472-23130.SDW - WCC - Boiler Replacment - Construction Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- RFQ-171-250000000253-2
- Issued by
- Washtenaw County, Michigan
About this file
This document is a set of mechanical and electrical construction drawings for the Boiler Replacement Project at Woodland Center Correctional Facility, prepared by the State of Michigan Department of Technology, Management and Budget (DTMB) for the Department of Corrections. The project involves comprehensive replacement of existing boiler systems, including demolition of current infrastructure and installation of new heating supply and return piping, boilers, pumps, side stream filters, heat exchangers, and associated mechanical and electrical components. The drawings are dated February 21, 2025, and detail a phased construction approach that requires temporary heating systems to be fully operational for 72 hours before demolition of existing equipment can commence.
The project scope includes installing multiple new boilers with sequencing controls, connecting to the existing Honeywell DDC control system, routing new piping through existing underground tunnels, and implementing temporary heating systems to maintain facility operations during construction. Specific requirements include painting new concrete equipment pads yellow, connecting boiler alarms to the Starnet 2 system, and ensuring minimal disruption to the correctional facility's heating and domestic hot water systems. The mechanical drawings specify detailed installation requirements, including specific pipe routing, insulation methods, and coordination with existing infrastructure, with an emphasis on maintaining facility security and operational continuity throughout the renovation process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL DRAWING INDEX
9036 E. M36, WHITMORE LAKE, MI 48189
FILE NUMBER: 472/23130.SDW
MATRIX PROJECT NUMBER: 24173.00MECHANICAL/ELECTRICAL ENGINEER
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FOR DEPARTMENT OF CORRECTIONS
WOODLAND CENTER CORRECTIONAL FACILITY - BOILER REPLACEMENT
N SITE MAP
MECHANICAL DRAWING INDEX
POWER PLANT
FOOD SERVICE BUILDING
HURON BUILDING
APPLICABLE CODES AND REFERENCES
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-000
TITLE SHEET
DBP
CAT
GENERAL HVAC NOTES
1. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURER'S WRITTEN INSTRUCTIONS.
2. ALL EXISTING SYSTEMS (AIR HANDLING UNITS; PUMPS) THAT SERVE
AREAS BEING RENOVATED SHALL BE REBALANCED AS REQUIRED.
3. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION THAT MAY
AFFECT NORMAL OPERATION OF OTHER AREAS.
4. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT WITH
NEW CONSTRUCTION AND RELOCATE AS NEEDED.
5. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
6. ALL REHEAT COIL HS&R RUNOUT PIPES SHALL BE 3/4" UNLESS
OTHERWISE NOTED.
7. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DISCIPLINES
PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
8. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
9. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT MAY
AFFECT THE WORK.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE
INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW" CONDITION
DURING CONSTRUCTION.
11. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND
SUBCONTRACTORS AS REQUIRED BY LAW.
12. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE, LATEST
APPLICABLE EDITION.
13. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT FITTINGS IN
ACCORDANCE WITH SMACNA. (WYES, RADIUSED OR VANED TEES, ETC.)
DUCTWORK SHALL BE GALVANIZED SHEET METAL, MIN. 26 GA.
14. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION. INCREASE
DUCT SIZE FOR LINING.
15. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE FLEXIBLE
DUCT CONNECTORS.
16. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST ITEM SHALL
BE USED.
17. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF
PIPES AND DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF
DRAWINGS TO INDICATE ALL NECESSARY OFFSETS. INSTALL WORK IN
MANNER TO CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
17. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER TO REVIEW
AND FIX ISSUES DURING THE WARRANTY PERIOD.
18. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO OWNER OF THE
AMOUNT OF MATERIAL BEING RECYCLED THROUGHOUT THE PROJECT.
19. CONTRACTOR WILL HAVE MULTIPLE ESCORTS AVAILABLE TO WORK WITH
THROUGHOUT THE PROJECT. CONTRACTOR IS ALLOWED TO HAVE
MULTIPLE CREWS WORKING IN MULTIPLE LOCATIONS THROUGHOUT THE
PROJECT. CONTRACTOR IS TO PROVIDE ATLEAST A 7 DAY NOTICE OF
HOW MANY ESCORTS WILL BE NEEDED THE FOLLOWING WEEK FOR THE
FACILITY TO COORDINATE INTERNALLY.
20. CONTRACTOR TO PATCH ALL EXTERIOR WALL PENETRATIONS AS
REQUIRED TO MATCH EXISTING AND SEAL WATERTIGHT.
21. CONTRACTOR TO PATCH ALL ROOF PENETRATIONS TO MATCH EXISTING,
SEAL WATER TIGHT, AND MAINTAIN ANY EXISTING ROOF WARRANTIES.
22. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING HEAT/DOMESTIC HOT
WATER IN BUILDINGS THROUGHOUT THE PROJECT.
23. FIELD VERIFY EXISTING SIZE OF ALL DAMPER ACTUATORS/CONTROL
VALVES AND EQUIPMENT PRIOR TO ORDERING.
24. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN ADVANCE FOR
ANY HOT WORK TO ALLOW THE OWNER TO DISABLE THE FIRE ALARM.
25. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL USE
TAMPERPROOF SCREWS.
26. COMBUSTION AIR AND VENT ROOF PENETRATIONS TO INCLUDE A CURB
AND ROOF CURB BOOT. PATCH AND SEAL ROOF PENETRATIONS TO BE
WATER TIGHT. ALL ROOF PENETRATIONS SHALL BE SEALED WATER TIGHT
AND SHALL MAINTAIN ALL EXISTING WARRANTIES. ALL COMBUSTION AIR
AND VENT PIPE EXTERIOR OPENINGS ARE TO BE EQUIPPED WITH BUG
SCREEN.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING
TEMPORARY HEATING SYSTEM (BOILER(S), PUMP(S), AIR SEPARATOR,
AND EXPANSION TANK) IN THE LOCATIONS INDICATED ON THE
CONSTRUCTION DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR ALL
MAINTENANCE OF TEMPORARY HEATING SYSTEMS TO ENSURE THAT
THEY ARE FULLY OPERATIONAL THROUGHOUT CONSTRUCTION.
28. ALL COORDINATION ITEMS AND/OR REQUIRED SYSTEM SHUTDOWNS
MUST BE COORDINATED AND APPROVED BY MDOC 10 DAYS IN ADVANCE.
CONTRACTOR TO PROVIDE DETAILED SCHEDULE OF WHAT IS GOING TO
OCCUR AND WHAT WILL BE AFFECTED. CONTRACTOR TO ALSO PROVIDE
MDOC WITH SAFETY AND BACKUP PLANS IF AN UNEXPECTED EVENT
WERE TO OCCUR DURING THE COORDINATION ITEMS AND/OR REQUIRED
SYSTEM SHUTDOWNS.
30. CONNECT NEW TEMPROARY HEATING SYSTEMS CONTROLS TO SECURITY
IT RACK WITH PURPLE CAT-6 CABLES(S) AS REQUIRED TO CONNECT TO
STARNET 2 SYSTEM. CONTRACTOR TO HIRE AND COORDINATE
CONNECTION TO SECURITY IT RACK WITH BRETT EMERSON FROM
COMMTECH DESIGN (PHONE 616-433-7210).
31. REFER TO SPECIFICATION 262923 - VARIABLE FREQUENCY MOTOR
CONTROLS FOR VFD REQUIREMENTS.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S
F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AP ACCESS PANEL
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
ACCESS PANEL
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T P
T N
M
M
SD
T
PROJECT PHASING
1. BOTH TEMPORARY HEATING SYSTEMS (BOILER(S),
PUMP(S), AIR SEPARATOR, AND EXPANSION TANK) MUST
BE PROPERLY INSTALLED AND FULLY OPERATION FOR
72 HOURS WITHOUT ANY ISSUES BEFORE ANY
DEMOLITION WORK ON THE EXISTING SYSTEM CAN
BEGIN. THE 72 HOUR TESTING MUST START ON A
MONDAY TO ENSURE ANY REQUIRED TROUBLE
SHOOTING IS COMPLETED PRIOR TO THE WEEKEND.
