This is a set of engineering drawings from SPN & Associates for CFMO Project #467078 to repave and restripe POV parking at the Mitchell CSMS #1 facility for the South Dakota Army National Guard in Mitchell, South Dakota. The project includes removing existing asphalt and concrete, milling and salvaging asphalt surfacing, installing new concrete curb and gutter, laying new asphalt pavement with granular base, and restriping the parking lot to create 89 total parking spaces (including 4 handicap spaces). The drawings include detailed site plans, grading plans, erosion control measures, and a comprehensive Storm Water Pollution Prevention Plan (SWPPP).
The drawings specify technical requirements including 4" asphalt surfacing with 8" granular base, geotextile fabric underlayment, concrete approaches, and detailed pavement marking specifications. The project location is shown on both state and vicinity maps, with benchmark elevation data and coordination with existing utilities noted. Project contact information lists Jeffrey P. McCormick, P.E. as the project engineer from SPN & Associates. No specific pricing or funding details are included in these construction drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf | ||
| 00 00 02 - Invitation to Bid - Electronic.pdf | ||
| 03 - TL Invitation to Builders Exchanges.pdf | ||
| 467078 - Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRIAL ROAD
AIRPORT INDUSTRIAL
TO
W
ER
R O
AD
AI
R
PO
R
T R
O
AD
FI
AL
A R
O
AD
NO
RTH HARM
O
N DRIVE
N O
R
TH
H
AR
M O
N D
R
IVE
AIRPORT ROAD
NATIONAL GUARD ROADNATIONAL GUARD ROAD
LAKE MITCHELL
O H
LM
AN
ST
R
EE
T
HENDRICKSON
SD ARMY
NATIONAL
GUARD
Mitchell, South Dakota 57301-0398 Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
Mitchell, South Dakota
Cover
VICINITY MAP
REPAVE & RESTRIPE
LOCATION MAP
INDEX OF SHEETS
CFMO #467078
LEGEND
MITCHELL CSMS #1
POV PARKING
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text None
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
MARSHALL
AutoCAD SHX Text
ROBERTS
AutoCAD SHX Text
DAY
AutoCAD SHX Text
SPINK
AutoCAD SHX Text
GRANT
AutoCAD SHX Text
CLARK
AutoCAD SHX Text
CODINGTON
AutoCAD SHX Text
CORSON
AutoCAD SHX Text
ZIEBACH
AutoCAD SHX Text
DEWEY
AutoCAD SHX Text
POTTER
AutoCAD SHX Text
CAMPBELL
AutoCAD SHX Text
WALLWORTH
AutoCAD SHX Text
FAULK
AutoCAD SHX Text McPHERSON
AutoCAD SHX Text
EDMUNDS
AutoCAD SHX Text
JERAULD
AutoCAD SHX Text
SANBORN
AutoCAD SHX Text
MINER
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
MOODY
AutoCAD SHX Text
AURORA
AutoCAD SHX Text
DAVISON
AutoCAD SHX Text
HANSON
AutoCAD SHX Text McCOOK
AutoCAD SHX Text
MINNEHAHA
AutoCAD SHX Text
DEUEL
AutoCAD SHX Text
HAMLIN
AutoCAD SHX Text
BEADLE
AutoCAD SHX Text
KINGSBURY
AutoCAD SHX Text
BROOKINGS
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
MELLETTE
AutoCAD SHX Text
JONES
AutoCAD SHX Text
LYMAN
AutoCAD SHX Text
HAAKON
AutoCAD SHX Text
STANELY
AutoCAD SHX Text
SULLY
AutoCAD SHX Text
HUGHES
AutoCAD SHX Text
BUFFALO
AutoCAD SHX Text
HYDE
AutoCAD SHX Text
BRULE
AutoCAD SHX Text
HAND
AutoCAD SHX Text
HARDING
AutoCAD SHX Text
PERKINS
AutoCAD SHX Text
BUTTE
AutoCAD SHX Text
PENNINGTON
AutoCAD SHX Text
CUSTER
AutoCAD SHX Text
LAWRENCE
AutoCAD SHX Text
MEADE
AutoCAD SHX Text
CHARLES
AutoCAD SHX Text
MIX
AutoCAD SHX Text
DOUGLAS
AutoCAD SHX Text
HUTCHINSON
AutoCAD SHX Text
TURNER
AutoCAD SHX Text
LINCOLN
AutoCAD SHX Text
BON HOMME
AutoCAD SHX Text
YANKTON
AutoCAD SHX Text
CLAY
AutoCAD SHX Text
UNION
AutoCAD SHX Text
BENNETT
AutoCAD SHX Text
TODD
AutoCAD SHX Text
TRIPP
AutoCAD SHX Text
GREGORY
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text 1 Cover Sheet Cover Sheet 2 Removals Removals 3 Site Plan Site Plan 4 Grading & Erosion Control Grading & Erosion Control 5 Details Details 6-8 SWPPPSWPPP
AutoCAD SHX Text
FALL RIVER
AutoCAD SHX Text
MITCHELL
AutoCAD SHX Text
OGLALA LAKOTA
AutoCAD SHX Text W
AutoCAD SHX Text = Existing Fire Hydrant
AutoCAD SHX Text = Existing Light Pole
AutoCAD SHX Text = Existing Sign
AutoCAD SHX Text = Existing Chain Linked Fence
AutoCAD SHX Text = Existing Valve
AutoCAD SHX Text = Existing Water Line
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text = Existing Underground Electric Line
AutoCAD SHX Text = Existing Contour
AutoCAD SHX Text = Proposed Contour
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
AutoCAD SHX Text 1/10/25
Mitchell, South Dakota 57301-0398 Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
Removals
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
Plan Quantities
AutoCAD SHX Text Existing Curb
AutoCAD SHX Text Existing Chain Linked Fence
AutoCAD SHX Text Handicap Signs
AutoCAD SHX Text Handicap Sign
AutoCAD SHX Text Existing Edge of Asphalt
AutoCAD SHX Text Mill & Salvage Asphalt Surfacing and Granular Base 3,660 SY
AutoCAD SHX Text Existing Asphalt Surface
AutoCAD SHX Text Existing Light Pole (Underground Electric Not Field Located)
AutoCAD SHX Text Remove & Dispose Curb and Gutter 18 LF
AutoCAD SHX Text Remove & Dispose Concrete Approach 2 SY
AutoCAD SHX Text Full Depth Concrete Saw Cut 8 LF
AutoCAD SHX Text Owner has an approximate 180'x120' area for construction staging located 1/4 mile southeast of the project site.
AutoCAD SHX Text Control Point #815
AutoCAD SHX Text Control Point #817
AutoCAD SHX Text Underground electric line to light poles was not located. Contractor shall coordinate and be responsible for all costs related to locating the underground electric line.
AutoCAD SHX Text Concrete removed shall be disposed at the City of Mitchell shop located at the southwest corner of West 8th Avenue/Highway 37 bypass intersection.
AutoCAD SHX Text Existing Light Pole (Underground Electric Not Field Located)
AutoCAD SHX Text Remove & Dispose Curb and Gutter 16 LF
AutoCAD SHX Text Full Depth Concrete Saw Cut 4 LF
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text 1" = 30'
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text BENCHMARK DATA: CONTROL POINT #815: PLASTIC CAPPED REBAR PLASTIC CAPPED REBAR N: 529284.900 E: 2573317.328 ELEV = 1299.439 CONTROL POINT #817: PLASTIC CAPPED REBAR PLASTIC CAPPED REBAR N: 529592.896 E: 2573281.778 ELEV = 1297.585 *NOTE: ELEVATIONS BASED ON NAVD-88 DATUM HORIZONTAL SYSTEM: SOUTH DAKOTA STATE PLANE COORDINATE SYSTEM SOUTH DAKOTA SOUTH ZONE - 4002 NAD 83 - GEOID 18
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
Site Plan
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
AutoCAD SHX Text 253.30' Total Length - 25 Spaces (10.13' Wide)
AutoCAD SHX Text 10.49'
AutoCAD SHX Text 10.13'
AutoCAD SHX Text 10.49'
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 4" Asphalt Surfacing with 8" Granular Base 3,660 SY
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 24.50'
AutoCAD SHX Text 31.76'
AutoCAD SHX Text 24.50'
AutoCAD SHX Text 188.81' Total Length - 18 Spaces (10.49' Wide)
AutoCAD SHX Text 32.87'
AutoCAD SHX Text Type P6 Concrete Gutter 18 LF
AutoCAD SHX Text 6" Concrete Approach with 8" Granular Base 3 SY
AutoCAD SHX Text 188.81' Total Length - 18 Spaces (10.49' Wide)
AutoCAD SHX Text 54' Total Length 6 Spaces (9' Wide)
AutoCAD SHX Text 199.39' Total Length - 19 Spaces (10.49' Wide)
AutoCAD SHX Text 30.65'
AutoCAD SHX Text 54' Total Length 3 Spaces (54' Wide)
AutoCAD SHX Text Parking Spaces: 85 Handicap Parking: 4 Total Parking Spaces: 89
AutoCAD SHX Text Parking Lot Striping Handicap Symbol: 4 EA Parking Lane: 1,719 LF No Parking: 809 LF Total Pavement Striping: 2,528 LF
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 18.00'
AutoCAD SHX Text Alternate #1: 3,660 SY Geotextile Fabric
AutoCAD SHX Text 10.49'
AutoCAD SHX Text 9.00'
AutoCAD SHX Text 9.00'
AutoCAD SHX Text 10.13'
AutoCAD SHX Text 10.49'
AutoCAD SHX Text 36.34'
AutoCAD SHX Text Concrete Curb and Gutter 16 LF
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text #16402-SD Dept of Military MHE National Guard
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text 1" = 30'
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
ASP: 1296.40 ASP: 1296.68
ASP: 1297.83
ASP: 1298.01 ASP: 1298.17
ASP: 1299.86
ASP: 1299.38
ASP: 1298.78ASP: 1298.17ASP: 1297.59
ASP: 1296.99
ASP: 1296.61 ASP: 1296.77 ASP: 1297.18 ASP: 1297.59
ASP: 1296.14
ASP: 1295.86
ASP: 1295.75
ASP: 1295.26
ASP: 1296.45
ASP: 1300.54
TC (THEO): 1296.98
TC (THEO): 1297.70
EC: 1297.29
EC: 1297.14
ASP: 1299.29 ASP: 1300.00
ASP: 1300.07
Mitchell, South Dakota 57301-0398 Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
Grading & Erosion Control
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
AutoCAD SHX Text 30.65'
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 18.00'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5'
AutoCAD SHX Text Control Point #815
AutoCAD SHX Text Control Point #817
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text 1" = 30'
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text
SILT FENCE 270 LF
AutoCAD SHX Text
SEED, FERTILIZER, & MULCH 150 SY
AutoCAD SHX Text BENCHMARK DATA: CONTROL POINT #815: PLASTIC CAPPED REBAR PLASTIC CAPPED REBAR N: 529284.900 E: 2573317.328 ELEV = 1299.439 CONTROL POINT #817: PLASTIC CAPPED REBAR PLASTIC CAPPED REBAR N: 529592.896 E: 2573281.778 ELEV = 1297.585 *NOTE: ELEVATIONS BASED ON NAVD-88 DATUM HORIZONTAL SYSTEM: SOUTH DAKOTA STATE PLANE COORDINATE SYSTEM SOUTH DAKOTA SOUTH ZONE - 4002 NAD 83 - GEOID 18
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
Details
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text None
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text
ASPHALT PAVEMENT SECTION
AutoCAD SHX Text 2" Class G Type 1 Asphalt Pavement
AutoCAD SHX Text 8" Scarify and Recompact as Necessary
AutoCAD SHX Text 6" Salvaged Base Course
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text Geotextile Fabric (Bid Alternate)
AutoCAD SHX Text Slope = Match Existing
AutoCAD SHX Text Slope = 1" per ft.
AutoCAD SHX Text
TYPE P6 CONCRETE GUTTER DETAIL
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text 1/4" Rad.
AutoCAD SHX Text 6"
AutoCAD SHX Text Match Existing
AutoCAD SHX Text Match Existing
AutoCAD SHX Text 9' or as shown in plans
AutoCAD SHX Text 9' or as shown in plans
AutoCAD SHX Text
BLUE
AutoCAD SHX Text 18'
AutoCAD SHX Text
4" WHITE
AutoCAD SHX Text 3' Max
AutoCAD SHX Text
ALL PAVEMENT MARKINGS TO BE WHITE PAVEMENT PAINT, UNLESS STATED OTHERWISE.
AutoCAD SHX Text
%%UPAVEMENT MARKINGS
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text Curb & Gutter
AutoCAD SHX Text 2" Class G Type 2 Asphalt Pavement
AutoCAD SHX Text 4'
AutoCAD SHX Text 4'
AutoCAD SHX Text 4" White
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
CURB AND GUTTER DETAIL
AutoCAD SHX Text General Notes:
AutoCAD SHX Text 6"
AutoCAD SHX Text Match Ex.
AutoCAD SHX Text 2"
AutoCAD SHX Text 8"
AutoCAD SHX Text 12"
AutoCAD SHX Text Match Ex.
AutoCAD SHX Text 5" (Min.)
AutoCAD SHX Text 5- "116"
AutoCAD SHX Text 30" long x 5/8" Smooth Rod Capped or Greased on One End at all Expansion Joints
AutoCAD SHX Text 1/2" Preformed expansion joint fillers shall be placed transversely in the curb and gutter at each junction of radius return curb and gutter and curb and gutter which is parallel to the project centerline and at intervals not greater than 150'.
AutoCAD SHX Text Weakened plane joints shall be constructed at a minimum of 10' intervals. when the curb and gutter is to be constructed adjacent to PCC pavement, then the joints shall coincide with the pavement's joints. The joints shall be constructed to a minimum depth of two inches by scoring with a tool which will leave the corners rounded and insure a free movement of concrete at the joint.
AutoCAD SHX Text 1/4" Radius
AutoCAD SHX Text 1/4" Radius
AutoCAD SHX Text Slope = 5%%%
AutoCAD SHX Text Slope = 2%%%
AutoCAD SHX Text 6"
AutoCAD SHX Text 3" Radius
AutoCAD SHX Text 2" Contractor Furnished Base Course
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
SWPPP
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
WEST HURON
STORM WATER POLLUTION PREVENTION PLAN
(The numbers right of the title headings are reference numbers to the
GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH
CONSTRUCTION ACTIVITIES)
vSTAFF TRAINING/SWPPP IMPLEMENTATION (5.4 1-2) To promote stormwater management awareness specific for this project, the Contractor's Erosion Control Supervisor should provide correspondence of how the SWPPP will be implemented. The Contractor's Erosion Control Supervisor is responsible for providing this information at the preconstruction meeting, and subsequently completing an attendance log, which should identify site-specific implementation of the SWPPP and the names of the personnel who attended the preconstruction meeting. Documentation of the preconstruction meeting will be filed with the SWPPP documents.
vSITE DESCRIPTION (5.4 3) Ø Project Limits: See Title Sheet Ø Project Description: See Title Sheet (5.4 3.a) Ø Site Map(s): See Title Sheet and Plans (5.4 4.(a)-(r)) Ø Major Soil Disturbing Activities (check all that apply) � Clearing and grubbing � 9 Excavation/borrows � 9 Grading and shaping � 9 Filling � 9 Cutting and filling � Other (describe):
Ø Total Project Area: 69.79 Ac (5.4 3.b.)
Ø Total Area To Be Disturbed: 0.81 Ac (5.4 3.b) Ø Total Area To Be Disturbed At One Time: 0.81 Ac (5.4 3.c) Ø Existing Vegetation and Percent Vegetation Cover: 4% (5.4 3.d) Ø Soil Properties: NA (5.4 3.e) Ø Name of Receiving Water Body/Bodies: Tributary to Lake Mitchell (5.4 3.f) vORDER OF CONSTRUCTION ACTIVITIES (5.4 3.h) Ø The Contractor will enter the Start Dates.
vEROSION AND SEDIMENT CONTROLS (5.4 5.(a)-(f)) Ø Perimeter Controls (See Detail Plan Sheets) (The Contractor will check all that apply and enter Start Dates.)
Ø Structural Erosion and Sediment Controls (The Contractor will check all that apply and enter Start Dates.)
Ø Dust Controls (The Contractor will check all that apply and enter Start Dates.)
Ø Dewatering BMPs (The Contractor will check all that apply and enter Start Dates.)
· Wetland Avoidance Will construction and/or erosion and sediment controls impinge on regulated wetlands? Yes No 9 If yes, the structural and erosion and sediment controls have been included in the total project wetland impacts and have been included in the 404 permit process with USACE.
Ø Storm Water Management (5.4 7.(a)-(c))
Storm water management will be handled by temporary controls outlined above, and permanent controls needed to meet permanent storm water management needs in the post construction period. Permanent controls will be shown on the plans and noted as permanent.
Description Start Date
Complete traffic control installation and protection devices.
Install perimeter protection where runoff sheets from site.
Clearing and grubbing.
Remove and store topsoil.
Stabilize disturbed areas.
Install curb and gutter.
Complete final grading and paving.
Reseed areas disturbed by construction activities.
Description Start Date
Temporary or Permanent Seeding
Sodding
Planting
Mulching (Straw or Cellulose Fiber)
Erosion Control Blankets or Mats Vegetation Buffer Strips
Roughened Surface (e.g. tracking)
Hydro Mulch
Soil Stabilizer
Bonded Fiber Matrix
Other:
Description Start Date
Natural Buffers
Silt Fence
Erosion Control Wattles Temporary Berm/Windrow
Floating Silt Curtain
Stabilized Construction Entrances Entrance/Exit Equipment Tire Wash
Other:
Description Start Date
Tarps & Wind impervious fabrics
Watering
Stockpile location/orientation
Dust Control Chlorides
Other:
Description Start Date
Sediment Basins Dewatering Bags
Weir Tanks Temporary Diversion Channel
Other:
Description Start Date
Temporary Sediment Barriers
Erosion Bales Temporary Slope Drain
Turf Reinforcement Mat Riprap
Gabions/Gabion Mattress
Check Rock Dams Sediment Traps/Basins
Culvert Inlet Protection
Transition Mats
Area Drain Inlet Protection
Curb Inlet Protection Interceptor Ditch
Concrete Washout Facility
Work Platform Temporary Water Barrier
Temporary Water Crossing
Permanent Stormwater Ponds Permanent Open Vegetated Swales
Natural Depressions to allow for Infiltration
Sequential Systems (Combined Practices)
Other:
Ø Stabilization Practices (See Detail Plan Sheets) (Stabilization measures shall be initiated as soon as possible, but in no case later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Initiation of final or temporary stabilization may exceed the 14-day limit if earth disturbing activities will be resumed within 21 days.)
(The Contractor will check all that apply and enter Start Dates.)
Ø Other Storm Water Controls (5.4 8.b) � Waste Disposal
All liquid waste materials will be collected and stored in sealed metal containers approved by the project engineer. All trash and construction debris from the site will be deposited in the approved containers. Containers will be serviced as necessary, and the trash will be hauled to an approved disposal site or licensed landfill. All onsite personnel will be instructed in the proper procedures for waste disposal, and notices stating proper practices will be posted in the field office. The general contractor's representative responsible for the conduct of work on the site will be responsible for seeing waste disposal procedures are followed.
� Hazardous Waste
All hazardous waste materials will be disposed of in a manner specified by local or state regulations or by the manufacturer. Site personnel will be instructed in these practices, and the individual designated as the contractor's on-site representative will be responsible for seeing that these practices are followed.
� Sanitary Waste Portable sanitary facilities will be provided on all construction sites. Sanitary waste will be collected from the portable units in a timely manner by a licensed waste management contractor or as required by any local regulations.
vMaintenance and Inspection (3.20 1 and 4.1) Ø Maintenance and Inspection Practices
· Inspections will be conducted at least once every 7 calendar days or every 14 calendar days and within 24 hours of precipitation that exceeds 0.25 inches or snowmelt that generates runoff. You must keep a properly maintained rain gauge on your site.
· All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report.
� Silt fence will be inspected for depth of sediment and for tears in order to ensure the fabric is securely attached to the posts and that the posts are well anchored.
Sediment buildup will be removed from the silt fence when it reaches 1/3 of the height of the silt fence.
� Sediment basins and traps will be checked. Sediment will be removed when the depth reaches approximately 50 percent of the structure's capacity, and at the conclusion of the construction.
� All seeded areas will be checked for bare spots, washouts, and vigorous growth free of significant weed infestations.
� Inspection and maintenance reports will be prepared for each site inspection, this form will also be used to document changes to the SWPPP. A copy of the completed inspection form will be filed with the SWPPP documents.
� The contractor's site superintendent is responsible for inspections. Maintenance, repair activities are the responsibility of the contractor. The Contractor will complete the inspection and maintenance reports and distribute copies to the owner and engineer.
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text None
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
SWPPP
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1
WEST HURON
vNon-Storm Water Discharges (5.4 10) The following non-storm water discharges are anticipated during the course of this project (The Contractor will check all that apply).
Ø Discharges from water line flushing.
Ø Pavement wash-water, where no spills or leaks of toxic or hazardous materials have occurred.
Ø Uncontaminated ground water associated with dewatering activities.
vSpill Prevention (5.4 8) Ø Material Management � Housekeeping
· Only needed products will be stored on-site by the contractor.
· Except for bulk materials the contractor will store all materials under cover and in appropriate containers.
· Products shall be kept in their original containers with the original manufacture's label.
· Material mixing will be conducted in accordance with the manufacturer's recommendations.
· Whenever possible, all products will be completely used before properly disposing of the container off site.
· The manufacturer's directions for disposal of materials and containers will be followed.
· The contractor's site superintendent will inspect materials storage areas regularly to ensure proper use and disposal.
· Dust generated will be controlled in an environmentally safe manner.
· Vegetation areas not essential to the construction project will be preserved and maintained as noted on the erosion control plans.
� Hazardous Materials
· Products will be kept in original containers unless the container is not resealable.
· Original labels and material safety data sheets will be retained in a safe place to relay important product information.
· If surplus product must be disposed of, manufacturer's label directions for disposal will be followed.
· Maintenance and repair of all equipment and vehicles involving oil changes, hydraulic system drain down, de-greasing operations, fuel tank drain down and removal, and other activities which may result in the accidental release of contaminants will be conducted on an impervious surface and under cover during wet weather to prevent the release of contaminants onto the ground.
· Wheel wash water will be collected and allowed to settle out suspended solids prior to discharge. Wheel wash water will not be discharged directly into any storm water system or storm water treatment system.
· Potential pH-modifying materials such as: bulk cement, cement kiln dust, fly ash, new concrete washings, concrete pumping, and mixer washout waters will be collected on site and managed to prevent contamination of storm water runoff.
vMaterials Inventory (5.4 9.(a)-(c)) The following materials or substances are expected to be present on the site during the construction period. These materials will be handled as noted under the headings "EROSION AND SEDIMENT CONTROLS" and "SPILL PREVENTION" (The Contractor will check all that apply).
Ø Concrete and Portland Cement Ø Detergents Ø Paints Ø Metals Ø Bituminous Materials Ø Petroleum Based Products Ø Cleaning Solvents Ø Wood Ø Cure Ø Texture Ø Chemical Fertilizers Ø Herbicides Ø Diesel Exhaust Fluid Ø Other:
Ø Product Specific Practices (5.4 9) � Petroleum Products
All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which are clearly labeled.
� Fertilizers Fertilizers will be applied only in the amounts recommended by the supplier. Once applied, fertilizers will be worked into the soil to limit the exposure to storm water. Fertilizers will be stored in an enclosed area. The contents of partially used fertilizer bags will be transferred to sealable containers to avoid spills.
� Paints All containers will be tightly sealed and stored when not required for use. The excess will be disposed of according to the manufacturer's instructions and any applicable state and local regulations.
� Concrete Trucks Contractors will provide designated truck washout areas on the site. These areas must be self contained and not connected to any storm water outlet of the site.
Upon completion of construction washout areas will be properly stabilized.
Ø Spill Control Practices (5.4 8) In addition to the previous housekeeping and management practices, the following practices will be followed for spill prevention and cleanup if needed.
� For all hazardous materials stored on site, the manufacturer's recommended methods for spill clean up will be clearly posted. Site personnel will be made aware of the procedures and the locations of the information and cleanup supplies.
� Appropriate cleanup materials and equipment will be maintained by the contractor in the materials storage area on-site. As appropriate, equipment and materials may include items such as booms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and plastic and metal trash containers specifically for clean up purposes.
� All spills will be cleaned immediately after discovery and the materials disposed of properly.
� The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance.
� After a spill a report will be prepared describing the spill, what caused it, and the cleanup measures taken. The spill prevention plan will be adjusted to include measures to prevent this type of spill from reoccurring, as well as clean up instructions in the event of reoccurrences.
� The contractor's site superintendent, responsible for day-to-day operations, will be the spill prevention and cleanup coordinator. The contractor is responsible for ensuring that the site superintendent has had appropriate training for hazardous materials handling, spill management, and cleanup.
Ø Spill Response (5.4 8) The primary objective in responding to a spill is to quickly contain the material(s) and prevent or minimize migration into storm water runoff and conveyance systems. If the release has impacted on-site storm water, it is critical to contain the released materials on-site and prevent their release into receiving waters. If a spill of pollutants threatens storm water or surface water at the site, the spill response procedures outlined below must be implemented in a timely manner to prevent the release of pollutants.
� The contractor's site superintendent will be notified immediately when a spill or the threat of a spill is observed. The superintendent will assess the situation and determine the appropriate response.
� If spills represent an imminent threat of escaping erosion and sediment controls and entering receiving waters, personnel will be directed to respond immediately to contain the release and notify the superintendent after the situation has been stabilized.
� Spill kits containing appropriate materials and equipment for spill response and cleanup will be maintained by the contractor at the site.
� If oil sheen is observed on surface water (e.g. settling ponds, detention ponds, swales), action will be taken immediately to remove the material causing the sheen. The contractor will use appropriate materials to contain and absorb the spill. The source of the oil sheen will also be identified and removed or repaired as necessary to prevent further releases.
� If a spill occurs the superintendent or the superintendent's designee will be responsible for completing the spill reporting form and for reporting the spill to SD
DANR.
� Personnel with primary responsibility for spill response and clean up will receive training by the contractor's site superintendent or designee. The training must include identifying the location of the spill kits and other spill response equipment and the use of spill response materials.
� Spill response equipment will be inspected and maintained as necessary to replace any materials used in spill response activities.
vSpill Notification (7.2 1.(a)-(i)) In the event of a spill, the contractor's site superintendent will make the appropriate notification(s), consistent with the following procedures:
Ø A reportable spill is a quantity of 25 gallons or more or any spill of oil which:
1) violates water quality standards, 2) produces a "sheen" on a surface water, or 3) causes a sludge or emulsion must be reported immediately to the National Response Center .
Ø Any spill of oil or hazardous substance to waters of the state must be reported immediately by telephone to the SD DANR.
vPost Construction Stormwater Management (5.4 7.(a)-(c))
Storm management will be handled by temporary controls outlined in "Description and maintenance of control measures" and any permanent controls needed to meet permanent stormwater management needs in the post construction period will be shown in the plans and noted as permanent.
vInfeasibility Document (5.4 11)
If it is determined to be infeasible to comply with any of the requirements of the Stormwater Permit, the infeasibility determination must be thoroughly documented in the SWPPP.
vRequired SWPPP Modifications (5.6)
Ø Conditions Requiring SWPPP Modifications (5.6 1) The SWPPP must be modified, including the site map(s) in response to any of the following conditions.
� When a new operator responsible for implementation of any part of the
SWPPP begins work on the site.
� When changes to the construction plans, sediment and erosion control measures, or any best management practices on site that are no longer accurately reflected in the SWPPP. This includes changes made in response to corrective actions triggered by inspections.
� To reflect areas on the site map where operational control has been transferred (including the date of the transfer) or has been covered under a new permit since initiating coverage under this general permit.
� If inspections by site staff, local officials, SDDANR, or U.S. EPA determine that SWPPP modifications are necessary for compliance with the Stormwater Permit.
� To reflect any revisions to applicable federal, state, or local requirements that affect the control measures implemented at the site.
� If approved to reflect any changes in chemical water treatment systems or controls, including the use of a different water treatment chemical, age rates, different areas, or methods of application.
Ø Deadlines for SWPPP Modification (5.6 2) Any required revisions to the SWPPP must be completed within 7 calendar days following any of the items listed above.
Ø Documentation of Modifications to the Plan (5.6 3) All SWPPP modification records are required to be maintained showing the dates of when the modification occurred. The records must include the name of the person authorizing each change and a brief summary of all changes.
Ø Certification Requirements (5.6 4) All modifications made to the SWPPP must be signed and certified as required in Section 7.4.
ØRequired Notice to Other Operators (5.6 5) If there are multiple operators at the site, the Contractor's Erosion Control Supervisor must notify each operator that may be impacted by the change to the SWPPP within 24 hours.
When changes are made to the construction project that will require alterations in the temporary erosion controls of the site, the Storm Water Pollution Prevention Plan (SWPPP) will be amended to provide appropriate protection to disturbed areas, all storm water structures, and adjacent waters.
The Contractor will modify the SWPPP plan and drawings to reflect the needed changes. Copies of forms and the SWPPP will be retained in a designated place for review over the course of the project.
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text None
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
Phone: (605) 996-7761 - Fax: (605) 996-0015
2100 North Sanborn Boulevard - P.O. Box 398
Engineers - Planners - Surveyors
& Associates
SPN
Mitchell, South Dakota
SWPPP
CFMO #467078
Repave & Restripe POV Parking Mitchell CSMS #1 v CERTIFICATIONS Ø Certification of Compliance with Federal, State, and Local
Regulations The Storm Water Pollution Prevention Plan (SWPPP) for this project reflects the requirements of all local municipal jurisdictions for storm water management and sediment and erosion control as established by ordinance, as well as other state and federal requirements for sediment and erosion control plans, permits, notices or documentation as appropriate.
Ø SD Department of Military National Guard
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Authorized Signature. (See the General Permit, Section 7.4.1.)
Ø Prime Contractor This section is to be executed by the General Contractor after the award of the contract and at least 15 days prior to the beginning of construction. This section may be executed any time there is a change in the Prime Contractor of the project.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Authorized Signature. (See the General Permit, Section 7.4.1.)
v CONTACT INFORMATION Ø Contractor Information:
� Prime Contractor Name:
� Contractor Contact Name:
� Address:
� Address:
� City:
� State:
� Zip:
� Office Phone:
� Field:
� Cell:
� Fax:
Ø Project Engineer � Name: Jeffrey P. McCormick, P.E.
� Business Address: 2100 N. Sanborn Blvd.
� Job Office Location 2100 N. Sanborn Blvd.
� City: Mitchell State: SD Zip: 57301 � Office Phone: 605-996-7761 Field: Cell: 605-770-6268 Fax:605-996-0015
Ø SD DENR Contact Spill Reporting � Business Hours Monday-Friday (605) 773-3296 � Nights and Weekends (605) 773-3231
Ø SD DENR Contact for Hazardous Materials.
� (605) 773-3153
Ø National Response Center Hotline � (800) 424-8802.
AutoCAD SHX Text Total Sheets:
AutoCAD SHX Text Sheet Name:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Located in:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Plan Horiz. Scale:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Date:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text File Name:
AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.
AutoCAD SHX Text Certificate
AutoCAD SHX Text 16403
AutoCAD SHX Text 01/10/2025
AutoCAD SHX Text
JPM
AutoCAD SHX Text
NJZ
AutoCAD SHX Text None
AutoCAD SHX Text #16403 - SD Dept of Military National Guard
AutoCAD SHX Text Revisions
AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.
| Sheets and Views |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-Cover |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-Removals |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-Installs |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-Grading & Erosion Control |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-Details |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-SWPPP |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-SWPPP (1) |
| 16403-SD Dept of Military MHE National Guard Updated 9.9.2024-SWPPP (2) |
File details come from the government source that posted it. Updated .