472-25256.JBB Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- RFQ 171 260000000218 4
- Issued by
- Alger County, Westland City, Michigan
About this file
This file consists of construction drawings and project specifications for the Michigan Department of Corrections (MDOC) Alger Correctional Facility, prepared by U.P. Engineers & Architects, Inc. The project scope involves the removal and replacement of an existing walk-in cooler/freezer combination unit with separate cooler and freezer units equipped with remote refrigeration condensing at the facility located in Wetmore, Michigan. The proposed work includes installation of a 20-foot by 17.5-foot by 10-foot walk-in cooler (561 square feet) and a 30-foot by 17.5-foot by 10-foot walk-in freezer (561 square feet), both featuring new LED lighting, digital thermometer and alarm systems, vinyl strip air curtains, and heated sliding doors with security fastenings. The project also requires removal of existing refrigeration equipment, condensate piping, controls, and ceiling-mounted evaporator units, along with preparation of floor surfaces including salvage of existing quarry tile. Construction is classified as Building Use Group S-1 (moderate-hazard storage), Construction Type II-B (unprotected, non-combustible), with automatic sprinkler fire protection throughout. The drawings indicate a bidding date of March 20, 2026, with design review stages completed at 50%, 90%, and 100% owner review phases between December 2025 and February 2026.
The project specifications require coordination with the MDOC facility for salvage of existing shelving and racking, compliance with EPA refrigerant disposal regulations under Section 608 of the Clean Air Act, and retention of existing floor drains tied to the building drainage system. The proposed cooler condensing unit is a 3-horsepower scroll unit operating on R-454C refrigerant at 35 degrees Fahrenheit with 26,911 BTU system capacity, while the freezer unit is a 7.5-horsepower scroll unit on R-454A refrigerant at minus 10 degrees Fahrenheit with 26,100 BTU capacity. Both units include insulated receiver tanks, electronic controllers, and mounted timers sized for 90-degree Fahrenheit ambient temperature at the condenser. The cooler floor requires a new 5-inch concrete slab with rigid insulation on an existing 6-inch concrete sub-floor, while the freezer floor is recessed and supplied by the manufacturer with an insulated floor system. The project requires a certified technician to handle refrigerant recovery and disposal with manifest documentation provided to the owner and architect, and mandates staff training on system operation and monitoring provided by the equipment supplier.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ZONING: INDUSTRIAL
BUILDING CODE REVIEW
2021 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS
2021 MICHIGAN BUILDING CODE & MICHIGAN BARRIER FREE
2021 MICHIGAN MECHANICAL CODE
2021 MICHIGAN PLUMBING CODE
2021 MICHIGAN ENERGY CODE
2023 NATIONAL ELECTRICAL CODE
2023 MICHIGAN ELECTRICAL CODE, PART 8
USE GROUP:
WAREHOUSE BLDG. 500 = S-1, MODERATE-HAZARD STORAGE
CONSTRUCTION TYPE: II-B, UNPROTECTED, NON-COMBUSTIBLE
SQUARE FOOTAGE OF NEW CONSTRUCTION: N/A (REPLACE EXISTING EQUIPMENT)
COOLER: 561 SQ. FT.
FREEZER: 561 SQ. FT.
FIRE PROTECTION:
AUTOMATIC SPRINKLER SYSTEM THROUGHOUT,
FIRE ALARM ACTIVATED BY SPRINKLER
TOTAL ALLOWABLE AREA: 70,000 ALLOWABLE
PROJECT DESCRIPTION:
REMOVE AND REPLACE EXISTING WALK-IN COOLER / FREEZER COMBINATION
AND PROVIDE SEPARATE COOLER AND SEPARATE FREEZER WITH REMOTE
REFRIGERATION CONDENSING. PROVIDE NEW LED LIGHTING IN COOLER &
FREEZER. MAINTAIN EXISTING FLOOR DRAINS. PROVIDE NEW QUARRY TILE AS
NEEDED.
FILE NO.: 472/25256.JBB
ACCOUNTING TEMPLATES:
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
33 G5
30 65
17 139
55 52
32 180
14 12
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GREEN BAY
GWINN
HERMANSVILLE
MENOMINEE
IRON MOUNTAIN
VULCAN
CASPIAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA
SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEYHOUGHTON
CHASSELL
HANCOCK
DELAWARE
LAKE
LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITY
ALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORTNORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
IRON RIVERBRULE
WASHBURN
POPLAR
ASHLAND
PORT WING BAYFIELD
ODARRAH
MELLEN
UPSON
HURLEY
GLIDDEN
PARK FALLS
CLAM LAKE
MERCER
PRESQUE
ISLE
LAND O'LAKES
EAGLE
RIVER
PHELPS
FLORENCE
NIAGRA
CRANDON
SUPERIOR
HAYWARD
MINONG
CABLE
SHELL LAKE
GRANTSBURG
BALSAM
LAKE BARRON
MENOMONIE
DURAND
ALMA
WHITEHALL
BLACK
RIVER
FALLS
SPARTA
LA CROSSE
FRIENDSHIP
MONTELLO
WAUTOMA
GREEN
LAKE
FOND DU LAC
OSHKOSH
APPLETON
DE PERE
GREEN BAY
KEWAUNEE
STURGEON BAY
MARINETTE
OCONTO
SHAWANO
KESHENA
WAUSAU
STEVENS
POINT
WAUPACA
RHINELANDERPHILIPS
MEDFORD
MERRILL
ANTIGO
EAU CLARE
LADYSMITH
THREE
LAKES
MICHIGAN
WISCONSIN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
100 PORTAGE STREET
HOUGHTON, MI 49931
P (906) 482-4810 F (906) 482-9799
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
U.P. ENGINEERS &
ARCHITECTS, INC.
2906 N. STEPHENSON AVE, SUITE 2
IRON MOUNTAIN, MI 49801
P (906) 779-0937 F (906) 779-0947
424 S. PINE ST.
ISHPEMING, MI 49849
P (906) 485-1011 F (906) 485-1013
1701 DUNLAP AVE., SUITE 8
MARINETTE, WI 54143
P (715) 732-4188 F (715) 732-4189
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
P (906) 635-0511 F (906) 635-0612
PR
OJ
EC
T
NO
w w w .u pe a.
co m
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
IS
SU
ED
F
O R
D
AT
E:
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:0
PM
COOLER / FREEZER REPLACEMENT
MDOC / ALGER CORRECTIONAL FACILITY
INDUSTRIAL PARK DRIVE, WETMORE, MI 49895
G001
COVER SHEET
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
PROJECT LOCATION
PROJECT VICINITY MAP
FILE NO. MDOC 472/25256.JBB
SHEET INDEX
NUMBER SHEET NAME
G001 COVER SHEET
A100 DEMOLITION FLOOR PLAN
A101 OVERALL PROPOSED FLOOR PLAN
A102 ENLARGED COOLER/FREEZER PLAN & DETAILS
A103 DETAILS
A104 PHOTOS
MP001 MECHANICAL & PLUMBING ABBREVIATIONS, SYMBOLS, & NOTES
MP100 OVERALL MECHANICAL PLAN
MP101 MECHANICAL & PLUMBING PLANS
MP102 MECHANICAL & PLUMBING RCP
MP501 MECHANICAL AND PLUMBING SCHEDULES & DETAILS
E001 ELECTRICAL SPECIFICATIONS
E002 ELECTRICAL ABBREVIATIONS
E100 OVERALL ELECTRICAL PLAN
E101 ELECTRICAL POWER PLANS
E102 ELECTRICAL LIGHTING PLANS
O W
NE
R
RE
VI
EW
/2 4/
O W
NE
R
RE
VI
EW
/0 6/
0%
O W
NE
R
RE
VI
EW
/2 7/
LA
RA
R
EV
IE
W
/2
7/
BI
DD
IN
G
/2 0/
03/20/2026
EMERGENCY
GENERATOR
SUBSTATION
STORAGE
LOCKSMITH
STAFF
LOCKER
RM
FOREMAN
SUPERVISOR
SECURE
MAINTENANCE
CRIB
VEHICLE
MAINTENANCE
MAINTENANCE
DETERGENT
ROOM
WAREHOUSE
RESIDENT
STORES
OFFICERS
CLOTHING
OFFICE
STAFF
TOILET
INMATE
TOILET
JANITOR'S
CLOSET
VESTIBULE
EX. FREEZER
EX. FREEZER
EX. COOLER
6 6
1'
- 4
VE
RI
FY
W
AL
K-
IN
F
RE
EZ
ER
6"
17' - 6"
DEMOLITION FLOOR PLAN KEYNOTES -
1 REMOVE EXISTING COOLER / FREEZER UNITS AND ALL APPRUTENANCES. PREPARE FLOOR SURFACE FOR NEW WALK-IN COOLER AND FREEZER UNIT. SALVAGE ANY LOOSE FLOOR TILE DURING DEMOLITION FOR RE-USE.
2 EXISTING FLOOR DRAIN TO REMAIN.
3 REMOVE EXISTING COOLER / FREEZER WALL SHROUD AND PREPARE SURFACE FOR NEW COOLER / FREEZER
ENCLOSURE.
4 REMOVE EXISTING CEILING MOUNTED COOLER / FREEZER EVAPORATOR UNITS.
5 REMOVE EXISTING LIGHT FIXTURES IN COOLER / FREEZER.
GENERAL DEMOLITION NOTES
1. PER SECTION 608 OF THE CLEAN AIR ACT (CAA), THE ENVIRONMENTAL
PROTECTION AGENCY (EPA) HAS ESTABLISHED REGULATIONS THAT ARE
RELEVANT TO THE DISPOSAL OF REFRIGERATION AND A/C EQUIPMENT.
