472_23170_JGH_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ - 171 - 240000000321
- Issued by
- Ionia County, Michigan
About this file
This document contains drawings and specifications for a food service flooring replacement project at the Bellamy Creek Correctional Facility, which is owned by the State of Michigan - Department of Technology, Management and Budget, Department of Corrections. The project scope includes removing existing quarry tile flooring, installing new epoxy mortar flooring system, and temporarily relocating kitchen equipment and operations to a rented food service trailer for two months during construction. The project area is approximately 8,157 square feet. Bids for this project are due by 2:00 PM on the bid date.
The drawings provide details on the new flooring system, temporary kitchen trailer setup, and required mitigation measures to contain dust and odors during construction. Pricing for the project is to be provided per the bid requirements, which include unit pricing for various components. The project will be funded by the State of Michigan, and there are no set-asides identified. The successful bidder will be required to coordinate closely with the facility to complete the work with minimal disruption to ongoing operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 472_23170_JGH_Appendix_V.pdf | ||
| 472_23170_JGH_Addendum1.pdf | ||
| 472_23170_JGH_Specifications.pdf | ||
| Sign-In 23170.pdf | ||
| Addendum 2 Photos.pdf | ||
| 472_23170_JGH_DTMB0415 Advertisment.pdf | ||
| LEIN Request 23170.pdf | ||
| 472_23170_JGH_Addendum_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOUSING
UNIT 1
HOUSING
UNIT 2
HOUSING
UNIT 3
HOUSING
UNIT 4
HOUSING
UNIT 5
HOUSING
UNIT 6
HOUSING
UNIT 7
BUILDING
BUILDING
BUILDING
BUILDING
SALLY
PORT
BLUEWATER HIGHWAY
FOOD SERVICE AREA
SEE SHEET A1
RENTED FOOD SERVICE
TRAILER LOCATION
LAWN RESTORATION
AROUND TRAILER AS
NECESSARY.
CONTRACTOR ACCESS
TO AREA OF WORK
BLUEWATER HIGHWAY
POTTER ROAD
LINCOLN AVENUE
B E
LL
A M
Y R
O A
D
MAIN STREET
W A
LL
S
TR
E E T
YEOMANS STREET H
A
Y N
O R
R O
A D
CITY OF IONIA
BELLAMY CREEK
CORRECTIONAL
FACILITY
RICHARD A. HANDLON
CORRECTIONAL FACILITY
MICHIGAN REFORMATORY
SITE PLAN
SCALE: 1" = 100'-0"
BELLAMY CREEK CORRECTIONAL FACILITY
FOOD SERVICE FLOORING REPLACEMENT
OWNER: STATE OF MICHIGAN - DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
DEPARTMENT OF CORRECTIONS
SHEET INDEX:
A0 COVER SHEET /SITE PLAN
A1 FOOD SERVICE FLOOR PLAN
A2 ENLARGED FLOOR PLANS
A3 DETAILS
LOCATION MAP
NO SCALE
CONTRACTOR LAY DOWN
AND STAGING AREA
STAFF
PARKING
VISITOR
PARKING
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A0
RELEASED FOR BIDS 03/05/2024
COVERSHEET and SITE PLAN
FILE NO: 472/23170.JGH
1727 BLUEWATER HWY
IONIA, MI 48846
BELLAMY CREEK
CORRRECTIONAL FACILITY
FOOD SERVICE FLOORING
REPLACEMENT
CODE COMPLIANCE:
MICHIGAN REHABILITATION CODE 2015 - LEVEL 2 ALTERATIONS
OCCUPANCY GROUP: A-2, B AND I-3 (CONDITION 5)
TOTAL BUILDING AREA: 29,293 GSF
AREA OF WORK: 8,157 SF
CONSTRUCTION TYPE: II-B
BUILDING IS FULLY SPRINKLERED PER NFPA 13
TEMPORARY KITCHEN TRAILER AND SCHEDULE:
THE CONTRACTOR SHALL RENT A KITCHEN TRAILER, AND INSTALL TEMPORARY UTILITY
HOOK UPS FOR TWO MONTHS. THE TRAILER IS TO BE SETUP AND CONNECTED TO EXISTING
UTILITIES AS NOTED ON SHEET A1 AND THE TRAILER KITCHEN IS OPERATIONAL PRIOR TO
KITCHEN SHUT-DOWN.
ONCE THE KITCHEN IS SHUT-DOWN, EQUIPMENT REMOVAL IS TO BEGIN, FOLLOWED BY
DEMOLITION OF FLOORING, AND INSTALLATION OF EPOXY MORTAR FLOORING SYSTEM.
AFTER THE FLOORIING HAS CURED, REINSTALL EXISTING KITCHEN EQUIPMENT AND BEGIN
OPERATIONS WITH KITCHEN. TERMINATE USE OF TEMPORARY KITCHEN TRAILER AND
RETURN TO RENTAL FACILITY.
FOR TEMPORARY TRAILER SPECIFICATIONS SEE SECTION 015000 - TEMPORARY FACILITIES
AND CONTROLS.
AutoCAD SHX Text
PROJECT NUMBER 2320
REMOVE STORAGE CAGES
PRIOR TO PREPARING FLOOR
SURECE. REINSTALL STORAGE
CAGES AFTER THE NEW
FLOORING SYSTEM HAS
FULLY CURED.
KITCHEN EQUIPMENT SCHEDULE
DESCRIPTION SYMBOL QTY WATER DRAIN DRAIN LOCATION ELECTRICAL EXHAUST GAS MOBILE
HOT FOOD PREP
SINK Shf 2 YES YES FLOOR NO NO NO NO
ICE MACHINE IM 1 YES YES WALL YES NO NO NO
SERVING LINE SL 2 NO NO NA YES NO NO YES
SERVING AREA
VICTORY
REFRIGERATOR
VR 4 NO NO NA YES NO NO NO
WASH DOWN
SINK Swd 1 NO YES SALVAJOR NO NO NO NO
SALVAJOR SAL 1 NO YES FLOOR NO NO YES NO
DISH MACHINE FT
1000 SE DM 1 YES YES WALL YES YES NO NO
3 COMPARTMENT
SINK WITH DRAIN
BOARDS
Sdw 1 YES YES FLOOR NO NO NO NO
COLD FOOD PREP
SINK Scf 1 YES YES FLOOR NO NO NO NO
VEGETABLE PREP
SINK Sv 1 YES YES FLOOR NO NO NO NO
VEGETABLE PREP
VICTORY COOLER VC 3 NO NO NA YES NO NO NO
HL 1400 HL 2 NO NO NA YES NO NO NO
BLODGETT
DFG-100-3 OVEN OV 8 NO NO NA YES NO YES YES
GROEN AH-1E-80 POT 4 NO NO NA YES NO YES NO
A1
RELOCATE EXISTING TABLES
TO ALLOW WALKING SPACE
BETWEEN TABLE AND S.S.
CURB.
OPP. HAND
A2
A2
MECHANICAL AND ELECTRICAL NOTES:
THE CONTRACTOR SHALL PROVIDE FANS AS NECESSARY TO EXHAUST AIR FROM THE AREA OF WORK DURING CONSTRUCTION. THE FANS SHALL
CREATE AN ADEQUATE AIR PRESSURE DROP
WITHIN THE CONSTRUCTION AREA SO THAT DUST WILL NOT TRAVEL THROUGH THE TEMPORARY DUST CONTROL SEALS INSTALLED FOR THE
PROJECT.
IF AIR IS TO BE RECIRCULATED RATHER THAN EXHAUSTED, INCLUDE A HEPA FILTER IN THE CIRCULATION SYSTEM TO REMOVE THE FINE DUST PARTICLES. ALL EXHAUST, KITCHEN HOODS AND RETURN AIR GRILLES ARE TO BE SEALED DURING CONSTRUCTION TO KEEP DUST FROM
ENTERING THE EXHAUST FANS OR REST OF THE BUILDING.
IF THE SUPPLY AIR IS NOT RUNNING 100% OF THE TIME, SEAL THE EXISTING DIFFUSERS AS WELL TO KEEP DUST FROM DRIFTING BACK INTO THE
MECHANICAL UNITS.
RUN A TEMPORARY ELECTRICAL CONNECTION FROM AN EXISTING PANEL IN THE KITCHEN TO A 200 AMP 208V 1PH PANEL IN THE TEMPORARY
KITCHEN TRAILER. ELECTRICAL FEED SHALL RUN IN TEMPORARY CONDUIT.
RUN A TEMPORARY 3
4" WATER SUPPLY TO THE TEMPORARY KITCHEN TRAILER. CONNECT TO MINIMUM 3
4" COLD WATER SUPPLY IN THE KITCHEN
AREA. PEX MAY BE USED FOR THE TEMPORARY SUPPLY.
RUN TWO (2) 4" PVC GRAY WATER WASTE PIPE FROM THE TEMPORARY KITCHEN TRAILER TO AN EXISTING SANITARY MANHOLE NEAR THE
TRAILER.
DISCONNECT AND REMOVE TEMPORARY ELECTRICAL, WATER AND WASTE PIPING AT END OF PROJECT, ONCE KITCHEN IS BACK UP AND IN
OPERATION. PATCH ALL HOLES MADE THROUGH THE WALLS TO RUN THE TEMPORARY SERVICES.
NOTES:
PREPARATION:
1. ERECT AND MAINTAIN TEMPORARY BARRIERS FOR PROTECTION OF THE OWNER AND OCCUPANTS.
2. ERECT AND MAINTAIN TEMPORARY PARTITIONS TO PREVENT SPREAD OF DUST AND ODORS INTO
CONTINUED OWNER OCCUPIED AREAS.
3. PROVIDE TEMPORARY SIGNAGE, INCLUDING EXIT SIGNAGE FOR EGRESS AROUND THE BARRIERED AREAS.
4. DO NOT HINDER OR OBSTRUCT BUILDING EGRESS PATHS AND REROUTED EGRESS PATHS.
5. DO NOT DISABLE OR DISRUPT ANY BUILDING UTILITIES WITHOUT THREE (3) DAYS NOTICE TO THE FACILITY.
6. INSTALL PROTECTIVE DUST COVERS OVER SMOKE AND HEAT DETECTORS WITHIN THE WORK AREA
DURING CONSTRUCTION.
7. ERECT AND MAINTAIN A TEMPORARY EXHAUSTING SYSTEM WHICH WILL CREATE A NEGATIVE PRESSURE
WITHIN THE WORK AREA. DURING CONSTRUCTION.
8. NOTIFY FACILITY MAINTENANCE PRIOR TO STARTING DEMOLITION AND UTILITY CONNECTION WORK.
DEMOLITION:
1. CONDUCT EQUIPMENT REMOVAL TO MINIMIZE INTERFERENCES WITH ADJACENT BUILDING AREAS.
2. MAINTAIN A PROTECTED EGRESS PATHWAYS OUTSIDE OF THE CONSTRUCTION AREA AND ACCESS TO
ADJACENT BUILDING AREAS NOT VACATED FOR THE CONSTRUCTION.
3. CARE SHALL BE TAKEN DURING GRINDING OF EXISTING CONCRETE TO LIMIT DAMAGE TO ADJACENT
MATERIALS AND WALLS.
4. EXECUTE DEMOLITION PROCEDURES TO MINIMIZE DAMAGE TO SURFACES NOT RECEIVING NEW WORK.
5. REMOVE DEMOLISHED MATERIALS FROM THE SITE. REMOVE MATERIALS BY THE END OF THE DAY. LEAVE
AREAS IN A CLEAN CONDITION.
6. PREPARE EXISTING SURFACES AND REMOVE EXISTING FINISHES AS NECESSARY IN ORDER TO INSTALL
NEW FINISH.
7. RESTORE FINISHES DAMAGED DURING DEMOLITION TO LIKE NEW CONDITION WITH MATCHING MATERIALS.
COMPLETELY SEAL VOIDS CAUSED BY CONSTRUCTION ACTIVITIES.
KEYED NOTES:
1 INSTALL A TEMPORARY DUST COVER OVER THIS DOOR OPENING.
2 ERECT A TEMPORARY DUST BARRIER WALL OF METAL STUDS AT 16" O.C. AND NON-COM PLYWOOD OR OSB. TAPE SHEETING JOINTS AND ALONG FLOOR, WALLS AND CEILING. REMOVE TEMPORARY WALL AT END OF PROJECT. PATCH AND CLEAN FLOOR, WALLS AND CEILINGS TO PRECONSTRUCTION OR BETTER
CONDITION.
3 INSTALL A COVER OVER THE EXISTING EXHAUST FAN GRILLES, KITCHEN HOODS, AND RETURN AIR GRILLES AT CEILING. DO NOT PERMIT AIR FLOW INTO THE CONNECTING DUCTS AND FANS. REMOVE
PROTECTION AT END OF PROJECT.
4 INSTALL COVED BASE OF FINISH COAT ONTO RISER OF FIRST STEP ONLY. TERMINATE FINISH ON THE
VERTICAL RISE. DO NOT EXTEND ONTO TREAD.
5 INSTALL WALL BASE COAT ON EXISTING COVED GLAZED STRUCTURAL TILE BASE. REFER TO DETAIL 2/A3.
6 EXISTING STAINLESS STEEL BASE OR METAL COOLER WALL. TERMINATE FLOORING TO PLATE WITH
SEALANT JOINT. REFER TO DETAIL 3/A3, 5/A3 OR 6/A3.
7 FEATHER NEW EPOXY COATING TO JOINT WITH EXISTING QUARRY TILE OR VINYL COMPOSITION TILE.
REFER TO DETAIL 1/A3.
8 FINISHED FLOOR SURFACE TO BE LEVEL THROUGHOUT AREA/ROOM.
9 FINISHED FLOOR SURFACE TO SLOPE TO DRAINS.
GENERAL INSTALLATION NOTES:
1. THE CONTRACTOR SHALL EMPLOY A FOOD SERVICE INSTALLER TO DISCONNECT FROM SERVICES AND MOVE THE FOOD SERVICE EQUIPMENT LISTED IN THE SCHEDULE FOR THE NEW FLOORING INSTALLATION.
AFTER THE FLOORING INSTALLATION, THE CONTRACTOR SHALL HAVE THE FOOD SERVICE INSTALLER MOVE EQUIPMENT BACK INTO PLACE, RECONNECT TO SERVICES, AND VERIFY THEIR OPERATION.
2. THE CONTRACTOR SHALL HOOK UP TEMPORARY ELECTRICAL, WATER AND WASTE CONNECTIONS TO AN OWNER RENTED KITCHEN TRAILER. VERIFY WITH OWNER LOCATION OF THE TRAILER. TEMPORARY ELECTRICAL AND WATER CONNECTIONS ARE TO BE MADE IN THE KITCHEN AREA. THE GRAY WATER TO
BE CONNECTED SPILL INTO AN EXISTING SANITARY MANHOLE NEAR THE TRAILER.
3. REMOVE QUARRY TILES AND SETTING BED IN AREAS NOTED, FILL VOID OR DAMAGE TO CONCRETE SLAB.
INSTALL NEW SETTING BED WITH SLOPES BETWEEN 1 AND 2% TO EXISTING FLOOR DRAINS. INSTALL NEW
MORTAR SLURRY FLOOR COAT AND EPOXY SEALER.
4. AT EXISTING FLOOR DRAINS, REMOVE STRAINER, POUR SLURRY COAT AND FEATHER TO DRAIN. INSTALL
FINISH COAT AND THE EPOXY SEALER. THEN REINSTALL THE STRAINER.
5. IMMEDIATELY CLEAN EXCESS COATINGS FROM FLOOR STRAINERS, CLEANOUTS, WALLS AND FLOORS
NOT INTENDED TO RECEIVE NEW FLOOR FINISH.
6. CARE SHALL BE TAKEN BY DOORS, FRAMES, AND INSULATED METAL PANELS SO AS NOT TO DAMAGE PAINT OR METAL. ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO REPAIR AT NO COST TO THE OWNER.
7. MAINTAIN A NEGATIVE PRESSURE WITHIN THE AREA OF ACTIVE CONSTRUCTION. MAINTAIN DUST BARRIERS AND DUST SEALS. DO NOT PERMIT ANY DUST TO ENTER OCCUPIED AREAS OUTSIDE THE KITCHEN. IF DUST IS ENTERING AREA, IMMEDIATE HALT CONSTRUCTION AND REPAIR DAMAGED OR INOPERABLE BARRIERS, SEALS OR FAN UNIT(S). CLEAN THE OCCUPIED AREA IMMEDIATELY. COVER ALL
SMOKE DETECTORS WITHIN THE DUST PROTECTED AREA DURING CONSTRUCTION.
8. HALT INSTALLATION OF FLOOR FINISH IMMEDIATELY IF COATING IS NOT ADHERING. REMOVE AREA OF COATING AND REWORK/REDO PREPARATION OF EXISTING SURFACE TO SOLVE ADHERENCE ISSUE.
POST INSTALLATION:
CONTRACTOR SHALL GUARANTEE ADHERENCE OF COATINGS AND REPLACE UNADHERING AREAS WITHIN ONE
YEAR AFTER SUBSTANTIAL COMPLETION AT NO COST TO THE OWNER.
AREA FOR TEMPORARY KITCHEN
6 5
3 3
8 8
CONTRACTOR ACCESS
TO WORK AREA
METAL RUNNER
EXPANSION ANCHORS
AT 48" O.C.
3 5 8" METAL STUDS
AT 16" O.C. FIRE RETARDANT TREATED
PLYWOOD OR O.S.B.
SEAL JOINTS
EXISTING QUARRY TILE
FLOORING
'-0
VE
RI
FY
IN
F
IE
LD
METAL CHANNEL
BRACE AT MID-HEIGHT
EXISTING CEILING TILE
ATTACH METAL RUNNER
TO EXISTING CEILING GRID
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A1
RELEASED FOR BIDS 03/05/2024
BELLAMY CREEK FOOD
SERVICE FLOOR PLAN
BELLAMY CREEK CORRECTIONAL
FACILITY
FOOD SERVICE FLOORING
REPLACEMENT
FILE NO: 472/23170.JGH
FLOOR PLAN
SCALE: 1 1/2" = 1'-0"
TEMPORARY WALL SECTION
SCALE: 3/4" = 1'-0"
AutoCAD SHX Text Shf
AutoCAD SHX Text
IM
AutoCAD SHX Text
SL
AutoCAD SHX Text
VR
AutoCAD SHX Text
VR
AutoCAD SHX Text
SL
AutoCAD SHX Text Swd
AutoCAD SHX Text
SAL
AutoCAD SHX Text
DM
AutoCAD SHX Text Scf
AutoCAD SHX Text Sv
AutoCAD SHX Text
VC
AutoCAD SHX Text
HL
AutoCAD SHX Text
HL
AutoCAD SHX Text
OV
AutoCAD SHX Text
POT
AutoCAD SHX Text
OV
AutoCAD SHX Text
OV
AutoCAD SHX Text
OV
AutoCAD SHX Text
POT
AutoCAD SHX Text Shf
AutoCAD SHX Text
VC
AutoCAD SHX Text Sdw
AutoCAD SHX Text
VR
AutoCAD SHX Text
VR
AutoCAD SHX Text
VC
AutoCAD SHX Text
POT
AutoCAD SHX Text
POT
AutoCAD SHX Text
PROJECT NUMBER 2320
1727 BLUEWATER HWY, IONIA, MI 48846
A3
A3
A3
A3
A3
3 A3
A3
INSTALL STAINLESS STEEL PANEL
ON WALL UP TO HOOD. SEE DETAIL
8/A3.
SIM. TO
OPP. HAND
A3
A3
12 TYP.
TYP.
EXISTING STRUCTURAL
GLAZED TILE
4" S.S. BENT CORNER PLATE
NEW URETHANE EPOXY FLOORING
REMOVED
WALL
CONTINUOUS
SEALANT
CONTINUOUS SEALANT
A3
A3
A3
A3
A3
A3
A3
EXISTING BASE BOARD
FINNED TUBE CONVECTOR
EXISTING BASE BOARD
FINNED TUBE CONVECTOR
A3
A3
A3
A3
EXTEND NEW EPOXY FLOOR COATING
INTO THIS LANDING AREA
A3
SHOT BLAST CONCRETE FLOOR FOR
INSTALLATION OF NEW URETHANE
EPOXY COATING
A2
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A2
RELEASED FOR BIDS 03/05/2024
ENLARGED PLANS
BELLAMY CREEK CORRECTIONAL
FACILITY
FOOD SERVICE FLOORING
REPLACEMENT
FILE NO: 472.23170.JGH
ENLARGED PLAN (SCULLERY)
SCALE: 1/2" = 1'-0"
ELARGED FLOOR PLAN (PREP AREA)
SCALE: 1/2" = 1'-0"
A3
AutoCAD SHX Text
PROJECT NUMBER 2320
1727 BLUEWATER HWY, IONIA, MI 48846
CONTINUOUS SEALANT
URETHANE TOP COAT OVER
URETHANE SLURRY COAT
REMOVE EXISTING QUARRY
TILE AND MUD BED
EXISTING CONCRETE
SLAB ON GRADE
CONCRETE TOPPING
EXISTING STAINLESS
STEEL BASE
FEATHER EPOXY COATING
AT TOP EDGE
TURN EPOXY COATING UP
WALL TO FIRST MORTAR JOINT
COVE DETAIL WITH BACKER
URETHANE EPOXY COATING
URETHANE SLURRY COAT
REMOVE EXISTING MUD
BED AND INSTALL NEW
MORTAR BED SLOPED TO
DRAINS
EXISTING CONCRETE
SLAB ON GRADE
EXISTING STRUCTURAL
GLAZED TILE
SCARIFY EXISTING GLAZED FACE
AS NECESSARY FOR NEW COATING
REMOVE EXISTING
SEALANT & INSTALL
NEW SEALANT
URETHANE TOP COAT BASE
EXISTING CONCRETE MASONRY
WALL WITHOUT BASE
COVE TRANSITION BETWEEN
FLOOR AND WALL
URETHANE TOP COAT OVER
URETHANE SLURRY COAT
EXISTING CONCRETE
SLAB ON GRADE
PREPARE AND GRIND
CONCRETE SURFACE
FEATHER SLURRY COAT
AND TOP COAT TO EXISTING
QUARRY TILE. FINISH ALONG
GROUT JOINT.
URETHANE TOP COAT
OVER URETHANE
SLURRY COAT
EXISTING QUARRY
TILE OVER MUD
BED
EXISTING CONCRETE SLAB ON GRADE
NEW CONCRETE TOPPING
AND URETHANE SLURRY
COATING
SEALANT
CONTINUOUS SEALANT
EXISTING INSULATED
METAL WALL PANELS
URETHANE TOP COAT OVER
URETHANE SLURRY COAT
EXISTING CONCRETE SLAB ON GRADE
CONTINUOUS SEALANT
URETHANE TOP COAT OVER
URETHANE SLURRY COAT
REMOVE EXISTING QUARRY TILE AND MUD BED
INSTALL NEW MORTAR BASE, SLOPE TO DRAINS
EXISTING CONCRETE SLAB ON GRADE
REMOVE EXISTING QUARRY TILE AND MUD BASE
GRIND TAPER IN EXISTING COATING SO THAT
NEW URETHANE TOP COAT FLUSHES OUT
WITH TOP OF EXISTING COATING
EXISTING URETHANE TOP COAT OVER
URETHANE SLURRY COAT
NEW URETHANE TOP COAT OVER
URETHANE SLURRY COAT
NEW CONCRETE TOPPING AND URETHANE SLURRY COAT
URETHANE TOP COAT
OVER URETHANE
SLURRY COAT
CONTINUOUS SEALANT
AT JOINT
8" S.S. PLATE OVER
EXISTING CONCRETE
MASONRY WALL
1/4" S.S. FLOOR
PLATES
2" NEW MUD BED
4'-11" ± 4"
8" V.
I.F
4"
1'-4" ± V.I.F.
EXHAUST HOOD
EXISTING CONCRETE
FLOOR SLAB
MODIFY EXISTING DRAIN
REMOVE EXISTING STRAINING
INSERT NEW S.S. TUBE INTO DRAIN
FORMED/BENT
S.S. PLATE CURB12
7'-
4"
IF POSSIBLE,
SLIDE SHEET BEHIND
BACK OF EXISTING
HOOD.
CONTINUOUS
SEALANT ALONG
JOINT.
CONTINUOUS
URETHANE SEALANT
CONCRETE ON GRADE
S.S. GRATE
19-W-4
4"
8" V.
I.F
4"
8" S.S. PIPE INSERT INTO EXISTING DRAIN MIN. 2"
FORM/BEND 1 8" S.S. PLATE
TO FORM A CURB
CONTINUOUSLY
WELDED IN FIELD
1'-4" ± V.I.F.
1/8" S.S. TRENCH DRAIN LINER
FORM/BEND FLOOR PLATE
INTO TRENCH DRAIN
EXTEND S.S. PLATE
INTO TRENCH DRAIN
URETHANE EPOXY
COATING OVER
SLURRY BASE
MORTAR BASE COAT
EXISTING CAST IRON OR PVC SANITARY PIPE
EXISTING DRAIN
TO REMAIN
4" S.S. FLOOR
PLATE
EXTEND 3 4" WATER
SUPPLY TO FLOOR
AND TO TRENCH
DRAIN
SHUT OFF VALVE
PIPE STAND
FASTEN TO FLOOR PLATE
4" WATER SUPPLY
3'- 6"
2"
TRENCH DRAIN
3'-81 4"
OPEN EXISTING CONC. MASONRY WALL
ATTACH TO EXISTING 3 4" SUPPLY LINE
PATCH CONC. MASONRY.
DRILL HOLE THROUGH NEW S.S.
PLATE AND COVER WITH ESCUTCHEON
CLAMP TAIL OF PIPE
TO FLOOR WITH
DOUBLE CLAMP
4'- 1"
4" S.S. BENT PLATE TO
COVER REMOVED PORTION
OF WALL
EXISTING STRUCTURAL
GLAZED TILE
9"
MORTAR BASE
SECURITY HEAD
FASTENERS AT 16" O.C.
GROUT END OF
EXISTING STRUCTURAL
GLAZED TILE SOLID
EPOXY BASE
A2
S.S. GRATE 19-W-4
STAINLESS STEEL ANGLE SUPPORTS
URETHANE EPOXY COATING
EXISTING FLOOR DRAIN
TO REMAIN
MORTAR BASE
REMOVE EXISTING QUARRY TILE
AND MUD BED, REPLACE WITH
NEW SETTING BED
#10 STAINLESS STEEL
MACHINE SCREWS
WITH SECURITY HEAD
AT MIN. 6" O.C.
SILICONE JOINT SEALANT
4" STAINLESS
STEEL FLOOR
PLATE
4" x 4" STAINLESS
STEEL JOINING PLATE
NEW SETTING
BED MORTAR
SOLDER JOINING
PLATE TO FLOOR
PLATE
DRENCH DRAIN DETAIL
SCALE: 3" = 1'-0"A2
7 SECTION DETAIL AT KETTLES
SCALE: 1" = 1'-0"
A2
BASE DETAIL W/O MUD BED FLOOR
SCALE: 3" = 1'-0"A1
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A3
ISSUED FOR BIDS 03/05/2024
FLOORING DETAILS
BELLAMY CREEK CORRECTIONAL
FACILITY
FOOD SERVICE FLOORING
REPLACEMENT
FILE NO: 472.23170.JGH
FLOOR DETAIL AT TRANSITION
SCALE: 3" = 1'-0"A1
4TYPICAL S.S. BASE
SCALE: 3"= 1'-0"A1
2NEW/EXISTING FLOOR DETAIL
SCALE: 3" = 1'-0"A1
BASE DETAIL AT COOLER WALL
SCALE: 3" = 1'-0"A1
BASE DETAIL AT COOLER WALL
SCALE: 1 1/2" = 1'-0"A2
9 WALL REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"A2
TRENCH DRAIN SECTION
SCALE: 3" = 1'-0"A2
TYPICAL BASE DET.
SCALE: 3"= 1'-0"A1
S.S. FLOOR PLATE JOINT
SCALE: 6" = 1'-0"A2
AutoCAD SHX Text
PROJECT NUMBER: 2320
AutoCAD SHX Text
1727 BLUEWATER HWY, IONIA, MI 48846
AutoCAD SHX Text A3
File details come from the government source that posted it. Updated .