466430 Duke Flooring Drawings.pdf

PDF 4 MB Posted

Attached to
Dept of Military, Duke Corning Armory Flooring Camp Rapid BLDG 100
Solicitation number
25IFB16964
Issued by
Pennington County, South Dakota

About this file

The document is a comprehensive set of architectural flooring plans for the Duke Corning Armory renovation project, prepared by the South Dakota Department of the Military's Construction & Facility Management Office. The project is located at Camp Rapid Building 100 in Rapid City, South Dakota, with a project date of August 2025 and CFMO# 466430. The scope involves a complete flooring replacement, including demolition of existing flooring and installation of new luxury vinyl tile (LVT) and carpet tiles across multiple rooms and corridors. The total flooring area includes approximately 7,715 square feet of proposed LVT and 10,990 square feet of proposed carpet tiles.

The project plans include detailed floor plans showing the demolition of existing flooring in various rooms such as offices, corridors, classrooms, locker rooms, and an assembly hall. The renovation specifications require the contractor to verify square footage, remove existing flooring and wall base, complete necessary floor patching and leveling, and ensure proper material storage and acclimation. The contractor will be responsible for providing samples for owner selection of carpet tiles, LVT, and vinyl wall base, as well as installing transition strips between different flooring materials. The project adheres to specifications 09 65 19 for resilient tile flooring and 09 68 13 for carpet tile installation.

View the file

Other files

File Type Posted
466430 Duke Flooring Specs.pdf PDF
466430 - Invitation to Bid - Electronic.docx DOCX document
Addendum 1 Document.pdf PDF
466430 - Invitation to Bid - Electronic.docx DOCX document
466430 Duke Flooring Drawings.pdf PDF
466430 Duke Flooring Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKE

CANYON LA

KE RD.

MAIN

SO

O

SOO SAN

DR.

ST

SH

ER

ID

AN

LA

KE

RD

CANYON

LAKE SCHOOL

W. ST. CLOUD

HARMONY LN.

DR

ST

NATIONAL GUARD

ARMORY

WEST

JUNIOR

BLACK HILLS

WORKSHOP SCHOOL

SIOUX

SANITARIUM

HIGH SCHOOL

MARY

HALL

PARK

SIOUX

PARK

NATIONAL

GUARD

CAMP

ST

BROOK S I DE

TH

ST

R E DE R

S

T .

HALL ST.ST

TH

R ANGE RD.

BO

U

LD

ER

BECKMAN

DR.

LANCE

W

. RAPID

FEDERAL

AVE.

KI

N

N

EY

AV

E.

VA

LE

ST

ST

W

HI

TE

W

O O

D

ST

U

R

WEST OMAHA

WEST RAPID

WEST MAIN

PI

ED

M O

N T

HA

RT

ER

D

R.

DA

KO

TA

D

R.

PL

U

M

TR

EE LN

LN.

J AN

J UD Y A

CT.

JUNE

CT.

STORYBOOK

ISLAND PARK

SH

EF

FE

R

ST.

ST.

ST.ST

ST

GI

S

CLOW ER

SU

N

N

YV

AL

E

POINT WEST

PL

AT

T

PAYTON

CT.

LIME

CREEK

DR. 32

N

D

ST

LOUISST.

COUNTRY

LANE

LE

SL

EY

ST

N

AT

IO

N

AL

PARKS &

RECREATION

DEPT.

DUKE CORNING

ARMORY

COVER SHEET, NOTES & GENERAL INFORMATION

G-001 COVER SHEET

ARCHITECTURAL

A-101 OVERALL FLOOR PLAN

A-102 DETAILED PLAN

A-103 DETAILED PLAN

A-104 DETAILED PLAN

A-202 DETAILED PLAN

A-203 DETAILED PLAN

A-204 DETAILED PLAN

REVISIONS

ZONE LTR DATE APPROVED

SHEET INDEX

SHEET No:

SOUTH DAKOTA

DEPARTMENT OF THE MILITARY

DUKE CORNING ARMORY FLOORING

CAMP RAPID BLDG 100

CFMO# 466430

RAPID CITY, SD

AUGUST 2025

STATE REFERENCE MAP

HARDING

PERKINS

CORSON

CAMBELL

McPHERSON

BROWN

MARSHALL ROBERTS

BUTTE

LAWRENCE

PENNINGTON

CUSTER

FALL RIVER

MEADE

SHANNON

BENNETT

WASHABAUGH

JACKSON

HAAKON

ZIEBACH

DEWEY

STANLEY

JONES

MELLETTE

TODD

TRIPP

LYMAN

HUGHES

SULLY

POTTER

WALWORTH

EDMUNDS

FAULK

SPINK

HYDE

HAND

BUFFALO

BRULE

CHARLES

MIXGREGORY

DAY

CLARK

CODINGTON

GRANT

DEUEL

HAMLIN

BEADLE

KINGSBURY BROOKINGS

JERAULD

MINER

LAKE

MOODY

AURORA McCOOK MINNEHAHA

DOUGLAS

HUTCHINSON

TURNER

LINCOLN

BON

HOMME

YANKTON

CLAY

SANBORN

DA

VI

SO

N

H

AN

SO

N

UNION

TE

OF

SOUTH DAKOTAATS

R G

TA

E L

AES9881

U

REDN

DOG

EL

UR

ELP

OET PEH

UNAUTHORIZED CHANGES

THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR

LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL

CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE

PREPARER OF THESE PLANS. THE ENGINEER SIGNING THESE PLANS IS

RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF THE

DESIGN HERON.

NOTICE TO CONTRACTOR

THE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH

GENERALLY ACCEPTED CONSTRUCTION PRACTICES, HE/SHE WILL BE

REQUESTED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE

CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,

INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS

REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO

NORMAL WORKING HOURS. THE CONSTRUCTION CONTRACTOR FURTHER

AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL

HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION

WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY

ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN ENGINEER.

CITY MAP

DATE:

SUBMITTAL:

CO

VE

R

SH

EE

T

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

G-001

Rapid City

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

Classroom

Classroom

Corridor

Viewing/

Engagement Skills Trng.

Classroom

Men

C or rid or

Classroom

Vest.

221B

Women

Corridor

Corridor

Vault

Office

231A

C or rid or

Plenum

Mechanical

Storage

Shower

Jan.

Office

Storage

Drying

Kitchen

Scullery

C or rid or

B

El ec tri ca l

C or rid or

Drying

Locker Room

M en

Lo ck er R oo m87

Office

Office

Office

La ct at io n

Men

Women

Ja ni to r

Telecom

Corridor

Corridor

Corridor

Vestibule

Office

Office 15B

Supply Room

Corridor

Assembly Hall

Office

Office

Office

Office

Office

Office

Office 100D

Office

Office

Break Room

Office

Office

Office

Office

Office

Office

Office

Office

Office

Elec

JOC

Office

Office

Office

Office

Office 102/103

Office

C or rid or

C or rid or

Corridor140

Corridor109108 Corridor

Office

Office

Janitor

Office

Vault

Office

Vault

Supply Room

Office

Break

Office

Office

Office

Office

Office

Break

Office

C or rid or

Office

Office 37A

Storage

C or rid or

94A

221C Control

Men Locker Room

Women

Office 100B

Office 100A

Office 15A

Office 20A

Mech.

221A

Conf

Office

Office

Office

Office 15C

9'-8"

'-4

1 8"

14'-11 3 16"

10'-1013 16"

9'-4" 9'-8" 13'

'-4

9' -1

0"

15'-1111 16"53'-2 5

16"

13'-8"

13'-2"

'-8

12'

7'

'-1

0"

20'-2" 9'-8"

'-1

0"

10'-2" 9'-8" 9'-8"

30'-2"

'-1

0"

10' 9'-8" 9'-10"

6'

27'-5"

10'-2" 9'-8" 9'-8"

9' -1

0"

'-2

7' -6

"24'-21 2"

7'39'

'-6

"39'-813 16"

6'

14'-8"

4' -4

7'-71 4"

5'

'-2

6'-111 8" 15'

Auditorium

Storage 210A

4'-8"

'-8

7' -7

3 8"

31'-2" 167'-8 7 16"7' 10

'-4

5'-3" 4'-8"

24'-6" 17'-8" 25'

'-8

'-1

0"

6'

4'

10'-8" 11'-6"

12' 12'-4" 10'-4"

'-8

'-2

'-2

9' -1

0"

15'-10" 9'-8" 9'-8"9'-8" 19'-8" 9'-8"

9'-10"

9' -8

9'

-8

'-8

'-8

3'-8"

3' -8

" 10 '-4

3'-8"

9'-8" 9'-8"

'-8

'-8

'-8

10'-21 2" 9'-8"15'-31

2" 9'-8" 13'-6"13'-8"9'-8"9'-8"

'-4

9 16

12'-3"

9' 9'

9'-8" 9'-8"

9'-8" 9'-8" 9'-8" 2'-8"

9' -8

9'-101 2"

22'-6"

'-5

7 16

4'-01 4"

32'

'-2

1 2"

3' -8

8' -1

0"

9'-10"

9' -6

7' -4

Office

Office

Snack

C or rid or

Office

Secret

Copier 133 Office

100C

C lo se t

Corridor

Corridor

Fitness

SHEET No:

DATE:

SUBMITTAL:

O

VE

RA

LL

F

LO

O R

PL

AN

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

A-101

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOOR PLAN

NTS

GENERAL NOTES:

1. CONTRACTOR TO VERIFY SQUARE FOOTAGE. QUANTITIES PROVIDED ARE

APPROXIMATE.

2. REMOVE ALL EXISTING FLOORING WHERE FLOORING DEMOLITION IS

INDICATED.

3. REMOVE EXISTING WALL BASE IN ROOMS WHERE FLOORING DEMOLITION IS

INDICATED.

4. CONTRACTOR SHALL COMPLETE ALL NECESSARY FLOOR PATCHING,

LEVELING, AND REPAIRS FOR THE PREPARATION OF PROPOSED FINISHED

PRODUCTS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS

TO INCLUDE MOISTURE OR OTHER TESTING.

5. CONTRACTOR TO PROVIDE SAMPLES FOR OWNERS SELECTION FOR CARPET

TILE, LUXURY VINYL TILE AND VINYL WALL BASE.

6. OWNER TO MAKE SELECTION FOR FLOOR PATTERN INSTALLATION PER

MANUFACTURERS RECOMMENDATION.

7. CONTRACTOR SHALL ENSURE ALL MATERIALS ARE PROPERLY STORED AND

ACCLIMATED PRIOR TO INSTALLATION PER MANUFACTURER'S

RECOMMENDATIONS.

8. FURNISH AND INSTALL NEW WALL BASE WHERE NEW FLOORING IS

INDICATED.

9. CONTRACT SHALL FURNISH AND INSTALL TRANSITION STRIPS EACH

LOCATION DIFFERING FLOORING MATERIALS MEET. CONTRACTOR TO

PROVIDE SAMPLES FOR OWNERS SELECTION.

10. CONTRACTOR SHALL REFERENCE SPECIFICATIONS 09 65 19 RESILIENT TILE

FLOORING AND 09 68 13 CARPET TILE FOR MATERIAL PREPARATION AND

INSTALLATION REQUIREMENTS.

Classroom

Fitness

Corridor

Viewing/

Engagement Skills Trng.

Classroom

Men

C or rid or

Classroom

Vest.

221B

Women

Corridor

Corridor

Vault

Office

231A C or rid or

Plenum

Mechanical

Storage

Shower

Jan.

Office

Drying

Kitchen

Scullery

C or rid or

B

El ec tri ca l

C or rid or

Drying

Locker Room

M en

Lo ck er R oo m87

Break Room

108 Corridor

94A

221C Control

Men Locker Room

Women

Mech.

221A

6'

14'-8"

4' -4

7'-71 4"

5'

'-2

6'-111 8" 15'

Auditorium

Storage 210A

4'-8"

'-8

7' -7

3 8"

31'-2" 167'-8 7 16"7' 10

'-4

5'-3" 4'-8"

24'-6" 17'-8" 25'

'-8

'-1

0"

6'

4'

10'-8"

'-8

9'

-1 0"

7' -4

Office

Office

Snack

Fitness

SHEET No:

DATE:

SUBMITTAL:

DE

TA

IL

ED

P

LA

N

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

RA

PI

D

CI

TY

, S D

CF

M

O

100%

AUGUST 2025

A-102

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOORING DEMOLITION PLANSCALE: 1

16" :1'-0"

CARPET DEMO (13,650SF APPROX.)

VINYL DEMO (5,055SF APPROX.)

C or rid or

Office

Storage

C or rid or

Office

Office

Office

La ct at io n

Men

Women

Ja ni to r

Telecom

Corridor

Office

Corridor

Assembly Hall

Office

Office

Office

Office

Office

Office

Office 100D

Office

Office

Break Room

Office

Office

Office

Office

Office

Office

Office

Office

Office

Elec

JOC

Office

Office

Office

Office

Office 102/103

Office

C or rid or

C or rid or

Corridor140

Corridor109108 Corridor

Office 100B

Office 100A

13'-2"

'-8

39'-8

6'

167'-8 7 16"

6'

4'

10'-8" 11'-6"

12' 12'-4" 10'-4"

'-8

'-2

'-2

9' -1

0" 15'-10" 9'-8" 9'-8"9'-8" 19'-8" 9'-8"

9'-10"

9' -8

9'

-8

'-8

'-8

3'-8"

3' -8

" 10 '-4

3'-8"

9'-8" 9'-8"

'-8

'-8

'-8

10'-21 2" 9'-8"15'-31

2" 9'-8" 13'-6"13'-8"9'-8"9'-8"

'-4

9 16

12'-3"

9' 9'

9'-8" 9'-8"

9'-8" 9'-8" 9'-8" 2'-8"

9' -8

9'-101 2"

22'-6"

'-5

7 16

4'-01 4"

32'

'-2

1 2"

3' -8

Office

Office

Snack

C or rid or

Office

Secret

Copier 133 Office

100C

C lo se t

SHEET No:

DATE:

SUBMITTAL:

DE

TA

IL

ED

P

LA

N

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

A-103

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOORING DEMOLITION PLANSCALE: 1

16":1'-0"

Corridor

Corridor

Vestibule

Office 15B

Supply Room

Corridor

Office

Office

Office

Janitor

Office

Vault

Office

Vault

Supply Room

Office

Break

Office

Office

Office

Office

Office

Break

Office

C or rid or

Office

Office 37A

Storage

C or rid or

Office 100A

Office 15A

Office 20A

Conf

Office

Office

Office

Office 15C

9'-8"

'-4

1 8"

14'-11 3 16"

10'-1013 16"

9'-4" 9'-8" 13'

'-4

9' -1

0"

15'-1111 16"53'-2 5

16"

13'-8"

13'-2"

12'

7'

'-1 0"

20'-2" 9'-8"

'-1

0"

10'-2" 9'-8" 9'-8"

30'-2"

'-1

0"

10' 9'-8" 9'-10"

6'

27'-5"

10'-2" 9'-8" 9'-8"

9' -1

0"

'-2

20'

7' -6

"24'-21 2"

7'39'

'-6

"39'-813 16"

9'

8' -1

0"

9'-10"

9' -6

Corridor

Corridor

SHEET No:

DATE:

SUBMITTAL:

DE

TA

IL

ED

P

LA

N

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

A-104

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOORING DEMOLITION PLANSCALE: 1

16":1'-0"

Classroom

Corridor

Viewing/

Engagement Skills Trng.

Classroom

Men

C or rid or

Classroom

Vest.

221B

Women

Corridor

Corridor

Vault

Office

231A C or rid or

Plenum

Mechanical

Storage

Shower

Jan.

Office

Drying

Kitchen

Scullery

C or rid or

B

El ec tri ca l

C or rid or

Drying

Locker Room

M en

Lo ck er R oo m87

Break Room

108 Corridor

94A

221C Control

Men Locker Room

Women

Mech.

221A

6'

14'-8"

4' -4

7'-71 4"

5'

'-2

6'-111 8" 15'

Auditorium

Storage 210A

4'-8"

'-8

7' -7

3 8"

31'-2" 167'-8 7 16"7' 10

'-4

5'-3" 4'-8"

24'-6" 17'-8" 25'

'-8

'-1

0"

6'

4'

10'-8"

'-8

9'

-1 0"

7' -4

Office

Office

Snack

Fitness

SHEET No:

DATE:

SUBMITTAL:

DE

TA

IL

ED

P

LA

N

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

A-202

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOORING PLANSCALE: 1

16" :1'-0"

PROPOSED LVT (7,715SF APPROX.)

PROPOSED CARPET TILES

(10,990 SF APPROX.)

C or rid or

Office

Storage

C or rid or

Office

Office

Office

La ct at io n

Men

Women

Ja ni to r

Telecom

Corridor

Office

Corridor

Assembly Hall

Office

Office

Office

Office

Office

Office

Office 100D

Office

Office

Break Room

Office

Office

Office

Office

Office

Office

Office

Office

Office

Elec

JOC

Office

Office

Office

Office

Office 102/103

Office

C or rid or

C or rid or

Corridor140

Corridor109108 Corridor

Office 100B

Office 100A

13'-2"

'-8

39'-8

6'

167'-8 7 16"

6'

4'

10'-8" 11'-6"

12' 12'-4" 10'-4"

'-8

'-2

'-2

9' -1

0" 15'-10" 9'-8" 9'-8"9'-8" 19'-8" 9'-8"

9'-10"

9' -8

9'

-8

'-8

'-8

3'-8"

3' -8

" 10 '-4

3'-8"

9'-8" 9'-8"

'-8

'-8

'-8

10'-21 2" 9'-8"15'-31

2" 9'-8" 13'-6"13'-8"9'-8"9'-8"

'-4

9 16

12'-3"

9' 9'

9'-8" 9'-8"

9'-8" 9'-8" 9'-8" 2'-8"

9' -8

9'-101 2"

22'-6"

'-5

7 16

4'-01 4"

32'

'-2

1 2"

3' -8

Office

Office

Snack

C or rid or

Office

Secret

Copier 133 Office

100C

C lo se t

SHEET No:

DATE:

SUBMITTAL:

DE

TA

IL

ED

P

LA

N

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

A-203

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOORING PLANSCALE: 1

16":1'-0"

PROPOSED LVT (7,715SF APPROX.)

(10,990SF APPROX.)

Corridor

Corridor

Vestibule

Office 15B

Supply Room

Corridor

Office

Office

Office

Janitor

Office

Vault

Office

Vault

Supply Room

Office

Break

Office

Office

Office

Office

Office

Break

Office

C or rid or

Office

Office 37A

Storage

C or rid or

Office 100A

Office 15A

Office 20A

Conf

Office

Office

Office

Office 15C

9'-8"

'-4

1 8"

14'-11 3 16"

10'-1013 16"

9'-4" 9'-8" 13'

'-4

9' -1

0"

15'-1111 16"53'-2 5

16"

13'-8"

13'-2"

12'

7'

'-1 0"

20'-2" 9'-8"

'-1

0"

10'-2" 9'-8" 9'-8"

30'-2"

'-1

0"

10' 9'-8" 9'-10"

6'

27'-5"

10'-2" 9'-8" 9'-8"

9' -1

0"

'-2

7' -6

"24'-21 2"

7'39'

'-6

"39'-813 16"

9'

8' -1

0"

9'-10"

9' -6

Corridor

Corridor

SHEET No:

DATE:

SUBMITTAL:

DE

TA

IL

ED

P

LA

N

DU

KE

C O

RN

IN

G A

RM

O

RY

FL

O O

RI

N

G

CA

M O

R

AP

ID

B

LD

G

RA

PI

D

CI

TY

, S

D

CF

M O

100%

AUGUST 2025

A-204

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

FLOORING PLANSCALE: 1

16":1'-0"

PROPOSED LVT (7,715SF APPROX.)

(10,990SF APPROX.)

Sheets and Views
466430 Duke-Model
466430 Duke-Title Page
466430 Duke-A-101
466430 Duke-A-102
466430 Duke-A-103
466430 Duke-A-104
466430 Duke-A-202
466430 Duke-A-203
466430 Duke-A-204
466430 Duke-FYI Page
466430 Duke-Layout1

File details come from the government source that posted it. Updated .