2. THE CONTRACTOR SHALL PROVIDE CERTIFIED TECHNICIAN(S) THAT DISPOSE OF
EQUIPMENT THAT COULD RELEASE OZONE DEPLETING REFRIGERANTS INTO
THE ATMOSPHERE.
3. THE CONTRACTOR SHALL RECOVER AND SEND REFRIGERANT TO AN EPA-
CERTIFIED RECLAIMER AND SHALL PROVIDE THE OWNER & ARCHITECT WITH A
MANIFEST FOR DISPOSAL OF REFRIGERATION EQUIPMENT THAT ARE
DISMANTLED ON-SITE.
4. THE CONTRACTOR SHALL SALVAGE ALL EXISTING FLOOR TILE THAT IS IN GOOD
CONDITION FOR RE-USE. COORDINATE SALVAGE WITH MDOC.
5. THE CONTRACTOR SHALL COORDINATE WITH MDOC FOR THE REMOVAL AND
SALVAGE OF EXISTING SHELVING AND RACKING IN THE EXISTING WALK-IN
COOLER / FREEZER.
6 REMOVE EXISTING DRY SPRINKLER PENDANTS IN COOLER AND FREEZER.
7 EXISTING DOOR SHALL BE TEMPORARILY CLOSED WHILE THE TEMPORARY DUST BARRIER IS IN PLACE.
9 REMOVE AND DISPOSE OF EXISTING FREEZER COMPRESSOR, PIPING, CONTROLS, AND ALL APPURTENANCES.
8 REMOVE AND DISPOSE OF EXISTING REFRIGERATION COMPRESSOR, PIPING, CONTROLS, AND ALL
APPURTENANCES.
10 REMOVE AND DISPOSE OF EXISTING COOLER "SOL" & "FAN" SWITCHES (LOCATED ON TOP OF THE EXISTING
COOLER/FREEZER UNITS.
11 COORDINATE SALVAGE OF EXISTING SHELVING WITH MDOC.
DASHED LINE INDICATES EXTENT OF TEMPORARY ENCLOSED STRUCTURE FOR DUST CONTROL BY PROVIDING A ZIPWALL DUST BARRIER, OR APPROVED EQUAL. ONCE THE TEMPORARY DUST BARRIER IS INSTALLED, IT SHALL
REMAIN INTACT AND WORK SHALL BE CONTINUOUS FROM DEMOLITION THROUGH INSTALLATION.
REMOVE AND SALVAGE EXISTING FLOOR TILE FOR REUSE. REMOVE EXISTING FREEZER SUB-FLOOR, INSULATION, VAPOR BARRIER, AND SAND BED FOUND UNDER EXISTING COOLER / FREEZER. PREPARE SURFACE FOR NEW WALK-IN FREEZER WITH FLOOR. REFER TO PROPOSED PLANS FOR NEW WALK-IN FREEZER SIZE.
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:0
PM
A100
DEMOLITION
FLOOR PLAN
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
1/8" = 1'-0"A1 OVERALL DEMOLITION FLOOR PLAN - WAREHOUSE BLDG 500
NORTH
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
GENERATOR
SUBSTATION
STORAGE
LOCKSMITH
STAFF
LOCKER
RM
FOREMAN
SUPERVISOR
SECURE
MAINTENANCE
CRIB
VEHICLE
MAINTENANCE
MAINTENANCE
SHOP
MAINTENANCE
DETERGENT
ROOM
WAREHOUSE
RESIDENT
STORES
OFFICERS
CLOTHING
OFFICE
STAFF
TOILET
INMATE
TOILET
JANITOR'S
CLOSET
VESTIBULE
PROPOSED
WALK-IN
FREEZER
PROPOSED
WALK-IN
COOLER
(FUTURE)
OPEN
OFFICE
HATCHED AREA INDICATES
NOT IN SCOPE OF WORK
A103 A5
5'
- 0
6'
- 0
5'
- 0
1'
- 0
6'
- 0
5'
- 0
6'
- 0
EX
IS
TI
NG
F
LO
OR
T
O
RE
MA
IN
6" (S
EE
K
EY
NO
TE
0" (S
EE
K
EY
NO
TE
0"
(SEE KEYNOTE #12)
17' - 10 1/2"
FL
OO
R
BY
C
ON
TR
AC
TO
R
FL
OO
R
BY
F
RE
EZ
ER
M
AN
UF
AC
TU
RE
R
CO
NT
RA
CT
OR
FL
OO
R
BY
PROPOSED FLOOR PLAN KEYNOTES -
1 PROPOSED WALK-IN COOLER (20' - 0" LONG x 17' - 6" WIDE x 10' - 0" HIGH):
2 PROPOSED WALK-IN FREEZER (30' - 0" LONG x 17' - 6" WIDE x 10' - 0" HIGH):
3 EXISTING COOLER / FREEZER FLOOR DRAIN TIED INTO EXISTING BUILDING DRAIN SYSTEM TO REMAIN.
4 PROVIDE NEW CLOSURE PANELS AT SIDES OF COOLER / FREEZER.
5 EXISTING QUARRY TILE FLOOR FINISH TO REMAIN. PLACE SALVAGED TILE AS NEEDED. CLEAN FLOORS AFTER COOLER / FREEZER
INSTALLATION.
6 PROPOSED CEILING MOUNTED EVAPORATOR UNIT (COOLER), FOR R448A / R449A HERMETIC CONDENSING UNITS, 13,600 BTU @
SUCTION TEMP +25°F, 10°F T.D., (2) FANS, 115V / 60 / 1-PH.
• 20' - 0"L x 17' - 6"W x 10' - 0"H WALK-IN COOLER (FLOORLESS - INSTALL ON EXISTING QUARRY TILE FLOOR).
• 26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL - INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING.
• 26-GA SMOOTH GALVANIZED - CEILING TOPSIDE, FLOOR BOTTOMSIDE.
• 1" VINYL FLOOR SEALER [COOLER].
• 72" x 84" MANUAL SINGLE SLIDING WALK-IN COOLER DOOR (SLIDE LEFT TO OPEN).
• ROUTE (INSULATED) CONDENSATE LINES DIRECTLY FROM COOLER / FREEZER EVAPORATORS THROUGH CEILING OR WALL DOWN TO
EXISTING CONDENSATE DRAIN & PROVIDE AIR GAP AS REQUIRED.
• MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM (INSTALLED IN COOLER DOOR PANEL).
• LED VAPOR PROOF ALL TEMPERATURE INTEGRATED LIGHT FIXTURES [COOLER & FREEZER].
• DIGITAL THERMOMETER [COOLER & FREEZER].
• VINYL STRIP CURTAIN [COOLER].
7 PROPOSED CEILING MOUNTED LOW TEMP EVAPORATOR COIL (FREEZER), FOR R-448A / R449A HERMETIC CONDENSING UNITS, 7600 BTU @ SUCTION TEMP -20°F, 10°F T.D., 90°F AMBIENT, (2) FANS, ELECTRIC DEFROST, 208-230V / 60 / 1-PH.
8 PLACE SALVAGED TILE AND PROVIDE NEW MATCHING QUARRY TILE AS NEEDED AT PERIMETER OF COOLER / FREEZER (AS REQ'D), MATCH EXISTING COLOR.
• 30' - 0"L x 17' - 6"W x 10' - 0"H WALK-IN FREEZER (w/ INSULATED FLOOR).
• 26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL - INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING.
• 26-GA SMOOTH GALVANIZED - CEILING TOPSIDE, FLOOR BOTTOMSIDE.
• .100 SMOOTH ALUMINUM - INTERIOR FLOOR [FREEZER].
• 66" x 84" MANUAL SINGLE SLIDING FREEZER DOOR (SLIDE RIGHT TO OPEN).
• ROUTE (INSULATED) CONDENSATE LINES DIRECTLY FROM COOLER / FREEZER EVAPORATORS THROUGH CEILING OR WALL DOWN TO
EXISTING CONDENSATE DRAIN & PROVIDE AIR GAP AS REQUIRED.
• MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM (INSTALLED IN COOLER DOOR PANEL).
• LED VAPOR PROOF ALL TEMPERATURE INTEGRATED LIGHT FIXTURES [COOLER & FREEZER].
• DIGITAL THERMOMETER [COOLER & FREEZER].
• VINYL STRIP CURTAIN [COOLER].
9 CLEAN EXISTING FLOOR AND WALLS AT AREA WHERE EXISTING WALK-IN COOLER WAS REMOVED. PROVIDE TOUCH-UP PAINT AS REQUIRED. REPLACE ANY BROKEN FLOOR TILES WITH NEW TILE (COLOR TO MATCH EXISTING).
DASHED LINE INDICATES EXTENT OF TEMPORARY ENCLOSED STRUCTURE FOR DUST CONTROL BY PROVIDING A ZIPWALL DUST BARRIER, OR APPROVED EQUAL. ONCE THE TEMPORARY DUST BARRIER IS INSTALLED, IT SHALL REMAIN INTACT AND WORK SHALL
BE CONTINUOUS FROM DEMOLITION THROUGH INSTALLATION.
11 PROPOSED POURED SEAMLESS SEALED CONCRETE FINISH ON PROPOSED 5" CONC. FLOOR WITH 3" RIGID INSULATION ON EXISTING 6" CONC. SUB-FLOOR. COORDINATE INSTALLATION OF (FLOORLESS) WALK-IN COOLER WITH MANUFACTURER.
PROPOSED RECESSED WALK-IN FREEZER FLOOR (BY MANUFACTURER) ON EXISTING 6" CONCRETE SUB-FLOOR. COORDINATE INSTALLATION OF INSULATED FREEZER FLOOR SYSTEM WITH FREEZER MANUFACTURER. CONTRACTOR SHALL CLEAN EXISTING CONC. SUBFLOOR PRIOR TO WALK-IN FREEZER FLOOR INSTALLATION, REFER TO DETAILS B1 & C1 ON SHEET A102.
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:0
PM
A101
OVERALL
PROPOSED
FLOOR PLAN
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
KP
S
/R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
1/8" = 1'-0"A3 PROPOSED FLOOR PLAN - WAREHOUSE BLDG 500
NORTH
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
PROPOSED
WALK-IN
FREEZER
PROPOSED
WALK-IN
COOLER
• (1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:
A. RIGHT HAND MANUAL OPERATION, FLUSH SILL.
B. ALUMINUM TRACK.
C. CHROME HARDWARE.
D. CHROME FRONT LOCK & INSIDE EMERGENCY RELEASE.
E. STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).
F. HEAT IN FOUR (4) SIDES OF DOOR & THREE (3) SIDES OF FRAME.
G. 12" x 14" HEATED WINDOW IN FREEZER SLIDING DOOR.
H. HEATER WIRE.
I. LED VAPOR PROOF LIGHT, QTY. 2.
J. 24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH
SIDES OF DOOR.
K. HEATED AIR VENT (STANDARD).
L. NL508 COMBINATION DIGITAL THERMOMETER & SWITCH w/ PILOT LIGHT.
M. PROVIDE SPECIAL SECURITY FASTENINGS.
N. COUNTERSUNK SCREWS FOR KICKPLATES.
• (1) OPENING FOR SLIDING DOOR INCLUDES:
A. BACKING FOR MOUNTING TRACK.
B. VAPOR PROOF LED LIGHT.
C. NL508 COMBINATION DIGITAL THERMOMETER.
D. SWITCH w/ PILOT LIGHT.
E. SLAM BRACES.
• (1) 12" x 14" HEATED VIEWPORT FREEZER.
• (495) SQ. FT. OF 3/4" CDS PLYWOOD SUBFLOOR & TUBULAR SUPPORTS FOR FREEZER.
• (1) VINYL STRIP AIR CURTAIN.
• NO SHELVING REQUIRED.
WALK-IN FREEZER EQUIPMENT:
• (1) MODEL # MSLA075MC
• 7.5-HP UNIT
• 208-230 / 60 / 3-PHASE
• R-454A
• OUTDOOR SCROLL UNIT ELECTRONIC CONTROLLER
• LOW TEMP -10°F
• 26,100 BTUH SYSTEM CAPACITY
• MOUNTED TIMER
• SIZED FOR 90°F TEMPERATURE AT CONDENSER
• CONNECTIONS - LIQUID: 0.625", SUCTION: 1.375".
• HEATED / INSULATED RECEIVER.
WALK-IN FREEZER CONDENSING UNIT: LOCATED OUTSIDE
• (2) MODEL # E1LAK140B-ME
• 208-230 / 60 / 1-PHASE
• R-454A ELECRIC DEFROST A2L MITIGATION LOW PROFILE
• LogiTemp CONTROLLER
• LOW TEMP -10°F
• 13,900 BTUH EVAPORATOR CAPACITY
• AMPS: 1.8
• DEFROST AMPS: 11.9
WALK-IN FREEZER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT
TRAINING NOTE:
THE SUPPLIER OF THE PROPOSED COOLER / FREEZER COMBINATION UNIT SHALL
PROVIDE STAFF TRAINING FOR OVERALL OPERATION, MONITORING, ALARM
OPERATION, AND ALL RELATED OPERATIONS. AN OWNER TRAINING VIDEO SHALL
BE PROVIDED TO MDOC / ALGER CORRECTIONAL FACILITY.
• (1) JAMISON MARK IV HORIZONTAL 6' x 7' SINGLE SLIDING DOOR:
A. LEFT HAND MANUAL OPERATION, FLUSH SILL.
B. ALUMINUM TRACK.
C. CHROME HARDWARE.
D. CHROM FRONT LOCK & INSIDE EMERGENCY RELEASE.
E. STANDARD STAINLESS STEEL CASING w/ INSIDE TRIM (NO JAMBS).
F. 12" x 14" NON-HEATED WINDOW IN COOLER SLIDING DOOR.
G. LED VAPOR PROOF LIGHT, QTY. 1.
H. 24" HIGH STANDARD ALUMINUM DIAMOND TREAD KICKPLATE ON BOTH SIDES OF DOOR.
I. PROVIDE SPECIAL SECURITY FASTENINGS.
• (1) MODULARM 75LC HIGH / LOW DIGITAL ALARM AND LIGHT MANAGEMENT SYSTEM.
A. INSTALLED IN DOOR PANEL w/ DIGITAL READOUT-SOUNDS ON RISE OR FALL OF TEMP.
• (1) OPENING FOR SLIDING DOOR INCLUDES:
A. BACKING FOR MOUNTING TRACK.
B. VAPOR PROOF LED LIGHT.
C. NL508 COMBINATION DIGITAL THERMOMETER.
D. SWITCH w/ PILOT LIGHT.
E. SLAM BRACES.
• (1) VINYL STRIP AIR CURTAIN.
• NO SHELVING REQUIRED.
WALK-IN COOLER EQUIPMENT:
• (1) MODEL # MSMC030MC
• 3-HP UNIT
• 208-230 / 60 / 3-PHASE
• R-454C
• OUTDOOR UNIT SCROLL ELECTRONIC CONTROLLER
• MEDIUM TEMP 35°F
• 26,911 BTUH SYSTEM CAPACITY
• MOUNTED TIMER
• SIZED FOR 90°F TEMPERATURE AT CONDENSER
• CONNECTIONS - LIQUID: 0.5", SUCTION: 0.875"
• HEATED / INSULATED RECEIVER
WALK-IN COOLER CONDENSING UNIT: LOCATED OUTSIDE
• (1) MODEL # E1MCK270A-MA
• 115 / 60 / 1-PHASE
• R-454C
• R-454C AIR DEFROST A2L MITIGATION LOW
PROFILE
• LogiTemp CONTROLLER
• MEDIUM TEMP 35°F
• 27,000 BTUH EVAPORATOR CAPACITY
• FAN AMPS: 2.4
WALK-IN COOLER EVAPORATOR UNIT: LOCATED ON TOP OF UNIT
• 26-GA CORROSION RESISTANT STUCCO EMBOSSED COATED STEEL
• (INTERIOR WALL, EXTERIOR WALL, INTERIOR CEILING)
• 26-GA SMOOTH GALVANIZED (CEILING TOPSIDE, FLOOR BOTTOMSIDE)
• .100 SMOOTH ALUMINUM - INTERIOR FLOOR
• 1" VINYL FLOOR SEALER (1) COOLER (35.0°F)
• 48" HIGH "ALUMINUM DIAMOND TREADPLATE STANDARD WALL PROTECTION"
• w/ COUNTERSUNK HOLES AND SCREWS
WALK-IN COOLER / FREEZER FINISHES:
A102 A1
OVERAL COOLER / FREEZER WIDTH
17' - 6" 4"
0"
DO
OR
6'
- 0
1'
- 0
PR
OP
OS
ED
W
AL
K-
IN
F
RE
EZ
ER
0"
PR
OP
OS
ED
W
AL
K-
IN
C
OO
LE
R
0"
1'
- 4
" C
LO
SU
RE
P
AN
EL
COOLER / FREEZER WIDTH
17' - 6" OVERALL
EXISTING FLOOR
DRAIN TO REMAIN
1' - 4"
3'
- 0
DO
OR
6'
- 0
8" TYP
5'
- 0
5'
- 0
5'
- 0
PROPOSED 2-1/2"Ø x
36" HIGH STEEL PIPE
BOLLARD FILLED w/
CONCRETE, TYP.
C1 A102
INSULATED FREEZER FLOOR
SYSTEM BY FREEZER
MANUFACTURER ON
EXISTING 6" CONC. SLAB
.080 DIAMOND ALUMINUM
w/ SUPER FLOOR SUPPORT
FLOOR FINISH
(BY FREEZER MANUFACTURER).
PROPOSED 5" CONCRETE
SLAB w/ #4's @ 16" O.C. EACH
WAY, ON 3" RIGID INSULATION
ON 15-MIL VAPOR BARRIER
ON EXISTING 6" CONC. SLAB
EPOXY COATED FLOOR
FINISH, UP TO 3/8" THICK
(MAX) BY CONTRACTOR
NOTE:
MAXIMUM ALLOWABLE LIVE LOAD ON
NEW FLOOR SLAB AT COOLER /
FREEZER = 500 PSF.
NOTE:
MAXIMUM ALLOWABLE LIVE LOAD ON
NEW FLOOR SLAB AT COOLER /
FREEZER = 500 PSF.
COORDINATE INSTALLATION OF PROPOSED
RECESSED FLOOR SLAB w/ EXISTING FLOOR
TO REMAIN. PROVIDE NEW QUARRY TILE AS
REQUIRED TO MAINTAIN A SEAMLESS
TRANSITION BETWEEN NEW / EXISTING.
B1 A102
A102
A5
PROPOSED WALK-IN FREEZER
PROPOSED 48" TALL 22-GA
STAINLESS STEEL WALL PROTECTION
PROPOSED WALK-IN COOLER
PROPOSED 6'W x 7'H
SLIDING DOOR @
COOLER
13' - 0"
SLIDING DOOR
6' - 0" 1' - 0"
PROVIDE A THERMAL BREAK BETWEEN THE
COOLER / FREEZER TO PREVENT FROST
ISSUES AT THE INTERIOR WALL BY CUTTING A
JOINT IN THE CONCRETE FLOOR
DOOR OPENS
TO RIGHT
DOOR OPENS
TO LEFT
3' - 0"
5" 6'
- 0
4'
- 0
5"
CLOSURE PANEL
1' - 4" 21' - 0"
SLIDING DOOR
6' - 0"
PROPOSED 48" TALL 22-GA
STAINLESS STEEL WALL
PROTECTION
PROPOSED 48" TALL
22-GA STAINLESS STEEL
WALL PROTECTION
2-1/2"Ø x 36" HIGH STEEL CRASH
BOLLARD (PAINTED YELLOW)
GROUTED SOLID, BOLTED TO
FLOOR, SEE PLAN FOR LOCATIONS
2-1/2"Ø x 36" HIGH STEEL CRASH BOLLARD
(PAINTED YELLOW) GROUTED SOLID, BOLTED
TO FLOOR, SEE PLAN FOR LOCATIONS
C1 A102
2"
5"
PROPOSED 6'W x 7'H SLIDING
DOOR @ FREEZER
5" 3"
M
IN
4"
EX
IS
T'G6"
PROPOSED WALK-IN
COOLER / FREEZER UNIT
SEALANT, TYPICAL
EXISTING CONC.
FLOOR
1" THICK SATURATED
ISOLATION JOINT
15-MIL VAPOR BARRIER
1" THICK
SATURATED
ISOLATION JOINT
EXISTING BUILDING
WALL
EXISTING CONC.
FLOOR
PROPOSED WALK-IN
COOLER / FREEZER UNIT
SEALANT, TYPICAL
EPOXY COATED
FLOOR FINISH,
3/8" THICK (MAX.)
VERIFY
4"
1"
NOTE:
FREEZER FLOOR SUPPLIED BY WALK-IN
FREEZER MANUFACTURER. COORDINATE
INSTALLATION OF COOLER FLOOR WITH
MANUFACTURED FREEZER FLOOR.
#4 BARS @ 16" O.C., EACH WAY
CL
R2"
COOLER / FREEZER FLOOR - GENERAL NOTES:
1. RIGID INSULATION SHALL BE EXTRUDED POLYSTYRENE CONFORMING TO ASTM C578 TYPE IV WITH A MINIMUM COMPRESSIVE RESISTANCE OF 25 PSI AT YIELD OR 10%
DEFORMATION LIMIT, WHICHEVER OCCURS FIRST. A MINIMUM DENSITY OF 1.6 PCF AND A MINIMUM NOMINAL RESISTIVITY (R) OF 5.0 hr-ft2-°F / BTU PER INCH, OR APPROVED.
2. PROVIDE MINIMUM 28-DAY CONCRETE COMPRESSIVE STRENGTH OF 4,000 PSI (f'c = 4,000 PSI). PROVIDE NORMAL WEIGHT CONCRETE WITH 6% (+/-) 1.5% ENTRAINED AIR (NON- TROWEL FINISHED FLOORS), MAXIMUM W/C RATIO <0.50 AND 4" MAXIMUM SLUMP, WITH A MINIMUM OF 520 LB / CYD CEMENT CONTENT FOR A MAXIMUM 1" COARSE AGGREGATE.
3. PROVIDE READY-MIX CONCRETE CONFORMING TO ASTM C-94.
4. CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 117, 301, 305R, 306.1 AND 308.1, LATEST APPLICABLE EDITION.
5. PROVIDE STEEL REINFORCEMENT CONFORMING TO ASTM A615, GRADE 60. PLACE REINFORCEMENT IN ACCORDANCE WITH CRSI MANUAL OF STANDARD PRACTICE. PROVIDE BOLSTERS,CHAIRS, REBAR SUPPORTS, ETC. WITH BASES THAT WILL NOT DAMAGE VAPOR RETARDER.
6. FINISHED CONCRETE SLAB SURFACE SHALL BE LEVEL AND FLAT WITHIN 1/4" MAXIMUM IN ANY DIRECTION WHEN MEASURED WITH A 10' STRAIGHTEDGE. PROVIDE A SMOOTH FLOAT FINISH ON SLAB BELOW FREEZER UNIT. COORDINATE FLOOR FINISH IN COOLER WITH REQUIREMENTS FOR QUARRY TILED FLOOR.
7. CURE CONCRETE WITH A LIQUID MEMBRANE-FORMING CURING COMPOUND FOR 7-DAYS MINIMUM PRIOR TO LOADING SLAB(S). COORDINATE QUARRY TILE INSTALLATION REQUIREMENTS WITH CONCRETE CURING METHODS AND MATERIALS (REMOVAL OF CURING COMPOUND PRIOR TO TILING, ETC.).
8. MONITOR THE TEMPERATURE OF THE CONCRETE SLAB WHEN REDUCING THE TEMPERATURE IN THE COOLER AND FREEZER. REDUCE THE TEMPERATURE OF THE CONCRETE SLAB AT NO MORE THAN 10 OF PER 24-HR PERIOD FROM AMBIENT TEMPERATURE DOWN TO 35 OF. HOLD AT 35 OF FOR 2-5 DAYS. REDUCE TEMPERATURE OF CONCRETE SLAB BELOW FREEZER FROM 35 OF TO FINAL TEMPERATURE AT NO MORE THAT 10 OF PER 24-HR PERIOD.
3" (MIN) RIGID INSULATION,
SEE NOTE 1
15-MIL VAPOR
BARRIER
1"
3/ 8"
M
AX
ALIGN
COOLER UNIT INSULATED
WALL PANEL
PROVIDE SEALANT @ THERMAL BREAK
1/2" ASPHALT SATURATED
ISOLATION JOINT
EX
IS
TI
NG
6"
3/ 8"
5/
8"
CL
R2"
EXISTING 1"Ø DRAIN HOLES,
WHERE OCCURS
EXISTING CONC. FLOOR
THINSET QUARRY
TILE ON CONC. SLAB
#4 BARS @ 16"
O.C., EACH WAY
3" (MIN) RIGID INSULATION, SEE
GENERAL NOTE 1 ON DETAIL C1,
THIS SHEET.
15-MIL VAPOR BARRIER
FREEZER COOLER
FREEZER UNIT INSULATED WALL PANEL
FREEZER FLOOR PROVIDED BY WALK-IN
FREEZER MANUFACTURER
PROPOSED POURED SEAMLESS SEALED
CONCRETE FINISH ON COOLER FLOOR BY
CONTRACTOR, SEE GENERAL NOTES 2 THRU 8
ON DETAIL C1, THIS SHEET FOR MORE INFO.
NOTE:
CONTRACTOR SHALL CLEAN
EXISTING CONC. SUBFLOOR
PRIOR TO WALK-IN FREEZER
FLOOR INSTALLATION, SEE
GENERAL NOTE 6 ON DETAIL
C1, THIS SHEET.
WALK-IN COOLER / FREEZER
17' - 6"
CLOSURE PANEL
4"
MIN
6"
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:0
PM
A102
ENLARGED
COOLER/FREEZER
PLAN & DETAILS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
3/16" = 1'-0"B3 ENLARGED COOLER/FREEZER PLAN
3/8" = 1'-0"A1 ELEV. @ COOLER / FREEZER
O W
N
ER
R
EV
IE
W
/2
4/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
1 1/2" = 1'-0"C1 SECTION @ FREEZER FLOOR
1 1/2" = 1'-0"B1 SECTION @ COOLER-FREEZER WALL
3/8" = 1'-0"A5 SIDE ELEV. @ COOLER / FREEZER
A103A2
A103
A1
EXISTING
2' - 6"
EXISTING
3' - 1"
EX
IS
TI
NG
3'
- 1
0"
EX
IS
TI
NG
4"
1/
2" 6'
- 1
1/ 4"
1/
2" 6'
- 1
1/ 4"
1/
2"
FREEZER
CONDENSING
UNIT
COOLER
CONDENSING
UNIT
PR
OP
OS
ED
4'
- 3
EX
IS
TI
NG
2'
- 4
PR
OP
OS
ED
4'
- 1
1"
EX
IS
TI
NG
2'
- 3 1/
2"
PROVIDE GAP BETWEEN SHED ROOF AND EXISTING
BUILDING WALL FOR CONDENSING UNIT CONDUIT(S)
3" / 1'-0"
STANDING SEAM METAL ROOF ATTACHED
TO TUBE STEEL FRAMING
STANDING SEAM METAL ROOF
ATTACHED TO TUBE STEEL FRAMING
5' - 6"2" GAP (+/-)
A103 C4
7'
- 1
1/
2"
6'
- 7
EX
IS
TI
NG
2'
- 3
1/ 2"
5'
- 6
6" 1'
- 7
1/
2"
EXIST'G
10" 6' - 2 3/4"
EXIST'G
10" 6' - 2 3/4"
EXIST'G
10"
EXISTING 10"Ø
CONCRETE COOKIE
EXISTING 2-1/2" x 2-1/2" SQ.
TUBE STEEL FRAME
PROPOSED EQUIPMENT
MOUNTING BRACKET
PROPOSED FREEZER
CONDENSING UNIT
PROPOSED COOLER
CONDENSING UNIT
WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL POST TO EXISTING FRAME w/
1/8" FILLET WELD ALL AROUND ALL
WELDED STEEL JOINTS
PROPOSED 22GA METAL ROOFING
ATTACHED TO TUBE STEEL w/ HILTI #10
HWH SCREWS @ 6" O.C. (MAX SPACING),
3" PER FOOT SLOPE
PROPOSED 2-1/2" x 2-1/2"
STEEL FRAME
PROPOSED 2-1/2" x 2-1/2" x 3/16"
STEEL FRAME & CROSS BRACING
(SIMILAR TO LOWER FRAME)
2" TO 3"
OVERHANG, TYP.
EXISTING 2-1/2" x 2-1/2" SQ.
TUBE STEEL CROSS BRACING
7'
- 9
1/ 2"
MOUNT EQUIPMENT OVER EXISTING 2-1/2" x 2-1/2" STEEL TUBE.
PROVIDE NEW 2-1/2" x 2-1/2" STEEL TUBE SUPPORT AT OTHER END
(TYPICAL AT ALL EQUIPMENT)
A103A2
EXISTING
2' - 6" 3' - 1"
2-1/2" x 2-1/2" x 3/16" TUBE STEEL
POSTS WELDED TO EXISTING
FRAME
2-1/2" x 2-1/2" x 3/16" TUBE STEEL
PERIMETER FRAME
2" x 2" x 3/16" TUBE STEEL
INTERIOR FRAMING
4"
1/
2" 6'
- 1
1/ 4"
1/
2" 6'
- 1
1/ 4"
1/
2"
1/2" +/- 2' - 5 1/2"
2 1/2" 2' - 8"
2 1/2"
MA
X
" O
.C
2" TO 3"
OVERHANG, TYP.
METAL ROOF PANELS
ATTACHED TO STEEL FRAME
WITH GASKETED FASTENERS
1/8" FILLET WELD ALL AROUND
ALL WELDED STEEL JOINTS
4" x 6" x 1/4" STEEL ANGLE BOLTED TO EXISTING WALL, PROVIDE GAP(S) TO ALLOW FOR CONDENSING UNIT
CONDUIT TO RUN UP EXISTING WALL
WELD PROPOSED 2-1/2" x 2-1/2" x 3/16" STEEL BEAM TO STEEL FRAME w/ 1/8"
FILLET WELD ALL AROUND ALL
WELDED STEEL JOINTS
2-1/2" x 2-1/2" x 3/16" STEEL BEAM
2-1/2" x 2-1/2" x 3/16" STEEL FRAMING
22GA STANDING SEAM METAL ROOFING
ATTACHED TO TUBE STEEL w/ HILTI #10 HWH
SCREWS @ 6" O.C. (MAX SPACING)
PROPOSED 5" x 5" x 5/16" STEEL
ANGLE, PERFORATED FOR DRAINAGE
EXISTING WALL
PROPOSED CONDENSING
UNIT CONDUIT(S) BEYOND
VERIFY
2" GAP (+/-)
1/2" HILTI WKIK BOLT
TZ2-SS304 @ 12" O.C.
1/82 - 6
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:0
PM
A103
DETAILS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
3/8" = 1'-0"A5 PLAN @ CONDENSING UNITS
1/2" = 1'-0"A1 ELEV @ CONDENSING UNITS - SIDE
1/2" = 1'-0"A2 ELEV @ CONDENSING UNITS - FRONT
3/8" = 1'-0"C5 ROOF @ CONDENSING UNITS
1 1/2" = 1'-0"C4 ROOF DETAIL @ EXISTING WALL
O W
N
ER
R
EV
IE
W
/0
6/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
REMOVE EXISTING WALK-IN
FREEZER UNIT AND
PREPARE SURFACE FOR
NEW WALK-IN COOLER
REMOVE & REPLACE ANY BROKEN
OR MISSING FLOOR TILE UPON
INSTALLATION OF NEW
COOLER / FREEZER COMBO UNIT.
EXISTING DOOR TO REMAIN.
REMOVE EXISTING COOLER / FREEZER
WALL SHROUD AND PREPARE SURFACE
FOR NEW COOLER / FREEZER
ENCLOSURE.
REMOVE EXISTING
WALK-IN COOLER UNIT
EXISTING FLOOR DRAIN TO REMAIN.
REMOVE EXISTING WALK-IN
COOLER & FREEZER
REMOVE EXISTING CRASH
BOLARDS, PATCH & GRIND
CONCRETE FLOOR SMOOTH
EXISTING FLOOR
DRAIN TO REMAIN
REMOVE EXISTING
FREEZER WALL SHROUD
AND PREPARE SURFACE
FOR NEW COOLER /
FREEZER ENCLOSURE.
REMOVE EXISTING
WALK-IN FREEZER
MAINTAIN EXISTING GAP BETWEEN
EXISTING WASHING MACHINE AND
PROPOSED WALK-IN FREEZER
EXISTING FLOOR
DRAIN TO REMAIN
REMOVE EXISTING PIPING FOR
COOLER CONDENSING UNIT. ROUTE
PROPOSED CONDUIT THROUGH
EXISTING WALL PENETRATION.
EXISTING CHAIN-LINK FENCE
TO REMAIN
REMOVE EXISTING COOLER CONDENSING UNIT
EXISTING CHAIN-LINK FENCE
TO REMAIN
REMOVE EXISTING DISCONNECT SWITCH
REMOVE EXISTING PIPING FOR
FREEZER CONDENSING UNIT. ROUTE
PROPOSED CONDUIT THROUGH
EXISTING WALL PENETRATION.
REMOVE TWO (2) EXISTING
FREEZER CONDENSING UNITS
EXISTING 2-1/2" x 2-1/2" TUBE STEEL
SUPPORT FRAME TO REMAIN. PROVIDE
NEW FRAME ABOVE WITH METAL ROOF,
SLOPED AWAY FROM BUILDING.
REMOVE TWO (2) EXISTING WALK-IN
FREEZER SAFETY SWITCHES. PROVIDE
ONE (1) NEW HEAVY DUTY SAFETY
SWITCH FOR NEW WALK-IN FREEZER.
REMOVE EXISTING WALK-IN
COOLER SAFETY SWITCH.
PROVIDE NEW HEAVY DUTY
SAFETY SWITCH FOR NEW
WALK-IN COOLER.
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:1
PM
A104
PHOTOS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
NO SCALEA4 PHOTO 01
NO SCALEA3 PHOTO 02
12" = 1'-0"A1 PHOTO 03
12" = 1'-0"B4 PHOTO 04
12" = 1'-0"B3 PHOTO 05
12" = 1'-0"B1 PHOTO 06
O W
N
ER
R
EV
IE
W
/0
6/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
PLUMBING PIPING
MECHANICAL PIPING
DUCTWORK
EA24x14
EA24x14
EA24x14
OA24x14
OA24x14
OA24x14
RA24x14
SA24x14
SA24x14
VD
S D
SA24x14
RA24x14
RA24x14
ABBREVIATIONS
WATER HAMMER ARRESTOR
PIPING "T"
HUMIDIFIER
PIPING 90
STRAINER
MECHANICAL\PLUMBING ABBREVIATIONS, SYMBOLS AND NOTES
SYMBOL LEGEND
CAP
NOTES
REDUCED PRESSURE PRINCIPLE
BACK
FLOW PREVENTER
INLINE PUMP
BALANCE VALVE
PRESSURE RELIEF VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
GLOBE VALVE
GATE VALVE
CHECK VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
BALL VALVE
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
RETURN AIR DUCT UP
SUPPLY AIR DUCT DOWN
SUPPLY AIR DUCT UP
PRESSURE SENSOR
HUMIDITY SENSOR
TEMPERATURE SENSOR
AIR FLOW
HUMIDISTAT - 48" A.F.F.
THERMOSTAT - 48" A.F.F.
