472-24052.JGH - Statewide Perimeter Repair-Replacement - Newberry CF - Addendum #1.pdf

PDF 2 MB Posted

Attached to
472/24052. JGH; Newberry CF - Perimeter Repair/ Replacement
Solicitation number
RFQ 171 250000000171 2
Issued by
Livingston County, Michigan

About this file

This is an Addendum No. 1 document issued by the State of Michigan, with Matrix Consulting Engineers serving as the engineer, for the Statewide Perimeter Repair/Replacement project at Newberry Correctional Facility located in Newberry, Michigan. The addendum, dated February 10, 2025, modifies and clarifies the original contract documents and takes precedence over them. The document specifies that all work shall be performed in accordance with the original drawings and specifications except as specifically noted in the addendum. All incidental items required to provide the modifications are included in the scope, even if not explicitly described.

The addendum was issued to all bidders receiving plans and specifications and requires that receipt of the addendum be noted on the Proposal Form. The addendum includes one primary item: the provision of a sign-in sheet that is attached for all bidders to review. Bidders are required to acknowledge receipt of this addendum as part of their proposal submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1601 E. CÉSAR E. CHÁVEZ AVENUE, LANSING, MI 48906

PHONE: (517) 487-2511

FAX: (517) 487-2544

ADDENDUM NO. 1

Newberry Correctional Facility – Statewide Perimeter Repair/Replacement

Date: 2/10/2025 File Number: 472/24052.JGH

Matrix Project Number: 24233.00

OWNER: ENGINEER:

State of Michigan Matrix Consulting Engineers 13747 E. County Road 428 1601 E. Cesar E. Chavez Ave.

Newberry, MI 49868 Lansing, MI 48906

This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.

Addendum Items:

1. Sign-In Sheet (Issued):

a. The sign-in sheet is attached to this addendum or all bidders to review.

End of Addendum No. 1

File details come from the government source that posted it. Updated .