472_19532_RLO Addendum 1.pdf
PDF 1 MB Posted
- Solicitation number
- RFQ-171-250000000539-3
- Issued by
- Macomb County, Mcbride Village, Michigan
About this file
This is a Construction Bid Addendum for the Oaks Correctional Facility ADA Egress Ramps and Infrastructure project, issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division. The project involves installing 3 ADA compliant ramps with new exit doors, associated lighting, exit signs, and sidewalks at Housing Units 1, 4, and 7. The bid addendum, numbered 1 and dated August 6, 2025, provides clarifications and updates to the original bidding documents, with a bid opening date of August 13, 2025. The scope includes modifying egress routes, installing new control fences, adding gates, and implementing storm drainage systems, with specific requirements for excavation, utility protection, and facility coordination.
The bid includes two primary allowances: a $25,000 contingency allowance and a $125,000 hydro-excavation and sand backfill allowance. Bidders are required to include these amounts in their base proposal, with bonds and insurance covering the allowance values. The project has specific operational constraints, including working with facility escorts, limited work hours (5 8-hour or 4 10-hour days), equipment security protocols, and careful coordination with the correctional facility's operations. The primary goal is to provide wheelchair-bound inmates with an accessible means of egress that does not require manual lifting, addressing current limitations with existing chairlifts. Specific technical requirements include using hydro-excavation near utilities, maintaining existing infrastructure, and following detailed site and construction specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Service Disabled Veteran Owned Business Info Sheet 2025.pdf | ||
| 472_19532_RLO Addendum 2.pdf | ||
| Plans_19532.pdf | ||
| Specifications_19532.pdf | ||
| Advertisement 19532.pdf | ||
| LEIN Request 19532.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/16)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents.
Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
August 6, 2025
PROJECT NAME
Oaks Correctional Facility – ADA Egress Ramps and Infrastructure
FILE NUMBER
472/19532.RLO
PROFESSIONAL
Richard Mann Straub Pettitt Mann Architecture
PROJECT DIRECTOR
Ronda Osga
BID OPENING DATE:
August 13, 2025
ADDENDUM ITEMS:
Drawings: C0 and C1 are reissued herewith and the topographic survey reference sheet is issued herewith:
C0 – Revised the access route to Housing Unit 4.
Revised the third, ninth and tenth notes.
Added the twelfth and thirteenth notes.
C1 – Revised the note grouping at the new gate to add a new post.
Revised notes pertaining to the new and existing fences – new control fence to the left can be installed after the sidewalk; new control fence to the right is to be installed before excavation begins. The existing fence is to be removed after the new control fence is in place.
Topographic Survey – issued is the 2021 topographic survey from Milanowski and Engert Engineering and Surveying for the areas of work.
Specifications:
Reissued is the Bid Schedule.
Reissued is SECTION 01020 – ALLOWANCES.
Questions and Answers:
Where is the lay-down area?
Outside the sally port by the Maintenance Building. Coordinate with Maintenance for the exact area.
Will we be able to have a job box inside?
Other projects have permitted a locked job box inside the Mechanical Room of the Housing Unit. The Facility will provide a padlock for the job box. The box will be inventoried at least once a day by the escorting officer.
Does the Facility have any spare brick?
The Facility does have some brick left over. New brick still may be required to supplement the existing units.
Reuse of the existing removed brick in good condition is permitted.
Can we stockpile the spoils in the area work?
Stockpiling will be permitted during the time work is occurring. At the end of the work day, the pile must be removed to outside the secured perimeter.
Can we dump the soils somewhere on the property outside the secured area?
No. The Facility does not want the spoils dumped on site. Remove the spoils by the end of the project of site.
Does the Facility have a specific order of ramp construction?
There is no preferred order; however, construction at Housing Unit 4 will likely be the easiest and may work best for first.
How many escorts will be provided?
Two escorts will be available. Under arranged circumstances, a third escort can be available, but only for a limited time.
Does all equipment need to be removed from the secured areas at the end of the day? What about at lunch?
Equipment will need to be removed from inside at night. It may be left inside for a lunch break; however, it will need to be locked and otherwise secured from movement.
http://www.michigan.gov/SIGMAVSS
Will we be permitted more than one area of work?
Yes, the Facility will permit more than one area of work to occur, but each area must have an escort.
Will we need more than one superintendent if we work in more than one area?
No. One superintendent is requested. Please, note that the superintendent is to be on-site whenever any work or deliveries occur.
What are the working hours?
The Facility will accommodate 5 8-hour days, 4 10-hour days, and by special arrangement longer times. The Facility currently has staff on 12 hour shifts.
Please confirm the Exit Sign Fixture, Remote Light Fixture:
Option 1 – Kenall Millenium METEC-40N-MW-R-2-6.5L-DT with a remote Kenall Millenium METER-MB-2-
12VAC/DC
Option 2 – Kenall Millenium METELHC-40N-MW-2-6.5L-DT with a remote Kenall Millenium METER-MB-1- 6.5L-12VAC/DC and a satellite exit sign Kenall Millenium METSS-MW-R-4VDC.
Clarify the desired mounting height of the remote light fixture intended to be powered from the stairwell emergency sign.
The desired mounting height is 8 to 9 feet above the ramp landing (1 to 2 feet above the door head).
Where is the remote intended to be mounted in relationship to the door?
The light should not be located over the door opening but 1 foot plus or minus from the latch edge of the door opening at a height of 8 to 9 feet above the landing.
Confirm if there is a specific fixture type or mounting detail intended for this remote light or if a standard remote emergency head is acceptable.
See above on the Remote Light Fixture model.
Are we adding a new remote light above the existing egress door also?
No – only at the new door.
Attached herewith is the Pre-Bid attendance sign-in sheet.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Richard Mann DATE August 6, 2025 Straub Pettitt Mann Architecture
APPROVED BY:
PROJECT DIRECTOR Ronda Osga DATE August 6, 2025
Bidding and Contract Document (R 03/25) Project Name: Oaks Correctional – ADA Egress Ramps File No. 472/19532.RLO
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description Unit Price
Item Bid Price
Concrete Work
Doors and Hardware
Electrical
Storm Drainage
Fencing
General Conditions
Miscellaneous
Hydro-Excavation ALLOWANCE 125,000.00
ALLOWANCE AMOUNT 25,000.00
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
Dollars $
(use words) (in figures)
Bidding and Contract Document (R 03/25) Project Name: Oaks Correctional – ADA Egress Ramps File No. 472/19532.RLO
01-30
SECTION 01010 SUMMARY OF WORK
1. General
1.1 General information covering the "Scope of Work" is specified on the Invitation to Bid. Additional information is as follows:
(a). Currently wheelchair bound inmates must rely on the inmates or custody staff to carry them up and down a half-flight of stairs whenever the chairlift ceases to operate, which tends to happen frequently.
(b) This project is intended to alleviate this problem by offering a means of egress/ingress which does not require lifting a wheelchair and person up the stairs.
(c) Furnish and install 3 ADA compliant ramps, with new exit doors, associated lighting and exit signs, and sidewalks to a nearby existing sidewalk. One ramp, door, etc. will be installed at Housing Units 1, 4 and 7.
(d) Furnish and install storm drainage systems in the new ramps and connect to nearby existing storm drainage structures.
1.2 The Agency will provide the following Work:
(a) State Salvage: The State reserves the right to salvage certain items and equipment and those salvaged items will be identified to the Bidder at the time of their inspection of the proposed Work. The State will remove salvaged items before commencement of the Work.
(b) Moving Furnishings and Equipment: The Contractor must give timely notice to the State Agency representative identified in the pre-construction meeting of all furnishings, window covering and movable equipment that will interfere with the Work or which the Contractor cannot protect with coverings of paper, plastic, drop cloths or clean tarpaulin. The Contractor must furnish, install, maintain, and remove all coverings used to protect furnishings, window coverings and movable equipment.
END OF SECTION 01010
SECTION 01020 ALLOWANCES
1. Allowances
1.1 Cash Allowances:
(a) Not used.
1.2 Provisional/Contingency Allowances:
(a) Bidders must include in their Base Proposal Sum a contingency allowance of $25,000.00. The base bid shall include bonds and insurance on the value of the allowance.
(b) Bidders must include in their Base Proposal Sum a contingency allowance of $125,000.00 for Hydro-Excavation and sand backfill at locations required to be hydro-excavated or hydro-bored. The base bid shall include bonds and insurance on the value of the allowance.
(c) Monies will be used in the contingency allowance only if directed in writing by the Project Director and Professional.
(d) Payments under a Provisionary Allowance will include not only the purchase/furnished cost of the materials and equipment involved, but also all related labor costs, subcontract costs, construction equipment costs, general conditions costs and Fee, provided they are calculated in accordance with the requirements of the contract documents.
(e) Unused allowances will be deducted from the contract amount through contract change order.
END OF SECTION 01020
SECTION 01025 MEASUREMENT AND PAYMENT
1. Schedule of Values: Unless noted otherwise, before mobilization and start of construction, the Contractor must submit a Schedule of Values to the Professional for review and approval, of the various tasks that must be performed to complete all the Work. The schedule must show each task and the corresponding value of the task, including separate monies allocated for General Condition items and Project close-out. The aggregate total value for all tasks must be equal to the total Contract sum.
END OF SECTION 01025
SECTION 01030 ALTERNATES
1. Use of Alternates: Determination of the lowest three Bidders shall be based on the sum of the Base Bid and any additive and deductive Alternates the Owner accepts, in the order in which they are listed only. The Owner will accept an Alternate only if all other previously listed Alternates are also accepted unless acceptance by the Owner of Alternates in a different order does not affect determination of the lowest three bidders in any way.
2. Execution:
STORM
ADMIN BLDG.
SERVICES BLDG.
EDUC. BLDG.
SALLYPORT
STORM
STORM
ACCESS ROUTES FOR
CONSTRUCTION EQUIPMENT
RESTORE LAWN IN AREA DISTURBED BY
CONSTRUCTION ACTIVITIES
RESTORE LAWN DISTURBED
BY CONSTRUCTION ACTIVITIES
SITE PLAN
SCALE: 1" = 100'-0"
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
DEPARTMENT OF CORRECTIONS
OAKS CORRECTIONAL FACILITY - ADA EGRESS RAMPS AND INFRASTRUCTURE
FILE NUMBER: 472/19532.RLO
ACCOUNT NUMBER: 472ECFMaintProj
SHEET INDEX:
C0 COVER SHEET /SITE PLAN
C1 LOWER LEVEL PLAN - HOUSING UNIT 1
C2 LOWER LEVEL PLAN - HOUSING UNIT 4
C3 LOWER LEVEL PLAN - HOUSING UNIT 7
C4 RAMP AND SIDEWALK DETAILS
C5 DOOR, RAMP AND STAIR SECTIONS
C6 DOOR AND FENCE DETAILS
REFERENCE
PARTIAL TOPOGRAPHIC SURVEY (JOB NO: 16447, DATED JULY 7, 2021)
MILANOWSKI & ENGLERT ENGINEERING & SURVEYING
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
C0
PROJECT NO: 2001
ADDENDUM 1 08/05/25
RELEASED FOR BIDS 07/09/25
OWNER REVIEW 07/07/25
COVERSHEET
OAKS CORRECTIONAL
FACILITY -
ADA EGRESS RAMPS AND
INFRASTRUCTURE
FILE NO. 472/19532.RLO
ACCT NO. 472ECFMaintProj
C1
C2
C3
CODE COMPLIANCE
MICHIGAN REHABILITATION CODE FOR EXISTING
BUILDINGS 2021 - ALTERATIONS LEVEL 2
MICHIGAN ELECTRIC CODE 2023
NFPA 101 - 2012
USE GROUP I-3 / EXISTING DETENTION/CORRECTIONS OCCUPANCY
CONSTRUCTION TYPE II B / II (0,0,0)
BLDGS ARE FULLY SPRINKLERED. (NFPA 13)
AREAS: HOUSING UNITS 1, 4 AND 7: 14,282 gsf EACH AREAS OF RENOVATION @ EACH BLDG: 200 sf
OCCUPANCY: 192 INMATES; 247 TOTAL OCCUPANCY
MISS DIG
M55
Pine Creek Rd.
Pine Creek Rd.
M ile B rid ge
R d.
C aberfae Hwy.
LOCATION MAP
N.T.S.
O ls on R d.
to Manistee
NOTES:
ALTHOUGH UTILITY LOCATIONS SHOWN ARE BASED ON EARLIER RECORD
DRAWINGS, THE CONTRACTOR SHALL PERFORM A GROUND
PENETRATION RADAR (GPR) SURVEY WITHIN THE CONSTRUCTION AREAS
TO LOCATE ALL BURIED PUBLIC AND PRIVATE UTILITIES. AFTER THE
SURVEY IN THE AREAS OF CONSTRUCTION IS COMPLETE, PROVIDE TO
THE OWNER A COPY OF THE REPORT INCLUDING A SITE MAP SHOWING
THE LOCATIONS OF ALL FOUND UTILITIES.
PREVENT DAMAGE TO EXISTING PAVEMENTS. ANY DAMAGE CAUSED BY
CONSTRUCTION ACTIVITIES SHALL BE REPAIRED TO NEW CONDITION AT
NO COST TO THE OWNER.
HYDRO-EXCAVATIONS AND HYDRO-BORING SHALL BE USED FOR
EXCAVATING FOR NEW CONSTRUCTION WITHIN 10 FEET OF ANY SHOWN
OR GPR LOCATED PIPE, UTILITY, CABLE, OR UNDERGROUND
CONSTRUCTION. SEE ALLOWANCE FOR HYDRO-EXCAVATION.
USE CAUTION DURING CONSTRUCTION SO AS NOT TO DAMAGE UTILITIES.
ANY UTILITIES DAMAGED CAUSED BY CONSTRUCTION ACTIVITIES WILL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE AND REPAIRS MUST BE MADE
BEFORE THE CONTRACTOR LEAVES FOR THE DAY.
COORDINATE WITH THE FACILITY FOR ELECTRICAL AND DATA LOCATIONS.
IF ELECTRICAL OR DATA CABLE MUST BE RELOCATED TO ACCOMPLISH
THE WORK OF THIS PROJECT. SPLICING OF ELECTRICAL CONDUCTORS IS
NOT PERMITTED. PULL NEW WIRES FROM ONE TERMINATION TO THE
OTHER.
SOILS ON THE SITE PER USDA NRCA SOILS SURVEY ARE MAINLY
PLAINFIELD SAND WHICH CONSISTS OF A THIN LAYER OF TOPSOIL OVER
SANDY SOIL. GRAVELLY SOILS BECOME MORE PROMINENT WITH DEPTH.
CONTRACTOR SHALL USE PERMANENT SHEET PILES AT BUILDING
FOOTING LOCATIONS AT NEW RAMP, AS INDICATED ON THE DRAWINGS.
CONTRACTOR SHALL USE TEMPORARY SHEET PILES AS NECESSARY TO
CONTROL EROSION AND SLIDING OF SOILS AT AREAS OF EXCAVATION.
THIS IS ESPECIALLY THE CASE IF SOILS ARE NOT FOUND TO BE STABLE
NEAR A FENCE OR EXISTING BURIED PIPE.
ONCE EXCAVATION FOR RAMP BEGINS, THE EXCAVATION, AND
INSTALLATION OF CONCRETE STRUCTURES, RAMP PAVEMENT AND
BACKFILL SHALL BE COMPLETED WITHOUT DELAY. THE FACILITY WILL
PERMIT EXCAVATION FOR THE NEXT RAMP TO START WHILE CONCRETE
INSTALLATION OCCURS AT THE PREVIOUS EXCAVATION.
ONCE EXCAVATION FOR DRAINAGE SYSTEMS OR STRUCTURES BEGINS,
THE EXCAVATION, INSTALLATION OF STRUCTURES, PIPE AND BACKFILL
SHALL BE COMPLETED WITHOUT DELAY.
CONTRACTOR SHALL REPAIR, AT NO COST TO THE OWNER, ANY
DAMAGE TO EXISTING CONCRETE OR ASPHALT PAVEMENT DURING
CONSTRUCTION CAUSED BY CONTRACTOR'S OR SUBCONTRACTOR'S
EQUIPMENT.
CONTRACTOR MAY TEMPORARILY STOCKPILE EXCAVATION MATERIALS
AT THE CONSTRUCTION AREA, BUT THESE WILL NEED TO BE REMOVED
BEFORE THE END OF THE DAY.
COORDINATE WITH THE FACILITY AS TO WHERE ON-SITE, OUTSIDE THE
SECURED PERIMETER THE REMOVED SPOILS ARE TO BE DISPOSED OF.
OAKS CORRECTIONAL
FACILITY
KEYED NOTES:
1. CONTRACTOR TO REMOVE EXISTING CONTROL FENCE. COORDINATE
TIMING OF WORK WITH THE FACILITY PRIOR TO REMOVAL.
2. CONTRACTOR SHALL INSTALL A NEW CONTROL FENCE AT THIS
LOCATION. THE CONTROL FENCE SHALL MATCH THE HEIGHT OF THE
ADJACENT EXISTING CONTROL FENCE(S) AND HAVE 1 ROW OF
DETAINER HOOK RAZOR RIBBON.
3. EXISTING CONTROL FENCE TO REMAIN.
4. REFER TO SPECIFICATION AND GENERAL NOTE G. ON SHEET C4. THIS
APPLIES TO ALL STAIRWELL EXIT DOORS IN THE HOUSING UNITS.
5. NEW GATE IN FENCE.
AutoCAD SHX Text 1500 Caberfae Hwy, Manistee MI 49660
AutoCAD SHX Text 800-482-7171
AutoCAD SHX Text
72 HOURS
AutoCAD SHX Text
(3 WORKING DAYS)
AutoCAD SHX Text
(TOLL-FREE)
AutoCAD SHX Text
CALL MISS DIG
AutoCAD SHX Text
BEFORE YOU DIG
FLOOR
657.81±
VERIFY
1.5%
C5
4" BRGEA END
C6
UP
SAWCUT NEW OPENING IN MASONRY
AND INSTALL NEW LINTEL AND DOOR
REFER TO SPECIFICATION AND GENERAL
NOTES F & G ON SHEET C4.
RETURN HANDRAIL
TO WALL
REMOVE OUTER EXISTING
CONCRETE MASONRY WITHE AND
REPLACE WITH NEW BRICK TO
MATCH EXISTING RED BRICK ABOVE
EXPANSION JOINT @ WALL
EXPANSION JOINT @ WALL
C4
C. J.
E. J.
C. J.
E. J.
E. J.
C . J
E.
J
C5
2 (&1)
C5
RETAINING WALL, TYPICAL
GUARD RAIL ON ONE
SIDE ONLY
7.5
7.5%
10'-8"±
8'-0"
4"
10"
C4
RESTORE GRADE AND LAWN
GALVANIZED PIPE
GUARDRAIL ON THIS
SIDE ONLY
C4
3A|3B
24" SQ. OR ROUND CATCH
BASIN AND ADA GRATE
RIM = 657.73
INV. 8" SW = 654.73
NEW 12" H CONTROL FENCE
NEW CONTROL FENCE
CENTERED ON NEW
RETAINING WALL
STORM STORM STORM STORM STORM
STORM
STORM
STORM
STORM
STORM
STORM
STORM
STORM
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
S
TO
R M
STORM
STM
STM
STM
STM
STM
STM
STM
STM
S
TM
S
TM
S
TM
S
TM
S
TM
S
TM
S
TM
S
TM
EXISTING 6" FOUNDATION DRAIN W/ SOCK TO REMAIN
STM
S
TO
R M
S
TO
R M
EXISTING 6" FOUNDATION DRAIN W/ SOCK
NEW 6" FOUNDATION
DRAIN W/ SOCK
RESTORE GRADE & LAWN
39 LF 8" PVC
STORM PIPE
SLOPE 2%
EXISTING 12" STORM PIPE
EXISTING 18" STORM PIPE
EXISTING 15" CPP STORM PIPE
NEW 6" TRENCH DRAIN WITH 4" OUTLET
NEW 6" FOUNDATION DRAIN W/ SOCK
EXISTING CATCH BASIN CB17
RIM = 658.67
I.E. 15" CPP N = 651.74
I.E. 15" CPP S = 651.62
INSTALL FILTER FABRIC DURING
CONSTRUCTION ACTIVITES
EXISTING CONTROL FENCE TO REMAIN,
PROTECT DURING CONSTRUCTION
S
TM
S
TM
S
TM
S
TM
S
TM
STM
STM
STM
STM
S
TM
STO
RM
S
TO
R M
STO
RM
STO
RM
NEW 6" FOUNDATION
DRAIN W/ SOCK
EXISTING 6" FOUNDATION DRAIN
W/ SOCK TO REMAIN
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
C. J.
4" BRGEA END
.70
657.72
660.27
660.00 T.C.
C. J.
659.40
661.10 T.W.
660.36
660.36
661.26
LANDING
661.81
660.80 T.W.
660.50 T.W.
661.10 T.
W . 659.96660.67
NEW 6" CLEAN OUT
660.6 7 T
.C
660.30 T.C.
660.00
660.66
659.59
659.15
658.82
M
AX. 2%
MAX. 2%
MAX. 2%
660.50 T.W.
660.O0
EXISTING MANHOLE MH16
RIM = 659.37
I.E. 15" CPP N = 651.24±
I.E. 18" W = 651.20± I.E. 12" E =
NEW 8" PVC NE = 653.93
EXISTING 15" CPP STORM PIPE
38 LF NEW 8" PVC STORM PIPE
WYE ELEVATION = 654.21
11 LF 4" PVC STORM PIPE
SLOPE 2%
EXISTING 6" STORM PIPE
EXISTING 12" STORM PIPE
EXISTING ASPHALT WALKING PATH TO
REMAIN. PROTECT FROM DAMAGE DURING
CONSTRUCTION. REPAIR ANY DAMAGE
CAUSED BY CONSTRUCTION ACTIVITIES.
EXPANSION
JOINT IN WALL
LIMITS OF CONSTRUCTION
EROSION CONTROLLIMITS OF CONSTRUCTION
EROSION CONTROL
LIMITS OF CONSTRUCTION
EROSION CONTROL
FILTER FABRIC BELOW LID
LIMITS OF
CONSTRUCTION
EROSION CONTROL
NEW 6" CLEAN OUT
660.67 T.C.
NOTE:
ELEVATIONS WITHOUT BOX ARE EXISTING FROM
REFERENCE SURVEY.
ELEVATIONS IN BOX ARE NEW
F.G. = FINISHED GRADE
T.C. = TOP OF CONCRETE WALK
T.W. = TOP OF CONCRETE WALL
SLOPE 1.5%
STM
S
TM
E. J.658.54 C. J.
658.54
.6
M A
X. 1.5%
NEW 6" CLEAN OUT
NEW 6" CLEAN OUT
NEW 6" CLEAN OUT
C. J.
E. J.
C. J.
NEW CONTROL FENCE
CENTERED ON RETAINING
WALL. MOUNT WITH BASE
PLATE AND ANCHORS TO
TOP OF WALL
C. J.
76°
10"
6'-0"
10"
10"
6'-0
10"
6'-0
11'- 0" R
AMP
9'-7 3 8
'-5 3
8 "
11'-2 1 2
"± 13'-71 2"±
RESTORE GRADE AND LAWN
PERIMETER FENCE,
PROTECT DURING
CONSTRUCTION
RETAINING WALL WITHOUT
GUARDRAIL.
C. J.
661.78 T.C.
E. J.
C. J.
C . J
C . J
E. J.
660.00 T.C. 660.60 T.C.
660.54 T.C.
.2
T.
C
NEW CONTROL FENCE CONSTRUCT
BEFORE EXCAVATION OF NEW RAMP
BEGINS.
REMOVE EXISTING CONTROL
FENCE AFTER CONSTRUCTION
OF NEW CONTROL FENCE.
REMOVE AND REPLACE
EXISTING FROST PORCH
WITH NEW STOOP AND
STEPS
C5
661.10 T.
C.
660.60 T.C.
1.6
T .C
.5
T.
C
SLOPE
2% MAX.
C . J
SLOPE
2% MAX.
23'-0
" RAM
P
1'-6"
659.30
659.86
M
AX. 5%
C. J.
C. J.
C. J.
E. J.
660.00
APPROXIMATE EXTENT OF SHORING
5'-0"
5' -8
C6
C6
5' -4
TEM
P. EXIT PA
TH
C5
3 (&1)
DN. 3 STEPS
C6
23'-0
FIELD
V
ERIFY
'-0
" V.I.F.
NEW POST FOR GATE
COORDINATE WITH FACILITY AND MDOC FIRE
SERVICES. INSTALL BARRICADE OVER
DOOR DURING TIME OF EXCAVATION AND POUR
OF THE STOOP AND STEPS.
C. J.
C. J.
C. J.
C. J.
657.78
657.75
E. J.
NEW 6" TRENCH DRAIN TYP.
28'-0
FIELD
V
ERIFY
2'-0
658.90
658.83
4'-0
658.77
658.80.
EXISTING FENCE POST
NEW 4'-0" GATE AND POST
(SEE DETAIL 4/C6) AND
REMOVE SECTION OF
EXISTING FENCE FABRIC.
MATCH EXISTING GRADE
ELEVATION OF TRACK
NEW GRADE BEAM.
SEE DETAIL 4/C6.
3 LF 4" PVC STORM PIPE
STM
STM
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
C1
PROJECT NO: 2001
ADDENDUM 1 08/05/25
RELEASED FOR BIDS 07/09/25
OWNER REVIEW 07/07/25
LOWER LEVEL PLAN
HOUSING UNIT 1
OAKS CORRECTIONAL
FACILITY -
ADA EGRESS RAMPS AND
INFRASTRUCTURE
FILE NO. 472/19532.RLO
ACCT NO. ECFMaintProj
HOUSING UNIT 1
SCALE: 1/4" = 1'0
AutoCAD SHX Text
A/B WING STAIR
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
WING - A
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text
INMATE
AutoCAD SHX Text
AutoCAD SHX Text 1500 Caberfae Hwy, Manistee MI 49660
File details come from the government source that posted it. Updated .