2. TEMPORARY HEATING SYSTEMS ARE TO SERVE THE
FACILITY FOR THE COMPLETE DURATION OF THE
PROJECT UNTIL THE NEW EQUIPMENT IN THE POWER
PLANT IS FULLY INSTALLED AND FULLY OPERATIONAL.
CONTRACTOR IS RESPONSIBLE FOR ALL
MAINTENANCE/SERVICE ON TEMPORARY HEATING
SYSTEMS TO ENSURE THE SYSTEM IS FULLY
OPERATION FOR THE DURATION OF THE PROJECT.
ONLY ALLOWABLE SHUTDOWNS ARE SHORT CHANGE
OVER SHUTDOWNS THAT ARE COORDINATED AND
APPROVED BY MDOC 10 DAYS IN ADVANCE.
3. DEMOLITION WORK THAT AFFECTS THE FACILITY'S
HEATING/DOMESTIC HOT WATER SYSTEM CAN NOT
BEGIN PRIOR TO MAY 1ST. PREPARATION WORK FOR
THE INSTALLATION OF THE TEMPORARY HEATING
SYSTEMS CAN BEGIN AS EARLY AS REQUIRED TO
ENSURE THE TEMPORARY HEATING SYSTEMS ARE
INSTALLED AND FULLY OPERATION FOR 72 HOURS
WITHOUT ANY ISSUES BEFORE ANY DEMOLITION WORK
ON THE EXISTING SYSTEM CAN BEGIN.
4. CONTRACTOR IS TO HAVE FULL ACCESS TO THE POWER
PLANT AND BELOW GRADE TUNNELS THROUGHOUT THE
DURATION OF THE PROJECT.
5. THE NEW POWER PLANT HEATING/DOMESTIC HOT
WATER SYSTEM IS TO BE PROPERLY INSTALLED AND
FULLY OPERATIONAL BY SEPTEMBER 30TH. THE NEW
POWER PLANT HEATING/DOMESTIC HOT WATER
SYSTEM IS TO OPERATE FOR 72 HOURS BEFORE THE
TEMPORARY HEATING SYSTEMS CAN BE
DISCONNECTED AND REMOVED FROM THE FACILITY.
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL
APPLICABLE LOCAL CODES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND
ACCESSORIES PER MANUFACTURERS WRITTEN
INSTRUCTIONS.
3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER
SUPPLY LINES.
4. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE
SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND
SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.
5. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING
UNDERGROUND UTILITIES BEFORE BEGINNING WORK.
6. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING
PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW
INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.
7. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE
AS NEEDED.
8. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY
AFFECT NORMAL OPERATION OF OTHER AREAS.
9. ALL FLOOR DRAINS TO BE EQUIPPED WITH TRAP
PRIMERS OR CODE APPROVED TRAP SEALS, UNLESS
OTHERWISE NOTED.
10. 2% SLOPE FOR ALL SANITARY PIPING 2-1/2" OR LESS IN
DIAMETER. 1% SLOPE FOR ALL SANITARY PIPING 3" OR
MORE IN DIAMETER.
11. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
13. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
14. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE CODES AND REGULATIONS ENFORCED BY
LOCAL BUILDING OFFICIALS.
15. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
16. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
17. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS AND ALL OTHER TRADES
PRIOR TO INSTALLATION. ANY CONTRACTOR INSTALLING
WORK WITHOUT PRIOR COORDINATION SHALL
RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW
PROPER INSTALLATION OF ANY AND ALL TRADES WORK.
18. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE
ELECTRICAL GEAR OR IN THE SERVICE SPACE
REQUIRED BY THE NATIONAL ELECTRICAL CODE.
19. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH
POST CONSTRUCTION MEETING WITH THE ENGINEER
AND OWNER TO REVIEW AND FIX ISSUES DURING THE
WARRANTY PERIOD.
20. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
21. CONTRACTOR TO SAW CUT EXISTING CONCRETE FLOOR
AS REQUIRED TO COMPLETE WORK. CONTRACTOR TO
PATCH EXISTING FLOOR TO MATCH EXISTING AND BE
FLUSH ONCE ALL BELOW FLOOR WORK IS COMPLETED.
22. CONTRACTOR TO PATCH ALL ROOF PENETRATIONS TO
MATCH EXISTING, SEAL WATER TIGHT, AND MAINTAIN
ANY EXISTING ROOF WARRANTIES.
23. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES
SHALL USE TAMPERPROOF SCREWS.
GENERAL PLUMBING NOTES
MISCELLANEOUS NOTES
PLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN BELOW FINISH
SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW FINISH
SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN BELOW
FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
ACID RESISTANT
VENT ACID RESISTANT WASTE
ACID RESISTANT WASTE BELOW FINISH SLAB
RAIN CONDUCTOR
STORM BELOW FINISH SLAB
OVERFLOW RAIN CONDUCTOR
OVERFLOW RAIN CONDUCTOR BELOW FINISH
SLAB
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
COMPRESSED AIR
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
VACUUM
DEMOLITION
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
PIPING FLEXIBLE CONNECTOR
SIGHT GLASS
PIPE EXPANSION
COMPENSATOR FLOW SENSOR DEVICE
FLOW METER
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
BUCKET TRAP
FLOAT & THERMOSTATIC TRAP
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
SW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
FP
G
LP
ARV
ARW
ARW
RC
ST
ORC
ORC
SAN
SAN
V
V
CA
NO
N2
MA
VAC
M M
P
FS
FT
BT
PS
SS
MECHANICAL/PLUMBING
SYMBOLS, NOTES, AND
ABBREVIATIONS
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-100
FOOD SERVICE
HURON HOUSING
HURON ADMIN
X-10" HS & HR
(IN X-TUNNEL)
M-200
M-200
X-4" HS&HR,
X-3" STM, &
X-1-1/4" SC
(IN X-TUNNEL)
X-10" HS & HR
(IN X-TUNNEL)
X-10" HS & HR
(IN X-TUNNEL)
X-10" HS & HR
(IN X-TUNNEL)
M-200
M-200
ACCESS POINT
ACCESS POINT
ACCESS POINT
ACCESS
POINT
ACCESS POINT
ACCESS POINT
M-200
X-4" HR
X-4" HS
X-METAL
PIPE RACK
X-3" STM
X-1-1/4" SC
6'
5'
X-CONCRETE TUNNEL
GENERAL DEMOLITION NOTES
1. ALL EXISTING PIPING IN THE EXISTING TUNNEL IS TO REMAIN ACTIVE DURING
INSTALLATION OF TEMPORARY BOILER AND TEMPORARY GAS LINE. CONTRACTOR
TO BEGIN DEMOLITION OF EXISTING PIPING IN EXISTING TUNNEL ONCE THE
INSTALLATION OF THE TEMPORARY HEATING SYSTEMS AND TEMPORARY GAS LINES
ARE COMPLETE AND OPERATE FOR 72 HOURS WITHOUT ANY ISSUES.
2. EXISTING TUNNEL, TUNNEL CAPS, METAL PIPE RACKING, PIPE SUPPORTS, WALL
MOUNTED PIPE ANCHORS, AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
CONTRACTOR IS RESPONSIBLE FOR THE REPLACEMENT OF ANY BROKEN/DAMAGED
TUNNEL CAPS, METAL PIPE RACKING, PIPE SUPPORTS, AND WALL MOUNTED PIPE
ANCHORS DURING CONSTRUCTION.
3. LOCATION OF THE EXISTING BURIED CONCRETE UTILITY TUNNELS SHOWN.
DIMENSIONS OF EXISTING BURIED CONCRETE UTILITY TUNNELS SHOWN IN
CORRESPONDING SECTION VIEWS ON DRAWINGS.
4. EXISTING PIPE ROUTING INSIDE TUNNEL NOT SHOWN ON PRINT FOR CLARITY.
EXISTING PIPE SIZES SHOWN ON PRINTS. EXISTING PIPE SIZE AND ORIENTATION
INSIDE TUNNEL SHOWN BY SECTION VIEWS THROUGHOUT TUNNEL.
5. CONTRACTOR TO PROVIDE GROUND PENETRATING RADAR SURVEY PRIOR TO
CONSTRUCTION TO VERIFY LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
IN THE AREA OF EXISTING TUNNEL EXCAVATION. ALL EXCAVATION WITHIN 6 FEET OF
EXISTING UNDERGROUND UTILITIES IS TO USE HYDROVAC-EXCAVATION.
CONTRACTOR TO BID TUNNEL USING A EXCAVATOR FOR EXISTING TUNNEL
EXCAVATION. ALL HYDRO-EXCAVATION COST IS TO COME FROM THE PROJECT
ALLOWANCE.
6. CONTRACTOR TO PROVIDE BARRICADES, SIGNS, AND OTHER SAFETY MEASURES
AROUND ALL AREAS OF EXCAVATION.
7. THE EXISTING TUNNEL CONTAINS ASBESTOS CONTAINING MATERIALS. THE
CONTRACTOR IS TO ABATE THE ASBESTOS CONTAINING MATERIALS. THE COST OF
THE ASBESTOS ABATEMENT IN THE TUNNEL WILL BE PULLED FROM THE ASBESTOS
ABATEMENT ALLOWANCE THAT IS INCLUDED ON THE PROJECT BID FORM.
8. CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY RE-LOCATION OF
CONDUIT/WIRE, SUPPORTS, JUNCTION BOXES, AND ALL OTHER MATERIALS
FASTENED TO THE EXISTING TUNNEL CAP IN AREAS WHERE THE TUNNEL CAP IS
REQUIRED TO BE REMOVED. CONTRACTOR TO MODIFY CONDUIT/WIRE, SUPPORTS,
JUNCTION BOXES, AND ALL OTHER MATERIALS FASTENED TO THE EXISTING TUNNEL
CAP AS REQUIRED TO BE TEMPORARY RELOCATED AND THEN RE-INSTALLED IN THE
EXISTING LOCATION ONCE THE TUNNEL CAP IS RE-INSTALLED.
DEMOLITION NOTES
ONCE INSTALLATION OF TEMPORARY HEATING SYSTEMS AND TEMPORARY GAS
PIPING ARE COMPLETE, CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO
EXISTING HEATING SUPPLY PIPING, HEATING RETURN PIPING, EXPANSION JOINTS,
GUIDES, ROLLERS, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY. EXISTING WALL MOUNTED PIPE ANCHORS AND METAL PIPE
SUPPORTS ARE TO REMAIN AND BE RE-USED. EXISTING STEAM PIPING, STEAM
CONDENSATE PIPING, AND ALL ASSOCIATED ACCESSORIES ARE TO REMAIN.
CONTRACTOR TO EXCAVATE EXISTING GREEN SPACE IN LOCATION SHOWN
WHERE APPLICABLE TO REMOVE EXISTING CONCRETE TUNNEL CAP. IN LOCATIONS
SHOWN WHERE GREEN SPACE IS NOT AVAILABLE, CONTRACTOR TO SAW CUT
EXISTING ASPHALT/CONCRETE AND THEN EXCAVATE AS REQUIRED TO REMOVE
EXISTING CONCRETE TUNNEL CAP. CONTRACTOR TO REMOVE EXISTING
CONCRETE TUNNEL CAP AS REQUIRED TO REMOVE AND RE-INSTALL PIPING AND
ALL ASSOCIATED ACCESSORIES AS INDICATED ON DRAWINGS. CONTRACTOR IS
RESPONSIBLE FOR COORDINATING WITH MDOC FOR THE LOCATIONS WHERE
EXCAVATION/SAW CUTTING ARE TO OCCUR AND TO PLAN FOR PARKING LOT
DISRUPTIONS. CONTRACTOR TO PROVIDE ALL NECESSARY SAFETY BARRICADES
AND SIGNAGE IN LOCATIONS OF EXCAVATION.
X-10" HS
6'
7'
X-CONCRETE TUNNEL1
X-10" HR
X-METAL
PIPE RACK
X-HS
X-HR
X-10"
X-
HS
X-
HR
1 1 1
X-TUNNEL
X-10"
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-200
PARTIAL SITE PLAN -
MECHANICAL DEMOLITION
DBP
CAT
N
PARTIAL SITE PLAN - MECHANICAL DEMOLITION
TUNNEL DETAIL - POWER PLANT TO FOOD SERVICE TYPICAL CROSS
SECTION
SCALE: NTS
SCALE: 1/32" = 1'-0"
0 51 10 25 80
TUNNEL DETAIL - POWER PLANT TO HURON
BUILDING TYPICAL CROSS SECTION
SCALE: NTS
TUNNEL PIPING ENTERING HURON ADMIN - MECHANICAL
DEMOLITION
SCALE: 1/4" = 1'-0"
N
FOOD SERVICE
HURON HOUSING
HURON ADMIN
ACCESS POINT
ACCESS POINT
ACCESS POINT
ACCESS
POINT
ACCESS POINT
ACCESS POINT
10" HS & HR
(X-TUNNEL)
M-201
M-201
4" HS & HR,
X-3" ST,
& X-1-1/4" SC
(X-TUNNEL)
10" HS & HR
(X-TUNNEL)
10" HS & HR
(X-TUNNEL)
10" HS & HR
(X-TUNNEL)
4" GAS (TEMP.), 10" HS,
& 10" HR UP TO POWER
PLANT
THS-1
M-201
1-1/2" G (TEMP), 4"
HS, & 4" HR UP TO
POWER PLANT
10" HS/HR &
4" G (TEMP.)
1-1/2" G (TEMP.)
M-201
M-201
G
HRHS
4" G
(TEMP.)
THS-2 2
R-THS-1
R-THS-2 3
HS
HR
G
6 6
1-1/2" G (TEMP), 4" HS, &
4" HR TO FOOD SERVICE
BUILDING
4" HS/HR (TEMP.)
& 1-1/2" G (TEMP.)
4" G (TEMP.)
4" G (TEMP.)
4" G (TEMP.)
4" G (TEMP.)
65'-0"
100'-0"
EXPANSION
JOINTS
EXPANSION
JOINTS
EXPANSION
JOINTS
EXPANSION
JOINTS
EXPANSION
JOINTS
X-METAL
PIPE RACK
X-3" STM
X-1-1/4" SC
6'
5'
X-CONCRETE TUNNEL
4" HR
4" HS1
11-1/2" TEMPORARY GAS LINE3
PIPING KEY NOTES
INSTALL NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN EXISTING CONCRETE
TUNNEL. RE-USE EXISTING METAL PIPE SUPPORTS, WALL MOUNTED PIPE
ANCHORS, PIPE GUIDES, AND PIPE ROLLERS TO ROUTE NEW PIPING. REFER
TO TUNNEL CROSS SECTION DETAILS FOR PIPING ORIENTATION.
INSTALL NEW TEMPORARY HEATING SYSTEM, HEATING SUPPLY PIPING,
HEATING RETURN PIPING, GAS PIPING, AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN. CONTRACTOR TO ENSURE THAT THE NEW
TEMPORARY HEATING SYSTEM IS FULLY OPERATIONAL FOR 72 HOURS WITH
NO ISSUES PRIOR TO REMOVAL OF THE EXISTING PIPING IN THE TUNNEL.
ROUTE NEW TEMPORARY PIPING THROUGH THE EXISTING DOOR OPENINGS
TO PREVENT ANY NEW BUILDING PENETRATIONS.
INSTALL NEW TEMPORARY GAS PIPING AND ALL ASSOCIATED ACCESSORIES IN
THE EXISTING TUNNEL. INSTALL TEMPORARY GAS PIPING THROUGH EXISTING
DOORWAYS TO SERVE TEMPORARY HEATING SYSTEMS. CONTRACTOR TO
INSTALL NEW TEMPORARY GAS PIPING PRIOR TO REMOVAL OF EXISTING
PIPING IN EXISTING TUNNEL. INSTALL NEW TEMPORARY GAS REGULATORS
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN.
CONNECT NEW TEMPORARY HEATING SUPPLY PIPING, HEATING RETURN
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO EXISTING
PIPING. MODIFY EXISTING PIPING AS REQUIRED TO MAKE NEW CONNECTION.
CONTRACTOR TO ROUTE NEW TEMPORARY PIPING THROUGH EXISTING
DOORWAY AND TEMPORARY PLYWOOD DOOR.
CONTRACTOR TO ROUTE TEMPORARY HEATING SUPPLY PIPING, HEATING
RETURN PIPING, AND GAS PIPING THROUGH EXISTING SECURITY FENCING
ACCESS DOOR (ROUGHLY 6' WIDE x 8' TALL CHAIN LINK FENCE DOOR) IN THE
LOCATION SHOWN. CONTRACTOR TO MODIFY EXISTING ACCESS DOOR AS
REQUIRED TO ROUTE NEW PIPES. CONTRACTOR TO PROVIDE 1 FOR 1
REPLACEMENT SECURITY FENCE ACCESS DOOR WHEN THE PROJECT IS
COMPLETE TO REPLACE THE MODIFIED DOOR.
REFER TO M-401 FOR PIPING CONTINUATION.
REFER TO M-403 FOR PIPING CONTINUATION.
REFER TO M-404 FOR PIPING CONTINUATION.
CONTRACTOR TO PATCH EXISTING CONCRETE/ASPHALT IN LOCATIONS USED
FOR TUNNEL ACCESS TO MATCH EXISTING AND MATCH EXISTING SLOPE.
CONTRACTOR TO INFILL, REGRADE, AND SEED EXISTING GREEN SPACES USED
FOR TUNNEL ACCESS TO MATCH EXISTING. REFER TO SEEDING SCHEDULE
FOR RE-SEEDING.
INSTALL EXPANSION JOINT FOR HEATING SUPPLY AND HEATING RETURN
PIPING IN LOCATION SHOWN PER MANUFACTURERS INSTALLATION
INSTRUCTIONS. HEATING SUPPLY AND HEATING RETURN EXPANSION JOINTS
ARE TO HAVE +/- 4" ABSORPTION. REFER TO M-801 DETAIL 6 FOR EXPANSION
JOINT DETAIL.
CONTRACTOR TO INSTALL THS-1 IN FENCED IN AREA HIGHLIGHTED ON
DRAWINGS. THE OPEN AREA WITHIN THE SECURED FENCE THAT CAN BE
UTILIZED FOR THE INSTALLATION OF THS-1 IS ROUGHLY 65' x 100'. EXISTING
SALLY PORT GATES WILL BE UTILIZED TO ACCESS THE AREA WITHIN IN THE
SECURITY FENCE. CONTRACTOR TO COORDINATE WITH THE FACILITY TO GET
APPROVAL ON THE PROPOSED ORIENTATION FOR THE INSTALLATION OF THS-1
PRIOR TO BEING INSTALLED.
GENERAL MECHANCIAL NOTES
1. PIPE ROUTING INSIDE TUNNEL NOT SHOWN ON PRINT FOR CLARITY. PIPE SIZES
SHOWN ON PRINTS. PIPE ORIENTATION INSIDE TUNNEL SHOWN BY SECTION
VIEWS THROUGHOUT TUNNEL.
2. ALL EXISTING PIPING IN THE EXISTING TUNNEL TO REMAIN ACTIVE DURING
INSTALLATION OF TEMPORARY HEATING SYSTEMS AND TEMPORARY GAS LINES.
CONTRACTOR TO BEGIN DEMOLITION OF EXISTING PIPING IN EXISTING TUNNEL
ONCE THE INSTALLATION OF THE TEMPORARY BOILER AND TEMPORARY GAS
LINE ARE COMPLETE AND OPERATE FOR 72 HOURS WITHOUT ANY ISSUES.
3. BEFORE ROUTING TEMPORARY HEATING SUPPLY PIPING, HEATING RETURN
PIPING, GAS PIPING PIPING, AND ALL ASSOCIATED ACCESSORIES, REMOVE AND
SALVAGE EXISTING DOORS WHERE THE THS-1 AND THS-2 TEMPORARY PIPING IS
SHOWN. THE DOORWAYS ARE TO BE UTILIZED FOR THE TEMPORARY PIPE
ROUTING. CONTRACTOR TO PROVIDED PLYWOOD TEMPORARY DOORS THAT CAN
HAVE THE PIPING ROUTED THROUGH THEM AND STILL BE LOCKED TO SECURE
THE DOORWAYS. THE FACILITY WILL PROVIDE PAD LOCKS TO SECURE THE
TEMPORARY DOORS DURING CONSTRUCTION. CONTRACTOR TO REMOVE
EXISTING TEMPORARY HEATING SYSTEMS, TEMPORARY PIPING, AND ALL
ASSOCIATED ACCESSORIES ONCE THE NEW POWER PLANT WORK IS COMPLETE
AND ONLINE. ONCE ALL THE TEMPORARY HEATING SYSTEMS AND PIPING ARE
REMOVED, THE EXISTING SALVAGED DOORS ARE TO BE RE-INSTALLED.
4. CONTRACTOR TO RENT AND PROVIDE THS-1 (TEMPORARY HEATING SYSTEM)
WITH AT LEAST THE FOLLOWING PERFORMANCE REQUIREMENTS/COMPONENTS:
10,000 MBH INPUT NATURAL GAS HOT WATER BOILER, 500 GPM AND 170 FT. HD
PUMP WITH VFD, AIR SEPARATOR, EXPANSION TANK, PIPING, ALARMS, AND ALL
REQUIRED CONTROLS ACCESSORIES. THS-1 IS TO BE A COMPLETE PACKAGED
SYSTEM WITH ALL THE COMPONENTS REQUIRED FOR A COMPLETE TEMPORARY
HEATING SYSTEM. ALL THS-1 ALARMS ARE TO BE TIED TO THE SECURITY IT RACK
WITH PURPLE CAT-6 CABLES(S) AS REQUIRED TO CONNECT TO STARNET 2
SYSTEM. CONTRACTOR TO HIRE AND COORDINATE CONNECTION TO SECURITY IT
RACK WITH BRETT EMERSON FROM COMMTECH DESIGN (PHONE 616-433-7210).
ALL THS-1 ALARMS THAT ARE TO BE TIED STARNET 2 SYSTEM AND TO THE
SECURITY IT RACK WITH PURPLE CAT-6 CABLES ARE TO BE REMOVED AT THE
END OF THE PROJECT WHEN THS-1 IS REMOVED. RENTAL EQUIPMENT
CONTRACTOR IS TO BE ON CALL 24/7 TO RESPOND TO ANY ISSUES WITH THE
OPERATION OF THS-1. RENTAL EQUIPMENT CONTRACTOR TO BE ONSITE TWICE A
WEEK THROUGHOUT CONSTRUCTION TO INSPECT THE RENTAL EQUIPMENT,
PERFORM AND REQUIRED PREVENTATIVE MAINTENANCE, AND ADDRESS ANY
FOUND ISSUES WITH THE EQUIPMENT.
5. CONTRACTOR TO RENT AND PROVIDE THS-2 (TEMPORARY HEATING SYSTEM)
WITH AT LEAST THE FOLLOWING PERFORMANCE REQUIREMENTS/COMPONENTS:
1,000 MBH INPUT NATURAL GAS HOT WATER BOILER, 50 GPM AND 30 FT. HD PUMP
WITH VFD, AIR SEPARATOR, EXPANSION TANK, PIPING, ALARMS, AND ALL
REQUIRED CONTROLS ACCESSORIES. THS-2 IS TO BE A COMPLETE PACKAGED
SYSTEM WITH ALL THE COMPONENTS REQUIRED FOR A COMPLETE TEMPORARY
HEATING SYSTEM. ALL THS-2 ALARMS ARE TO BE TIED TO THE SECURITY IT RACK
WITH PURPLE CAT-6 CABLES(S) AS REQUIRED TO CONNECT TO STARNET 2
SYSTEM. CONTRACTOR TO HIRE AND COORDINATE CONNECTION TO SECURITY IT
RACK WITH BRETT EMERSON FROM COMMTECH DESIGN (PHONE 616-433-7210).
ALL THS-2 ALARMS THAT ARE TO BE TIED STARNET 2 SYSTEM AND TO THE
SECURITY IT RACK WITH PURPLE CAT-6 CABLES ARE TO BE REMOVED AT THE
END OF THE PROJECT WHEN THS-1 IS REMOVED. RENTAL EQUIPMENT
CONTRACTOR IS TO BE ON CALL 24/7 TO RESPOND TO ANY ISSUES WITH THE
OPERATION OF THS-2. RENTAL EQUIPMENT CONTRACTOR TO BE ONSITE TWICE A
WEEK THROUGHOUT CONSTRUCTION TO INSPECT THE RENTAL EQUIPMENT,
PERFORM AND REQUIRED PREVENTATIVE MAINTENANCE, AND ADDRESS ANY
FOUND ISSUES WITH THE EQUIPMENT.
6. CONTRACTOR TO SUPPORT AND INSULATE ALL TEMPORARY PIPING. OUTDOOR
TEMPORARY PIPING INSULATION TO BE COVERED WITH VISQUEEN DURING
CONSTRUCTION TO PROTECT IT FROM THE WEATHER.
7. EXISTING TUNNEL, TUNNEL CAPS, METAL PIPE RACKING, PIPE SUPPORTS, PIPE
GUIDES, PIPE ROLLERS, WALL MOUNTED PIPE ANCHORS, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN AND BE RE-USED. CONTRACTOR IS RESPONSIBLE FOR
THE REPLACEMENT OF ANY BROKEN/DAMAGED TUNNEL CAPS, METAL PIPE
RACKING, PIPE SUPPORTS, PIPE GUIDES, PIPE ROLLERS AND WALL MOUNTED
PIPE ANCHORS DURING CONSTRUCTION.
8. THE EXISTING TUNNEL CONTAINS ASBESTOS CONTAINING MATERIALS. THE
CONTRACTOR IS TO ABATE THE ASBESTOS CONTAINING MATERIALS. THE COST
OF THE ASBESTOS ABATEMENT IN THE TUNNEL WILL BE PULLED FROM THE
ASBESTOS ABATEMENT ALLOWANCE THAT IS INCLUDED ON THE PROJECT BID
FORM.
9. CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY RE-LOCATION OF
CONDUIT/WIRE, SUPPORTS, JUNCTION BOXES, AND ALL OTHER MATERIALS
FASTENED TO THE EXISTING TUNNEL CAP IN AREAS WHERE THE TUNNEL CAP IS
REQUIRED TO BE REMOVED. CONTRACTOR TO MODIFY CONDUIT/WIRE,
SUPPORTS, JUNCTION BOXES, AND ALL OTHER MATERIALS FASTENED TO THE
EXISTING TUNNEL CAP AS REQUIRED TO BE TEMPORARY RELOCATED AND THEN
RE-INSTALLED IN THE EXISTING LOCATION ONCE THE TUNNEL CAP IS
RE-INSTALLED.
SEEDING SCHEDULE
CONTRACTOR TO SUPPLY 6" OF TOPSOIL
OVER ALL DISTURBED AREAS. SEED ALL
DISTURBED AREAS WITH THE FOLLOWING
SEED MIX:
40% KENTUCKY BLUEGRASS
25% CREEPING FESCUE
20% PERENNIAL RYEGRASS
15% CHEWING FESCUE
APPLY AT A RATE OF 8 LBS PER 1,000
SQUARE FEET OR 350 LBS PER ACRE.
X-METAL
PIPE RACK
6'
7'
X-CONCRETE TUNNEL
10" HR
10" HS
4" TEMPORARY GAS LINE3
X-HS
X-HR
X-10"
X-TUNNEL
HRHS G GHRHS
G
HR
HS
10" HS/HR &
4" G (TEMP.)
4310" HS/HR &
4" G (TEMP.)
4" G (TEMP.)
10"
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-201
PARTIAL SITE PLAN -
MECHANICAL NEW
DBP
CAT
TUNNEL DETAIL - POWER PLANT TO HURON BUILDING
TYPICAL CROSS SECTION
SCALE: NTS 1
TUNNEL DETAIL - POWER PLANT TO FOOD SERVICE
TYPICAL CROSS SECTION
SCALE: NTS
N
PARTIAL SITE PLAN - MECHANICAL NEW
SCALE: 1/32" = 1'-0"
0 51 10 25 80
3 TUNNEL PIPING ENTERING HURON ADMIN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, METAL FRAME, METAL
ACCESS PLATFORM, FLUE, GAS PIPING, REGULATOR VENT PIPING, HEATING
SUPPLY PIPING, HEATING RETURN PIPING, RELIEF VENT PIPING, CONTROLS,
AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO
PATCH EXISTING CONCRETE FLOOR TO BE FLUSH AND MATCH EXISTING IN
LOCATION WHERE BOILER IS REMOVED. CONTRACTOR TO PATCH FLUE ROOF
PENETRATION TO MATCH EXISTING, SEAL WATER TIGHT, AND MAINTAIN ANY
ROOF WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING BASE MOUNTED BOILER PUMP,
PIPING, VALVES, FITTINGS, CONCRETE PAD, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING
CONCRETE FLOOR TO BE FLUSH AND MATCH EXISTING IN LOCATION WHERE
EXISTING CONCRETE PAD IS REMOVED.
DISCONNECT, REMOVE, AND DEMO EXISTING BASE MOUNTED PUMP, PIPING,
VALVES, FITTINGS, CONTROLS, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY. CONCRETE PAD TO REMAIN AND BE RE-USED AS SHOWN ON NEW
DRAWING. CONTRACTOR TO RE-PAINT ENTIRE CONCRETE PAD YELLOW TO
MATCH EXISTING CONCRETE PAD.
DISCONNECT, REMOVE, AND DEMO GAS PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
DISCONNECT, REMOVE, AND DEMO EXISTING WATER SOFTENER, BRINE TANK,
PIPING, CONCRETE PAD, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY. CONTRACTOR TO PATCH EXISTING CONCRETE FLOOR TO BE FLUSH
AND MATCH EXISTING IN LOCATION WHERE EXISTING CONCRETE PAD IS
REMOVED.
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC COLD WATER PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS
SHOWN.
CONTRACTOR TO INSTALL 1-1/2" TEMPORARY COLD WATER LINE (UTILIZING
THE X-BFP) AS REQUIRED TO SERVE THE EXISTING COLD WATER LINES WHILE
THE EXISTING WATER SOFTENER SYSTEM IS BEING DEMOLISHED. ONCE NEW
WATER SOFTENER SYSTEM SHOWN ON NEW DRAWINGS IS INSTALLED, THE
DOMESTIC COLD WATER PIPING AND X-BFP CAN BE DEMOLISHED TO THE
EXTENTS SHOWN AND CONNECTED TO THE NEW COLD WATER PIPING SHOWN
ON THE NEW DRAWINGS.
DISCONNECT, REMOVE, AND DEMO EXISTING SIDE STREAM FILTERS, FILTER
HOUSINGS, CONTROLS, PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONCRETE PAD TO REMAIN AND BE
RE-USED AS SHOWN ON NEW DRAWING. CONTRACTOR TO RE-PAINT ENTIRE
CONCRETE PAD YELLOW TO MATCH EXISTING CONCRETE PAD.
DISCONNECT, REMOVE, AND DEMO EXISTING PLATE AND FRAME HEAT
EXCHANGER, CONTROLS, PIPING, VALVES, FITTINGS, CONCRETE PAD, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH
EXISTING CONCRETE FLOOR TO BE FLUSH AND MATCH EXISTING IN LOCATION
WHERE EXISTING CONCRETE PAD IS REMOVED.
DISCONNECT, REMOVE, AND DEMO EXISTING AIR SEPARATOR, PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING SIDE STREAM FILTER, FILTER
HOUSING, INLINE PUMP, CONCRETE PAD, CONTROLS, CONCRETE PAD, PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
CONTRACTOR TO PATCH EXISTING CONCRETE FLOOR TO BE FLUSH AND
MATCH EXISTING IN LOCATION WHERE EXISTING CONCRETE PAD IS REMOVED.
DISCONNECT, REMOVE, AND DEMO EXISTING WATER TREATMENT CHEMICAL,
INJECTOR, SAMPLING STATION, PIPING, CONCRETE PAD, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING
CONCRETE FLOOR TO BE FLUSH AND MATCH EXISTING IN LOCATION WHERE
EXISTING CONCRETE PAD IS REMOVED.
EXISTING DDC CONTROL PANELS, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN.
EXISTING DOMESTIC WATER HEATER AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING EPO SWITCHES TO REMAIN AND BE RE-USED IN NEW DESIGN.
DISCONNECT, REMOVE, AND DEMO EXISTING SIDESTREAM FILTER, FILTER
HOUSING, CONTROLS, PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY.
GENERAL DEMOLITION NOTES
1. DEMOLITION WORK CANNOT BEGIN UNTIL TEMPORARY HEATING SYSTEMS HAVE BEEN INSTALLED
AND HAVE BEEN FULLY OPERATIONAL FOR 72 HOURS WITH NO ISSUES. REFER TO NEW DRAWINGS
FOR INSTALLATION OF TEMPORARY HEATING SYSTEMS, TEMPORARY HEATING SUPPLY PIPING,
TEMPORARY HEATING RETURN PIPING, TEMPORARY GAS PIPING, AND ALL ASSOCIATED
ACCESSORIES.
2. EXISTING STEAM BOILER AND ALL ASSOCIATED ACCESSORIES ARE TO REMAIN. STEAM BOILER
AND ALL ASSOCIATED ACCESSORIES TO REMAIN FULLY OPERATIONAL DURING CONSTRUCTION.
CONTRACTOR TO PROVIDE TEMPORARY COLD WATER PIPING, TEMPORARY GAS PIPING, AND ANY
OTHER ACCESSORIES AS REQUIRED TO ENSURE THE STEAM BOILER SYSTEM REMAINS
OPERATIONAL THROUGHOUT CONSTRUCTION.
3. DISCONNECT, REMOVE, AND DEMO ALL EXISTING HEATING HOT WATER SUPPLY PIPING, HEATING HOT WATER RETURN PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY.
4. ALL EQUIPMENT, CONTROLS, CONCRETE PADS, AND ALL ASSOCIATED ACCESSORIES ARE TO BE
REMAIN UNLESS OTHERWISE NOTED.
5. ALL EXISTING DOMESTIC COLD WATER PIPING, DOMESTIC HOT WATER PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS OTHERWISE NOTED.
X-B-1-3
X-B-1-2 X-B-1-1X-P-1-6 X-P-1-7
X-P-1-8
X-P-1-2
X-P-1-1
X-P-1-9
X-P-1-4
X-HX-1-1
X-AS-1-1
X-AS-1-2
X-P-1-3
X-P-1-5
X-FLUE
X-F-1-1
X-FLUE X-FLUE
X-F-1-6
X-F-1-2
X-F-1-3
X-F-1-4
X-F-1-5
X-WH-1-1
X-BT
X-WS
X-CONCRETE PAD
X-CONCRETE PAD
X-CONCRETE PAD
CONCRETE PAD
X-CONCRETE PAD
X-WS
X-CONCRETE PAD X-CONCRETE PAD
X-CONCRETE PAD
X-CONCRETE PAD
X-CONCRETE PAD
X-WATER TREATMENT
CHEMICAL (TYP.)
X-BOILER EPO
X-BOILER EPO
X-CONTROL
PANEL
X-CONCRETE PAD
X-CONCRETE PAD
X-CONCRETE
PAD
X-
HS
X-
HS
X-HS
X-
HS
X-10"
X-10"
X-8"
(TYP.)
X-10" X-10"
X-8" (TYP.)
X-10" HS
& HR DN TO
TUNNEL
X-4"
X-
HR
X-4"
X-
HS
X-4" HS/HR DN
TO TUNNEL
X-P-1-9
X-
HR X-
HS
X-
HR
X-
HS
X-HR
X-
HR
X-
HR
X-
HR
X-HR
X-HR
X-
HS
X-
HS
X-HS
X-10"&
HR UP
X-10"
HS UP
X-
HR
X-HR
X-HS
X-HS
X-5" HS
& HR UP
X-HR
X-HR
X-10"
X-4"
X-4"
X-2"
HS UP
X-2"
HS UP
X-10"
X- G
X- G
X- G
X-GX-G
X-G
X- G
X-G
X-G X-G
X- G
X-6"
X-4" X-4"
X-4"
X-4"
X-3/4"
X-2"
X-1-1/4" X-1-1/4"
X-4"
G DN
X-6" G DN
(6 PSI)
X-1-1/4"
G DN
X-2"
G DN
X-3/4"
G DN
X-8"
HR UP
X-R (5 PSI
TO 1 PSI)
2 2
X-CW
X-CW
X-
CW
X-
CW
X-
CW
X-2" HS UP
X-
CW
X-
CW
X-CW
X-1-1/2"
X-1-1/2"
X-2" X-4" X-4"
X-
CW
X-4"
X-4" CW DN
X-CW
X-1-1/2" X-1"
X-1" CW
TO X-BS
X-2"
X-CW
X-1-1/2"
CW
X-1-1/2"
X-PRV
X-5" FD
X-5" FD
X-5" FD
X-2"
X-4"
G DN
X-8"
HR UP
2 2
X-8"
HR UP
X-4"
G DN
2 2
X-2"
X-1-1/4"
X-2" V UP,
3" VTR
1-1/2"
POWER PLANT
LOWER LEVEL FLOOR PLAN -
MECHANICAL DEMOLITION
POWER PLANT LOWER FLOOR PLAN - MECHANICAL DEMOLITION
N
SCALE: 1/4" = 1'-0"
0 1 5 10 24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-300
X-B-1-3
X-B-1-2 X-B-1-1
X-FLUE
X-UH-1-3
X-UH-1-2
X-UH-1-1
X-UH-1-6
X-FLUE X-FLUE
X-XT-1-12
X-XT-1-10 X-XT-1-9
X-AHU-1-1
X-XT-1-1
X-XT-1-2
X-XT-1-3
X-XT-1-4
X-XT-1-5
X-XT-1-6
X-XT-1-7
X-XT-1-8
X-XT-1-11
X-UH-1-5
X-UH-1-4
X-AHU-1-2
X-L (96x72)
X-SD 1640
--- TYP. 5
X-SD 1640
--- TYP. 5
T
X-AHU-1-1
T
X-AHU-1-2
X-RH
(ON ROOF)
X-RH
(ON ROOF)
X-10"
HR DN
X-10"
HS DN
X-5" HS
& HR DN
X-
HR
X-HR
X-8"
HR DNX-8"
HR DN
X-
HR
X-HR
X-8"
HR DN
X-8"
HR DN
X-
HR
X-HR
X-8"
HR DN
X-8"
HR DN
X-8"
HS DN
X-HS
X-8"
X-8"
X-8"
HS DN
X-HS
X-8"
X-8"
HS DN
X-HS
X-HS X-HS X-HS
X-HRX-HRX-HR
X-10" X-10"
X-10"
X-8"
X-HR X-HR
X-10"
X-10"
X-1-1/2"
X-1-1/2" X-1-1/2"
X-2" HS
DN TO X-AS
X-1-1/2"
X-1-1/2"
HS DN
TO X-AS
X-2"
HS DN
X-2"
HS DN
X-
HS
X-5"
X-5"
X-HSX-HS
X-
HSX-
HR
X-
HRX-
HSX-1-1/2"
X-1-1/2"
X-HR
X-
HS
X-
HR
X-
HS X-
HR
X-HS
X-HR
X-HS
X-HR
X-
HSX-
HR
X-
HSX-
HR
X-HRX-HR
X-1-1/2"
X-1-1/2" HS
& 5" HR
X-1-1/2" HS
& 5" HR
X-1-1/2"X-1-1/2" X-2" HS
& 4" HR
X-2" HS
& 4" HR
X-2-1/2" HS
& 4" HR
X-1-1/2"
X-3" HS
& 4" HR
X-1"
X-P
X-4" HS &
HR DN
X-5" HS
& 2" HR
X-5" HS &
1-1/2" HR
X-5" HS &
1-1/2" HR
X-10"
X-8"
HR DN
X-P
4 4 4 4 4
4 4 4 4 4
X-60x28 X-46x28 X-36x28 X-36x22 X-22x22 4 4 4 4 4
X-HS
X-
HS
X-HS
X-2"
X-2"X-2"
1 1
2 2
2 2 2 2
X-HC5
7 7
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, METAL FRAME, METAL
ACCESS PLATFORM, FLUE, GAS PIPING, REGULATOR VENT PIPING, HEATING
SUPPLY PIPING, HEATING RETURN PIPING, RELIEF VENT PIPING, CONTROLS,
AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO
PATCH FLUE ROOF PENETRATION TO MATCH EXISTING, SEAL WATER TIGHT,
AND MAINTAIN ANY ROOF WARRANTIES.
DISCONNECT, REMOVE, AND DEMO EXISTING EXPANSION TANK, PIPING,
VALVES, FITTINGS, SUPPORT BRACKETS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING UNIT HEATER, PIPING,
CONTROLS, CONTROL WIRING, THERMOSTAT, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING AIR HANDLING UNIT, SUPPLY AIR
DUCTWORK, OUTDOOR AIR DUCTWORK, DIFFUSER, CONTROLS, CONTROL
WIRING, THERMOSTAT, METAL FRAME/SUPPORTS, METAL ACCESS PLATFORM,
PIPING, INLINE PUMP, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES
IN THEIR ENTIRETY.
EXISTING AIR HANDLING UNIT, DUCTWORK, CONTROLS, CONTROL WIRING,
AND ALL ASSOCIATED ACCESSORIES TO REMAIN. DISCONNECT, REMOVE, AND
DEMO EXISTING HYDRONIC HEATING COIL, INLINE PUMP, PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
CONTRACTOR TO MODIFY EXISTING AHU ENCLOSURE AS REQUIRED TO
REMOVE EXISTING HEATING COIL.
EXISTING LOUVER AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
EXISTING ROOF MOUNTED RELIEF HOOD, CURB, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN.
GENERAL DEMOLITION NOTES
1. DEMOLITION WORK CANNOT BEGIN UNTIL TEMPORARY HEATING SYSTEMS HAVE BEEN INSTALLED
AND HAVE BEEN FULLY OPERATIONAL FOR 72 HOURS WITH NO ISSUES. REFER TO NEW DRAWINGS
FOR INSTALLATION OF TEMPORARY HEATING SYSTEMS, TEMPORARY HEATING SUPPLY PIPING,
TEMPORARY HEATING RETURN PIPING, TEMPORARY GAS PIPING, AND ALL ASSOCIATED
ACCESSORIES.
2. DISCONNECT, REMOVE, AND DEMO ALL EXISTING HEATING HOT WATER SUPPLY PIPING, HEATING HOT WATER RETURN PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY.
3. ALL EQUIPMENT, CONTROLS, AND ALL ASSOCIATED ACCESSORIES ARE TO BE REMAIN UNLESS
OTHERWISE NOTED.
4. CONTRACTOR TO PATCH ALL ROOF PENETRATIONS TO MATCH EXISTING, SEAL WATER TIGHT, AND
MAINTAIN ALL EXISTING ROOF WARANTIES AFTER DEMOLITION/NEW WORK IS COMPLETE.
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-301
POWER PLANT UPPER
LEVEL FLOOR PLAN -
MECHANICAL DEMOLITION
CAT
POWER PLANT UPPER FLOOR PLAN - MECHANICAL DEMOLITION
DBP
SCALE: 1/4" = 1'-0"
0 1 5 10
X-
HR
X-
HS
X-
HR
X-4" HR UP TO
MECH ROOM
X-HS/HR
UP
X-HS
UP
X-HS
UP
X-HR
UP
X-HR
UP
X-HR
UP
X-HS
UP
X-HR
UP
X-HS
UP
X-HR
UP
X-
HR
X-
HS
X-HS
UP
X-
HR
X-
HS
X-
HR
X-
HS
X-4" HS & HR
FROM TUNNEL
X-4"
X-4"
X-
HR
X-
HS
X-4"
X-4"
X-4" HS/HR UP TO
MECH ROOM
GENERAL DEMOLITION NOTES
1. DEMOLITION WORK CANNOT BEGIN UNTIL TEMPORARY HEATING
SYSTEMS HAVE BEEN INSTALLED AND HAVE BEEN FULLY OPERATIONAL
FOR 72 HOURS WITH NO ISSUES. REFER TO NEW DRAWINGS FOR
INSTALLATION OF TEMPORARY HEATING SYSTEMS, TEMPORARY
HEATING SUPPLY PIPING, TEMPORARY HEATING RETURN PIPING,
TEMPORARY GAS PIPING, AND ALL ASSOCIATED ACCESSORIES.
2. ALL EXISTING PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN UNLESS OTHERWISE NOTED.
3. ALL EQUIPMENT, CONTROLS, CONCRETE PADS, AND ALL ASSOCIATED
ACCESSORIES ARE TO BE REMAIN UNLESS OTHERWISE NOTED.
4. PIPING SHOWN IS LOCATED IN A CRAWL SPACE BELOW FLOOR. CRAWL
SPACE IS APPROXIMATELY 36" TALL. EXISTING CRAWL SPACE IS A
CONFINED SPACE AREA.
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO ALL EXISTING
HEATING HOT WATER SUPPLY PIPING, HEATING HOT
WATER RETURN PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS
SHOWN.
REFER TO M-200 FOR PIPING CONTINUATION.
REFER TO M-303 FOR PIPING CONTINUATION.
M-302
FOOD SERVICE
BELOW FLOOR PLAN -
MECHANICAL DEMOLITION
DBP
CAT
N
FOOD SERVICE BELOW FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/8" = 1'-0"
0 1 5 10 20
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
X-P-12-1
X-P-12-2
X-HX-12-1
X-HX-12-2
X-WH-12
X-XT-12-1
X-AHU-12-1
X-WS-12
X-BT-12
X-L-12-1
X-AS-12
X-XT-12-2
X-F-12-1
X-
HR
X-
HS
X-
HR
X-
HS
X-
HR
X-4" HS/HR
DN TO
TUNNEL
T T
TT
T
T
T
T
T
T
T
T
X-UH-12-1
X-UH-12-2
X-UH-12-3
X-UH-12-7
X-UH-12-5X-UH-12-6
X-UH-12-15
X-UH-12-14
X-UH-12-12
X-UH-12-10
X-UH-12-8
X-L-12-2
X-L-12-3
X-UH-12-13
X-UH-12-11
X-UH-12-9
X-CUH-12-2
X-CUH-12-3
X-CUH-12-4
X-CUH-12-5
X-FT-12-1
X-UH-12-4
X-CUH-12-4
X-CUH-12-5
X-UH-12-2
X-UH-12-3
X-UH-12-7
X-CUH
X-1-1/2"
X-1-1/2"
X-1-1/2"
X-1-1/2"
X-1-1/2"
X-
HR
X-
HS
X-HR
X-HS
X-HR
X-HS
X-1-1/2"
X-1-1/2"
X-1-1/2"
X-1-1/2"
X-
HR
X-
HS
X-HR
X-HS
X-1-1/2"
HS/HR DN
M-303
X-
HR
X-
HS
X-
HR
X-
HS
X-HR DN X-HS DN
X-HR DN
X-HS DN
X-HR DN
X-HS DN
X-HR DN
X-HS DN
X-HR DNX-HS DN DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. DEMOLITION WORK CANNOT BEGIN UNTIL TEMPORARY HEATING SYSTEMS
HAVE BEEN INSTALLED AND HAVE BEEN FULLY OPERATIONAL FOR 72
HOURS WITH NO ISSUES. REFER TO NEW DRAWINGS FOR INSTALLATION
OF TEMPORARY HEATING SYSTEMS, TEMPORARY HEATING SUPPLY
PIPING, TEMPORARY HEATING RETURN PIPING, TEMPORARY GAS PIPING,
AND ALL ASSOCIATED ACCESSORIES.
2. ALL EXISTING PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN UNLESS OTHERWISE NOTED.
3. ALL EQUIPMENT, CONTROLS, CONCRETE PADS, AND ALL ASSOCIATED
ACCESSORIES ARE TO BE REMAIN UNLESS OTHERWISE NOTED.
DISCONNECT, REMOVE, AND DEMO EXISTING
HEATING SUPPLY PIPING RISER, HEATING
RETURN PIPING RISER, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES TO THE
EXTENTS SHOWN.
M-303
FOOD SERVICE
FIRST FLOOR PLAN -
MECHANICAL DEMOLITION
DBP
CAT
N
FOOD SERVICE FIRST FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/8" = 1'-0"
0 1 5 10 20
1 FOOD SERVICE MECHANICAL ROOM- MECHANICAL DEMOLITION
SCALE: 1/4" = 1' - 0"
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
X-3" SAN UP
TO X-FD
X-3" SAN UP
TO X-FD
X-3" SAN UP
TO X-FD
X-SAN X-SAN X-SAN
X-V UP
X-3" X-3" X-3"
CONCRETE
PAD
CONCRETE
PAD
CO3" SAN UP
TO FD-1
3" SAN UP
TO FD-1
3" SAN UP
TO FD-1
3" SAN UP
TO FD-1
3"
3"
3"
3"
SAN
SAN SAN
SAN
3"
3"
SA
N
SA
N
SA
N
1 1
2 2
2" V UP 3
3" SAN UP
TO FD-1
1 2
10" HS & HR
DN TO TUNNEL & UP
TO POWER PLANT
4" HS/HR DN TO
TUNNEL & UP TO
POWER PLANT
4" G DN (TEMP.)
TO TUNNEL &
UP TO POWER
PLANT
1-1/2" G (TEMP.) DN
TO TUNNEL & UP TO
POWER PLANT
MECHANICAL KEY NOTES
INSTALL NEW BELOW FLOOR SANITARY PIPING AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN. CONNECT NEW SANITARY PIPING TO EXISTING PIPING IN THE
LOCATION SHOWN. MODIFY THE EXISTING BELOW FLOOR SANITARY PIPING AS
REQUIRED FOR NEW CONNECTION.
CONTRACTOR TO COORDINATE THE LOCATION OF NEW SANITARY RISERS TO NEW
FLOOR DRAINS WITH THE LOCATION OF THE NEW BOILER CONCRETE PADS. NEW
BOILER CONCRETE PAD SHOWN FOR REFERENCE.
INSTALL NEW BELOW FLOOR VENT PIPING AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN.
MECHANICAL GENERAL NOTES
1. CONTRACTOR TO SAW CUT EXISTING CONCRETE FLOOR AS REQUIRED TO INSTALL
NEW BELOW GRADE SANITARY PIPING AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN.
2. CONTRACTOR TO PATCH CONCRETE FLOOR AS REQUIRED AFTER NEW WORK IS
COMPLETED TO BE FLUSH AND MATCH EXISTING CONCRETE FLOOR.
3. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING BURIED UTILITIES PRIOR
TO STARTING CONSTRUCTION.
4. NEW ABOVE GRADE CONCRETE PADS SHOWN FOR REFERENCE.
POWER PLANT
BELOW FLOOR PLAN -
MECHANICAL NEW
POWER PLANT BELOW FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5 10
24173.00
472/23130.SDW
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/21/2025 CD SET
M-400
DBP
CP-01-1
CP-01-2
CP-01-3
R-01-2
R-01-3
R-01-4
R-01-5
R-01-6
14" CA UP
BACKDRAFT
DAMPER (TYP.)
3" G DN
3" G DN
14" CA UP
14" CA UP
14" CA UP
14" CA UP
CONCRETE
PAD
3" G DN
3" G DN
3" G DN
B-01-2
B-01-3
B-01-4
B-01-5
B-01-6
G G
6" HS &
HR UP
6" HS &
HR UP
6" HS &
HR UP
6" HS &
HR UP
6" HS &
HR UP
B-01-1
R-01-1
3" G DN
14" CA UP
6" HS &
HR UP
X-WH-1-1
X-CONCRETE PAD
X-CONCRETE PAD
CONCRETE PAD
X-CONCRETE PAD
X-CONCRETE PAD
X-BOILER EPO
X-BOILER EPO
X-CONTROL
PANEL
X- G
X- G
X- G
X-GX-G
X-G
X- G
X-G
X-G X-G
X- G
X-6"
X-4" X-4"
X-4"
X-4"
X-3/4"
X-2"
X-1-1/4" X-1-1/4"
X-6" G DN
(6 PSI)
X-1-1/4"
G DN
X-2"
G DN
X-3/4"
G DN
X-R (5 PSI
TO 1 PSI)
X-CW
X-CW
X-
CW
X-
CW
X-
CW
X-
CW
X-CW
X-1-1/2"
X-1-1/2"
X-2" X-4" X-4"
X-
CW
X-4"
X-4" CW DN
X-1"
X-1" CW
TO X-BS
X-2" X-1-1/2"
CW
X-1-1/2"
X-PRV
X-5" FD
X-5" FD
X-5" FD
X-2"
X-1-1/4"
X-2" V UP,
3" VTR
BT-01-1
WS-01-1
CONCRETE PAD
WS-01-1
CP-01-4
CW CW
CW
CW
2" 2"
2-1/2"
2-1/2"
BOILER SEQUENCING
CONTROL PANEL
G
4"
3"
3"
3"
3"
4" R-01-13
6"
36" VTR
14" V DN
14" V DN
14" V DN
36" V
36" V
36" V
36" V
R-01-8
R-01-9
R-01-10
R-01-11
R-01-12
14" CA UP
3" G DN
3" G DN
14" CA UP
14" CA UP
14" CA UP
14" CA UP
CONCRETE
PAD
3" G DN
3" G DN
3" G DN
B-01-8
B-01-9
B-01-10
B-01-11
B-01-12
G G
6" HS &
HR UP
6" HS &
HR UP
6" HS &
HR UP
6" HS &
HR UP
6" HS &
HR UP
B-01-7
R-01-7
3" G DN
14" CA UP
6" HS &
HR UP
3"
3"
3"
3"
4"
R-01-14
BACKDRAFT
DAMPER (TYP.)
36" VTR
14" V DN
36" V
36" V
36" V
36" V
G
6"
4"
10"
8" (TYP.)
HS
HS
HS
10"
10" HS & HR
DN TO TUNNEL
HR HS
4" HS/HR DN TO
TUNNEL
HR HS
HR HS
HR
HS
4"
4"
HR
HR
HR
4"
2"
4"
HR
4" 10"
HR
HR
HR
HS
4" HR
HR4"
HR
10"
HS
HS
8" (TYP.)
AS-01-1
10"
HS
6'- 6"
M
IN
6'- 6"
M
IN
HR
10" HS &
HR UP
10"
HS
HS
HS
HS
10"
10"
10" HR
HX-01-1
CP-01-5
14" V DN
14" V DN
14" V DN
14" V DN
FD-1
FD-1
14" V DN
14" V DN
14" V DN
14" V DN
14" V DN
FD-1
FD-1
2" V DN
2"
2"
2"
V V
V
3" HS &
HR UP
SSF-01-1
SSF-01-2
CP-01-6
SSF-01-3
XT-01-3
XT-01-1
AS-01-2
3"
HR
HS
CONCRETE PAD
CONCRETE PAD
CONCRETE PAD
CONCRETE PAD
10"
2-1/2"
2-1/2"
HS
2-1/2"
HR
HR
HS
2-1/2"
3"
HR
HS
HS
HS
HR
HS
PRV
G
G
4" (TEMP.)
4" G (TEMP.) DN
TO TUNNEL
1-1/2"
(TEMP.)
1-1/2" G DN TO
TUNNEL (TEMP.)
1-1/2" (TEMP.)
1-1/2"
G
G G G
4"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .