
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
4/
/2
8:
:0
AM
A103
DETAILS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
3/8" = 1'-0"A5 PLAN @ CONDENSING UNITS
1/2" = 1'-0"C2 ELEV @ CONDENSING UNITS - SIDE
1/2" = 1'-0"A2 ELEV @ CONDENSING UNITS - FRONT
3/8" = 1'-0"C5 ROOF @ CONDENSING UNITS
1 1/2" = 1'-0"C4 ROOF DETAIL @ EXISTING WALL
O W
N
ER
R
EV
IE
W
/0
6/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
AD
D
EN
D
U M
/1
5/
3/16" = 1'-0"A1 PROPOSED FLOOR FINISH PLAN
NORTHNORTH
PIPING INSULATION SCHEDULE
SYSTEM TYPE
PLUMBING
DOMESTIC HOT WATER SUPPLY AND RECIRCULATION
DOMESTIC COLD WATER
COOLING
CONDENSATE PIPING FROM COOLING COILS
TYPE PIPE SIZE
P-5
1-1/4" AND SMALLER
INSULATION THICKNESS
1/2"
P-5
1-1/4" AND SMALLER 1"
P-5 ALL SIZES 1/2"
1-1/2" AND LARGER 1-1/2"
1-1/2" AND LARGER 1"
REFRIGERANT SUCTION P-5 ALL SIZES 1/2"
PIPING INSULATION TYPES
TYPE
P-5
DESCRIPTION
ASTM C534, TYPE I, FLEXIBLE, CLOSED CELL ELASTOMERIC INSULATION, TUBULAR, OPERATING TEMPERATURE RANGE:
MINUS 70 TO 180 DEG F.
MSMD030MC CONDENSING UNIT SCHEDULE (COOLER)
GENERAL
REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL
R-454C 208-230 / 60 / 3 SCROLL ZS21KAE-TF5
HP AWEF LISTINGS
3 5.61 UL / CUL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)
-30
-20
-10
25,324
27,826
30,467
33,250
36,092
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)
-30
-20
-10
23,298
25,600
28,030
30,590
36,092
DIMENSIONAL DATA
L
OVERALL (TO NEAREST INCH)
WT (lbs)W H BASE SIZE BASE / HOOD
30 25031 26 M3 031M
INSTALLATION
REFRIGERANT
R-448A / R-449A 7/815.2 1/2 37,134
RECEIVER TANK (lbs) 90% / 90°F
CONNECTIONS
LIQUID SUCTION
ESTIMATED TOTAL
HEAT REJECTION (BTUH)
ELECTRICAL
MCA
MOP
COMP VOLTS
208-230
COMP PHASE
COMP HZ
COMP RLA
13.7
COMP LRA
OTHER LOAD
DATA
FAN PHASE FAN HZ FAN FLA FAN HP
FAN
QUANTITY
MAX EVAP
FAN AMPS
MAX EVAP DEF
HEATER AMPS
1 60 1.6 1 / 4 1 12 25.0
VOLTS 208-230
PHASE 1
AMPS 0.5
MSLA100ME CONDENSING UNIT SCHEDULE (FREEZER)
GENERAL
REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL
R-454A 460 / 60 / 3 SCROLL YF26KAE-TFD
HP AWEF LISTINGS
01 3.15 UL / CUL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)
-30
27,802
-20
35,420
-10
44,436
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)
-30
23,910
-20
31,524
-10
39,548
DIMENSIONAL DATA
L
OVERALL (TO NEAREST INCH)
WT (lbs)W H BASE SIZE BASE / HOOD
64 54044 40 M6 062M
INSTALLATION
REFRIGERANT
R-454A 1 5/846.0 7/8 59,116
RECEIVER TANK (lbs) 90% / 90°F
CONNECTIONS
LIQUID SUCTION
ESTIMATED TOTAL
HEAT REJECTION (BTUH)
ELECTRICAL
MCA
34.7
MOP
COMP VOLTS
COMP PHASE
COMP HZ
COMP RLA
17.9
COMP LRA
OTHER LOAD
DATA
FAN PHASE FAN HZ FAN FLA FAN HP
FAN
QUANTITY
MAX EVAP
FAN AMPS
MAX EVAP DEF
HEATER AMPS
1 60 2.9 1 / 3 2 6 15.0
VOLTS 460
PHASE 1
AMPS 0.5
E1MCK270A-MA EVAPORATOR UNIT SCHEDULE (COOLER)
GENERAL
REFRIGERANT VOLTAGE EVAPORATOR MODEL DEFROST SCHEME
R-454C 115 / 60 / 1 KLP427MA-S1E AIR
CONTROLLER LISTINGS
LogiTemp™ UL / CUL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)
-30
-20
-10
27,000
27,433
27,865
28,733
DIMENSIONAL DATA
L
OVERALL (INCHES)
WT (lbs)W H SUCTION
78.25 13516.5 17.25 1 1/8
ELECTRICAL
EVAPORATOR ELECTRICAL DATA EXPANSION VALVE
FAN
QUANTITY
FAN
AMPS
DEFROST AMPS
3 PHASE
4 4.0 N/A N/A
INSTALLATION
REFRIGERANT
TYPE
R-448A / R-449A
CONNECTIONS
LIQUID
1/2
DISTRIBUTOR NOZZLE / ORIFICE
1 PHASE
TXV / EEV
MODEL #
19-14658 SER-6
PART # TYPE
PART #
AWEF
E1LAK160B-ME EVAPORATOR UNIT SCHEDULE (FREEZER)
GENERAL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)
-30
14,900
-20
16,200
-10
16,808
DIMENSIONAL DATA
L
OVERALL (INCHES)
WT (lbs)W H SUCTION
62.25 11516.5 17.25 1 1/8
ELECTRICAL
EVAPORATOR ELECTRICAL DATA EXPANSION VALVE
FAN
QUANTITY
FAN
AMPS
DEFROST AMPS
3 PHASE
3 1.8 11.9 N/A
INSTALLATION
REFRIGERANT
TYPE
R-454A
CONNECTIONS
LIQUID
3/8
DISTRIBUTOR NOZZLE / ORIFICE
1 PHASE
TXV / EEV
MODEL #
19-14658 SER-6
PART # TYPE
PART #
REFRIGERANT VOLTAGE EVAPORATOR MODEL DEFROST SCHEME
R-454A
CONTROLLER LISTINGS
LogiTemp™ UL / CUL
AWEF
4.15ELECTRICKLP316LE-S2E208-230 / 60 / 1
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
4/
/2
8:
:5
AM
MP501
MECHANICAL AND
PLUMBING
SCHEDULES &
DETAILS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
O
W N
ER
R
EV
IE
W
/2 4/
O W
N
ER
R
EV
IE
W
/0
6/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
AD
D
EN
D
U M
/1
5/
EMERGENCY
GENERATOR
SUBSTATION
STORAGE
LOCKSMITH
STAFF
LOCKER
RM
FOREMAN
SUPERVISOR
SECURE
MAINTENANCE
CRIB
VEHICLE
MAINTENANCE
MAINTENANCE
SHOP
MAINTENANCE
DETERGENT
ROOM
WAREHOUSE
RESIDENT
STORES
OFFICERS
CLOTHING
OFFICE
STAFF
TOILET
INMATE
TOILET
JANITOR'S
CLOSET
VESTIBULE
PROPOSED
WALK-IN
FREEZER
PROPOSED
WALK-IN
COOLER
(FUTURE)
OPEN
OFFICE
PANEL "RP-B"
PANEL "PDP-502"
E101
A1DEMO POWER
E101
A4PROPOSED POWER
E102
A1DEMO LIGHTING
E102
A4PROPOSED LIGHTING
PANEL "SEP-500"
PANEL "RP-X"
PANEL "LP-XX"PANEL "SEDP SEC 2"
I.T . R
AC
K
(S ym ph on y)
ROUTE CONDUIT & WIRING TO EXISTING
SUBSTATION ROOM FROM WALK-IN
COOLER / FREEZER, COORDINATE
CONDUIT LOCATION(S) WITH MDOC
1. ROUTE CONDUIT & WIRING FROM EXISTING SYMPHONY I.T. RACK CONTROL
CENTER, LOCATED IN THE SUBSTATION ROOM (FIELD VERIFY LOCATION).
2. CONNECT NEW COOLER / FREEZER CONTROL PANEL ALARM CONTACTS TO
EXISTING ULTRALINK DIRECTLY. THE EXISTING ULTRALINK IS CONNECTED TO THE
EXISTING SECURITY NETWORK SWITCH.
3. CONNECT TO SECURITY I.T. RACK CONTROL SYSTEM WITH PURPLE CAT-6 CABLE(S)
AS REQUIRED TO CONNECT TO THE SYMPHONY SYSTEM. CONTRACTOR TO HIRE
AND COORDINATE CONNECTION TO SECURITY I.T. RACK CONTROL CENTER WITH
CHUCK BROWN, ENTERPRISE ACCOUNT MANAGER, FROM ALLIED UNIVERSAL
TECHNOLOGY SERVICES (PHONE 616-299-2814 or 616-299-2814).
4. ALONG WITH PROGRAMMING OF THE SYMPHONY, THE FOLLOWING SHALL BE
PROVIDED TO MONITOR THE COOLER / FREEZER EQUIPMENT:
IN SUBSTATION: INSTALL CAT-6 CABLE FROM COOLER / FREEZER CONTROL
PANEL TO CAMERA I.T. RACK.
IN SUBSTATION: INSTALL SENSTAR ULTRALINK TRANSEIVER AND CONNECT
TO FIBER PANEL IN I.T. RACK.
AT CENTRAL CONTROL: INSTALL SENSTAR ULTRALINK TRANSCEIVER AND
CONNECT TO FIBER PANEL IN I.T. RACK (IF NEEDED).
AT CENTRAL CONTROL: CONFIGURE THE SYMPHONY SYSTEM TO NOTE THE
ULTRA LINKS AND SETUP FAULTS ON THE SYSTEM.
FOR THE SYSTEM TO MONITOR FAULTS WITH COOLER / FREEZER SYSTEM
AND ANNUNCIATE IN THE SUBSTATION.
SYMPHONY MONITORING SYSTEM:
178' - 2"
2"
77' - 9" 100' - 5"
A102
A5
ALTERNATE #1:
REMOVE EXISTING 40A/3P BREAKER SERVING PANEL LP-XX AND
REPLACE WITH NEW 60A/3P BREAKER TO FEED NEW REPLACEMENT
PANEL LP--XX. SEE ALSO PARTIAL POWER RISER DIAGRAM FOR
ADDITIONAL WORK. COORDINATE REQUIRED OUTAGE WITH MDOC.
EXISTING PANEL SEDP IS WESTINGHOUSE POW-R-LINEC TYPE PRL4B
PANELBOARD, 800A MLO, 480Y/277V, 3 PHASE, 4 WIRE.
ALTERNATE #1:
REMOVE AND REPLACE EXISTING PANELS LP-XX AND
AND RP-X AND TRANSFORMER T-X. SEE ALSO
PARTIAL POWER RISER DIAGRAM AND PANEL
SCHEDULES FOR ADDITIONAL WORK. COORDINATE
REQUIRED OUTAGE WITH MDOC. PROVIDE WALL
MOUNTING BRACKET FOR TRANSFORMER T-X TO BE
MOUNTED ABOVE PANELS.
X'FMR "T-X"
ALTERNATE #1:
REMOVE EXISTING FUSES SERVING PANEL LP-XX AND REPLACE WITH
(3) NEW 60A FUSES TO FEED NEW REPLACEMENT PANEL LP--XX. SEE
ALSO PARTIAL POWER RISER DIAGRAM FOR ADDITIONAL WORK.
COORDINATE REQUIRED OUTAGE WITH MDOC. EXISTING PANEL
SEP-500 IS SQUARE 'D' QMB TYPE E1 PANELBOARD, 600A MLO,
480Y/277V, 3 PHASE, 4 WIRE.
ATS
REPLACEMENT PANEL (LP-XX)VOLTAGE: 277 / 480
AMPERAGE: 60 A
PHASE: 3
WIRE: 4
MAIN: MCB
MOUNTING: SURFACE
MODEL: SQUARE 'D'
SERVICE / FEEDER: 1"C 3 #6 & 1 #10 GND
LOAD
DESCRIPTION
BRKR
NO.
BRKR
NO.
LOAD
DESCRIPTION
COOLER COMPRESSOR
SPARE
LTS, NITE LT. & EM LITE IN E (E)
NIGHT LIGHTS & EXIT LITES (E)
PHASE
A
B
C
A
B
C
A
B
C
A
CKT
LOAD
BRKR
POLES
BRKR
SIZE
CKT
LOAD
BRKR
POLES
BRKR
SIZE
-320
-120
- 1 20
- 1 20
- B
C
A
B
C
FREEZER COMPRESSOR3 55
30 KVA TRANSFORMER PNL RP-X 145 -
3 30 TVSS (SPD)
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ALTERNATE #1
REPLACEMENT PANEL (RP-X)VOLTAGE: 120 / 208
AMPERAGE: 100 A
PHASE: 3
WIRE: 4
MAIN: MCB
MOUNTING: SURFACE
MODEL: SQUARE 'D'
SERVICE / FEEDER: 1 1/4"C 3 #3 & 1 #6 GND
LOAD
DESCRIPTION
BRKR
NO.
BRKR
NO.
LOAD
DESCRIPTION
DATA GATHERING (E)
MAINT SUP. OFFICE CAM-PC (E)
OUT. DIESEL TANK GAUGE SYS (E)
FREEZER EVAPORATOR
DIESEL PUMP (E)
CSAH-1 (E)
PHASE
A
B
C
A
B
C
A
B
C
A
CKT
LOAD
BRKR
POLES
BRKR
SIZE
CKT
LOAD
BRKR
POLES
BRKR
SIZE
-120
-120
-120
- 1 20
- 1 20
- 1 20
- 1 20
COOLER EVAPORATOR B
C
A
B
C
3 30
- 1 20
1 20
PA (E)1 20
LEAK MONITORING SYS PNL (E) 120 -
1 30 MTR. DG DAY TANK FUEL PUMP (E)
HEAT TAPE FREEZER E
HEAT TAPE FREEZER W
SPARE
SPARE
COOLER/FREEZER LIGHTS
FREEZER DOOR HEATER
TVSS (SPD)
RTU-1 (E) 120
FIRE ALARM (E) 120
SPARE (E) 120
TELEPHONE (E) 120
MTR. OUSIDE GAS PUMP (E)1 20
JOHNSON CONTROLS (E)1 20
MOTION DETECTOR (E)1 20
BATTERY CHARGER (E)1 20
ALTERNATE #1
FREEZER EVAPORATOR 220
PANEL
LP-XX
PANEL
RP-X
X'FMR
T-X
480V PRI
120/208V
SEC.
30 KVA
PANEL
SEDP
(ETR)
PARTIAL RISER DIAGRAM (ALTERNATE #1)D4
PANEL
SEDP
(ETR)
ATS
(ETR)
1"C 4#6 & 1 #10 GND
1"C 4#6 & 1 #10 GND
3/4"C 3#8 & 1 #10 GND
1 1/4"C 4 #8 & 1 #6 GND
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
1 2 3 4 5
FI
LE
N O.
: 4
/25
-0
D
TM
B- Al ge r C
F C oo le r-F re ez er a nd
R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er
\M
-0
_A lg er
C F
C oo le r-F re ez er _R
.rv t
4/
/2
9:
:4
AM
E100
OVERALL
ELECTRICAL
PLAN
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
KP
S
SC
P
SC
P
AJ
M
C O
O
LE
R
FR
EE
ZE
R
R
EP
LA
C
EM
EN
T
M D
O C
A
LG
ER
C O
R R
EC
TI
O N
A L
FA
C
IL
IT
Y
1/8" = 1'-0"A1 OVERALL ELECTRICAL FLOOR PLAN - WAREHOUSE BLDG 500
NORTH
O W
N
ER
R
EV
IE
W
/2
4/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
AD
D
EN
D
U M
/1
5/
DEMOLITION ELECTRICAL POWER KEYNOTES -
1 DISCONNECT EXISTING POWER CONNECTION SERVING EXISTING EVAPORATOR UNIT BEING REMOVED.
2 REMOVE EXISTING STEPDOWN TRANSFOMER. EXISTING BRANCH CIRCUITRY FROM PANEL PDP-502 TO
REMAIN AND BE REUSED TO FEED NEW OUTDOOR CONDENSING UNITS.
3 EXISTING COOLER REFRIGERANT AND FAN SWITCHES TO BE REMOVED.
4 EXISTING SECURITY CAMERA TO BE REMOVED AND REINSTALLED AT NEW LOCATOIN SHOWN.
PROPOSED ELECTRICAL POWER KEYNOTES -
1 PROVIDE ELECTRICAL CONNECTION TO PROPOSED COOLER EVAPORATOR UNIT FROM EXISTING
PANEL RP-B.
2 PROVIDE ELECTRICAL CONNECTION TO PROPOSED FREEZER EVAPORATOR UNIT FROM EXISTING
PANEL RP-B.
3 PROVIDE WEATHERPROOF (TOGGLE STYLE) DISCONNECT SWITCH FOR PROPOSED COOLER
EVAPORATOR UNIT.
4 PROVIDE WEATHERPROOF (TOGGLE STYLE) DISCONNECT SWITCH FOR PROPOSED FREEZER
EVAPORATOR UNIT.
5 REINSTALL EXISTING SECURITY CAMERA.
6 PROVIDE POWER WIRING TO NEW COOLER/FREEZER LIGHT FIXTUES AND PILOT LIGHT SWITCH.
7 PROVIDE POWER WIRING TO NEW HEAT TRACE/FREEZER DEFROST
PROVIDE SURFACE MOUNTED EMT CONDUIT ALONG CEILING TO CONNECT COOLER / FREEZER
MONITORING POINTS TO I.T. RACK LOCATED IN THE EXSTING SUBSTATION ROOM OF THE
WAREHOUSE BUILDING.
9 PROVIDE POWER WIRING TO NEW FREEZER DOOR HEATER.
10 PROVIDE POWER WIRING TO NEW WEATHERPROOF, GFCI TYPE RECEPTACLE LOCATED AT
CONDENSING UNITS. POWER FROM EXISTING CORD DROP REEL CIRCUIT.
EXISTING PANEL (RP-B)VOLTAGE: 120 / 208
AMPERAGE: 90 A
PHASE: 3
WIRE: 4
MAIN: MCB
MOUNTING: SURFACE
MODEL: SQUARE 'D' NQOD
SERVICE / FEEDER: 1 1/4"C 4 #3 & 1 #6 GND
LOAD
DESCRIPTION
BRKR
NO.
BRKR
NO.
DOCK LIGHTS & RECEPTACLE
LOAD
DESCRIPTION
RECEP-WAREHOUSE TOILETS
HEAT TAPE FREEZER E
HEAT TAPE FREEZER W
SPARE
EBH-3
EBH-1 & EBH-2
HAND DRYER, RECEP J.C. GFI
HAND DRYER
PHASE
A
B
C
A
B
C
A
B
C
A
CKT
LOAD
BRKR
POLES
BRKR
SIZE
CKT
LOAD
BRKR
POLES
BRKR
SIZE
-120
-120
-120
-120
-120
-120
-120
- 1 20
- 1 20
- 1 20
-120
- 1 20
EBH-4
EF-1
DRYER
DRYER
DRYER
DRYER
DOCK DOOR LEFT
TRUCK POWER REEL
B
C
A
B
C
A
B
C
A
-120
-120
2 30
1 20
- 1 20
- 1 20
EVAPORATOR COOLER- 1 20
41 O.H. DOOR OPENER
DOOR HTR FREEZER (NEW BKR)
DROP PLUGS
DROP PLUGS B
C
-120
-120
- 1 20
- 1 20
DOOR HEATER FREEZER1 20
DOCK DOOR RIGHT-
LIGHTS-COOLER & FREEZER1 20
1 20
RECEP-WAREHOUSE1 20
1 20
WASHER 220
WASHER 220
SPARE 120
RECEP-WAREHOUSE, OFFICE, EF-3 RECEP-WAREHOUSE
GAS BURNER-WAREHOUSE
GAS BURNER-WAREHOUSE
GAS BURNER-WAREHOUSE
GAS BURNER-DOCK
EWC-WAREHOUSE
2 20
2 20 EVAPORATOR FREEZER
(NEW BREAKER)
EX. FREEZER (EAST)
EX. FREEZER (WEST)
EX. REFRIGERATOR
T
RP-B/24
RP-B/12,14
RP-B/20,22
RP-B/40
RP-B/16
RP-B/18
RP-B/10
RP-B/10
RP-B/41
EXISTING PANEL (PDP-502)VOLTAGE: 480 / 277V
AMPERAGE: 225 A
PHASE: 3
WIRE: 4
MAIN: MCB
MOUNTING: SURFACE
MODEL: SQUARE 'D' I-LINE
SERVICE / FEEDER: 2"C 4 #4/0 & 1 #4 GND
LOAD
DESCRIPTION
BRKR
NO.
BRKR
NO.
LOAD
DESCRIPTION
SPARE
PHASE
A
B
C
A
B
C
A
B
C
A
CKT
LOAD
BRKR
POLES
BRKR
SIZE
CKT
LOAD
BRKR
POLES
BRKR
SIZE
- 3 30
3 45
3 45SPARE 345
REFRIGERATOR COMPRESSOR 320
ECUH-1 315
SPARE 315
LP-5A
- 3 20
RP-B
- 3 15
BALER
- 3 15
SPARE
SPARE
WASHER
SPACE
B
C
B
C
B
C
A
A
A
B
C
SPACE --
FREEZER COMPRESSOR
(NEW BREAKER)
SPARE
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
1 2 3 4 5
FI
LE
N O.
: 4
/25
-0
D
TM
B- Al ge r C
F C oo le r-F re ez er a nd
R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er
\M
-0
_A lg er
C F
C oo le r-F re ez er _R
.rv t
4/
/2
9:
:0
AM
E101
ELECTRICAL
POWER PLANS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
KP
S
SC
P
SC
P
AJ
M
C O
O
LE
R
FR
EE
ZE
R
R
EP
LA
C
EM
EN
T
M D
O C
A
LG
ER
C O
R R
EC
TI
O N
A L
FA
C
IL
IT
Y
1/4" = 1'-0"A1 ELECTRICAL DEMO POWER PLAN
1/4" = 1'-0"A4 ELECTRICAL PROPOSED POWER PLAN
NORTHNORTH
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
AD
D
EN
D U
M
/1 5/
PROPOSED ELECTRICAL LIGHTING KEYNOTES -
1 EXISTING DISCONNECT SWITCH FOR SINGLE POINT CONNECTION TO OUTDOOR CONDENSING UNIT TO REMAIN, FUSE PER UNIT
NAME PLATE. SEE ALSO PANELBOARD SCHEDULES.
2 CONTRACTOR TO INSTALL CONTROL WIRING BETWEEN THE EVAPORATOR COIL AND THE CONDENSING UNIT.
3 PROPOSED 48" LED VAPOR PROOF ALL TEMPERATURE LIGHT FIXTURES (TWO PER UNIT), PROVIDED BY EQUIPMENT SUPPLIER, INSTALLED BY CONTRACTOR. PROVIDE BRANCH CIRCUITRY FROM EXISTING PANEL RP-B.
4 MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM (INSTALLED IN COOLER DOOR PANEL).
PROVIDE NEW LIGHING FIXTURE EQUAL TO METALUX #SPHB-1224SE-M-UNV-L84050-CD-SP1-U CONNECT TO EXISTING WAREHOUSE LIGHING BRANCH CIRCUITY SERVING SIMILAR FIXTURES IN VICNITY. NEW FIXTURES SHALL BE CONTORLED WITH EXISTING
FIXTURES.
DEMOLITION ELECTRICAL LIGHTING KEYNOTES -
1 REMOVE EXISTING SINGLE POINT CONNECTION TO EXISTING CONDENSING UNIT'S DISCONNECT SWITCH. EXISTING
DISCONNECT SWITCH TO REMAIN AND BE REUSED.
2 REMOVE EXISTING SINGLE POINT CONNECTION TO EXISTING CONDENSING UNIT'S DISCONNECT SWITCH. EXISTING
DISCONNECT SWITCH TO REMAIN AND BE LABLED AS SPARE.
REMOVE EXISTING LIGHTING FIXTURES AND SWITCHES IN COOLER/FREEZER. EXISTING BRANCH CIRCUITRY SHALL BE REUSED TO FEED NEW LIGHING AND EQUIPMENT, SEE PANELBOARD SCHEDULE FOR NEW WORK
REQUIREMENTS.
EX. FREEZER
EX. FREEZER
EX. REFRIGERATOR
B1 A102
3 3
3 3
3 3
PROPOSED
WALK-IN
FREEZER
PROPOSED
WALK-IN
COOLER
3 3
3 3
B1 A102
5 5
5 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
1 2 3 4 5
FI
LE
N O.
: 4
/25
-0
D
TM
B- Al ge r C
F C oo le r-F re ez er a nd
R oo f R ep la ce m en t\D w gs \C oo le r-F re ez er
\M
-0
_A lg er
C F
C oo le r-F re ez er _R
.rv t
4/
/2
9:
:3
AM
E102
ELECTRICAL
LIGHTING PLANS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
KP
S
SC
P
SC
P
AJ
M
C O
O
LE
R
FR
EE
ZE
R
R
EP
LA
C
EM
EN
T
M D
O C
A
LG
ER
C O
R R
EC
TI
O N
A L
FA
C
IL
IT
Y
1/4" = 1'-0"A1 ELECTRICAL LIGHTING DEMOLITION PLAN
1/4" = 1'-0"A4 ELECTRICAL LIGHTING PROPOSED PLAN
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
AD
D
EN
D U
M
/1 5/
| 5975 Crossroads Commerce Parkway SW |
| Wyoming, MI 49519 |
File details come from the government source that posted it. Updated .