472-25256.JBB Drawings.pdf

PDF 4 MB Posted

Attached to
472/25256. JBB; Alger C. F. Cooler/Freezer Replacement
Solicitation number
RFQ 171 260000000218 4
Issued by
Alger County, Westland City, Michigan

About this file

This file consists of construction drawings and project specifications for the Michigan Department of Corrections (MDOC) Alger Correctional Facility, prepared by U.P. Engineers & Architects, Inc. The project scope involves the removal and replacement of an existing walk-in cooler/freezer combination unit with separate cooler and freezer units equipped with remote refrigeration condensing at the facility located in Wetmore, Michigan. The proposed work includes installation of a 20-foot by 17.5-foot by 10-foot walk-in cooler (561 square feet) and a 30-foot by 17.5-foot by 10-foot walk-in freezer (561 square feet), both featuring new LED lighting, digital thermometer and alarm systems, vinyl strip air curtains, and heated sliding doors with security fastenings. The project also requires removal of existing refrigeration equipment, condensate piping, controls, and ceiling-mounted evaporator units, along with preparation of floor surfaces including salvage of existing quarry tile. Construction is classified as Building Use Group S-1 (moderate-hazard storage), Construction Type II-B (unprotected, non-combustible), with automatic sprinkler fire protection throughout. The drawings indicate a bidding date of March 20, 2026, with design review stages completed at 50%, 90%, and 100% owner review phases between December 2025 and February 2026.

The project specifications require coordination with the MDOC facility for salvage of existing shelving and racking, compliance with EPA refrigerant disposal regulations under Section 608 of the Clean Air Act, and retention of existing floor drains tied to the building drainage system. The proposed cooler condensing unit is a 3-horsepower scroll unit operating on R-454C refrigerant at 35 degrees Fahrenheit with 26,911 BTU system capacity, while the freezer unit is a 7.5-horsepower scroll unit on R-454A refrigerant at minus 10 degrees Fahrenheit with 26,100 BTU capacity. Both units include insulated receiver tanks, electronic controllers, and mounted timers sized for 90-degree Fahrenheit ambient temperature at the condenser. The cooler floor requires a new 5-inch concrete slab with rigid insulation on an existing 6-inch concrete sub-floor, while the freezer floor is recessed and supplied by the manufacturer with an insulated floor system. The project requires a certified technician to handle refrigerant recovery and disposal with manifest documentation provided to the owner and architect, and mandates staff training on system operation and monitoring provided by the equipment supplier.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZONING: INDUSTRIAL

BUILDING CODE REVIEW

2021 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS

2021 MICHIGAN BUILDING CODE & MICHIGAN BARRIER FREE

2021 MICHIGAN MECHANICAL CODE

2021 MICHIGAN PLUMBING CODE

2021 MICHIGAN ENERGY CODE

2023 NATIONAL ELECTRICAL CODE

2023 MICHIGAN ELECTRICAL CODE, PART 8

USE GROUP:

WAREHOUSE BLDG. 500 = S-1, MODERATE-HAZARD STORAGE

CONSTRUCTION TYPE: II-B, UNPROTECTED, NON-COMBUSTIBLE

SQUARE FOOTAGE OF NEW CONSTRUCTION: N/A (REPLACE EXISTING EQUIPMENT)

COOLER: 561 SQ. FT.

FREEZER: 561 SQ. FT.

FIRE PROTECTION:

AUTOMATIC SPRINKLER SYSTEM THROUGHOUT,

FIRE ALARM ACTIVATED BY SPRINKLER

TOTAL ALLOWABLE AREA: 70,000 ALLOWABLE

PROJECT DESCRIPTION:

REMOVE AND REPLACE EXISTING WALK-IN COOLER / FREEZER COMBINATION

AND PROVIDE SEPARATE COOLER AND SEPARATE FREEZER WITH REMOTE

REFRIGERATION CONDENSING. PROVIDE NEW LED LIGHTING IN COOLER &

FREEZER. MAINTAIN EXISTING FLOOR DRAINS. PROVIDE NEW QUARRY TILE AS

NEEDED.

FILE NO.: 472/25256.JBB

ACCOUNTING TEMPLATES:

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

ADAM P. LACH, RA, DIRECTOR

33 G5

30 65

17 139

55 52

32 180

14 12

CEDARVILLE

HESSEL

WHITEFISH

POINT

SAULT

STE

MARIE

NATIONAL PARK

ISLE ROYALE

NORWAY

MARENISCO

WHITE PINE

BERGLAND

NEWBERRY

SILVER

CITY

BESSEMER

IRONWOOD

WAKEFIELD

GREEN BAY

GWINN

HERMANSVILLE

MENOMINEE

IRON MOUNTAIN

VULCAN

CASPIAN

TROUT

WATERSMEET

CREEK

CROSSING

MASS

CITY

BRUCE

ONTONAGON

ROCKLAND BARAGA

ARNHEIM

CRYSTAL

FALLS

ISHPEMING

MICHIGAMME

L'ANSE

AURA

SKANEE

MARQUETTE

NEGAUNEE

MANISTIQUE

ESCANABA

FAYETTE

GARDEN

MUNISING

CURTIS

CITY

GOULD

HARBOR

CALUMET

RIPLEYHOUGHTON

CHASSELL

HANCOCK

DELAWARE

LAKE

LINDEN

LAURIUM

EAGLE

HARBOR

COPPER

MACKINAC

ISLAND

IGNACE

ST

INDIAN

RIVER

CHEBOYGAN

MACKINAW CITY

PELSTON

ONAWAY

GAYLORD

PETOSKEY

CHARLEVOIX

MANCELONA

KALKASKA

TRAVERSE

CITY

EMPIRE

ELBERTA

ARCADIA

MANISTEE

SCOTTVILLE

BALDWINLUDINGTON

SHELBY

BIG RAPIDS

MOUNT

PLEASANT

CADILLAC

GRAYLING

EAST

TAWAS

ROSCOMMON

LACHINE ALPENA

WOLVERINE

ATLANTA

ROGERS CITY

ALANSON

CROSS

VILLAGE

BOYNE CITY

BELLAIRE

JORDAN

E.

EASTPORTNORTHPORT

LELAND

BUCKLEY

FIFE

LAKE

FRANKFORT

MESICK

MANTON

BEAR

LAKE

LILLEY

HESPERIA

WHITE

CLOUD

EVART

REMUS

MIDLAND

SAGINAW

BAY

CITY

HARRISVILLE

CURRAN

MIO

OSCODA

TAWAS CITY

WEST

BRANCH

STANDISH

GLADWIN

McBAIN

LAKE CITY

CLARE

CARO

TROUT LAKE

BREVORT

IRON RIVERBRULE

WASHBURN

POPLAR

ASHLAND

PORT WING BAYFIELD

ODARRAH

MELLEN

UPSON

HURLEY

GLIDDEN

PARK FALLS

CLAM LAKE

MERCER

PRESQUE

ISLE

LAND O'LAKES

EAGLE

RIVER

PHELPS

FLORENCE

NIAGRA

CRANDON

SUPERIOR

HAYWARD

MINONG

CABLE

SHELL LAKE

GRANTSBURG

BALSAM

LAKE BARRON

MENOMONIE

DURAND

ALMA

WHITEHALL

BLACK

RIVER

FALLS

SPARTA

LA CROSSE

FRIENDSHIP

MONTELLO

WAUTOMA

GREEN

LAKE

FOND DU LAC

OSHKOSH

APPLETON

DE PERE

GREEN BAY

KEWAUNEE

STURGEON BAY

MARINETTE

OCONTO

SHAWANO

KESHENA

WAUSAU

STEVENS

POINT

WAUPACA

RHINELANDERPHILIPS

MEDFORD

MERRILL

ANTIGO

EAU CLARE

LADYSMITH

THREE

LAKES

MICHIGAN

WISCONSIN

LAKE

MICHIGAN

LAKE

SUPERIOR

HURON

LAKE

100 PORTAGE STREET

HOUGHTON, MI 49931

P (906) 482-4810 F (906) 482-9799

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

U.P. ENGINEERS &

ARCHITECTS, INC.

2906 N. STEPHENSON AVE, SUITE 2

IRON MOUNTAIN, MI 49801

P (906) 779-0937 F (906) 779-0947

424 S. PINE ST.

ISHPEMING, MI 49849

P (906) 485-1011 F (906) 485-1013

1701 DUNLAP AVE., SUITE 8

MARINETTE, WI 54143

P (715) 732-4188 F (715) 732-4189

707 ASHMUN STREET

SAULT STE. MARIE, MI 49783

P (906) 635-0511 F (906) 635-0612

PR

OJ

EC

T

NO

w w w .u pe a.

co m

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

IS

SU

ED

F

O R

D

AT

E:

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:0

PM

COOLER / FREEZER REPLACEMENT

MDOC / ALGER CORRECTIONAL FACILITY

INDUSTRIAL PARK DRIVE, WETMORE, MI 49895

G001

COVER SHEET

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

PROJECT LOCATION

PROJECT VICINITY MAP

FILE NO. MDOC 472/25256.JBB

SHEET INDEX

NUMBER SHEET NAME

G001 COVER SHEET

A100 DEMOLITION FLOOR PLAN

A101 OVERALL PROPOSED FLOOR PLAN

A102 ENLARGED COOLER/FREEZER PLAN & DETAILS

A103 DETAILS

A104 PHOTOS

MP001 MECHANICAL & PLUMBING ABBREVIATIONS, SYMBOLS, & NOTES

MP100 OVERALL MECHANICAL PLAN

MP101 MECHANICAL & PLUMBING PLANS

MP102 MECHANICAL & PLUMBING RCP

MP501 MECHANICAL AND PLUMBING SCHEDULES & DETAILS

E001 ELECTRICAL SPECIFICATIONS

E002 ELECTRICAL ABBREVIATIONS

E100 OVERALL ELECTRICAL PLAN

E101 ELECTRICAL POWER PLANS

E102 ELECTRICAL LIGHTING PLANS

O W

NE

R

RE

VI

EW

/2 4/

O W

NE

R

RE

VI

EW

/0 6/

0%

O W

NE

R

RE

VI

EW

/2 7/

LA

RA

R

EV

IE

W

/2

7/

BI

DD

IN

G

/2 0/

03/20/2026

EMERGENCY

GENERATOR

SUBSTATION

STORAGE

LOCKSMITH

STAFF

LOCKER

RM

FOREMAN

SUPERVISOR

SECURE

MAINTENANCE

CRIB

VEHICLE

MAINTENANCE

MAINTENANCE

DETERGENT

ROOM

WAREHOUSE

RESIDENT

STORES

OFFICERS

CLOTHING

OFFICE

STAFF

TOILET

INMATE

TOILET

JANITOR'S

CLOSET

VESTIBULE

EX. FREEZER

EX. FREEZER

EX. COOLER

6 6

1'

- 4

VE

RI

FY

W

AL

K-

IN

F

RE

EZ

ER

6"

17' - 6"

DEMOLITION FLOOR PLAN KEYNOTES -

1 REMOVE EXISTING COOLER / FREEZER UNITS AND ALL APPRUTENANCES. PREPARE FLOOR SURFACE FOR NEW WALK-IN COOLER AND FREEZER UNIT. SALVAGE ANY LOOSE FLOOR TILE DURING DEMOLITION FOR RE-USE.

2 EXISTING FLOOR DRAIN TO REMAIN.

3 REMOVE EXISTING COOLER / FREEZER WALL SHROUD AND PREPARE SURFACE FOR NEW COOLER / FREEZER

ENCLOSURE.

4 REMOVE EXISTING CEILING MOUNTED COOLER / FREEZER EVAPORATOR UNITS.

5 REMOVE EXISTING LIGHT FIXTURES IN COOLER / FREEZER.

GENERAL DEMOLITION NOTES

1. PER SECTION 608 OF THE CLEAN AIR ACT (CAA), THE ENVIRONMENTAL

PROTECTION AGENCY (EPA) HAS ESTABLISHED REGULATIONS THAT ARE

RELEVANT TO THE DISPOSAL OF REFRIGERATION AND A/C EQUIPMENT.

2. THE CONTRACTOR SHALL PROVIDE CERTIFIED TECHNICIAN(S) THAT DISPOSE OF

EQUIPMENT THAT COULD RELEASE OZONE DEPLETING REFRIGERANTS INTO

THE ATMOSPHERE.

3. THE CONTRACTOR SHALL RECOVER AND SEND REFRIGERANT TO AN EPA-

CERTIFIED RECLAIMER AND SHALL PROVIDE THE OWNER & ARCHITECT WITH A

MANIFEST FOR DISPOSAL OF REFRIGERATION EQUIPMENT THAT ARE

DISMANTLED ON-SITE.

4. THE CONTRACTOR SHALL SALVAGE ALL EXISTING FLOOR TILE THAT IS IN GOOD

CONDITION FOR RE-USE. COORDINATE SALVAGE WITH MDOC.

5. THE CONTRACTOR SHALL COORDINATE WITH MDOC FOR THE REMOVAL AND

SALVAGE OF EXISTING SHELVING AND RACKING IN THE EXISTING WALK-IN

COOLER / FREEZER.

6 REMOVE EXISTING DRY SPRINKLER PENDANTS IN COOLER AND FREEZER.

7 EXISTING DOOR SHALL BE TEMPORARILY CLOSED WHILE THE TEMPORARY DUST BARRIER IS IN PLACE.

9 REMOVE AND DISPOSE OF EXISTING FREEZER COMPRESSOR, PIPING, CONTROLS, AND ALL APPURTENANCES.

8 REMOVE AND DISPOSE OF EXISTING REFRIGERATION COMPRESSOR, PIPING, CONTROLS, AND ALL

APPURTENANCES.

10 REMOVE AND DISPOSE OF EXISTING COOLER "SOL" & "FAN" SWITCHES (LOCATED ON TOP OF THE EXISTING

COOLER/FREEZER UNITS.

11 COORDINATE SALVAGE OF EXISTING SHELVING WITH MDOC.

DASHED LINE INDICATES EXTENT OF TEMPORARY ENCLOSED STRUCTURE FOR DUST CONTROL BY PROVIDING A ZIPWALL DUST BARRIER, OR APPROVED EQUAL. ONCE THE TEMPORARY DUST BARRIER IS INSTALLED, IT SHALL

REMAIN INTACT AND WORK SHALL BE CONTINUOUS FROM DEMOLITION THROUGH INSTALLATION.

REMOVE AND SALVAGE EXISTING FLOOR TILE FOR REUSE. REMOVE EXISTING FREEZER SUB-FLOOR, INSULATION, VAPOR BARRIER, AND SAND BED FOUND UNDER EXISTING COOLER / FREEZER. PREPARE SURFACE FOR NEW WALK-IN FREEZER WITH FLOOR. REFER TO PROPOSED PLANS FOR NEW WALK-IN FREEZER SIZE.

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:0

PM

A100

DEMOLITION

FLOOR PLAN

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

1/8" = 1'-0"A1 OVERALL DEMOLITION FLOOR PLAN - WAREHOUSE BLDG 500

NORTH

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

GENERATOR

SUBSTATION

STORAGE

LOCKSMITH

STAFF

LOCKER

RM

FOREMAN

SUPERVISOR

SECURE

MAINTENANCE

CRIB

VEHICLE

MAINTENANCE

MAINTENANCE

SHOP

MAINTENANCE

DETERGENT

ROOM

WAREHOUSE

RESIDENT

STORES

OFFICERS

CLOTHING

OFFICE

STAFF

TOILET

INMATE

TOILET

JANITOR'S

CLOSET

VESTIBULE

PROPOSED

WALK-IN

FREEZER

PROPOSED

WALK-IN

COOLER

(FUTURE)

OPEN

OFFICE

HATCHED AREA INDICATES

NOT IN SCOPE OF WORK

A103 A5

5'

- 0

6'

- 0

5'

- 0

1'

- 0

6'

- 0

5'

- 0

6'

- 0

EX

IS

TI

NG

F

LO

OR

T

O

RE

MA

IN

6" (S

EE

K

EY

NO

TE

0" (S

EE

K

EY

NO

TE

0"

(SEE KEYNOTE #12)

17' - 10 1/2"

FL

OO

R

BY

C

ON

TR

AC

TO

R

FL

OO

R

BY

F

RE

EZ

ER

M

AN

UF

AC

TU

RE

R

CO

NT

RA

CT

OR

FL

OO

R

BY

PROPOSED FLOOR PLAN KEYNOTES -

1 PROPOSED WALK-IN COOLER (20' - 0" LONG x 17' - 6" WIDE x 10' - 0" HIGH):

2 PROPOSED WALK-IN FREEZER (30' - 0" LONG x 17' - 6" WIDE x 10' - 0" HIGH):

3 EXISTING COOLER / FREEZER FLOOR DRAIN TIED INTO EXISTING BUILDING DRAIN SYSTEM TO REMAIN.

4 PROVIDE NEW CLOSURE PANELS AT SIDES OF COOLER / FREEZER.

5 EXISTING QUARRY TILE FLOOR FINISH TO REMAIN. PLACE SALVAGED TILE AS NEEDED. CLEAN FLOORS AFTER COOLER / FREEZER

INSTALLATION.

6 PROPOSED CEILING MOUNTED EVAPORATOR UNIT (COOLER), FOR R448A / R449A HERMETIC CONDENSING UNITS, 13,600 BTU @

SUCTION TEMP +25°F, 10°F T.D., (2) FANS, 115V / 60 / 1-PH.

• 20' - 0"L x 17' - 6"W x 10' - 0"H WALK-IN COOLER (FLOORLESS - INSTALL ON EXISTING QUARRY TILE FLOOR).

• 26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL - INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING.

• 26-GA SMOOTH GALVANIZED - CEILING TOPSIDE, FLOOR BOTTOMSIDE.

• 1" VINYL FLOOR SEALER [COOLER].

• 72" x 84" MANUAL SINGLE SLIDING WALK-IN COOLER DOOR (SLIDE LEFT TO OPEN).

• ROUTE (INSULATED) CONDENSATE LINES DIRECTLY FROM COOLER / FREEZER EVAPORATORS THROUGH CEILING OR WALL DOWN TO

EXISTING CONDENSATE DRAIN & PROVIDE AIR GAP AS REQUIRED.

• MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM (INSTALLED IN COOLER DOOR PANEL).

• LED VAPOR PROOF ALL TEMPERATURE INTEGRATED LIGHT FIXTURES [COOLER & FREEZER].

• DIGITAL THERMOMETER [COOLER & FREEZER].

• VINYL STRIP CURTAIN [COOLER].

7 PROPOSED CEILING MOUNTED LOW TEMP EVAPORATOR COIL (FREEZER), FOR R-448A / R449A HERMETIC CONDENSING UNITS, 7600 BTU @ SUCTION TEMP -20°F, 10°F T.D., 90°F AMBIENT, (2) FANS, ELECTRIC DEFROST, 208-230V / 60 / 1-PH.

8 PLACE SALVAGED TILE AND PROVIDE NEW MATCHING QUARRY TILE AS NEEDED AT PERIMETER OF COOLER / FREEZER (AS REQ'D), MATCH EXISTING COLOR.

• 30' - 0"L x 17' - 6"W x 10' - 0"H WALK-IN FREEZER (w/ INSULATED FLOOR).

• 26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL - INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING.

• 26-GA SMOOTH GALVANIZED - CEILING TOPSIDE, FLOOR BOTTOMSIDE.

• .100 SMOOTH ALUMINUM - INTERIOR FLOOR [FREEZER].

• 66" x 84" MANUAL SINGLE SLIDING FREEZER DOOR (SLIDE RIGHT TO OPEN).

• ROUTE (INSULATED) CONDENSATE LINES DIRECTLY FROM COOLER / FREEZER EVAPORATORS THROUGH CEILING OR WALL DOWN TO

EXISTING CONDENSATE DRAIN & PROVIDE AIR GAP AS REQUIRED.

• MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM (INSTALLED IN COOLER DOOR PANEL).

• LED VAPOR PROOF ALL TEMPERATURE INTEGRATED LIGHT FIXTURES [COOLER & FREEZER].

• DIGITAL THERMOMETER [COOLER & FREEZER].

• VINYL STRIP CURTAIN [COOLER].

9 CLEAN EXISTING FLOOR AND WALLS AT AREA WHERE EXISTING WALK-IN COOLER WAS REMOVED. PROVIDE TOUCH-UP PAINT AS REQUIRED. REPLACE ANY BROKEN FLOOR TILES WITH NEW TILE (COLOR TO MATCH EXISTING).

DASHED LINE INDICATES EXTENT OF TEMPORARY ENCLOSED STRUCTURE FOR DUST CONTROL BY PROVIDING A ZIPWALL DUST BARRIER, OR APPROVED EQUAL. ONCE THE TEMPORARY DUST BARRIER IS INSTALLED, IT SHALL REMAIN INTACT AND WORK SHALL

BE CONTINUOUS FROM DEMOLITION THROUGH INSTALLATION.

11 PROPOSED POURED SEAMLESS SEALED CONCRETE FINISH ON PROPOSED 5" CONC. FLOOR WITH 3" RIGID INSULATION ON EXISTING 6" CONC. SUB-FLOOR. COORDINATE INSTALLATION OF (FLOORLESS) WALK-IN COOLER WITH MANUFACTURER.

PROPOSED RECESSED WALK-IN FREEZER FLOOR (BY MANUFACTURER) ON EXISTING 6" CONCRETE SUB-FLOOR. COORDINATE INSTALLATION OF INSULATED FREEZER FLOOR SYSTEM WITH FREEZER MANUFACTURER. CONTRACTOR SHALL CLEAN EXISTING CONC. SUBFLOOR PRIOR TO WALK-IN FREEZER FLOOR INSTALLATION, REFER TO DETAILS B1 & C1 ON SHEET A102.

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:0

PM

A101

OVERALL

PROPOSED

FLOOR PLAN

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

KP

S

/R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

1/8" = 1'-0"A3 PROPOSED FLOOR PLAN - WAREHOUSE BLDG 500

NORTH

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

PROPOSED

WALK-IN

FREEZER

PROPOSED

WALK-IN

COOLER

• (1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:

A. RIGHT HAND MANUAL OPERATION, FLUSH SILL.

B. ALUMINUM TRACK.

C. CHROME HARDWARE.

D. CHROME FRONT LOCK & INSIDE EMERGENCY RELEASE.

E. STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).

F. HEAT IN FOUR (4) SIDES OF DOOR & THREE (3) SIDES OF FRAME.

G. 12" x 14" HEATED WINDOW IN FREEZER SLIDING DOOR.

H. HEATER WIRE.

I. LED VAPOR PROOF LIGHT, QTY. 2.

J. 24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH

SIDES OF DOOR.

K. HEATED AIR VENT (STANDARD).

L. NL508 COMBINATION DIGITAL THERMOMETER & SWITCH w/ PILOT LIGHT.

M. PROVIDE SPECIAL SECURITY FASTENINGS.

N. COUNTERSUNK SCREWS FOR KICKPLATES.

• (1) OPENING FOR SLIDING DOOR INCLUDES:

A. BACKING FOR MOUNTING TRACK.

B. VAPOR PROOF LED LIGHT.

C. NL508 COMBINATION DIGITAL THERMOMETER.

D. SWITCH w/ PILOT LIGHT.

E. SLAM BRACES.

• (1) 12" x 14" HEATED VIEWPORT FREEZER.

• (495) SQ. FT. OF 3/4" CDS PLYWOOD SUBFLOOR & TUBULAR SUPPORTS FOR FREEZER.

• (1) VINYL STRIP AIR CURTAIN.

• NO SHELVING REQUIRED.

WALK-IN FREEZER EQUIPMENT:

• (1) MODEL # MSLA075MC

• 7.5-HP UNIT

• 208-230 / 60 / 3-PHASE

• R-454A

• OUTDOOR SCROLL UNIT ELECTRONIC CONTROLLER

• LOW TEMP -10°F

• 26,100 BTUH SYSTEM CAPACITY

• MOUNTED TIMER

• SIZED FOR 90°F TEMPERATURE AT CONDENSER

• CONNECTIONS - LIQUID: 0.625", SUCTION: 1.375".

• HEATED / INSULATED RECEIVER.

WALK-IN FREEZER CONDENSING UNIT: LOCATED OUTSIDE

• (2) MODEL # E1LAK140B-ME

• 208-230 / 60 / 1-PHASE

• R-454A ELECRIC DEFROST A2L MITIGATION LOW PROFILE

• LogiTemp CONTROLLER

• LOW TEMP -10°F

• 13,900 BTUH EVAPORATOR CAPACITY

• AMPS: 1.8

• DEFROST AMPS: 11.9

WALK-IN FREEZER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT

TRAINING NOTE:

THE SUPPLIER OF THE PROPOSED COOLER / FREEZER COMBINATION UNIT SHALL

PROVIDE STAFF TRAINING FOR OVERALL OPERATION, MONITORING, ALARM

OPERATION, AND ALL RELATED OPERATIONS. AN OWNER TRAINING VIDEO SHALL

BE PROVIDED TO MDOC / ALGER CORRECTIONAL FACILITY.

• (1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:

A. LEFT HAND MANUAL OPERATION, FLUSH SILL.

B. ALUMINUM TRACK.

C. CHROME HARDWARE.

D. CHROM FRONT LOCK & INSIDE EMERGENCY RELEASE.

E. STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).

F. 12" x 14" NON-HEATED WINDOW IN COOLER SLIDING DOOR.

G. LED VAPOR PROOF LIGHT, QTY. 1.

H. 24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH SIDES OF DOOR.

I. PROVIDE SPECIAL SECURITY FASTENINGS.

• (1) MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM.

A. INSTALLED IN DOOR PANEL w/ DIGITAL READOUT-SOUNDS ON RISE OR FALL OF TEMP.

• (1) OPENING FOR SLIDING DOOR INCLUDES:

A. BACKING FOR MOUNTING TRACK.

B. VAPOR PROOF LED LIGHT.

C. NL508 COMBINATION DIGITAL THERMOMETER.

D. SWITCH w/ PILOT LIGHT.

E. SLAM BRACES.

• (1) VINYL STRIP AIR CURTAIN.

• NO SHELVING REQUIRED.

WALK-IN COOLER EQUIPMENT:

• (1) MODEL # MSMC030MC

• 3-HP UNIT

• 208-230 / 60 / 3-PHASE

• R-454C

• OUTDOOR UNIT SCROLL ELECTRONIC CONTROLLER

• MEDIUM TEMP 35°F

• 26,911 BTUH SYSTEM CAPACITY

• MOUNTED TIMER

• SIZED FOR 90°F TEMPERATURE AT CONDENSER

• CONNECTIONS - LIQUID: 0.5", SUCTION: 0.875"

• HEATED / INSULATED RECEIVER

WALK-IN COOLER CONDENSING UNIT: LOCATED OUTSIDE

• (1) MODEL # E1MCK270A-MA

• 115 / 60 / 1-PHASE

• R-454C

• R-454C AIR DEFROST A2L MITIGATION LOW

PROFILE

• LogiTemp CONTROLLER

• MEDIUM TEMP 35°F

• 27,000 BTUH EVAPORATOR CAPACITY

• FAN AMPS: 2.4

WALK-IN COOLER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT

• 26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL

• (INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING)

• 26-GA SMOOTH GALVANIZED (CEILING TOPSIDE, FLOOR BOTTOMSIDE)

• .100 SMOOTH ALUMINUM - INTERIOR FLOOR

• 1" VINYL FLOOR SEALER (1) COOLER (35.0°F)

• 48" HIGH "ALUMINUM DIAMOND TREADPLATE STANDARD WALL PROTECTION"

• w/ COUNTERSUNK HOLES AND SCREWS

WALK-IN COOLER / FREEZER FINISHES:

A102 A1

OVERAL COOLER / FREEZER WIDTH

17' - 6" 4"

0"

DO

OR

6'

- 0

1'

- 0

PR

OP

OS

ED

W

AL

K-

IN

F

RE

EZ

ER

0"

PR

OP

OS

ED

W

AL

K-

IN

C

OO

LE

R

0"

1'

- 4

" C

LO

SU

RE

P

AN

EL

COOLER / FREEZER WIDTH

17' - 6" OVERALL

EXISTING FLOOR

DRAIN TO REMAIN

1' - 4"

3'

- 0

DO

OR

6'

- 0

8" TYP

5'

- 0

5'

- 0

5'

- 0

PROPOSED 2-1/2"Ø x

36" HIGH STEEL PIPE

BOLLARD FILLED w/

CONCRETE, TYP.

C1 A102

INSULATED FREEZER FLOOR

SYSTEM BY FREEZER

MANUFACTURER ON

EXISTING 6" CONC. SLAB

.080 DIAMOND ALUMINUM

w/ SUPER FLOOR SUPPORT

FLOOR FINISH

(BY FREEZER MANUFACTURER).

PROPOSED 5" CONCRETE

SLAB w/ #4's @ 16" O.C. EACH

WAY, ON 3" RIGID INSULATION

ON 15-MIL VAPOR BARRIER

ON EXISTING 6" CONC. SLAB

EPOXY COATED FLOOR

FINISH, UP TO 3/8" THICK

(MAX) BY CONTRACTOR

NOTE:

MAXIMUM ALLOWABLE LIVE LOAD ON

NEW FLOOR SLAB AT COOLER /

FREEZER = 500 PSF.

NOTE:

MAXIMUM ALLOWABLE LIVE LOAD ON

NEW FLOOR SLAB AT COOLER /

FREEZER = 500 PSF.