DUCT SMOKE DETECTOR
MOTORIZED DAMPER
COMBINATION FIRE/SMOKE DAMPER
SMOKE DAMPER
FIRE DAMPER (RATING DETERMINED BY WALL TYPE)
VOLUME CONTROL DAMPER
SQUARE TO ROUND TRANSITION
RETURN OR EXHAUST REGISTER
SUPPLY REGISTER
RELIEF AIR HOOD - ROOF
FRESH AIR INTAKE HOOD - ROOF
EXHAUST FAN - ROOF
RETURN OR EXHAUST AIR GRILLE
LINEAR DIFFUSER
SUPPLY AIR DIFFUSER PIPE BREAK
PIPE DOWN
PIPE UP
CLEAN OUT
GAS METER
UNION
HOSE BIBB
FLOW DETECTOR / SWITCH
VALVE WITH TAMPER SWITCH
ELECTRIC BELL
SIDEWALL SPRINKLER HEAD
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
SIAMESE CONNECTION
BARE FIN TUBE ELEMENT
FIN TUBE ELEMENT WITH COVER
EXTERNALLY INSULATED DUCTWORK
INTERNALLY LINED DUCTWORK
SUPPLY AIR DUCT - EXISTING
SUPPLY AIR DUCT - DEMO
SUPPLY AIR DUCT - NEW
RETURN AIR DUCT - EXISTING
RETURN AIR DUCT - DEMO
RETURN AIR DUCT - NEW
OUTSIDE AIR DUCT - EXISTING
OUTSIDE AIR DUCT - DEMO
OUTSIDE AIR DUCT - NEW
EXHAUST AIR DUCT - EXISTING
EXHAUST AIR DUCT - DEMO
EXHAUST AIR DUCT - NEW
GAS VALVE OR PLUG VALVE
METER
CONNECTION TO EXISTING
AAV AIR ADMITANCE VALVE
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPERATOR
B BOILER
BB BASEBOARD
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSE POWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BATH TUB
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C CONVECTOR
CA COMPRESSED AIR
CB CATCH BASIN
CC COOLING COIL
CCF 100 CUBIC FEET
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CLEAN OUT FERRULE AND PLUG
CH CHILLER
CI CAST IRON
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
COND CONDENSATE
CO2 CARBON DIOXIDE
CT COOLING TOWER
CU CONDENSING UNIT
CU FT CUBIC FOOT
CUH CABINET UNIT HEATER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DIFFUSER
DB DRY BULB
DEG F DEGREE FAHRENHEIT
DF DRINKING FOUNTAIN
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DWV DRAIN, WASTE AND VENT
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
ELEV ELEVATION
ER EXHAUST AIR REGISTER
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
F FURNACE
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FAN COIL
FD FLOOR DRAIN
FD FIRE DAMPER
FIN FIN TUBE RADIATION
FLG FLANGE
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT OR FEET
F&T FLOAT AND THERMOSTATIC TRAP
G GAS (NATURAL)
GAL GALLON
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H HYDROGEN
HB HOSE BIBB
HC HEATING COIL
HCO HORIZONTAL CLEANOUT
HP HORSE POWER
HTR HEATER
HVAC HEATING, VENTILATING & AIR COND
HW HOT WATER
HWC HOT WATER RECIRCULATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IE INVERT ELEVATION
IF INLINE FAN
IN INCH OR INCHES
IP IRON PIPE
INV INVERT
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
JC JANITOR'S CLOSET
JS JANITOR'S SINK
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LHWR LOW TEMPERATURE HOT WATER RETURN
LHWS LOW TEMPERATURE HOT WATER SUPPLY
LIQ LIQUID (REFRIGERATION)
LV LOUVER
LP PROPANE GAS (LIQUID)
LWT LEAVING WATER TEMPERATURE
M METER
MAU MAKE-UP AIR HANDLING UNIT
MAX MAXIMUM
MB MOP BASIN
MBH BRITISH THERMAL UNITS (1000)
MBTUH BRITISH THERMAL UNITS (1000)
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
OA OUTDOOR AIR
OAI OUTDOOR AIR INTAKE
OC ON CENTER
OD OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OXY OXYGEN
P PUMP
PC PLUMBING CONTRACTOR
PD PNEUMATIC OPERATED DAMPER
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PT PRESSURE TEMPERATURE PLUG
PTAC PACKAGED TERMINAL AIR COND. UNIT
PVAC PROCESS VACUUM
S SINK
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAF SUPPLY AIR FAN
SAN SANITARY SEWER
SD SMOKE DETECTOR
SG SUPPLY AIR GRILLE
SH SHOWER HEAD
SHC STEAM HEATING COIL
SR SUPPLY REGISTER
SS STAINLESS STEEL
ST STORM
STM STEAM
SUCT SUCTION (REFRIGERATION)
TCC TEMPERATURE CONTROL CONTRACTOR
TCD TEMPERATURE CONTROL DAMPER
TCP TEMPERATURE CONTROL PANEL
TD TRANSFER DUCT
TG TRANSFER AIR GRILLE
TOG TOP OF GRILLE
TT THERMOSTATIC TRAP
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UV UNIT VENTILATOR
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME BOX
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK (SANITARY)
VTR VENT THRU ROOF (SANITARY)
VUV VERTICAL UNIT VENTILATOR
W WASTE
WB WET BULB
WC WATER CLOSET
W/O WITHOUT
WH WATER HEATER
WSHP WATER SOURCE HEAT PUMP
NOTE:
NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE USED IN THIS
SET OF DOCUMENTS.
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NIC NOT INCLUDED OR NOT IN CONTRACT
NIT NITROGEN
NO NORMALLY OPEN
KW KILOWATT
R REGISTER
RA RETURN AIR
RD ROOF DRAIN
RET RETURN
RF RETURN FAN
RG RETURN AIR GRILLE
RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER
RR RETURN REGISTER
RTU ROOF TOP UNIT
MECHANCIAL/PLUMBING GENERAL NOTES
M
M
P
H
T
H
T
M
F S
S
F
1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE EVERY OFFSET, VALVE, FITTING ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING ALL DUCTWORK AND PIPING AT
NO ADDITIONAL COST.
2. CONTRACTOR SHALL SECURE AND PAY FOR ANY AND ALL PERMITS AND INSPECTION FEES APPLICABLE TO
THE WORK, AND PAY FOR ALL STATE AND FEDERAL TAXES IMPOSED.
3. VERIFY ALL LAYOUTS, DIMENSIONS, CLEARANCES, AND METHODS WITH EQUIPMENT SUPPLIERS AND ALL TRADES. COORDINATE WITH OWNER FOR REQUIREMENTS PERTAINING TO ALL OWNER FURNISHED EQUIPMENT.
4. CONTRACTORS SHALL COORDINATE WITH ALL OTHER TRADES FOR INSTALLATION OF ALL MATERIALS AND EQUIPMENT. CONTRACTORS SHALL FIELD VERIFY ANY EXISTING CONDITIONS. PREPARE COORDINATION DRAWINGS AT A MINIMUM OF 1/2"=1'-0" SCALE WHERE ACCURATE COORDINATION IS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR PROJECT COORDINATION WITH OTHER TRADES AND SUPERVISION OF THEIR OWN SUB-
CONTRACTORS.
5. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR PROPER DRAINAGE. COORDINATE WITH THE OTHER TRADES TO AVOID CONFLICT. THE ORDER OF PRIORITY FOR ALL PIPING, DUCTWORK AND CONDUITS SHALL BE INSTALLED AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.
A. PLUMBING DRAIN LINES
B. CONDENSATE LINES
C. DUCTWORK
D. FIRE PROTECTION
E. HOT AND COLD WATER PIPING
F. ELECTRICAL CONDUIT
6. EACH CONTRACTOR SHALL PERFORM ALL FORMING, CUTTING AND PATCHING NECESSARY FOR
INSTALLATION OF THEIR WORK. CONTRACTORS SHALL REPAIR/PATCH ALL AREAS DISTURBED DURING INSTALLATION TO MATCH SURROUNDING AREAS. MAINTAIN ALL FIRE RATED ASSEMBLY CONSTRUCTION WHEN APPLICABLE.
CUTTING AND PATCHING NECESSARY TO EXPOSE DEFECTIVE WORK FOR REPAIR WILL BE DONE AT THE
CONTRACTORS EXPENSE.
7. CONTRACTORS ARE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING TILES AND CEILING GRID
"T" BARS IN ASSOCIATION WITH THEIR WORK.
8. PROVIDE ALL ROOF AND SIDE WALL MOUNTED EQUIPMENT SUPPORTS, CURBS, PENETRATIONS, FLASHING AND SEALING, MAKE OPENINGS WEATHER TIGHT. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE
ALL EQUIPMENT BUILDING OPENINGS WITH THE GENERAL CONTRACTOR.
9. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND STANDARDS. IF NON- CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTATION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE
CONTRACTORS FINANCIAL RESPONSIBILITY.
10. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR SERVICE INSTALLATION WITH, AND THE OWNER SHALL PAY ALL SERVICE FEES AND CHARGES, INCLUDING METERS, REQUIRED BY UTILITY COMPANIES FOR NEW GAS, WATER, AND SEWER SERVICES. CONTRACTOR SHALL SECURE AND PAY FOR ANY AND ALL PERMITS AND INSPECTION FEES.
11. INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2015 MICHIGAN MECHANICAL CODE, 2015 PLUMBING CODE, MICHIGAN PART 8 & 2014 NATIONAL ELECTRICAL CODES, OR LATEST ADOPTED EDITION, ALL LOCAL CODES
AND AUTHORITIES HAVING JURISDICTION.
12. REFER TO ARCHITECTURAL SHEETS FOR FLOOR PLANS AND SECTIONS AS REQUIRED TO DETERMINE
ROUTING REQUIREMENTS AND POTENTIAL CONFLICTS.
13. MANUFACTURERS MODEL NUMBERS LISTED ON DRAWINGS ARE BASIS FOR DESIGN. CONTRACTOR MAY SUBMIT AN "APPROVED EQUAL" FOR REVIEW BY THE ARCHITECT/ENGINEER. DESIGNATION OF AN "APPROVED
EQUAL" IS OF THE ENGINEER'S DISCRETION.
14. IF EQUIPMENT OTHER THAN AS SPECIFIED IN THESE BID DOCUMENTS IS PROVIDED, THE CONTRACTOR FURNISHING THE EQUIPMENT IS RESPONSIBLE FOR THE COORDINATION AND IMPACT OF ANY REDESIGN AND INSTALLATION COSTS, INCLUDING BUT NOT LIMITED TO: STRUCTURE, FOUNDATIONS, ENVIRONMENTAL, UTILITIES, PIPING, DUCTWORK, WIRING, DEVICES, ETC.. REDESIGN SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER, ARCHITECT & ENGINEER.
15. MATERIALS, VALVES, EQUIPMENT AND FIXTURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS. CONNECTIONS TO FIXTURES, DEVICES AND EQUIPMENT SHALL BE VERIFIED
WITH MANUFACTURER'S CERTIFIED DRAWINGS.
16. FINAL LOCATION OF ALL CEILING DIFFUSERS, REGISTERS, GRILLES, LIGHT FIXTURES, SPRINKLER HEADS, DEVICES, ETC. SHALL BE INSTALLED PER REFLECTED CEILING PLAN AND LOCATED CONSISTENT WITH CEILING AS
INSTALLED.
17. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.
18. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE, JOINTS, OR
CONNECTED EQUIPMENT.
19. PROVIDE ALL VALVING FOR THE PROPER SECTIONALIZING, ZONING AND OPERATION OF PIPING SYSTEMS.
PROVIDE ACCESS PANELS AS REQUIRED FOR ACCESS TO VALVES.
20. ALL INSULATION AND JACKETS SHALL HAVE 25 OR LESS FLAME SPREAD, 50 OR LESS SMOKE DEVELOPED
RATING.
21. PENETRATIONS OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE-RESISTANCE RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. PROVIDE FIRE STOPPING WHERE PIPING OR DUCTWORK PENETRATE THE RATED ASSEMBLIES. REFER TO ARCHITECTURAL PLANS
FOR LOCATION OF FIRE/SMOKE RATED ASSEMBLIES.
22. PROVIDE PIPE TAPE MARKERS AND EQUIPMENT TAGS, WHITE ON BLACK, CONFORMING TO ANSI AND ASME A13.1 STANDARDS. MINIMUM INFORMATION FOR EQUIPMENT SHALL BE EQUIPMENT NAME AND NUMBER SCREWED OR RIVETED WHENEVER POSSIBLE. MINIMUM IDENTITY OF PIPING CONVEYING GAS OR FLUID WITH FLOW DIRECTION ARROWS AROUND ENTIRE DIAMETER COVERING BOTH ENDS OF PIPE LABEL. INTERVAL OF LABEL SPACING SHALL NOT EXCEED 25 FEET. LABELS ARE NOT REQUIRED FOR GUESTROOM TOILET EXHAUST FANS, PTAC UNITS, WALL
HEATERS AND SIMILAR UNITS IN PUBLIC SPACES.
23. SUBMIT FOR REVIEW CERTIFIED EQUIPMENT AND FIXTURE DRAWINGS AND/OR SUBMITTALS TO THE ARCHITECT/ENGINEER FOR APPROVAL OF MAJOR EQUIPMENT SUCH AS PLUMBING FIXTURES, AIR HANDLING UNITS, GRILLES AND REGISTERS, FANS, WATER HEATERS, CONTROLS, ETC.. ARCHITECT/ENGINEER REVIEW OF SHOP DRAWINGS, PRODUCT DATA OR SAMPLES DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
24. PROVIDE OPERATION AND MAINTENANCE MANUAL PRIOR TO PROJECT COMPLETION. THE MANUAL SHALL CONSIST OF, AT A MINIMUM; REVIEWED EQUIPMENT DRAWINGS AND/OR SUBMITTALS WITH COLOR SAMPLES (IF APPLICABLE), AND OPERATING & MAINTENANCE MANUALS. THE MANUAL SHALL ALSO CONTAIN INSPECTION AND TESTING REPORTS, COPY OF OWNERS TRAINING ATTENDANCE SHEET, M.S.D.S. INFORMATION FOR MATERIALS LEFT ON THE PROJECT LOCATION, AS-BUILT DRAWINGS MARKED IN RED, CONTROLS DIAGRAMS, PREVENTIVE MAINTENANCE CHECKLIST, PARTS LISTS AND PRODUCT WARRANTY INFORMATION. PROVIDE EMERGENCY CONTACT LIST FOR ALL CONTRACTORS AND THEIR SUBCONTRACTORS WITH A BRIEF DESCRIPTION OF THE DISCIPLINE OF RESPONSIBILITY. INCLUDE IN EACH MANUAL CONTRACTORS GUARANTEES OF MATERIAL AND WORKMANSHIP A MINIMUM OF ONE YEAR, AND EQUIPMENT WARRANTIES BEGINNING FROM DATE OF OWNER ACCEPTANCE.
25. AT PROJECT COMPLETION AND PRIOR TO FINAL OWNER ACCEPTANCE PROVIDE OWNER INSTRUCTION FOR
ALL EQUIPMENT AND SYSTEMS OPERATION AND MAINTENANCE.
26. GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER OWNER ACCEPTANCE
OF THE ENTIRE PROJECT.
CEILING RADIATION DAMPERC
STM
STM
CDS
CDR
CHWS
CHWR
CDS
CDR
CHWR
CHWS
AIRST
G
G
AIR
HWR
HWR
HWS
HWS
FP
FP
C
C
ST
V
V
SAN
HWC
SAN
HW
CW
HWC
CW
HW
STM
CDR
CDS
CHWR
CHWS
HWR
HWS
G
AIR
FP
C
ST
CW
V
SAN
HWC
HW
HYDRONIC HOT WATER SUPPLY - NEW
HYDRONIC HOT WATER SUPPLY - EXISTING
HYDRONIC HOT WATER SUPPLY - DEMO
HYDRONIC HOT WATER RETURN - NEW
HYDRONIC HOT WATER RETURN - EXISTING
HYDRONIC HOT WATER RETURN - DEMO
COMPRESSED AIR - NEW
COMPRESSED AIR - EXISTING
COMPRESSED AIR - DEMO
GAS - NEW
GAS - EXISTING
GAS - DEMO
DOMESTIC COLD WATER - EXISTING
DOMESTIC COLD WATER - DEMO
DOMESTIC COLD WATER - NEW
DOMESTIC HOT WATER - EXISTING
DOMESTIC HOT WATER - DEMO
DOMESTIC HOT WATER - NEW
DOMESTIC HOT WATER RECIRC - EXISTING
DOMESTIC HOT WATER RECIRC DEMO
DOMESTIC HOT WATER RECIRC - NEW
SANITARY ABOVE GROUND - EXISTING
SANITARY UNDER GROUND - EXISTING
SANITARY- DEMO
VENT - EXISTING
VENT - DEMO
VENT- NEW
STORM - EXISTING
STORM - DEMO
STORM - NEW
CONDENSATE - EXISTING
CONDENSATE - DEMO
CONDENSATE - NEW
FIRE PROTECTION - EXISTING
FIRE PROTECTION - DEMO
FIRE PROTECTION - NEW
CONDENSOR WATER SUPPLY
CONDENSOR WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSOR WATER SUPPLY - DEMO
CONDENSOR WATER SUPPLY - EXIST
CONDENSOR WATER RETURN - DEMO
CONDENSOR WATER RETURN - EXIST
CHILLED WATER SUPPLY - DEMO
CHILLED WATER SUPPLY - EXIST
CHILLED WATER RETURN - DEMO
CHILLED WATER RETURN - EXIST
STEAM - NEW
STEAM - EXISTING
STEAM - DEMO
SAN
SAN SANITARY ABOVE GROUND - NEW
SANITARY UNDER GROUND - NEW
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:1
PM
MP001
MECHANICAL &
PLUMBING
ABBREVIATIONS,
SYMBOLS, &
NOTES
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
O
W N
ER
R
EV
IE
W
/2 4/
O W
N
ER
R
EV
IE
W
/0
6/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
GENERATOR
SUBSTATION
STORAGE
LOCKSMITH
STAFF
LOCKER
RM
FOREMAN
SUPERVISOR
SECURE
MAINTENANCE
CRIB
VEHICLE
MAINTENANCE
MAINTENANCE
SHOP
MAINTENANCE
DETERGENT
ROOM
WAREHOUSE
RESIDENT
STORES
OFFICERS
CLOTHING
OFFICE
STAFF
TOILET
INMATE
TOILET
JANITOR'S
CLOSET
VESTIBULE
PROPOSED
WALK-IN
FREEZER
PROPOSED
WALK-IN
COOLER
(FUTURE)
OPEN
OFFICE
PANEL "RP-B"
PANEL "PDP-502"
A102
A5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:1
PM
MP100
OVERALL
MECHANICAL
PLAN
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
NORTH
1/8" = 1'-0"1 OVERALL MECHANICAL FLOOR PLAN - WAREHOUSE BLDG 500
O W
N
ER
R
EV
IE
W
/0
6/
0% O
W N
ER
R
EV
IE
W
/2 7/
LA
R
A R
EV
IE
W
/2 7/
BI
D
D
IN
G
/2 0/
PROPOSED MECHANICAL KEYNOTES -
INDOOR WALK-IN COOLER WITH REMOTE PRE-CHARGED CONDENSING UNITS (LOCATED
OUTSIDE), INSTALLED BY REFRIGERANT CONTRACTOR. CONTRACTOR SHALL
COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT SUPPLIER. PROVIDE
REFRIGERANT LINES TO REMOTE CONDENSERS AND INSTALL ALL ITEMS INCLUDED.
INDOOR WALK-IN FREEZER WITH REMOTE PRE-CHARGED CONDENSING UNITS (LOCATED
OUTSIDE), INSTALLED BY REFRIGERANT CONTRACTOR. CONTRACTOR SHALL
COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT SUPPLIER. PROVIDE
REFRIGERANT LINES TO REMOTE CONDENSERS AND INSTALL ALL ITEMS INCLUDED.
REMOTE PRE-CHARGED STEEL FRAME MOUNTED CONDENSING UNIT FOR COOLER,
INSTALLED BY REFRIGERANT CONTRACTOR. DO NOT OBSTRUCT AIRFLOW OF
EQUIPMENT.
REMOTE PRE-CHARGED STEEL FRAME MOUNTED CONDENSING UNIT FOR FREEZER,
INSTALLED BY REFRIGERANT CONTRACTOR. DO NOT OBSTRUCT AIRFLOW OF
EQUIPMENT.
5 PROPOSED 1" CONDENSATE DRAIN PIPING FROM COOLER / FREEZER.
6 EXISTING 1" CONDENSATE ROUTED TO EXISTING SANITARY PIPING.
7 EXISTING FLOOR DRAIN TO REMAIN.
ROUTE PROPOSED CONDUIT / PIPING THROUGH EXISTING WALL AT EXISTING WALL
PENETRATIONS. INSULATE ALL VOIDS, ALL PENETRATIONS SHALL BE PATCHED AND
SEALED WATERTIGHT.
DEMOLITION MECHANICAL KEYNOTES -
1 REMOVE EXISTING COOLER CONDENSING UNIT, PIPING, CONTROLS, WIRING, AND ALL
APPURTENANCES.
2 REMOVE EXISTING FREEZER CONDENSING UNIT, PIPING, CONTROLS, WIRING, AND ALL
APPURTENANCES.
3 REMOVE EXISTING EVAPORATION COIL AND WALK-IN COOLER.
4 REMOVE EXISTING EVAPORTATION COIL AND WALK-IN FREEZER.
5 REMOVE EXISTING CONDENSATE PIPING FROM FORMER WALK-IN FREEZER.
6 EXISTING 1" CONDENSATE ROUTED TO EXISTING SANITARY PIPING TO REMAIN.
PROPOSED
WALK-IN
COOLER
PROPOSED
WALK-IN
FREEZER
(FUTURE)
OPEN
OFFICE
1" COND.
1" COND.
B1 A102
B1 A102
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:1
PM
MP101
MECHANICAL &
PLUMBING PLANS
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
NORTHNORTH
CONTRACTOR'S NOTE:
1. CONTRACTOR SHALL RECOGNIZE AND DISPOSE OF
REFRIGERANTS AND ALL ASSOCIATED EQUIPMENT
ACCORDING TO THE REGULATIONS OF SECTION 608 OF THE
CLEAN AIR ACT (CAA) SET FORTH BY THE EPA.
2. CONTRACTOR SHALL FOLLOW ALL CERTIFICATION
REQUIREMENTS FOR INDIVIDUALS REMOVING
REFRIGERANT FROM EQUIPMENT IS BEING PREPPED FOR
DISPOSAL.
3. CONTRACTOR SHALL OBTAIN A CHAIN OF CUSTODY
DISPOSAL MANIFEST FOR DTMB DOCUMENTATION OF
PROPER DISPOSAL.
1/4" = 1'-0"A4 PROPOSED MECHANICAL PLAN
1/4" = 1'-0"A2 DEMOLITION MECHANICAL PLAN
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
PROPOSED MECHANICAL KEYNOTES -
1 INSTALL DRAIN PER MANUFACTURER'S RECOMMENDATIONS.
2 INSTALL 1" CONDENSATE LINES FROM EVAPORATOR UNITS TO EXISTING FIRST FLOOR INDIRECT HUB DRAIN.
3 PROPOSED EVAPORATOR UNIT IN NEW COOLER.
4 PROPOSED EVAPORATOR UNIT IN NEW FREEZER.
5 PROVIDE DRY SPRINKLER PENDANT AT COOLER / FREEZER. PROVIDE BOOT, INSULATION, & SEALANT AROUND PIPE AT WALL
PENETRATION. TIE INTO WET PIPE FIRE SUPPRESSION SYSTEM.
6 EXTEND EXISTING WET PIPE FIRE SUPPRESSION PIPING & PROVIDE NEW SPRINKLER HEADS AT FUTURE OFFICE AREA
(FUTURE OFFICE AREA NOT IN SCOPE OF WORK).
7 EXISTING WET PIPE FIRE SUPPRESSION SYSTEM TO REMAIN.
PROPOSED
WALK-IN
COOLER
(FUTURE)
OPEN
OFFICE
PROPOSED
WALK-IN
FREEZER
6 6
6 6
B1 A102
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \C oo le r- Fr ee ze r\M
-0
_A lg er
C F
C oo le r-
Fr ee ze r_
R
.rv t
3/
/2
2:
:1
PM
MP102
MECHANICAL &
PLUMBING RCP
CO
OL
ER
/ F
RE
EZ
ER
R
EP
LA
CE
ME
NT
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
SC
P
SC
P
R M
A
CO
O
LE
R
FR
EE
ZE
R R
EP
LA
C
EM
EN
T
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
1/4" = 1'-0"A4 MECHANICAL PROPOSED RCP
NORTH
O W
N
ER
R
EV
IE
W
/2
4/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
PIPING INSULATION SCHEDULE
SYSTEM TYPE
PLUMBING
DOMESTIC HOT WATER SUPPLY AND RECIRCULATION
DOMESTIC COLD WATER
COOLING
CONDENSATE PIPING FROM COOLING COILS
TYPE PIPE SIZE
P-5
1-1/4" AND SMALLER
INSULATION THICKNESS
1/2"
P-5
1-1/4" AND SMALLER 1"
P-5 ALL SIZES 1/2"
1-1/2" AND LARGER 1-1/2"
1-1/2" AND LARGER 1"
REFRIGERANT SUCTION P-5 ALL SIZES 1/2"
PIPING INSULATION TYPES
TYPE
P-5
DESCRIPTION
ASTM C534, TYPE I, FLEXIBLE, CLOSED CELL ELASTOMERIC INSULATION, TUBULAR, OPERATING TEMPERATURE RANGE:
MINUS 70 TO 180 DEG F.
MSMD030MC CONDENSING UNIT SCHEDULE (COOLER)
GENERAL
REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL
R-448A / R-449A 208-230 / 60 / 3 SCROLL ZS21KAE-TF5
HP AWEF LISTINGS
3 5.61 UL / CUL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)
-30
-20
-10
25,324
27,826
30,467
33,250
36,092
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)
-30
-20
-10
23,298
25,600
28,030
30,590
36,092
DIMENSIONAL DATA
L
OVERALL (TO NEAREST INCH)
WT (lbs)W H BASE SIZE BASE / HOOD
30 25031 26 M3 031M
INSTALLATION
REFRIGERANT
R-448A / R-449A 7/815.2 1/2 37,134
RECEIVER TANK (lbs) 90% / 90°F
CONNECTIONS
LIQUID SUCTION
ESTIMATED TOTAL
HEAT REJECTION (BTUH)
ELECTRICAL
MCA
MOP
COMP VOLTS
208-230
COMP PHASE
COMP HZ
COMP RLA
13.7
COMP LRA
OTHER LOAD
DATA
FAN PHASE FAN HZ FAN FLA FAN HP
FAN
QUANTITY
MAX EVAP
FAN AMPS
MAX EVAP DEF
HEATER AMPS
1 60 1.6 1 / 4 1 12 25.0
VOLTS 208-230
PHASE 1
AMPS 0.5
MSLA100ME CONDENSING UNIT SCHEDULE (FREEZER)
GENERAL
REFRIGERANT VOLTAGE COMPRESSOR TYPE COMPRESSOR MODEL
R-454A 460 / 60 / 3 SCROLL YF26KAE-TFD
HP AWEF LISTINGS
01 3.15 UL / CUL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 90° AMBIENT AT CONDENSER)
-30
27,802
-20
35,420
-10
44,436
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) AND 100° AMBIENT AT CONDENSER)
-30
23,910
-20
31,524
-10
39,548
DIMENSIONAL DATA
L
OVERALL (TO NEAREST INCH)
WT (lbs)W H BASE SIZE BASE / HOOD
64 54044 40 M6 062M
INSTALLATION
REFRIGERANT
R-454A 1 5/846.0 7/8 59,116
RECEIVER TANK (lbs) 90% / 90°F
CONNECTIONS
LIQUID SUCTION
ESTIMATED TOTAL
HEAT REJECTION (BTUH)
ELECTRICAL
MCA
34.7
MOP
COMP VOLTS
COMP PHASE
COMP HZ
COMP RLA
17.9
COMP LRA
OTHER LOAD
DATA
FAN PHASE FAN HZ FAN FLA FAN HP
FAN
QUANTITY
MAX EVAP
FAN AMPS
MAX EVAP DEF
HEATER AMPS
1 60 2.9 1 / 3 2 6 15.0
VOLTS 460
PHASE 1
AMPS 0.5
E1MCK270A-MA EVAPORATOR UNIT SCHEDULE (COOLER)
GENERAL
REFRIGERANT VOLTAGE EVAPORATOR MODEL DEFROST SCHEME
R-454C 115 / 60 / 1 KLP427MA-S1E AIR
CONTROLLER LISTINGS
LogiTemp™ UL / CUL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)
-30
-20
-10
27,000
27,433
27,865
28,733
DIMENSIONAL DATA
L
OVERALL (INCHES)
WT (lbs)W H SUCTION
78.25 13516.5 17.25 1 1/8
ELECTRICAL
EVAPORATOR ELECTRICAL DATA EXPANSION VALVE
FAN
QUANTITY
FAN
AMPS
DEFROST AMPS
3 PHASE
4 4.0 N/A N/A
INSTALLATION
REFRIGERANT
TYPE
R-448A / R-449A
CONNECTIONS
LIQUID
1/2
DISTRIBUTOR NOZZLE / ORIFICE
1 PHASE
TXV / EEV
MODEL #
19-14658 SER-6
PART # TYPE
PART #
AWEF
E1LAK160B-ME EVAPORATOR UNIT SCHEDULE (FREEZER)
GENERAL
BTUH CAPACITY (AT SATURATED SUCTION TEMPERATURE (SST) WITH 10° TD)
-30
14,900
-20
16,200
-10
16,808
DIMENSIONAL DATA
L
OVERALL (INCHES)
WT (lbs)W H SUCTION
62.25 11516.5 17.25 1 1/8
ELECTRICAL
EVAPORATOR ELECTRICAL DATA EXPANSION VALVE
FAN
QUANTITY
FAN
AMPS
DEFROST AMPS
3 PHASE
3 1.8 11.9 N/A
INSTALLATION
REFRIGERANT
TYPE
R-454A
CONNECTIONS
LIQUID
3/8
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .