This document is a set of drawings for the demolition of a building at the Michigan Reformatory in Ionia, Michigan, which is being managed by the State of Michigan Department of Technology, Management and Budget Facilities Administration. The drawings provide details on the scope of work, which includes demolishing an existing barn and removing all underground utilities, as well as installing sedimentation control measures. The project requires the contractor to obtain all necessary permits and have a state-certified stormwater operator on site. Bid submissions must be uploaded to the SIGMA VSS system, and any questions should be emailed directly to the project manager. The bid deadline is 2:00 PM on the specified date.
The drawings provide specifics on the existing building layout and construction, including dimensions, materials, and structural elements. Pricing and funding details are not included in the document, but the project is being funded by the State of Michigan. There are no set-asides or incumbent contractors mentioned, and the contract term and renewal options are not specified.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
'-0
123'-0"
'-0
"14'-138"
7' -0
123'-0" 1'-5"
1'-
W A
LL
S
T.
EXISTING BARN
EXISTING EQUIPMENT SHED
STORAGE BUILDING
INSTALL SEDIMENTATION CONTROL FENCE AT START OF CONSTRUCTION
MAINTAIN FENCE AND REMOVE AFTER GRASS IS ESTABLISHED
FIBER OPTIC LINE TO
REMAIN. PROTECT
DURING CONSTRUCTION.
INSTALL FILTER
FABRIC BAG IN
CATCH BASEN
DURING
CONSTRUCTION
EXISTING CONCRETE DRIVEWAY
TO REMAIN. PROTECT DURING
DEMOLITION ACTIVITIES. PATCH/
REPAIR ANY SECTION DAMAGED
BY DEMOLITION ACTIVITIES.
REMOVE EXISTING
CONCRETE PAD
TEMPORARY SNOW FENCE
APPROX. 30'-O FROM BUILDING PARAMETER
STEAM LINE COVER
PUMP HOUSE
DEMOLISH EXISTING BARN, AND REMOVE FOOTING AND BURIED ABANDONED
UTILITIES. (STEAM PIPE, ELECTRICAL, AND WATER). DISPOSE OR RECYCLE ALL MATERIALS
INCLUDING ABANDONED EQUIPMENT AND MACHINERY LEFT INSIDE BUILDING.
AFTER BUILDING REMOVAL, REGRADE AREA FROM
EXISTING DRIVE TO APPROX. 30' SOUTH OF BUILDING.
GRADE SHALL BE EVENLY SLOPED AND EASED INTO
THE EXISTING SLOPE AT EAST AND WEST LIMITS.
SLOPE OF FINISHED
GRADE AFTER
REGRADING
CONTRACTOR
PARKING AND
STAGING AREA
REMOVE STEAM LINES (APPROX. 20')
EXISTING SANITARY PIPE,
PLUG AND REMOVE PIPE
TO BARN
EXISTING SANITARY PIPE
TO REMAIN
EXISTING PEDESTAL
TO REMAIN.
REMOVE EXISTING SANITARY LINES
REMOVE EXISTING WATER SUPPLY PIPE.
CAP NEAR DRIVEWAY. EXISTING PIPE
UNDER DRIVEWAY TO REMAIN.
NOTE: ELECTRICAL SERVICE IS
ALREADY DISCONNECTED FROM THE
BUILDING AND TERMINATED AT THE
EXISTING POLE.
FIBER OPTIC LINE TO
REMAIN. PROTECT
DURING CONSTRUCTION.
NOTE:
EMPLOY GROUND PENETRATING
RADAR TO LOCATE EXISTING
UNDERGROUND UTILITIES
AROUND THE ENTIRE BARN.
W A
LL
S
T.
W. M
AIN ST
BLUEWATER HWY M-21
YEOMANS ST
W LINCOLN AVE
W A
LL
S
T.
MICHIGAN
REFORMATORY
BARN
MAINTENANCE
OFFICE
POWER HOUSE
CITY OF
IONIA
ENTRY DRIVE TO
MAINTENANCE
BUILDING
SOIL EROSION AND SEDIMENTATION CONTROL
1. ALL EROSION AND SEDIMENT CONTROL WORK SHALL CONFORM TO THE STANDARDS AND
SPECIFICATIONS OF THE STATE OF MICHIGAN. CONTRACTOR IS RESPONSIBLE FOR OBTAINING
ALL PERMITS AND FOR ALL APPLICABLE FEES.
2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING A STORM WATER OPERATOR CERTIFIED BY
THE STATE OF MICHIGAN.
3.ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
COMMENCEMENT OF ANY EXCAVATION OPERATIONS.
4.DAILY INSPECTIONS SHALL BE MADE BY THE CONTRACTOR'S STORM WATER OPERATOR TO
DETERMINE THE EFFECTIVENESS OF EROSION AND SEDIMENT CONTROL MEASURES. ANY
NECESSARY REPAIRS SHALL BE PERFORMED WITHOUT DELAY.
5.ANY EROSION AND SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE
SITE AND NOT ALLOWED TO COLLECT IN ANY OFF-SITE AREAS OR IN WATERWAYS.
WATERWAYS INCLUDE BOTH NATURAL AND MAN-MADE OPEN DITCHES, STREAMS, STORM
DRAINS, LAKES OR PONDS.
6.EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO, OR AS THE
FIRST STEP IN DEMOLITION. SEDIMENT CONTROL PRACTICES WILL BE APPLIED AS A PERIMETER
AGAINST ANY TRANSPORTING OF SILT OFF THE SITE.
7.CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION CONTROL
MEASURES AS REQUIRED AND AS DIRECTED ON THESE PLANS.
8.CONTRACTOR SHALL MAINTAIN CLEAN STREET SURFACES STREET SWEEPING SHALL TAKE
PLACE AT THE END OF EACH DAY AT A MINIMUM. CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONS TO PREVENT THE VEHICULAR TRACKING OF SOILS OFF-SITE AND ONTO PUBLIC
STREETS AND ROADS, INCLUDING INSTALLATION OF STABILIZED CONSTRUCTION ACCESS
POINTS IF REQUIRED BY THE ENGINEER OR THE STATE OF MICHIGAN.
9.PERMANENT SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES OR
ANY DISTURBED LAND AREA SHALL BE COMPLETED WITHIN 5 CALENDAR DAYS AFTER FINAL
GRADING OR THE FINAL EARTH CHANGES HAVE HAVE BEEN COMPLETED. WHEN IT IS NOT
POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA AFTER AN EARTH CHANGE HAS
BEEN COMPLETED OR WHERE SIGNIFICANT EARTH CHANGE ACTIVITY CEASES, TEMPORARY
SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED WITHIN 30 CALENDAR DAYS. ALL
TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL PERMANENT
SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED. ALL PERMANENT SOIL EROSION
CONTROL MEASURES WILL BE IMPLEMENTED AND ESTABLISHED BEFORE A CERTIFICATE OF
COMPLIANCE IS ISSUED.
10.DEMOLITION PLAN IS ENGINEERED IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS.
ACCEPTANCE OF PLAN BY PERMITTING AUTHORITIES DOES NOT ENSURE THAT ADDITIONAL
EROSION CONTROL MEASURES WILL NOT BE REQUIRED. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING AND INSTALLING ALL EROSION CONTROL MEASURES AS REQUIRED BY STATE AND
LOCAL AUTHORITIES THROUGH PROJECT COMPLETION.
11.AFTER PROJECT COMPLETION, THE FACILITY IS RESPONSIBLE FOR MAINTAINING PERMANENT
EROSION CONTROL MEASURES.
12. THE CONTRACTOR SHALL HAVE AVAILABLE ON SITE A WATER TRUCK OR OTHER READY
SUPPLY OF WATER TO CONTROL AND/OR PREVENT THE PRODUCTION OF DUST ARISING FROM
THE CONTRACTOR'S CONSTRUCTION OPERATIONS AND SHALL PERFORM ALL REQUIRED
MEASURES TO PREVENT THE WINDBORNE TRANSPORT OF DUST TO OFF-SITE AREAS.
MDOC- MICHIGAN REFORMATORY
BUILDING DEMOLITION
OWNER: STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FACILITIES ADMINISTRATION
LOCATION MAP
NO SCALE
EROSION CONTROL DETAILS
1 1/2" = 1'-0"
SITE PLAN
1/16" = 1'-0"
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
AD1
RELEASED FOR BIDS 03/10/2023
90% OWNER REVIEW 03/07/2023
COVERSHEET, SITE PLAN, &
SEDIMENTATION DETAILS
MICHIGAN REFORMATORY
BUILDING DEMOLITION
FILE NO: 472/21357.SMD
SHEET INDEX
AD1 COVERSHEET, SITE PLAN AND SEDIMENTATION DETAILS
AD2 FLOOR PLAN, ELEVATIONS AND SECTION OF BARN
AutoCAD SHX Text
GEOTEXTILE FILTER FABRIC FASTENED ON UPHILL SIDE, TOWARDS EARTH DISRUPTION
AutoCAD SHX Text
RIDGE OF COMPACTED EARTH ON UPHILL SIDE OF FILTER FABRIC.
AutoCAD SHX Text
SHEET FLOW
AutoCAD SHX Text 6"x6" ANCHOR TRENCH
AutoCAD SHX Text
UNDISTURBED VEGETATION.
AutoCAD SHX Text
WHERE CURB OCCURS, EXTEND FABRIC OVER CURB AND TUCK IN BEHIND CURB.
AutoCAD SHX Text
INSTALL FILTER FABRIC IN CATCH BASIN BELOW GRATE.
AutoCAD SHX Text
EXTEND FABRIC 1'± BEYOND EDGE OFGRATE.
AutoCAD SHX Text
EXISTING CATCH BASIN
AutoCAD SHX Text
EROSION CONTROL - CATCH BASINS
AutoCAD SHX Text
EROSION CONTROL - SILT FENCE
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text Project No: 2237
AutoCAD SHX Text
1342 W. MAIN ST. IONIA, MI 48846
FILLED IN
WINDOW
WINDOW WITH
METAL SCREEN
6" LAP SIDING
CONC. COLUMNS
ASPHALT SHINGLES
VENTS
WINDOW WITH
METAL SCREEN
'-4
1'-6"
METAL
STAIR
CONC.
COLUMNS
6" LAP SIDING WOOD PANELS
'-1
1"
1'-
4'-0"
'-6
'-7
7' -1
1"±
STEAM LINE COVER
'-6
STAIR SUPPORT
COLUMNS
METAL
STAIR
7'
-1
'-0
'-6
1'-
7' -6
'-4
'-1
4" CONC. FLOOR SLAB
5" CONC. FLOOR SLAB
CLAY TILE
'-0
1'-0"
ASPHALT SHINGLES
FLOOR SUPPORT COLUMNS
WOOD PANEL WALLS
8"
6" LAP SIDING
WOOD PANELS
2X WOOD BRACING
2X WOOD STUDS @24" O.C. ±
1X WOOD BRACES/ TIES EACH SIDE OF RAFTERS
WOOD TIES
@ 4'-0" O.C. ±
2X WOOD RAFTERS @24 O.C. ±
1X WOOD BRACE/TIES
EACH SIDE OF RAFTER
EXISTING BARN
EXISTING REINFORCED CONCRETE COLUMNS, TYP.
EXISTING REINF.CONC. COLUMN
EXISTING STRUCTURAL CLAY TILE
INFILL , TYPICAL
STUD WALL
TYP.
STEEL BEAM
AND PIPE COLUMN
UP TO LOFT
EXISTING WOOD COLUMNS
ANCHORED TO FLOOR AND
SLAB ABOVE, TYPICAL
EXISTING CONCRETE SLAB
TO BE REMOVED
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
AD2
RELEASED FOR BIDS 03/10/2023
90% OWNER REVIEW 03/07/2023
FLOOR PLAN, ELEVATIONS &
SECTIONS OF EXISTING BARN
MICHIGAN REFORMATORY
BUILDING DEMOLITION
FILE NO: 472/21357.SMD
2 1/8"=1'-0"
WEST ELEVATION
4 1/8"=1'-0"
EAST ELEVATION
6 1/8"=1'-0"
CROSS SECTION
3 1/8"=1'-0"
SOUTH ELEVATION
1 1/8"=1'-0"
NORTH ELEVATION
CLAY
TILE
5 3/32"=1'-0"
FLOOR PLAN (FIRST FLOOR)
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text Project No: 2237
AutoCAD SHX Text
1342 W. MAIN ST. IONIA, MI 48846
File details come from the government source that posted it. Updated .