COORDINATE INSTALLATION OF PROPOSED

RECESSED FLOOR SLAB w/ EXISTING FLOOR

TO REMAIN. PROVIDE NEW QUARRY TILE AS

REQUIRED TO MAINTAIN A SEAMLESS

TRANSITION BETWEEN NEW / EXISTING.

B1 A102

A102

A5

PROPOSED WALK-IN FREEZER

PROPOSED 48" TALL 22-GA

STAINLESS STEEL WALL PROTECTION

PROPOSED WALK-IN COOLER

PROPOSED 6'W x 7'H

SLIDING DOOR @

COOLER

13' - 0"

SLIDING DOOR

6' - 0" 1' - 0"

PROVIDE A THERMAL BREAK BETWEEN THE

COOLER / FREEZER TO PREVENT FROST

ISSUES AT THE INTERIOR WALL BY CUTTING A

JOINT IN THE CONCRETE FLOOR

DOOR OPENS

TO RIGHT

DOOR OPENS

TO LEFT

3' - 0"

5" 6'

- 0

4'

- 0

5"

CLOSURE PANEL

1' - 4" 21' - 0"

SLIDING DOOR

6' - 0"

PROPOSED 48" TALL 22-GA

STAINLESS STEEL WALL

PROTECTION

PROPOSED 48" TALL

22-GA STAINLESS STEEL

WALL PROTECTION

2-1/2"Ø x 36" HIGH STEEL CRASH

BOLLARD (PAINTED YELLOW)

GROUTED SOLID, BOLTED TO

FLOOR, SEE PLAN FOR LOCATIONS

2-1/2"Ø x 36" HIGH STEEL CRASH BOLLARD

(PAINTED YELLOW) GROUTED SOLID, BOLTED

TO FLOOR, SEE PLAN FOR LOCATIONS

C1 A102

2"

5"

PROPOSED 6'W x 7'H SLIDING

DOOR @ FREEZER

5" 3"

M

IN

4"

EX

IS

T'G6"

PROPOSED WALK-IN

COOLER / FREEZER UNIT

SEALANT, TYPICAL

EXISTING CONC.

FLOOR

1" THICK SATURATED

ISOLATION JOINT

15-MIL VAPOR BARRIER

1" THICK

SATURATED

ISOLATION JOINT

EXISTING BUILDING

WALL

EXISTING CONC.

FLOOR

PROPOSED WALK-IN

COOLER / FREEZER UNIT

SEALANT, TYPICAL

EPOXY COATED

FLOOR FINISH,

3/8" THICK (MAX.)

VERIFY

4"

1"

NOTE:

FREEZER FLOOR SUPPLIED BY WALK-IN

FREEZER MANUFACTURER. COORDINATE

INSTALLATION OF COOLER FLOOR WITH

MANUFACTURED FREEZER FLOOR.

#4 BARS @ 16" O.C., EACH WAY

CL

R2"

COOLER / FREEZER FLOOR - GENERAL NOTES:

1. RIGID INSULATION SHALL BE EXTRUDED POLYSTYRENE CONFORMING TO ASTM C578 TYPE IV WITH A MINIMUM COMPRESSIVE RESISTANCE OF 25 PSI AT YIELD OR 10%

DEFORMATION LIMIT, WHICHEVER OCCURS FIRST. A MINIMUM DENSITY OF 1.6 PCF AND A MINIMUM NOMINAL RESISTIVITY (R) OF 5.0 hr-ft2-°F / BTU PER INCH, OR APPROVED.

2. PROVIDE MINIMUM 28-DAY CONCRETE COMPRESSIVE STRENGTH OF 4,000 PSI (f'c = 4,000 PSI). PROVIDE NORMAL WEIGHT CONCRETE WITH 6% (+/-) 1.5% ENTRAINED AIR (NON- TROWEL FINISHED FLOORS), MAXIMUM W/C RATIO <0.50 AND 4" MAXIMUM SLUMP, WITH A MINIMUM OF 520 LB / CYD CEMENT CONTENT FOR A MAXIMUM 1" COARSE AGGREGATE.

3. PROVIDE READY-MIX CONCRETE CONFORMING TO ASTM C-94.

4. CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 117, 301, 305R, 306.1 AND 308.1, LATEST APPLICABLE EDITION.

5. PROVIDE STEEL REINFORCEMENT CONFORMING TO ASTM A615, GRADE 60. PLACE REINFORCEMENT IN ACCORDANCE WITH CRSI MANUAL OF STANDARD PRACTICE. PROVIDE BOLSTERS,CHAIRS, REBAR SUPPORTS, ETC. WITH BASES THAT WILL NOT DAMAGE VAPOR RETARDER.

6. FINISHED CONCRETE SLAB SURFACE SHALL BE LEVEL AND FLAT WITHIN 1/4" MAXIMUM IN ANY DIRECTION WHEN MEASURED WITH A 10' STRAIGHTEDGE. PROVIDE A SMOOTH FLOAT FINISH ON SLAB BELOW FREEZER UNIT. COORDINATE FLOOR FINISH IN COOLER WITH REQUIREMENTS FOR QUARRY TILED FLOOR.

7. CURE CONCRETE WITH A LIQUID MEMBRANE-FORMING CURING COMPOUND FOR 7-DAYS MINIMUM PRIOR TO LOADING SLAB(S). COORDINATE QUARRY TILE INSTALLATION REQUIREMENTS WITH CONCRETE CURING METHODS AND MATERIALS (REMOVAL OF CURING COMPOUND PRIOR TO TILING, ETC.).

8. MONITOR THE TEMPERATURE OF THE CONCRETE SLAB WHEN REDUCING THE TEMPERATURE IN THE COOLER AND FREEZER. REDUCE THE TEMPERATURE OF THE CONCRETE SLAB AT NO MORE THAN 10 OF PER 24-HR PERIOD FROM AMBIENT TEMPERATURE DOWN TO 35 OF. HOLD AT 35 OF FOR 2-5 DAYS. REDUCE TEMPERATURE OF CONCRETE SLAB BELOW FREEZER FROM 35 OF TO FINAL TEMPERATURE AT NO MORE THAT 10 OF PER 24-HR PERIOD.

3" (MIN) RIGID INSULATION,

SEE NOTE 1

15-MIL VAPOR

BARRIER

1"

3/ 8"

M

AX

ALIGN

COOLER UNIT INSULATED

WALL PANEL

PROVIDE SEALANT @ THERMAL BREAK

1/2" ASPHALT SATURATED

ISOLATION JOINT

EX

IS

TI

NG

6"

3/ 8"

5/

8"

CL

R2"

EXISTING 1"Ø DRAIN HOLES,

WHERE OCCURS

EXISTING CONC. FLOOR

THINSET QUARRY

TILE ON CONC. SLAB

#4 BARS @ 16"

O.C., EACH WAY

3" (MIN) RIGID INSULATION, SEE

GENERAL NOTE 1 ON DETAIL C1,

THIS SHEET.

15-MIL VAPOR BARRIER

FREEZER COOLER

FREEZER UNIT INSULATED WALL PANEL

FREEZER FLOOR PROVIDED BY WALK-IN

FREEZER MANUFACTURER

PROPOSED POURED SEAMLESS SEALED

CONCRETE FINISH ON COOLER FLOOR BY

CONTRACTOR, SEE GENERAL NOTES 2 THRU 8

ON DETAIL C1, THIS SHEET FOR MORE INFO.

NOTE:

CONTRACTOR SHALL CLEAN

EXISTING CONC. SUBFLOOR

PRIOR TO WALK-IN FREEZER

FLOOR INSTALLATION, SEE

GENERAL NOTE 6 ON DETAIL

C1, THIS SHEET.

WALK-IN COOLER / FREEZER

17' - 6"

CLOSURE PANEL

4"

MIN

6"

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:0

PM

A102

ENLARGED

COOLER/FREEZER

PLAN & DETAILS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

3/16" = 1'-0"B3 ENLARGED COOLER/FREEZER PLAN

3/8" = 1'-0"A1 ELEV. @ COOLER / FREEZER

O W

N

ER

R

EV

IE

W

/2

4/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

1 1/2" = 1'-0"C1 SECTION @ FREEZER FLOOR

1 1/2" = 1'-0"B1 SECTION @ COOLER-FREEZER WALL

3/8" = 1'-0"A5 SIDE ELEV. @ COOLER / FREEZER

A103A2

A103

A1

EXISTING

2' - 6"

EXISTING

3' - 1"

EX

IS

TI

NG

3'

- 1

0"

EX

IS

TI

NG

4"

1/

2" 6'

- 1

1/ 4"

1/

2" 6'

- 1

1/ 4"

1/

2"

FREEZER

CONDENSING

UNIT

COOLER

CONDENSING

UNIT

PR

OP

OS

ED

4'

- 3

EX

IS

TI

NG

2'

- 4

PR

OP

OS

ED

4'

- 1

1"

EX

IS

TI

NG

2'

- 3 1/

2"

PROVIDE GAP BETWEEN SHED ROOF AND EXISTING

BUILDING WALL FOR CONDENSING UNIT CONDUIT(S)

3" / 1'-0"

STANDING SEAM METAL ROOF ATTACHED

TO TUBE STEEL FRAMING

STANDING SEAM METAL ROOF

ATTACHED TO TUBE STEEL FRAMING

5' - 6"2" GAP (+/-)

A103 C4

7'

- 1

1/

2"

6'

- 7

EX

IS

TI

NG

2'

- 3

1/ 2"

5'

- 6

6" 1'

- 7

1/

2"

EXIST'G

10" 6' - 2 3/4"

EXIST'G

10" 6' - 2 3/4"

EXIST'G

10"

EXISTING 10"Ø

CONCRETE COOKIE

EXISTING 2-1/2" x 2-1/2" SQ.

TUBE STEEL FRAME

PROPOSED EQUIPMENT

MOUNTING BRACKET

PROPOSED FREEZER

CONDENSING UNIT

PROPOSED COOLER

CONDENSING UNIT

WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL POST TO EXISTING FRAME w/

1/8" FILLET WELD ALL AROUND ALL

WELDED STEEL JOINTS

PROPOSED 22GA METAL ROOFING

ATTACHED TO TUBE STEEL w/ HILTI #10

HWH SCREWS @ 6" O.C. (MAX SPACING),

3" PER FOOT SLOPE

PROPOSED 2-1/2" x 2-1/2"

STEEL FRAME

PROPOSED 2-1/2" x 2-1/2" x 3/16"

STEEL FRAME & CROSS BRACING

(SIMILAR TO LOWER FRAME)

2" TO 3"

OVERHANG, TYP.

EXISTING 2-1/2" x 2-1/2" SQ.

TUBE STEEL CROSS BRACING

7'

- 9

1/ 2"

MOUNT EQUIPMENT OVER EXISTING 2-1/2" x 2-1/2" STEEL TUBE.

PROVIDE NEW 2-1/2" x 2-1/2" STEEL TUBE SUPPORT AT OTHER END

(TYPICAL AT ALL EQUIPMENT)

A103A2

EXISTING

2' - 6" 3' - 1"

2-1/2" x 2-1/2" x 3/16" TUBE STEEL

POSTS WELDED TO EXISTING

FRAME

2-1/2" x 2-1/2" x 3/16" TUBE STEEL

PERIMETER FRAME

2" x 2" x 3/16" TUBE STEEL

INTERIOR FRAMING

4"

1/

2" 6'

- 1

1/ 4"

1/

2" 6'

- 1

1/ 4"

1/

2"

1/2" +/- 2' - 5 1/2"

2 1/2" 2' - 8"

2 1/2"

MA

X

" O

.C

2" TO 3"

OVERHANG, TYP.

METAL ROOF PANELS

ATTACHED TO STEEL FRAME

WITH GASKETED FASTENERS

1/8" FILLET WELD ALL AROUND

ALL WELDED STEEL JOINTS

4" x 6" x 1/4" STEEL ANGLE BOLTED TO EXISTING WALL, PROVIDE GAP(S) TO ALLOW FOR CONDENSING UNIT

CONDUIT TO RUN UP EXISTING WALL

WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL BEAM TO STEEL FRAME w/ 1/8"

FILLET WELD ALL AROUND ALL

WELDED STEEL JOINTS

2-1/2" x 2-1/2" x 3/16" STEEL BEAM

2-1/2" x 2-1/2" x 3/16" STEEL FRAMING

22GA STANDING SEAM METAL ROOFING

ATTACHED TO TUBE STEEL w/ HILTI #10 HWH

SCREWS @ 6" O.C. (MAX SPACING)

PROPOSED 5" x 5" x 5/16" STEEL

ANGLE, PERFORATED FOR DRAINAGE

EXISTING WALL

PROPOSED CONDENSING

UNIT CONDUIT(S) BEYOND

VERIFY

2" GAP (+/-)

1/2" HILTI WKIK BOLT

TZ2-SS304 @ 12" O.C.

1/82 - 6

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:0

PM

A103

DETAILS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

3/8" = 1'-0"A5 PLAN @ CONDENSING UNITS

1/2" = 1'-0"A1 ELEV @ CONDENSING UNITS - SIDE

1/2" = 1'-0"A2 ELEV @ CONDENSING UNITS - FRONT

3/8" = 1'-0"C5 ROOF @ CONDENSING UNITS

1 1/2" = 1'-0"C4 ROOF DETAIL @ EXISTING WALL

O W

N

ER

R

EV

IE

W

/0

6/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

REMOVE EXISTING WALK-IN

FREEZER UNIT AND

PREPARE SURFACE FOR

NEW WALK-IN COOLER

REMOVE & REPLACE ANY BROKEN

OR MISSING FLOOR TILE UPON

INSTALLATION OF NEW

COOLER / FREEZER COMBO UNIT.

EXISTING DOOR TO REMAIN.

REMOVE EXISTING COOLER / FREEZER

WALL SHROUD AND PREPARE SURFACE

FOR NEW COOLER / FREEZER

ENCLOSURE.

REMOVE EXISTING

WALK-IN COOLER UNIT

EXISTING FLOOR DRAIN TO REMAIN.

REMOVE EXISTING WALK-IN

COOLER & FREEZER

REMOVE EXISTING CRASH

BOLARDS, PATCH & GRIND

CONCRETE FLOOR SMOOTH

EXISTING FLOOR

DRAIN TO REMAIN

REMOVE EXISTING

FREEZER WALL SHROUD

AND PREPARE SURFACE

FOR NEW COOLER /

FREEZER ENCLOSURE.

REMOVE EXISTING

WALK-IN FREEZER

MAINTAIN EXISTING GAP BETWEEN

EXISTING WASHING MACHINE AND

PROPOSED WALK-IN FREEZER

EXISTING FLOOR

DRAIN TO REMAIN

REMOVE EXISTING PIPING FOR

COOLER CONDENSING UNIT. ROUTE

PROPOSED CONDUIT THROUGH

EXISTING WALL PENETRATION.

EXISTING CHAIN-LINK FENCE

TO REMAIN

REMOVE EXISTING COOLER CONDENSING UNIT

EXISTING CHAIN-LINK FENCE

TO REMAIN

REMOVE EXISTING DISCONNECT SWITCH

REMOVE EXISTING PIPING FOR

FREEZER CONDENSING UNIT. ROUTE

PROPOSED CONDUIT THROUGH

EXISTING WALL PENETRATION.

REMOVE TWO (2) EXISTING

FREEZER CONDENSING UNITS

EXISTING 2-1/2" x 2-1/2" TUBE STEEL

SUPPORT FRAME TO REMAIN. PROVIDE

NEW FRAME ABOVE WITH METAL ROOF,

SLOPED AWAY FROM BUILDING.

REMOVE TWO (2) EXISTING WALK-IN

FREEZER SAFETY SWITCHES. PROVIDE

ONE (1) NEW HEAVY DUTY SAFETY

SWITCH FOR NEW WALK-IN FREEZER.

REMOVE EXISTING WALK-IN

COOLER SAFETY SWITCH.

PROVIDE NEW HEAVY DUTY

SAFETY SWITCH FOR NEW

WALK-IN COOLER.

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:1

PM

A104

PHOTOS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

NO SCALEA4 PHOTO 01

NO SCALEA3 PHOTO 02

12" = 1'-0"A1 PHOTO 03

12" = 1'-0"B4 PHOTO 04

12" = 1'-0"B3 PHOTO 05

12" = 1'-0"B1 PHOTO 06

O W

N

ER

R

EV

IE

W

/0

6/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

PLUMBING PIPING

MECHANICAL PIPING

DUCTWORK

EA24x14

EA24x14

EA24x14

OA24x14

OA24x14

OA24x14

RA24x14

SA24x14

SA24x14

VD

S D

SA24x14

RA24x14

RA24x14

ABBREVIATIONS

WATER HAMMER ARRESTOR

PIPING "T"

HUMIDIFIER

PIPING 90

STRAINER

MECHANICAL\PLUMBING ABBREVIATIONS, SYMBOLS AND NOTES

SYMBOL LEGEND

CAP

NOTES

REDUCED PRESSURE PRINCIPLE

BACK

FLOW PREVENTER

INLINE PUMP

BALANCE VALVE

PRESSURE RELIEF VALVE

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE

GLOBE VALVE

GATE VALVE

CHECK VALVE

CIRCUIT SETTER

BUTTERFLY VALVE

BALL VALVE

EXHAUST AIR DUCT DOWN

EXHAUST AIR DUCT UP

RETURN AIR DUCT DOWN

RETURN AIR DUCT UP

SUPPLY AIR DUCT DOWN

SUPPLY AIR DUCT UP

PRESSURE SENSOR

HUMIDITY SENSOR

TEMPERATURE SENSOR

AIR FLOW

HUMIDISTAT - 48" A.F.F.

THERMOSTAT - 48" A.F.F.

DUCT SMOKE DETECTOR

MOTORIZED DAMPER

COMBINATION FIRE/SMOKE DAMPER

SMOKE DAMPER

FIRE DAMPER (RATING DETERMINED BY WALL TYPE)

VOLUME CONTROL DAMPER

SQUARE TO ROUND TRANSITION

RETURN OR EXHAUST REGISTER

SUPPLY REGISTER

RELIEF AIR HOOD - ROOF

FRESH AIR INTAKE HOOD - ROOF

EXHAUST FAN - ROOF

RETURN OR EXHAUST AIR GRILLE

LINEAR DIFFUSER

SUPPLY AIR DIFFUSER PIPE BREAK

PIPE DOWN

PIPE UP

CLEAN OUT

GAS METER

UNION

HOSE BIBB

FLOW DETECTOR / SWITCH

VALVE WITH TAMPER SWITCH

ELECTRIC BELL

SIDEWALL SPRINKLER HEAD

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

SIAMESE CONNECTION

BARE FIN TUBE ELEMENT

FIN TUBE ELEMENT WITH COVER

EXTERNALLY INSULATED DUCTWORK

INTERNALLY LINED DUCTWORK

SUPPLY AIR DUCT - EXISTING

SUPPLY AIR DUCT - DEMO

SUPPLY AIR DUCT - NEW

RETURN AIR DUCT - EXISTING

RETURN AIR DUCT - DEMO

RETURN AIR DUCT - NEW

OUTSIDE AIR DUCT - EXISTING

OUTSIDE AIR DUCT - DEMO

OUTSIDE AIR DUCT - NEW

EXHAUST AIR DUCT - EXISTING

EXHAUST AIR DUCT - DEMO

EXHAUST AIR DUCT - NEW

GAS VALVE OR PLUG VALVE

METER

CONNECTION TO EXISTING

AAV AIR ADMITANCE VALVE

ACCU AIR COOLED CONDENSING UNIT

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AI ANALOG INPUT

AO ANALOG OUTPUT

APD AIR PRESSURE DROP

AS AIR SEPERATOR

B BOILER

BB BASEBOARD

BC BOOSTER COIL

BDD BACKDRAFT DAMPER

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BHP BRAKE HORSE POWER

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BT BATH TUB

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

C CONVECTOR

CA COMPRESSED AIR

CB CATCH BASIN

CC COOLING COIL

CCF 100 CUBIC FEET

CD CEILING DIFFUSER

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFP CLEAN OUT FERRULE AND PLUG

CH CHILLER

CI CAST IRON

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEAN OUT

CO CARBON MONOXIDE

COND CONDENSATE

CO2 CARBON DIOXIDE

CT COOLING TOWER

CU CONDENSING UNIT

CU FT CUBIC FOOT

CUH CABINET UNIT HEATER

CW COLD WATER

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DIFFUSER

DB DRY BULB

DEG F DEGREE FAHRENHEIT

DF DRINKING FOUNTAIN

DI DIGITAL INPUT

DIA DIAMETER

DN DOWN

DO DIGITAL OUTPUT

DWV DRAIN, WASTE AND VENT

EA EACH

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EG EXHAUST AIR GRILLE

ELEV ELEVATION

ER EXHAUST AIR REGISTER

EUH ELECTRIC UNIT HEATER

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

EXH EXHAUST

F FURNACE

FAI FRESH AIR INTAKE

FBO FURNISHED BY OTHERS

FC FAN COIL

FD FLOOR DRAIN

FD FIRE DAMPER

FIN FIN TUBE RADIATION

FLG FLANGE

FP FIRE PROTECTION

FPM FEET PER MINUTE

FT FOOT OR FEET

F&T FLOAT AND THERMOSTATIC TRAP

G GAS (NATURAL)

GAL GALLON

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GT GREASE TRAP

H HYDROGEN

HB HOSE BIBB

HC HEATING COIL

HCO HORIZONTAL CLEANOUT

HP HORSE POWER

HTR HEATER

HVAC HEATING, VENTILATING & AIR COND

HW HOT WATER

HWC HOT WATER RECIRCULATING

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

IE INVERT ELEVATION

IF INLINE FAN

IN INCH OR INCHES

IP IRON PIPE

INV INVERT

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

JC JANITOR'S CLOSET

JS JANITOR'S SINK

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LBS POUNDS

LHWR LOW TEMPERATURE HOT WATER RETURN

LHWS LOW TEMPERATURE HOT WATER SUPPLY

LIQ LIQUID (REFRIGERATION)

LV LOUVER

LP PROPANE GAS (LIQUID)

LWT LEAVING WATER TEMPERATURE

M METER

MAU MAKE-UP AIR HANDLING UNIT

MAX MAXIMUM

MB MOP BASIN

MBH BRITISH THERMAL UNITS (1000)

MBTUH BRITISH THERMAL UNITS (1000)

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MD MOTORIZED DAMPER

MECH MECHANICAL

MIN MINIMUM

MOCP MAXIMUM OVER CURRENT PROTECTION

OA OUTDOOR AIR

OAI OUTDOOR AIR INTAKE

OC ON CENTER

OD OVERFLOW DRAIN

ODP OPEN DRIP PROOF

OXY OXYGEN

P PUMP

PC PLUMBING CONTRACTOR

PD PNEUMATIC OPERATED DAMPER

PIV POST INDICATING VALVE

PRV PRESSURE REDUCING VALVE

PT PRESSURE TEMPERATURE PLUG

PTAC PACKAGED TERMINAL AIR COND. UNIT

PVAC PROCESS VACUUM

S SINK

SA SUPPLY AIR

SAD SUPPLY AIR DIFFUSER

SAF SUPPLY AIR FAN

SAN SANITARY SEWER

SD SMOKE DETECTOR

SG SUPPLY AIR GRILLE

SH SHOWER HEAD

SHC STEAM HEATING COIL

SR SUPPLY REGISTER

SS STAINLESS STEEL

ST STORM

STM STEAM

SUCT SUCTION (REFRIGERATION)

TCC TEMPERATURE CONTROL CONTRACTOR

TCD TEMPERATURE CONTROL DAMPER

TCP TEMPERATURE CONTROL PANEL

TD TRANSFER DUCT

TG TRANSFER AIR GRILLE

TOG TOP OF GRILLE

TT THERMOSTATIC TRAP

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UV UNIT VENTILATOR

V VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME BOX

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

VS VENT STACK (SANITARY)

VTR VENT THRU ROOF (SANITARY)

VUV VERTICAL UNIT VENTILATOR

W WASTE

WB WET BULB

WC WATER CLOSET

W/O WITHOUT

WH WATER HEATER

WSHP WATER SOURCE HEAT PUMP

NOTE:

NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE USED IN THIS

SET OF DOCUMENTS.

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NIC NOT INCLUDED OR NOT IN CONTRACT

NIT NITROGEN

NO NORMALLY OPEN

KW KILOWATT

R REGISTER

RA RETURN AIR

RD ROOF DRAIN

RET RETURN

RF RETURN FAN

RG RETURN AIR GRILLE

RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER

RR RETURN REGISTER

RTU ROOF TOP UNIT

MECHANCIAL/PLUMBING GENERAL NOTES

M

M

P

H

T

H

T

M

F S

S

F

1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE EVERY OFFSET, VALVE, FITTING ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING ALL DUCTWORK AND PIPING AT

NO ADDITIONAL COST.

2. CONTRACTOR SHALL SECURE AND PAY FOR ANY AND ALL PERMITS AND INSPECTION FEES APPLICABLE TO

THE WORK, AND PAY FOR ALL STATE AND FEDERAL TAXES IMPOSED.

3. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENT SUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TO ALL OWNER FURNISHED EQUIPMENT.

4. CONTRACTORS SHALL COORDINATE WITH ALL OTHER TRADES FOR INSTALLATION OF ALL MATERIALS AND EQUIPMENT. CONTRACTORS SHALL FIELD VERIFY ANY EXISTING CONDITIONS. PREPARE COORDINATION DRAWINGS AT A MINIMUM OF 1/2"=1'-0" SCALE WHERE ACCURATE COORDINATION IS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR PROJECT COORDINATION WITH OTHER TRADES AND SUPERVISION OF THEIR OWN SUB-

CONTRACTORS.

5. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR PROPER DRAINAGE. COORDINATE WITH THE OTHER TRADES TO AVOID CONFLICT. THE ORDER OF PRIORITY FOR ALL PIPING, DUCTWORK AND CONDUITS SHALL BE INSTALLED AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.

A. PLUMBING DRAIN LINES

B. CONDENSATE LINES

C. DUCTWORK

D. FIRE PROTECTION

E. HOT AND COLD WATER PIPING

F. ELECTRICAL CONDUIT

6. EACH CONTRACTOR SHALL PERFORM ALL FORMING, CUTTING AND PATCHING NECESSARY FOR

INSTALLATION OF THEIR WORK. CONTRACTORS SHALL REPAIR/PATCH ALL AREAS DISTURBED DURING INSTALLATION TO MATCH SURROUNDING AREAS. MAINTAIN ALL FIRE RATED ASSEMBLY CONSTRUCTION WHEN APPLICABLE.

CUTTING AND PATCHING NECESSARY TO EXPOSE DEFECTIVE WORK FOR REPAIR WILL BE DONE AT THE

CONTRACTORS EXPENSE.

7. CONTRACTORS ARE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING TILES AND CEILING GRID

"T" BARS IN ASSOCIATION WITH THEIR WORK.

8. PROVIDE ALL ROOF AND SIDE WALL MOUNTED EQUIPMENT SUPPORTS, CURBS, PENETRATIONS, FLASHING AND SEALING, MAKE OPENINGS WEATHER TIGHT. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE

ALL EQUIPMENT BUILDING OPENINGS WITH THE GENERAL CONTRACTOR.

9. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND STANDARDS. IF NON- CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTATION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE

CONTRACTORS FINANCIAL RESPONSIBILITY.

10. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR SERVICE INSTALLATION WITH, AND THE OWNER SHALL PAY ALL SERVICE FEES AND CHARGES, INCLUDING METERS, REQUIRED BY UTILITY COMPANIES FOR NEW GAS, WATER, AND SEWER SERVICES. CONTRACTOR SHALL SECURE AND PAY FOR ANY AND ALL PERMITS AND INSPECTION FEES.

11. INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2015 MICHIGAN MECHANICAL CODE, 2015 PLUMBING CODE, MICHIGAN PART 8 & 2014 NATIONAL ELECTRICAL CODES, OR LATEST ADOPTED EDITION, ALL LOCAL CODES

AND AUTHORITIES HAVING JURISDICTION.

12. REFER TO ARCHITECTURAL SHEETS FOR FLOOR PLANS AND SECTIONS AS REQUIRED TO DETERMINE

ROUTING REQUIREMENTS AND POTENTIAL CONFLICTS.

13. MANUFACTURERS MODEL NUMBERS LISTED ON DRAWINGS ARE BASIS FOR DESIGN. CONTRACTOR MAY SUBMIT AN "APPROVED EQUAL" FOR REVIEW BY THE ARCHITECT/ENGINEER. DESIGNATION OF AN "APPROVED

EQUAL" IS OF THE ENGINEER'S DISCRETION.

14. IF EQUIPMENT OTHER THAN AS SPECIFIED IN THESE BID DOCUMENTS IS PROVIDED, THE CONTRACTOR FURNISHING THE EQUIPMENT IS RESPONSIBLE FOR THE COORDINATION AND IMPACT OF ANY REDESIGN AND INSTALLATION COSTS, INCLUDING BUT NOT LIMITED TO: STRUCTURE, FOUNDATIONS, ENVIRONMENTAL, UTILITIES, PIPING, DUCTWORK, WIRING, DEVICES, ETC.. REDESIGN SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER, ARCHITECT & ENGINEER.

15. MATERIALS, VALVES, EQUIPMENT AND FIXTURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS. CONNECTIONS TO FIXTURES, DEVICES AND EQUIPMENT SHALL BE VERIFIED

WITH MANUFACTURER'S CERTIFIED DRAWINGS.

16. FINAL LOCATION OF ALL CEILING DIFFUSERS, REGISTERS, GRILLES, LIGHT FIXTURES, SPRINKLER HEADS, DEVICES, ETC. SHALL BE INSTALLED PER REFLECTED CEILING PLAN AND LOCATED CONSISTENT WITH CEILING AS

INSTALLED.

17. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.

18. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE, JOINTS, OR

CONNECTED EQUIPMENT.

19. PROVIDE ALL VALVING FOR THE PROPER SECTIONALIZING, ZONING AND OPERATION OF PIPING SYSTEMS.

PROVIDE ACCESS PANELS AS REQUIRED FOR ACCESS TO VALVES.

20. ALL INSULATION AND JACKETS SHALL HAVE 25 OR LESS FLAME SPREAD, 50 OR LESS SMOKE DEVELOPED

RATING.

21. PENETRATIONS OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE-RESISTANCE RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. PROVIDE FIRE STOPPING WHERE PIPING OR DUCTWORK PENETRATE THE RATED ASSEMBLIES. REFER TO ARCHITECTURAL PLANS

FOR LOCATION OF FIRE/SMOKE RATED ASSEMBLIES.

22. PROVIDE PIPE TAPE MARKERS AND EQUIPMENT TAGS, WHITE ON BLACK, CONFORMING TO ANSI AND ASME A13.1 STANDARDS. MINIMUM INFORMATION FOR EQUIPMENT SHALL BE EQUIPMENT NAME AND NUMBER SCREWED OR RIVETED WHENEVER POSSIBLE. MINIMUM IDENTITY OF PIPING CONVEYING GAS OR FLUID WITH FLOW DIRECTION ARROWS AROUND ENTIRE DIAMETER COVERING BOTH ENDS OF PIPE LABEL. INTERVAL OF LABEL SPACING SHALL NOT EXCEED 25 FEET. LABELS ARE NOT REQUIRED FOR GUESTROOM TOILET EXHAUST FANS, PTAC UNITS, WALL

HEATERS AND SIMILAR UNITS IN PUBLIC SPACES.

23. SUBMIT FOR REVIEW CERTIFIED EQUIPMENT AND FIXTURE DRAWINGS AND/OR SUBMITTALS TO THE ARCHITECT/ENGINEER FOR APPROVAL OF MAJOR EQUIPMENT SUCH AS PLUMBING FIXTURES, AIR HANDLING UNITS, GRILLES AND REGISTERS, FANS, WATER HEATERS, CONTROLS, ETC.. ARCHITECT/ENGINEER REVIEW OF SHOP DRAWINGS, PRODUCT DATA OR SAMPLES DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH

REQUIREMENTS OF THE CONTRACT DOCUMENTS.

24. PROVIDE OPERATION AND MAINTENANCE MANUAL PRIOR TO PROJECT COMPLETION. THE MANUAL SHALL CONSIST OF, AT A MINIMUM; REVIEWED EQUIPMENT DRAWINGS AND/OR SUBMITTALS WITH COLOR SAMPLES (IF APPLICABLE), AND OPERATING & MAINTENANCE MANUALS. THE MANUAL SHALL ALSO CONTAIN INSPECTION AND TESTING REPORTS, COPY OF OWNERS TRAINING ATTENDANCE SHEET, M.S.D.S. INFORMATION FOR MATERIALS LEFT ON THE PROJECT LOCATION, AS-BUILT DRAWINGS MARKED IN RED, CONTROLS DIAGRAMS, PREVENTIVE MAINTENANCE CHECKLIST, PARTS LISTS AND PRODUCT WARRANTY INFORMATION. PROVIDE EMERGENCY CONTACT LIST FOR ALL CONTRACTORS AND THEIR SUBCONTRACTORS WITH A BRIEF DESCRIPTION OF THE DISCIPLINE OF RESPONSIBILITY. INCLUDE IN EACH MANUAL CONTRACTORS GUARANTEES OF MATERIAL AND WORKMANSHIP A MINIMUM OF ONE YEAR, AND EQUIPMENT WARRANTIES BEGINNING FROM DATE OF OWNER ACCEPTANCE.

25. AT PROJECT COMPLETION AND PRIOR TO FINAL OWNER ACCEPTANCE PROVIDE OWNER INSTRUCTION FOR

ALL EQUIPMENT AND SYSTEMS OPERATION AND MAINTENANCE.

26. GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER OWNER ACCEPTANCE

OF THE ENTIRE PROJECT.

CEILING RADIATION DAMPERC

STM

STM

CDS

CDR

CHWS

CHWR

CDS

CDR

CHWR

CHWS

AIRST

G

G

AIR

HWR

HWR

HWS

HWS

FP

FP

C

C

ST

V

V

SAN

HWC

SAN

HW

CW

HWC

CW

HW

STM

CDR

CDS

CHWR

CHWS

HWR

HWS

G

AIR

FP

C

ST

CW

V

SAN

HWC

HW

HYDRONIC HOT WATER SUPPLY - NEW

HYDRONIC HOT WATER SUPPLY - EXISTING

HYDRONIC HOT WATER SUPPLY - DEMO

HYDRONIC HOT WATER RETURN - NEW

HYDRONIC HOT WATER RETURN - EXISTING

HYDRONIC HOT WATER RETURN - DEMO

COMPRESSED AIR - NEW

COMPRESSED AIR - EXISTING

COMPRESSED AIR - DEMO

GAS - NEW

GAS - EXISTING

GAS - DEMO

DOMESTIC COLD WATER - EXISTING

DOMESTIC COLD WATER - DEMO

DOMESTIC COLD WATER - NEW

DOMESTIC HOT WATER - EXISTING

DOMESTIC HOT WATER - DEMO

DOMESTIC HOT WATER - NEW

DOMESTIC HOT WATER RECIRC - EXISTING

DOMESTIC HOT WATER RECIRC DEMO

DOMESTIC HOT WATER RECIRC - NEW

SANITARY ABOVE GROUND - EXISTING

SANITARY UNDER GROUND - EXISTING

SANITARY- DEMO

VENT - EXISTING

VENT - DEMO

VENT- NEW

STORM - EXISTING

STORM - DEMO

STORM - NEW

CONDENSATE - EXISTING

CONDENSATE - DEMO

CONDENSATE - NEW

FIRE PROTECTION - EXISTING

FIRE PROTECTION - DEMO

FIRE PROTECTION - NEW

CONDENSOR WATER SUPPLY

CONDENSOR WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSOR WATER SUPPLY - DEMO

CONDENSOR WATER SUPPLY - EXIST

CONDENSOR WATER RETURN - DEMO

CONDENSOR WATER RETURN - EXIST

CHILLED WATER SUPPLY - DEMO

CHILLED WATER SUPPLY - EXIST

CHILLED WATER RETURN - DEMO

CHILLED WATER RETURN - EXIST

STEAM - NEW

STEAM - EXISTING

STEAM - DEMO

SAN

SAN SANITARY ABOVE GROUND - NEW

SANITARY UNDER GROUND - NEW

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:1

PM

MP001

MECHANICAL &

PLUMBING

ABBREVIATIONS,

SYMBOLS, &

NOTES

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

O

W N

ER

R

EV

IE

W

/2 4/

O W

N

ER

R

EV

IE

W

/0

6/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

GENERATOR

SUBSTATION

STORAGE

LOCKSMITH

STAFF

LOCKER

RM

FOREMAN

SUPERVISOR

SECURE

MAINTENANCE

CRIB

VEHICLE

MAINTENANCE

MAINTENANCE

SHOP

MAINTENANCE

DETERGENT

ROOM

WAREHOUSE

RESIDENT

STORES

OFFICERS

CLOTHING

OFFICE

STAFF

TOILET

INMATE

TOILET

JANITOR'S

CLOSET

VESTIBULE

PROPOSED

WALK-IN

FREEZER

PROPOSED

WALK-IN

COOLER

(FUTURE)

OPEN

OFFICE

PANEL "RP-B"

PANEL "PDP-502"

A102

A5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:1

PM

MP100

OVERALL

MECHANICAL

PLAN

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

NORTH

1/8" = 1'-0"1 OVERALL MECHANICAL FLOOR PLAN - WAREHOUSE BLDG 500

O W

N

ER

R

EV

IE

W

/0

6/

0% O

W N

ER

R

EV

IE

W

/2 7/

LA

R

A R

EV

IE

W

/2 7/

BI

D

D

IN

G

/2 0/

PROPOSED MECHANICAL KEYNOTES -

INDOOR WALK-IN COOLER WITH REMOTE PRE-CHARGED CONDENSING UNITS (LOCATED

OUTSIDE), INSTALLED BY REFRIGERANT CONTRACTOR. CONTRACTOR SHALL

COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT SUPPLIER. PROVIDE

REFRIGERANT LINES TO REMOTE CONDENSERS AND INSTALL ALL ITEMS INCLUDED.

INDOOR WALK-IN FREEZER WITH REMOTE PRE-CHARGED CONDENSING UNITS (LOCATED

OUTSIDE), INSTALLED BY REFRIGERANT CONTRACTOR. CONTRACTOR SHALL

COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT SUPPLIER. PROVIDE

REFRIGERANT LINES TO REMOTE CONDENSERS AND INSTALL ALL ITEMS INCLUDED.

REMOTE PRE-CHARGED STEEL FRAME MOUNTED CONDENSING UNIT FOR COOLER,

INSTALLED BY REFRIGERANT CONTRACTOR. DO NOT OBSTRUCT AIRFLOW OF

EQUIPMENT.

REMOTE PRE-CHARGED STEEL FRAME MOUNTED CONDENSING UNIT FOR FREEZER,

INSTALLED BY REFRIGERANT CONTRACTOR. DO NOT OBSTRUCT AIRFLOW OF

EQUIPMENT.

5 PROPOSED 1" CONDENSATE DRAIN PIPING FROM COOLER / FREEZER.

6 EXISTING 1" CONDENSATE ROUTED TO EXISTING SANITARY PIPING.

7 EXISTING FLOOR DRAIN TO REMAIN.

ROUTE PROPOSED CONDUIT / PIPING THROUGH EXISTING WALL AT EXISTING WALL

PENETRATIONS. INSULATE ALL VOIDS, ALL PENETRATIONS SHALL BE PATCHED AND

SEALED WATERTIGHT.

DEMOLITION MECHANICAL KEYNOTES -

1 REMOVE EXISTING COOLER CONDENSING UNIT, PIPING, CONTROLS, WIRING, AND ALL

APPURTENANCES.

2 REMOVE EXISTING FREEZER CONDENSING UNIT, PIPING, CONTROLS, WIRING, AND ALL

APPURTENANCES.

3 REMOVE EXISTING EVAPORATION COIL AND WALK-IN COOLER.

4 REMOVE EXISTING EVAPORTATION COIL AND WALK-IN FREEZER.

5 REMOVE EXISTING CONDENSATE PIPING FROM FORMER WALK-IN FREEZER.

6 EXISTING 1" CONDENSATE ROUTED TO EXISTING SANITARY PIPING TO REMAIN.

PROPOSED

WALK-IN

COOLER

PROPOSED

WALK-IN

FREEZER

(FUTURE)

OPEN

OFFICE

1" COND.

1" COND.

B1 A102

B1 A102

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:1

PM

MP101

MECHANICAL &

PLUMBING PLANS

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

NORTHNORTH

CONTRACTOR'S NOTE:

1. CONTRACTOR SHALL RECOGNIZE AND DISPOSE OF

REFRIGERANTS AND ALL ASSOCIATED EQUIPMENT

ACCORDING TO THE REGULATIONS OF SECTION 608 OF THE

CLEAN AIR ACT (CAA) SET FORTH BY THE EPA.

2. CONTRACTOR SHALL FOLLOW ALL CERTIFICATION

REQUIREMENTS FOR INDIVIDUALS REMOVING

REFRIGERANT FROM EQUIPMENT IS BEING PREPPED FOR

DISPOSAL.

3. CONTRACTOR SHALL OBTAIN A CHAIN OF CUSTODY

DISPOSAL MANIFEST FOR DTMB DOCUMENTATION OF

PROPER DISPOSAL.

1/4" = 1'-0"A4 PROPOSED MECHANICAL PLAN

1/4" = 1'-0"A2 DEMOLITION MECHANICAL PLAN

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

PROPOSED MECHANICAL KEYNOTES -

1 INSTALL DRAIN PER MANUFACTURER'S RECOMMENDATIONS.

2 INSTALL 1" CONDENSATE LINES FROM EVAPORATOR UNITS TO EXISTING FIRST FLOOR INDIRECT HUB DRAIN.

3 PROPOSED EVAPORATOR UNIT IN NEW COOLER.

4 PROPOSED EVAPORATOR UNIT IN NEW FREEZER.

5 PROVIDE DRY SPRINKLER PENDANT AT COOLER / FREEZER. PROVIDE BOOT, INSULATION, & SEALANT AROUND PIPE AT WALL

PENETRATION. TIE INTO WET PIPE FIRE SUPPRESSION SYSTEM.

6 EXTEND EXISTING WET PIPE FIRE SUPPRESSION PIPING & PROVIDE NEW SPRINKLER HEADS AT FUTURE OFFICE AREA

(FUTURE OFFICE AREA NOT IN SCOPE OF WORK).

7 EXISTING WET PIPE FIRE SUPPRESSION SYSTEM TO REMAIN.

PROPOSED

WALK-IN

COOLER

(FUTURE)

OPEN

OFFICE

PROPOSED

WALK-IN

FREEZER

6 6

6 6

B1 A102

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

PR

OJ

EC

T

NO

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

AT

E:

1 2 3 4 5

FI

LE

N O.

: 4

/25

6.J

BB

P:

\M

-0

D

TM

B- Al ge r C

F C oo le r- Fr ee ze r a nd

R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M

-0

_A lg er

C F

C oo le r-

Fr ee ze r_

R

.rv t

3/

/2

2:

:1

PM

MP102

MECHANICAL &

PLUMBING RCP

CO

OL

ER

/ F

RE

EZ

ER

R

EP

LA

CE

ME

NT

MD

OC

/ A

LG

ER

C

OR

RE

CT

IO

NA

L

FA

CI

LI

TY

IN

DU

ST

RI

AL

P

AR

K

DR

IV

E, W

ET

MO

RE

, M

I 4

M

-0

R M

A

SC

P

SC

P

R M

A

CO

O

LE

R

FR

EE

ZE

R R

EP

LA

C

EM

EN

T

M D

O C

/ A

LG

ER

C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

1/4" = 1'-0"A4 MECHANICAL PROPOSED RCP

NORTH

O W

N

ER

R

EV

IE

W

/2

4/

O

W N

ER

R

EV

IE

W

/0 6/

0%

O W

N

ER

R

EV

IE

W

/2

7/

LA

R A

R

EV

IE

W

/2

7/

BI

D D

IN

G

/2

0/

PIPING INSULATION SCHEDULE

SYSTEM TYPE

PLUMBING

DOMESTIC HOT WATER SUPPLY AND RECIRCULATION

DOMESTIC COLD WATER

COOLING

CONDENSATE PIPING FROM COOLING COILS

TYPE PIPE SIZE

P-5

1-1/4" AND SMALLER

INSULATION THICKNESS

1/2"

P-5

1-1/4" AND SMALLER 1"

P-5 ALL SIZES 1/2"

1-1/2" AND LARGER 1-1/2"

1-1/2" AND LARGER 1"

REFRIGERANT SUCTION P-5 ALL SIZES 1/2"

PIPING INSULATION TYPES

TYPE

P-5

DESCRIPTION

ASTM C534, TYPE I, FLEXIBLE, CLOSED CELL ELASTOMERIC INSULATION, TUBULAR, OPERATING TEMPERATURE RANGE:

MINUS 70 TO 180 DEG F.

MSMD030MC CONDENSING UNIT SCHEDULE (COOLER)

GENERAL

REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL

R-448A / R-449A 208-230 / 60 / 3 SCROLL ZS21KAE-TF5

HP AWEF LISTINGS

3 5.61 UL / CUL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)

-30

-20

-10

25,324

27,826

30,467

33,250

36,092

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)

-30

-20

-10

23,298

25,600

28,030

30,590

36,092

DIMENSIONAL DATA

L

OVERALL (TO NEAREST INCH)

WT (lbs)W H BASE SIZE BASE / HOOD

30 25031 26 M3 031M

INSTALLATION

REFRIGERANT

R-448A / R-449A 7/815.2 1/2 37,134

RECEIVER TANK (lbs) 90% / 90°F

CONNECTIONS

LIQUID SUCTION

ESTIMATED TOTAL

HEAT REJECTION (BTUH)

ELECTRICAL

MCA

MOP

COMP VOLTS

208-230

COMP PHASE

COMP HZ

COMP RLA

13.7

COMP LRA

OTHER LOAD

DATA

FAN PHASE FAN HZ FAN FLA FAN HP

FAN

QUANTITY

MAX EVAP

FAN AMPS

MAX EVAP DEF

HEATER AMPS

1 60 1.6 1 / 4 1 12 25.0

VOLTS 208-230

PHASE 1

AMPS 0.5

MSLA100ME CONDENSING UNIT SCHEDULE (FREEZER)

GENERAL

REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL

R-454A 460 / 60 / 3 SCROLL YF26KAE-TFD

HP AWEF LISTINGS

01 3.15 UL / CUL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)

-30

27,802

-20

35,420

-10

44,436

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)

-30

23,910

-20

31,524

-10

39,548

DIMENSIONAL DATA

L

OVERALL (TO NEAREST INCH)

WT (lbs)W H BASE SIZE BASE / HOOD

64 54044 40 M6 062M

INSTALLATION

REFRIGERANT

R-454A 1 5/846.0 7/8 59,116

RECEIVER TANK (lbs) 90% / 90°F

CONNECTIONS

LIQUID SUCTION

ESTIMATED TOTAL

HEAT REJECTION (BTUH)

ELECTRICAL

MCA

34.7

MOP

COMP VOLTS

COMP PHASE

COMP HZ

COMP RLA

17.9

COMP LRA

OTHER LOAD

DATA

FAN PHASE FAN HZ FAN FLA FAN HP

FAN

QUANTITY

MAX EVAP

FAN AMPS

MAX EVAP DEF

HEATER AMPS

1 60 2.9 1 / 3 2 6 15.0

VOLTS 460

PHASE 1

AMPS 0.5

E1MCK270A-MA EVAPORATOR UNIT SCHEDULE (COOLER)

GENERAL

REFRIGERANT VOLTAGE EVAPORATOR MODEL DEFROST SCHEME

R-454C 115 / 60 / 1 KLP427MA-S1E AIR

CONTROLLER LISTINGS

LogiTemp™ UL / CUL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)

-30

-20

-10

27,000

27,433

27,865

28,733

DIMENSIONAL DATA

L

OVERALL (INCHES)

WT (lbs)W H SUCTION

78.25 13516.5 17.25 1 1/8

ELECTRICAL

EVAPORATOR ELECTRICAL DATA EXPANSION VALVE

FAN

QUANTITY

FAN

AMPS

DEFROST AMPS

3 PHASE

4 4.0 N/A N/A

INSTALLATION

REFRIGERANT

TYPE

R-448A / R-449A

CONNECTIONS

LIQUID

1/2

DISTRIBUTOR NOZZLE / ORIFICE

1 PHASE

TXV / EEV

MODEL #

19-14658 SER-6

PART # TYPE

PART #

AWEF

E1LAK160B-ME EVAPORATOR UNIT SCHEDULE (FREEZER)

GENERAL

BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)

-30

14,900

-20

16,200

-10

16,808

DIMENSIONAL DATA

L

OVERALL (INCHES)

WT (lbs)W H SUCTION

62.25 11516.5 17.25 1 1/8

ELECTRICAL

EVAPORATOR ELECTRICAL DATA EXPANSION VALVE

FAN

QUANTITY

FAN

AMPS

DEFROST AMPS

3 PHASE

3 1.8 11.9 N/A

INSTALLATION

REFRIGERANT

TYPE

R-454A

CONNECTIONS

LIQUID

3/8

D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .