466430 Duke Flooring Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- 25IFB16964
- Issued by
- Pennington County, South Dakota
About this file
The document is a comprehensive set of architectural flooring plans for the Duke Corning Armory renovation project, prepared by the South Dakota Department of the Military's Construction & Facility Management Office. The project is located at Camp Rapid Building 100 in Rapid City, South Dakota, with a project date of August 2025 and CFMO# 466430. The scope involves a complete flooring replacement, including demolition of existing flooring and installation of new luxury vinyl tile (LVT) and carpet tiles across multiple rooms and corridors. The total flooring area includes approximately 7,715 square feet of proposed LVT and 10,990 square feet of proposed carpet tiles.
The project plans include detailed floor plans showing the demolition of existing flooring in various rooms such as offices, corridors, classrooms, locker rooms, and an assembly hall. The renovation specifications require the contractor to verify square footage, remove existing flooring and wall base, complete necessary floor patching and leveling, and ensure proper material storage and acclimation. The contractor will be responsible for providing samples for owner selection of carpet tiles, LVT, and vinyl wall base, as well as installing transition strips between different flooring materials. The project adheres to specifications 09 65 19 for resilient tile flooring and 09 68 13 for carpet tile installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 466430 Duke Flooring Specs.pdf | ||
| 466430 - Invitation to Bid - Electronic.docx | DOCX document | |
| Addendum 1 Document.pdf | ||
| 466430 - Invitation to Bid - Electronic.docx | DOCX document | |
| 466430 Duke Flooring Drawings.pdf | ||
| 466430 Duke Flooring Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE
CANYON LA
KE RD.
MAIN
SO
O
SOO SAN
DR.
ST
SH
ER
ID
AN
LA
KE
RD
CANYON
LAKE SCHOOL
W. ST. CLOUD
HARMONY LN.
DR
ST
NATIONAL GUARD
ARMORY
WEST
JUNIOR
BLACK HILLS
WORKSHOP SCHOOL
SIOUX
SANITARIUM
HIGH SCHOOL
MARY
HALL
PARK
SIOUX
PARK
NATIONAL
GUARD
CAMP
ST
BROOK S I DE
TH
ST
R E DE R
S
T .
HALL ST.ST
TH
R ANGE RD.
BO
U
LD
ER
BECKMAN
DR.
LANCE
W
. RAPID
FEDERAL
AVE.
KI
N
N
EY
AV
E.
VA
LE
ST
ST
W
HI
TE
W
O O
D
ST
U
R
WEST OMAHA
WEST RAPID
WEST MAIN
PI
ED
M O
N T
HA
RT
ER
D
R.
DA
KO
TA
D
R.
PL
U
M
TR
EE LN
LN.
J AN
J UD Y A
CT.
JUNE
CT.
STORYBOOK
ISLAND PARK
SH
EF
FE
R
ST.
ST.
ST.ST
ST
GI
S
CLOW ER
SU
N
N
YV
AL
E
POINT WEST
PL
AT
T
PAYTON
CT.
LIME
CREEK
DR. 32
N
D
ST
LOUISST.
COUNTRY
LANE
LE
SL
EY
ST
N
AT
IO
N
AL
PARKS &
RECREATION
DEPT.
DUKE CORNING
ARMORY
COVER SHEET, NOTES & GENERAL INFORMATION
G-001 COVER SHEET
ARCHITECTURAL
A-101 OVERALL FLOOR PLAN
A-102 DETAILED PLAN
A-103 DETAILED PLAN
A-104 DETAILED PLAN
A-202 DETAILED PLAN
A-203 DETAILED PLAN
A-204 DETAILED PLAN
REVISIONS
ZONE LTR DATE APPROVED
SHEET INDEX
SHEET No:
SOUTH DAKOTA
DEPARTMENT OF THE MILITARY
DUKE CORNING ARMORY FLOORING
CAMP RAPID BLDG 100
CFMO# 466430
RAPID CITY, SD
AUGUST 2025
STATE REFERENCE MAP
HARDING
PERKINS
CORSON
CAMBELL
McPHERSON
BROWN
MARSHALL ROBERTS
BUTTE
LAWRENCE
PENNINGTON
CUSTER
FALL RIVER
MEADE
SHANNON
BENNETT
WASHABAUGH
JACKSON
HAAKON
ZIEBACH
DEWEY
STANLEY
JONES
MELLETTE
TODD
TRIPP
LYMAN
HUGHES
SULLY
POTTER
WALWORTH
EDMUNDS
FAULK
SPINK
HYDE
HAND
BUFFALO
BRULE
CHARLES
MIXGREGORY
DAY
CLARK
CODINGTON
GRANT
DEUEL
HAMLIN
BEADLE
KINGSBURY BROOKINGS
JERAULD
MINER
LAKE
MOODY
AURORA McCOOK MINNEHAHA
DOUGLAS
HUTCHINSON
TURNER
LINCOLN
BON
HOMME
YANKTON
CLAY
SANBORN
DA
VI
SO
N
H
AN
SO
N
UNION
TE
OF
SOUTH DAKOTAATS
R G
TA
E L
AES9881
U
REDN
DOG
EL
UR
ELP
OET PEH
UNAUTHORIZED CHANGES
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR
LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL
CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE
PREPARER OF THESE PLANS. THE ENGINEER SIGNING THESE PLANS IS
RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF THE
DESIGN HERON.
NOTICE TO CONTRACTOR
THE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH
GENERALLY ACCEPTED CONSTRUCTION PRACTICES, HE/SHE WILL BE
REQUESTED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,
INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
NORMAL WORKING HOURS. THE CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY
ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN ENGINEER.
CITY MAP
DATE:
SUBMITTAL:
CO
VE
R
SH
EE
T
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
G-001
Rapid City
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
Classroom
Classroom
Corridor
Viewing/
Engagement Skills Trng.
Classroom
Men
C or rid or
Classroom
Vest.
221B
Women
Corridor
Corridor
Vault
Office
231A
C or rid or
Plenum
Mechanical
Storage
Shower
Jan.
Office
Storage
Drying
Kitchen
Scullery
C or rid or
B
El ec tri ca l
C or rid or
Drying
Locker Room
M en
Lo ck er R oo m87
Office
Office
Office
La ct at io n
Men
Women
Ja ni to r
Telecom
Corridor
Corridor
Corridor
Vestibule
Office
Office 15B
Supply Room
Corridor
Assembly Hall
Office
Office
Office
Office
Office
Office
Office 100D
Office
Office
Break Room
Office
Office
Office
Office
Office
Office
Office
Office
Office
Elec
JOC
Office
Office
Office
Office
Office 102/103
Office
C or rid or
C or rid or
Corridor140
Corridor109108 Corridor
Office
Office
Janitor
Office
Vault
Office
Vault
Supply Room
Office
Break
Office
Office
Office
Office
Office
Break
Office
C or rid or
Office
Office 37A
Storage
C or rid or
94A
221C Control
Men Locker Room
Women
Office 100B
Office 100A
Office 15A
Office 20A
Mech.
221A
Conf
Office
Office
Office
Office 15C
9'-8"
'-4
1 8"
14'-11 3 16"
10'-1013 16"
9'-4" 9'-8" 13'
'-4
9' -1
0"
15'-1111 16"53'-2 5
16"
13'-8"
13'-2"
'-8
12'
7'
'-1
0"
20'-2" 9'-8"
'-1
0"
10'-2" 9'-8" 9'-8"
30'-2"
'-1
0"
10' 9'-8" 9'-10"
6'
27'-5"
10'-2" 9'-8" 9'-8"
9' -1
0"
'-2
7' -6
"24'-21 2"
7'39'
'-6
"39'-813 16"
6'
14'-8"
4' -4
7'-71 4"
5'
'-2
6'-111 8" 15'
Auditorium
Storage 210A
4'-8"
'-8
7' -7
3 8"
31'-2" 167'-8 7 16"7' 10
'-4
5'-3" 4'-8"
24'-6" 17'-8" 25'
'-8
'-1
0"
6'
4'
10'-8" 11'-6"
12' 12'-4" 10'-4"
'-8
'-2
'-2
9' -1
0"
15'-10" 9'-8" 9'-8"9'-8" 19'-8" 9'-8"
9'-10"
9' -8
9'
-8
'-8
'-8
3'-8"
3' -8
" 10 '-4
3'-8"
9'-8" 9'-8"
'-8
'-8
'-8
10'-21 2" 9'-8"15'-31
2" 9'-8" 13'-6"13'-8"9'-8"9'-8"
'-4
9 16
12'-3"
9' 9'
9'-8" 9'-8"
9'-8" 9'-8" 9'-8" 2'-8"
9' -8
9'-101 2"
22'-6"
'-5
7 16
4'-01 4"
32'
'-2
1 2"
3' -8
8' -1
0"
9'-10"
9' -6
7' -4
Office
Office
Snack
C or rid or
Office
Secret
Copier 133 Office
100C
C lo se t
Corridor
Corridor
Fitness
SHEET No:
DATE:
SUBMITTAL:
O
VE
RA
LL
F
LO
O R
PL
AN
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
A-101
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOOR PLAN
NTS
GENERAL NOTES:
1. CONTRACTOR TO VERIFY SQUARE FOOTAGE. QUANTITIES PROVIDED ARE
APPROXIMATE.
2. REMOVE ALL EXISTING FLOORING WHERE FLOORING DEMOLITION IS
INDICATED.
3. REMOVE EXISTING WALL BASE IN ROOMS WHERE FLOORING DEMOLITION IS
INDICATED.
4. CONTRACTOR SHALL COMPLETE ALL NECESSARY FLOOR PATCHING,
LEVELING, AND REPAIRS FOR THE PREPARATION OF PROPOSED FINISHED
PRODUCTS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
TO INCLUDE MOISTURE OR OTHER TESTING.
5. CONTRACTOR TO PROVIDE SAMPLES FOR OWNERS SELECTION FOR CARPET
TILE, LUXURY VINYL TILE AND VINYL WALL BASE.
6. OWNER TO MAKE SELECTION FOR FLOOR PATTERN INSTALLATION PER
MANUFACTURERS RECOMMENDATION.
7. CONTRACTOR SHALL ENSURE ALL MATERIALS ARE PROPERLY STORED AND
ACCLIMATED PRIOR TO INSTALLATION PER MANUFACTURER'S
RECOMMENDATIONS.
8. FURNISH AND INSTALL NEW WALL BASE WHERE NEW FLOORING IS
INDICATED.
9. CONTRACT SHALL FURNISH AND INSTALL TRANSITION STRIPS EACH
LOCATION DIFFERING FLOORING MATERIALS MEET. CONTRACTOR TO
PROVIDE SAMPLES FOR OWNERS SELECTION.
10. CONTRACTOR SHALL REFERENCE SPECIFICATIONS 09 65 19 RESILIENT TILE
FLOORING AND 09 68 13 CARPET TILE FOR MATERIAL PREPARATION AND
INSTALLATION REQUIREMENTS.
Classroom
Fitness
Corridor
Viewing/
Engagement Skills Trng.
Classroom
Men
C or rid or
Classroom
Vest.
221B
Women
Corridor
Corridor
Vault
Office
231A C or rid or
Plenum
Mechanical
Storage
Shower
Jan.
Office
Drying
Kitchen
Scullery
C or rid or
B
El ec tri ca l
C or rid or
Drying
Locker Room
M en
Lo ck er R oo m87
Break Room
108 Corridor
94A
221C Control
Men Locker Room
Women
Mech.
221A
6'
14'-8"
4' -4
7'-71 4"
5'
'-2
6'-111 8" 15'
Auditorium
Storage 210A
4'-8"
'-8
7' -7
3 8"
31'-2" 167'-8 7 16"7' 10
'-4
5'-3" 4'-8"
24'-6" 17'-8" 25'
'-8
'-1
0"
6'
4'
10'-8"
'-8
9'
-1 0"
7' -4
Office
Office
Snack
Fitness
SHEET No:
DATE:
SUBMITTAL:
DE
TA
IL
ED
P
LA
N
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
RA
PI
D
CI
TY
, S D
CF
M
O
100%
AUGUST 2025
A-102
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOORING DEMOLITION PLANSCALE: 1
16" :1'-0"
CARPET DEMO (13,650SF APPROX.)
VINYL DEMO (5,055SF APPROX.)
C or rid or
Office
Storage
C or rid or
Office
Office
Office
La ct at io n
Men
Women
Ja ni to r
Telecom
Corridor
Office
Corridor
Assembly Hall
Office
Office
Office
Office
Office
Office
Office 100D
Office
Office
Break Room
Office
Office
Office
Office
Office
Office
Office
Office
Office
Elec
JOC
Office
Office
Office
Office
Office 102/103
Office
C or rid or
C or rid or
Corridor140
Corridor109108 Corridor
Office 100B
Office 100A
13'-2"
'-8
39'-8
6'
167'-8 7 16"
6'
4'
10'-8" 11'-6"
12' 12'-4" 10'-4"
'-8
'-2
'-2
9' -1
0" 15'-10" 9'-8" 9'-8"9'-8" 19'-8" 9'-8"
9'-10"
9' -8
9'
-8
'-8
'-8
3'-8"
3' -8
" 10 '-4
3'-8"
9'-8" 9'-8"
'-8
'-8
'-8
10'-21 2" 9'-8"15'-31
2" 9'-8" 13'-6"13'-8"9'-8"9'-8"
'-4
9 16
12'-3"
9' 9'
9'-8" 9'-8"
9'-8" 9'-8" 9'-8" 2'-8"
9' -8
9'-101 2"
22'-6"
'-5
7 16
4'-01 4"
32'
'-2
1 2"
3' -8
Office
Office
Snack
C or rid or
Office
Secret
Copier 133 Office
100C
C lo se t
SHEET No:
DATE:
SUBMITTAL:
DE
TA
IL
ED
P
LA
N
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
A-103
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOORING DEMOLITION PLANSCALE: 1
16":1'-0"
Corridor
Corridor
Vestibule
Office 15B
Supply Room
Corridor
Office
Office
Office
Janitor
Office
Vault
Office
Vault
Supply Room
Office
Break
Office
Office
Office
Office
Office
Break
Office
C or rid or
Office
Office 37A
Storage
C or rid or
Office 100A
Office 15A
Office 20A
Conf
Office
Office
Office
Office 15C
9'-8"
'-4
1 8"
14'-11 3 16"
10'-1013 16"
9'-4" 9'-8" 13'
'-4
9' -1
0"
15'-1111 16"53'-2 5
16"
13'-8"
13'-2"
12'
7'
'-1 0"
20'-2" 9'-8"
'-1
0"
10'-2" 9'-8" 9'-8"
30'-2"
'-1
0"
10' 9'-8" 9'-10"
6'
27'-5"
10'-2" 9'-8" 9'-8"
9' -1
0"
'-2
20'
7' -6
"24'-21 2"
7'39'
'-6
"39'-813 16"
9'
8' -1
0"
9'-10"
9' -6
Corridor
Corridor
SHEET No:
DATE:
SUBMITTAL:
DE
TA
IL
ED
P
LA
N
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
A-104
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOORING DEMOLITION PLANSCALE: 1
16":1'-0"
Classroom
Corridor
Viewing/
Engagement Skills Trng.
Classroom
Men
C or rid or
Classroom
Vest.
221B
Women
Corridor
Corridor
Vault
Office
231A C or rid or
Plenum
Mechanical
Storage
Shower
Jan.
Office
Drying
Kitchen
Scullery
C or rid or
B
El ec tri ca l
C or rid or
Drying
Locker Room
M en
Lo ck er R oo m87
Break Room
108 Corridor
94A
221C Control
Men Locker Room
Women
Mech.
221A
6'
14'-8"
4' -4
7'-71 4"
5'
'-2
6'-111 8" 15'
Auditorium
Storage 210A
4'-8"
'-8
7' -7
3 8"
31'-2" 167'-8 7 16"7' 10
'-4
5'-3" 4'-8"
24'-6" 17'-8" 25'
'-8
'-1
0"
6'
4'
10'-8"
'-8
9'
-1 0"
7' -4
Office
Office
Snack
Fitness
SHEET No:
DATE:
SUBMITTAL:
DE
TA
IL
ED
P
LA
N
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
A-202
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOORING PLANSCALE: 1
16" :1'-0"
PROPOSED LVT (7,715SF APPROX.)
PROPOSED CARPET TILES
(10,990 SF APPROX.)
C or rid or
Office
Storage
C or rid or
Office
Office
Office
La ct at io n
Men
Women
Ja ni to r
Telecom
Corridor
Office
Corridor
Assembly Hall
Office
Office
Office
Office
Office
Office
Office 100D
Office
Office
Break Room
Office
Office
Office
Office
Office
Office
Office
Office
Office
Elec
JOC
Office
Office
Office
Office
Office 102/103
Office
C or rid or
C or rid or
Corridor140
Corridor109108 Corridor
Office 100B
Office 100A
13'-2"
'-8
39'-8
6'
167'-8 7 16"
6'
4'
10'-8" 11'-6"
12' 12'-4" 10'-4"
'-8
'-2
'-2
9' -1
0" 15'-10" 9'-8" 9'-8"9'-8" 19'-8" 9'-8"
9'-10"
9' -8
9'
-8
'-8
'-8
3'-8"
3' -8
" 10 '-4
3'-8"
9'-8" 9'-8"
'-8
'-8
'-8
10'-21 2" 9'-8"15'-31
2" 9'-8" 13'-6"13'-8"9'-8"9'-8"
'-4
9 16
12'-3"
9' 9'
9'-8" 9'-8"
9'-8" 9'-8" 9'-8" 2'-8"
9' -8
9'-101 2"
22'-6"
'-5
7 16
4'-01 4"
32'
'-2
1 2"
3' -8
Office
Office
Snack
C or rid or
Office
Secret
Copier 133 Office
100C
C lo se t
SHEET No:
DATE:
SUBMITTAL:
DE
TA
IL
ED
P
LA
N
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
A-203
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOORING PLANSCALE: 1
16":1'-0"
PROPOSED LVT (7,715SF APPROX.)
(10,990SF APPROX.)
Corridor
Corridor
Vestibule
Office 15B
Supply Room
Corridor
Office
Office
Office
Janitor
Office
Vault
Office
Vault
Supply Room
Office
Break
Office
Office
Office
Office
Office
Break
Office
C or rid or
Office
Office 37A
Storage
C or rid or
Office 100A
Office 15A
Office 20A
Conf
Office
Office
Office
Office 15C
9'-8"
'-4
1 8"
14'-11 3 16"
10'-1013 16"
9'-4" 9'-8" 13'
'-4
9' -1
0"
15'-1111 16"53'-2 5
16"
13'-8"
13'-2"
12'
7'
'-1 0"
20'-2" 9'-8"
'-1
0"
10'-2" 9'-8" 9'-8"
30'-2"
'-1
0"
10' 9'-8" 9'-10"
6'
27'-5"
10'-2" 9'-8" 9'-8"
9' -1
0"
'-2
7' -6
"24'-21 2"
7'39'
'-6
"39'-813 16"
9'
8' -1
0"
9'-10"
9' -6
Corridor
Corridor
SHEET No:
DATE:
SUBMITTAL:
DE
TA
IL
ED
P
LA
N
DU
KE
C O
RN
IN
G A
RM
O
RY
FL
O O
RI
N
G
CA
M O
R
AP
ID
B
LD
G
RA
PI
D
CI
TY
, S
D
CF
M O
100%
AUGUST 2025
A-204
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
FLOORING PLANSCALE: 1
16":1'-0"
PROPOSED LVT (7,715SF APPROX.)
(10,990SF APPROX.)
| Sheets and Views |
| 466430 Duke-Model |
| 466430 Duke-Title Page |
| 466430 Duke-A-101 |
| 466430 Duke-A-102 |
| 466430 Duke-A-103 |
| 466430 Duke-A-104 |
| 466430 Duke-A-202 |
| 466430 Duke-A-203 |
| 466430 Duke-A-204 |
| 466430 Duke-FYI Page |
| 466430 Duke-Layout1 |
File details come from the government source that posted it. Updated .