This document is a Questions and Answers (Q&A) document for Request for Quote (RFQ) 459544, issued by Brookhaven Science Associates for Construction Manager as Advisor (CMa) services for the Electron-Ion Collider (EIC) project. The Q&A addresses 34 detailed questions from potential offerors regarding project specifics, including design document volumes (estimated 900-1100 pages for 90% detailed design drawings and 1600-1800 pages for specifications), project phasing, scheduling requirements, and scope of pre-construction services. Key clarifications include that the project will proceed in construction phases, the CMa will be responsible for reviewing project commissioning plans, developing construction schedules, performing constructability reviews, and preparing cost estimates, with projected 90% and 100% design submission dates of 4/4/25 and 6/4/25 respectively. The project budget remains at $305M using 2022 dollars, and the solicitation is limited to pre-construction services with no actual commissioning activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers RFQ 459544 3_17_2025.pdf | ||
| Questions and Answers RFQ 459544.pdf | ||
| Enclosure C - Quotation Pricing Sheet.docx | DOCX document | |
| Attachment A - Statement of Work 459544.pdf | ||
| Enclosure C - Quotation Pricing Sheet.docx | DOCX document | |
| Enclosure E - Form W-9.pdf | ||
| Enclosure F - Exhibit G-2 Staffing Plan.pdf | ||
| RFQ Letter 459544.pdf | ||
| Enclosure A - Draft Contract.pdf | ||
| Enclosure B - AMS-FORM-050 - Reps and Certs.pdf | ||
| Enclosure D - ACH Authorization Form.pdf | ||
| Enclosure G - Exhibit G-4 Supplier Utilization Plan.pdf | ||
| Attachment B - BNL-QA-101 459544.pdf | ||
| Enclosure H - Exhibit G-6 Supplier Compliance and Payment Report.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement & Property Management Division
P.O. Box 5000
Upton, NY 11973-5000 Phone 631-344-4605 kkirkenda@bnl.gov
Managed by Brookhaven Science Associates for the U.S. Department of Energy www.bnl.gov
March 24, 2025
Questions and Answers RFQ 459544
1. The Quotation Pricing Sheet (Enclosure B) appears to be for “Commissioning
Services.” Other than Review of Commissioning Plans as part of CMa scope of work, we anticipate no role in Commissioning. Please confirm this is the correct format for our Fee Proposal.
A. Enclosure C is the Quotation pricing sheet. The deliverable as noted in the statement of work is ‘Review of Project Commissioning Plan’. This RFQ is limited to pre-construction services. No commissioning activities, only plan review.
2. Please clarify how the Alternates (Additive and Deduct) are to be priced by the CMa;
(i.e. the CMa’s staffing costs). Will the Cost Estimates and Schedules both require revision by CMa staff? Is it acceptable to assume that the Alternates will be priced after the 90% Cost Estimate is completed or concurrently with the 90% Cost Estimate process?
A. Currently there are two add alternatives detail in the Div.01 specifications. The schedule and estimate should reflect these to the best of the CMa’s ability concurrently for any alternatives (Additive and Deduct).
3. Please clarify the approximate size (number) of the initial 90% Detailed Design drawings.
A. It is estimated to be 900-1100 pages in the 90% detailed design drawing set.
Specifications are estimated to have 1600-1800 pages.
4. Considering the size of this program and the requisite elements to be Cost
Estimated, the level of detail required and site complexities, we believe a realistic duration for the 90% Cost Estimate is closer to (8-12) weeks for this effort. Would extending the time for the 90% Cost Estimate be considered?
A. Offerors may include exceptions to schedules, detailed in exceptions and recommendations when quotes are submitted.
5. Given project schedule and duration for the 90% Cost Estimate preparation, please advise if after (NTP issued), the 60% design documents can be provided as a resource for the estimating team to become familiar with the project (this assumes
90% drawings will not be provided on Day-1).
A. Yes, 60% design documents can be provided at NTP.
6. Please advise if prior to the 90% documents being issued, the CMa may mobilize their Senior Estimating, Scheduling, Constructability Review staff to plan and prepare for the full 90% Design Submission.
A. Upon NTP, the CMa may proceed in this manner.
7. Please clarify the projected dates for the 90% and 100% drawing submissions to be provided; as 4/4/25 and 6/4/25 would likely be impacted by the date of this CMa
Proposal Submission date of 3/31/25 and an actual NTP for the selected firm would likely be well beyond the 4/4/25 date.
A. Projected submission dates for the 90% and 100% design drawings remain the same, 4/4/25 and 6/4/25 respectively.
8. Please clarify if the intention is for Construction to proceed in Phases; or will total access to the site be provided to the eventual selected Construction Contractor? If there are phases to the physical work this will likely impact both projected costs and the schedule.
A. Construction will proceed in phases.
9. Section 4.7 of the SOW states that (1) Schedule is required; please clarify if the intent is to break down the Schedule into multiple schedules based on Bid Packages, Phases etc.
A. Section 4.7.1. states that ‘Preparation of one (1) detailed construction schedule based on the 90% Detailed Design Documents and preparation of one (1) detailed construction schedule based on the 100% Detailed Design
Documents’. In section 6 – Deliverables, items numbered 5 & 8 reflect the schedules required.
Section 4.7.1.b states that ‘The CPM schedule shall reflect the project phasing and priorities as directed by BSA and as impacted by the availability of construction funds’. The project will employ a tailoring strategy and the CMa will work with BSA to develop a CPM schedule. This is not multiple schedules but a schedule with the appropriate WBS to capture bid packages and availability of construction funds, resulting in construction phases.
10. Section 4.7 d of the SOW states that CMa shall identify Bid Packages to complete the work. Will this be an early required action in order to align the Cost Estimates with the Bid Package Strategy? Otherwise, the 90% Cost Estimate may not reflect the proposed Bid Package Strategy, developed during the Scheduling Phase.
A. Yes, to accurately inform the cost estimates the Bid Package Strategy shall be coordinated with BSA and the CMa at the early stage of these deliverables.
11. If Cost and Resource loading of the P6 Schedule is required, please define the maximum duration for resource loading (i.e. for each work activity).
A. Maximum duration is 25 calendar days.
12. Section 1.2 of the SOW states that utility maps are available but that the selected firm will be responsible for “due-diligence field verification.” Please clarify if the field verification is CMa task or another firm. If CMa task, when will this be performed?
A. This falls under the constructability review, due-diligence field verification shall consist of desktop utility reviews and site assessments.
13. Section 1.3 of the SOW Proposed Budget is $305M using 2022 dollars; has the budget been escalated to account for market changes in the (3) years since then, to 2025 dollars; prior to the start of Bidding and Construction?
A. Proposed Budget remains the same. It is understood that deliverables will use current data.
14. The SOW states under Section 1.3 additive/deduct alternates may be proposed in the range of (8- 12) total. Are these to be Estimated by the CMa as part of their scope of work? If so, when will this be performed? Will drawings be issued for each additive/deduct alternate to assist in the pricing?
A. Additive/deduct alternates will be detailed in the specifications and estimates are required. No drawings will be provided.
15. There are critical infrastructure components for both temporary and permanent support that are indicated, ie, vibration, heating and cooling, RHIC, cut over capacities. Does the current budget include the ancillary support of existing services and buildings required to integrate this project?
A. Ancillary support of existing services and buildings and considered ‘off project’ dependances and not part of the current infrastructure budget.
16. Have settlement surveys, construction stabilization, or provisions for future tie-in scope of existing been performed? There will need to be an extensive effort to understand “how” this project will integrate into the existing program while keeping the existing program operational. An example is current capacity of electrical service from main utility provider or water capacity and pressure for fire protection services.
A. Structural analysis of the tunnel penetrations has been performed, along with water and electricity studies.
17. Are there any known site issues that require mitigation? Such as soil contamination, endangered species, protected land, contaminated water, etc. If so these will need to be addressed during design and construction.
A. Land use, environmental and rare & endangered species items have been documented, and work will be planned accordingly.
18. Under preconstruction services there are both constructability and estimating required.
Has the infrastructure support been identified and confirmed able to include temporary and permanent loads? If not, will this be accounted for in the WBS 6.11.02, 6.11.03, and 6.11.04?
A. Temporary and permanent loads are being coordinated. Constraints if found by the
CMa can be identified in the constructability review reports.
19. To what extent have the funds been appropriated from DOE? Has the design been fully funded? Has this RFP been fully funded? To what extent do we need to look at the incremental funding on an annual basis? Exclude design and CMa services? Include construction to a certain value? In order to keep the schedule – we will need to see the proposed funding profile immediately upon NTP.
A. CMa Services as fully funded, as with Design. Construction has not yet been funded by DOE. The RFQ Letter also includes an anticipated period of performance.
20. If developed, please provide a list of Long Lead items with preliminary Lead Times.
A. This has not been developed.
21. Are Lead times available for any Long Lead Equipment?
A. See response to question 20.
22. Have separate Procurement Specifications been developed (and completed) for each of the Long Lead /Major Equipment items? Or Specs are provided in the AIA/Masterspec
Format? Will Div 00 and Div 01 Sections need to be added?
A. Construction/Equipment specifications have been developed. Major equipment procurement package(s) has not been developed.
23. Does BNL intend to purchase the Long Lead equipment/elements in full? Provide a down-payment and consign the balance of the PO to the contractor?
A. BSA can purchase long lead equipment if identified and approved. Contractor payments would adhere to their contract documents.
24. Have equipment quotes been provided for any of the Long Lead Equipment items?
A. No equipment quotes have been provided.
25. Is there a definition for what the 90% set of documents is to include? Level of completeness? Difference in levels of completeness depending upon the discipline?
A. For the purposes of this RFQ, the 90% set Is the set that will be transmitted to the CMa based on the anticipated A/E deliverable date of 4/4/25. Its level of completeness has already evolved from the 30% and 60% design submittals and reviews. The CMa shall provide their professional judgement on the level of completeness however some disciplines may be further ahead than others.
26. The Constructability reviews are cited to provide ”…… facilitates ease of construction, and to assess construction processes from start to finish to identify obstacles, minimize or prevent errors or delays, minimize costs, and maximize value to the EIC.”
a. Is the last portion intended to be a “Value Engineering” effort?
A. Value engineering is not intended to be part of the Construability review.
Cost effectiveness is intended to be a result of the Constructability Review
– to avoid costly changes in construction.
b. Are these reviews intended to address constructability and maintainability only?
A. Intent is not limited to these two categories, see Section 4.5.
27. Will the review team receive the Revit model for review of “Clash Detection” and other coordination purposes?
A. Yes. These models will be shared after NTP.
28. The SOW appears to only cite DOE [Federal] standards. Was this project designed in accordance with the United Facilities Codes (UFC) or any other Federal Governmental Standards other than DOE?
A. United Facilities Codes were not used.
29. The RFQ letter requests offerors provide information as it relates to their previous experience to meet contractual requirements in both A. Project Experience, and B. Past Performance. Please clarify if overlapping experience on projects is acceptable in both A and B.
A. No overlapping for B. Past performance is permitted, as the requirements to qualify necessitate the offeror demonstrate a record performing on projects of a similar nature, defined by value and schedule.
30. Regarding Key Personnel, the RFQ letter describes at least one Project Manager, Estimator, Scheduler, and Project Engineer. However, the SOW includes an additional position of “Analyst” under 4.1 CMa Pre-Construction Support Services Team, please clarify if this is also a Key Personnel position, and if so, please provide their education and experience requirements
A. It is anticipated that an Analyst would be required to assist with BIM reviews and coordinating with the CMa team for the deliverables and noted as needed. No education and experience requirements are specified to qualify.
31. In order to allow sufficient time to respond to offeror questions, and for offerors to incorporate answers into our quotations, please consider a two week extension of the submission deadline.
A. No time extension is being considered currently
32. What is BNL’s vision of the Analyst and Project Engineer duties during the Pre-
Construction stage?
A. It is anticipated that an Analyst would be required to assist with BIM reviews and coordinating with the CMa team for the deliverables and noted as needed. No education and experience requirements are specified to qualify. See Section 2.1.C for the RFQ letter for the Project Engineer qualifications. It is anticipated that the Project Engineer will have significant input to each deliverable, as their experience will provide sound and disciplined guidance at this pre-construction stage.
33. Can BNL please provide a list of the current design drawings (sheet index)?
A. Drawing index sheets are now included for reference (Attached).
34. The scope of work notes the utilization of BIM. What is the associated BIM standards and BIM-specific tasks for these later stages of the design?
A. BIM can also be used to derive the cost estimates.
ELECTRON-ION COLLIDER
UNDER CONTRACT WITH
UNITED STATES DEPARTMENT OF ENERGY
PLANT ENGINEERING DIVISION
UPTON, NEW YORK 11973
JOB TITLE
JOB NO.
SCALE
ESHG RISK LEVEL
BLDG. NO.
DWN. BY
APP'D. BY
DATE
REV'D BY
DWG. TITLE
DWG. NO.
08/30/2024
G001
SHEET INDEX - VOLUME I
10376646
H. YANG
HDR Architecture
HDR ARLINGTON
3001 WASHINGTON BLVD., SUITE 200
ARLINGTON, VIRGINIA 22201
H. YANG
D. CAPELLI
MY803-11A MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1011A
MY802-11A MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1011A
MY803-10E MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1010E
MY802-10E MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1010E
MY803-10D MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1010D
MY802-10D MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1010D
MY803-09A MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1009A
MY802-09A MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1009A
MY803-07A MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1007A
MY802-07A MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1007A
MY803-06G MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1006G EC101-03A TELCOMMUNICATIONS FLOOR PLAN -BUILDING 1003A
MY802-06G MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1006G E706-03A ELECTRICAL SCHEDULES EC101-11A TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1011A
MY803-05T MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1005T E705-03A ELECTRICAL SCHEDULES E706-11A ELECTRICAL SCHEDULES
MY802-05T MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1005T E704-03A ELECTRICAL SCHEDULES E705-11A ELECTRICAL SCHEDULES
MY803-03A MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1003A E703-03A ELECTRICAL SCHEDULES E704-11A ELECTRICAL SCHEDULES
MY802-03A MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1003A E702-03A ELECTRICAL SCHEDULES E703-11A ELECTRICAL SCHEDULES
MY803-01A MECHANICAL CONTROLS -PLC - COOLING TOWER P&ID - B1001A E701-03A ELECTRICAL SCHEDULES E702-11A ELECTRICAL SCHEDULES
MY802-01A MECHANICAL CONTROLS -PLC - HEAT EXCHANGER P&ID - B1001A E602-03A UNIT SUBSTATION 1003B ONLINE DIAGRAM E701-11A ELECTRICAL SCHEDULES
MY801 MECHANICAL CONTROLS -PLC - NETWORK ARCHITECTURE E601-03A UNIT SUBSTATION 1003A ONLINE DIAGRAM E602-11A UNIT SUBSTATION 1011B ONELINE DIAGRAM
MY800 MECHANICAL CONTROLS -PLC - INSTRUMENTATION LEGEND EP101-03A ELECTRICAL POWER PLAN -BUILDING 1003A E601-11A UNIT SUBSTATION 1011A ONELINE DIAGRAM
MI881 MECHANICAL CONTROLS -BMS -CONTROL DETAILS EL101-03A LIGHTING PLAN -BUILDING 1003A EP101-11A ELECTRICAL POWER PLAN -BUILDING 1011A
MI841 MECHANICAL CONTROLS -ROOM CONTROLS EL101-11A LIGHTING PLAN -BUILDING 1011A
MI812 MECHANICAL CONTROLS -EXHAUST FAN SYSTEM CONTROLS MP604-03A MECHANICAL PIPING -DIAGRAM -PS HX CHILLED WATER SYSTEM -1003A EC101-07A TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1007A
MI811 MECHANICAL CONTROLS -RTU/AHU CONTROLS MP603-03A MECHANICAL PIPING -DIAGRAM -TUNNEL COOLING WATER DIST -1003A E706-07A ELECTRICAL SCHEDULES MP604-11A MECHANICAL PIPING -DIAGRAM -PS HX CHILLED WATER SYSTEM -1001A
MI803 MECHANICAL CONTROLS -BMS -NETWORK ARCHITECTURE MP602-03A MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1003A E705-07A ELECTRICAL SCHEDULES MP603-11A MECHANICAL PIPING -DIAGRAM -TUNNEL COOLING WATER DIST -1011A
MI802 MECHANICAL CONTROLS -BMS -NETWORK ARCHITECTURE MP601-03A MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1003A E704-07A ELECTRICAL SCHEDULES MP602-11A MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1011A
MI801 MECHANICAL CONTROLS -BMS -NETWORK ARCHITECTURE MH601-03A MECHANICAL HVAC -AIR FLOW DIAGRAM -BUILDING 1003A E703-07A ELECTRICAL SCHEDULES MP601-11A MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1011A
MI800 MECHANICAL CONTROLS -BMS -SYMBOLS AND ABBREVIATIONS MH401-03A MECHANICAL HVAC -ENLARGED PLANS -BUILDING 1003A E702-07A ELECTRICAL SCHEDULES MH601-11A MECHANICAL HVAC -DIAGRAM -BUILDING 1011A
MP603 MECHANICAL PIPING -SCHEDULES MP302-03A MECHANICAL PIPING -SECTIONS -BUILDING 1003A E701-07A ELECTRICAL SCHEDULES MH401-11A MECHANICAL HVAC -ENLARGED PLANS -AHU
MP602 MECHANICAL PIPING -SCHEDULES MP301-03A MECHANICAL PIPING -SECTIONS -BUILDING 1003A E602-07A UNIT SUBSTATION 1007B ONELINE DIAGRAM MP302-11A MECHANICAL PIPING -SECTIONS -BUILDING 1011A
MP601 MECHANICAL PIPING -SCHEDULES MH301-03A MECHANICAL HVAC -SECTIONS -BUILDING 1003A E601-07A UNIT SUBSTATION 1007A ONELINE DIAGRAM MP301-11A MECHANICAL PIPING -SECTIONS -BUILDING 1011A
MH605 MECHANICAL HVAC -SCHEDULES MP102-03A MECHANICAL PIPING -AREA PLAN -BUILDING 1003A EP101-07A ELECTRICAL POWER PLAN -BUILDING 1007A MH301-11A MECHANICAL HVAC -SECTIONS -BUILDING 1011A
MH604 MECHANICAL HVAC -SCHEDULES MP101-03A MECHANICAL PIPING -AREA PLAN -BUILDING 1003A MP102-11A MECHANICAL PIPING -AREA PLAN -BUILDING 1011A
MH603 MECHANICAL HVAC -SCHEDULES MH102-03A MECHANICAL HVAC -AREA PLAN -BUILDING 1003A EAST MP604-07A MECHANICAL PIPING -DIAGRAM -PS HX CHILLED WATER SYSTEM -1007A MP101-11A MECHANICAL PIPING -AREA PLAN -BUILDING 1011A
MH602 MECHANICAL HVAC -SCHEDULES MH101-03A MECHANICAL HVAC -AREA PLAN -BUILDING 1003A WEST MP603-07A MECHANICAL PIPING -DIAGRAM -TUNNEL WATER DISTRIBUTION -1007A MH102-11A MECHANICAL HVAC -AREA PLAN -BUILDING 1011A
MH601 MECHANICAL HVAC -SCHEDULES EY505-SUB SECURITY CAMERA RISER DIAGRAM AND DETAILS - SUBSTATION EXPANSION M101-03A MECHANICAL-OVERALL PLAN -BUILDING 1003A MP602-07A MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1007A MH101-11A MECHANICAL HVAC -AREA PLAN -BUILDING 1011A
MP501 MECHANICAL PIPING -DETAILS EY102-SUB BUILDING 638 - FIRST FLOOR PLAN - SECURITY - SUBSTATION EXPANSION MP601-07A MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1007A M101-11A MECHANICAL -OVERALL PLAN -BUILDING 1011A
MH501 MECHANICAL HVAC -DETAILS EY101-SUB SECURITY SITE PLAN - SUBSTATION EXPANSION PP103-03A PLUMBING -ROOF PLAN -BUILDING 1003A MH601-07A MECHANICAL HVAC -DIAGRAMS -BUILDING 1007A
MP301 MECHANICAL PIPING -SECTIONS PP102-03A PLUMBING -FIRST FLOOR PLAN -BUILDING 1003A MH401-07A MECHANICAL HVAC -ENLARGED PLAN -AHU PP103-11A PLUMBING -ROOF PLAN -BUILDING 1011A
MP124 MECHANICAL PIPING -PLAN -PLAN -SECTOR 12 -TUNNEL PP103-SUB PLUMBING -ROOF PLAN -SUBSTATION EXPANSION PP101-03A PLUMBING -UNDERSLAB PLAN -BUILDING 1003A MP302-07A MECHANICAL PIPING -SECTIONS -BUILDING 1007A PP102-11A PLUMBING- FIRST FLOOR PLAN -BUILDING 1011A
MP123 MECHANICAL PIPING -PLAN -PLAN -SECTOR 12 -TUNNEL PP102-SUB PLUMBING -FIRST FLOOR PLAN -SUBSTATION EXPANSION MP301-07A MECHANICAL PIPING -SECTIONS -BUILDING 1007A PP101-11A PLUMBING -UNDERSLAB PLAN -1011A
MP122 MECHANICAL PIPING -PLAN -PLAN -SECTOR 11 -TUNNEL PP101-SUB PLUMBING -UNDERSLAB PLAN -SUBSTATION EXPANSION Q101-03A FIRST FLOOR EQUIPMENT PLAN -BUILDING 1003A MH301-07A MECHANICAL HVAC -SECTIONS -BUILDING 1007A
MP121 MECHANICAL PIPING -PLAN -PLAN -SECTOR 11 -TUNNEL A100-03A SITE PLAN AND SECTION -BUILDING 1003A MP102-07A MECHANICAL PIPING -AREA PLAN -BUILDING 1007A Q101-11A FIRST FLOOR EQUIPMENT PLAN -BUILDING 1011A
MP120 MECHANICAL PIPING -PLAN -PLAN -SECTOR 10 -TUNNEL MC01-SUB MECHANICAL SITE PLAN - SUBSTATION EXPANSION MP101-07A MECHANICAL PIPING -AREA PLAN -BUILDING 1007A A100-11A SITE PLAN AND SECTION -BUILDING 1011A
MP119 MECHANICAL PIPING -PLAN -PLAN -SECTOR 10 -TUNNEL SS12-SUB STRUCTURAL DETAILS - SW PLATFORM, STEEL DETAILS - SUBSTATION EXTENSION S111-03A FRAMING PLAN -ROOF -BUILDING 1003A MH102-07A MECHANICAL HVAC -AREA PLAN -BUILDING 1007A
MP118 MECHANICAL PIPING -PLAN -PLAN -SECTOR 9 -TUNNEL SS11-SUB STRUCTURAL DETAILS -13.8kV 3Ø U.G. GETAWAY STR - SUBSTATION EXTENSION S101-03A FOUNDATION PLAN -BUILDING 1003A MH101-07A MECHANICAL HVAC -AREA PLAN -BUILDING 1007A S111-11A FRAMING PLAN -ROOF -BUILDING 1011A
MP117 MECHANICAL PIPING -PLAN -PLAN -SECTOR 9 -TUNNEL SS10-SUB STRUCTURAL DETAILS -13.8kV 3Ø SWITCH STAND - SUBSTATION EXTENSION M101-07A MECHANICAL -OVERALL PLAN -BUILDING 1007A S101-11A FOUNDATION PLAN -BUILDING 1011A
MP116 MECHANICAL PIPING -PLAN -PLAN -SECTOR 8 -TUNNEL SS09-SUB STRUCTURAL DETAILS STATIC MAST TOWER - SUBSTATION EXPANSION LP102-03A LANDSCAPE PLAN -BUILDING 1003A
MP115 MECHANICAL PIPING -PLAN -PLAN -SECTOR 8 -TUNNEL SS08-SUB STRUCTURAL DETAILS 69kV DEADEND TOWER - SUBSTATION EXPANSION CU342 PROPOSED UTILITY PROFILES - BUILDING 1003A PP103-07A PLUMBING -ROOF PLAN -BUILDING 1007A LP109-11A LANDSCAPE PLAN -BUILDING 1011A
MP114 MECHANICAL PIPING -PLAN -PLAN -SECTOR 7 -TUNNEL SS07-SUB STRUCTURAL DETAILS 69kV 3Ø VT SUPPORT - SUBSTATION EXPANSION CU323 PROPOSED SANITARY PROFILES - BUILDING 1003A PP102-07A PLUMBING -FIRST FLOOR PLAN -BUILDING 1007A CU349 PROPOSED UTILITY PROFILES - BUILDING 1011A
MP113 MECHANICAL PIPING -PLAN -PLAN -SECTOR 7 -TUNNEL SS06-SUB STRUCTURAL DETAILS 69kV 3Ø HIGH SWITCH STAND - SUBSTATION EXTENSION CU302 PROPOSED STORM PROFILES - BUILDING 1003A PP101-07A PLUMBING -UNDERSLAB PLAN -BUILDING 1007A CU332 PROPOSED SANITARY PROFILES - BUILDING 1011A
MP112 MECHANICAL PIPING -PLAN -PLAN -SECTOR 6 -TUNNEL SS05-SUB STRUCTURAL DETAILS 69kV 3Ø LOW SWITCH STAND - SUBSTATION EXPANSION CU102-03A PROPOSED UTILITY PLAN - BUILDING 1003A CU309 PROPOSED STORM PROFILES - BUILDING 1011A
MP111 MECHANICAL PIPING -PLAN -PLAN -SECTOR 6 -TUNNEL SS04-SUB STRUCTURAL DETAILS 69kV 3Ø HIGH BUS SUPPORT - SUBSTATION EXPANSION CG102-03A PROPOSED GRADING AND DRAINAGE PLAN -BUILDING 1003A Q101-07A FIRST FLOOR EQUIPMENT PLAN -BUILDING 1007A CU109-11A PROPOSED UTILITY PLAN - BUILDING 1011A
MP110 MECHANICAL PIPING -PLAN -PLAN -SECTOR 5 -TUNNEL SS03-SUB STRUCTURAL DETAILS 69kV 3Ø LOW BUS SUPPORT - SUBSTATION EXPANSION CS102-03A PROPOSED SITE PLAN -BUILDING 1003A A100-07A SITE PLAN AND SECTION -BUILDING 1007A CG109-11A PROPOSED GRADING AND DRAINAGE PLAN -BUILDING 1011A
MP109 MECHANICAL PIPING -PLAN -PLAN -SECTOR 5 -TUNNEL SS02-SUB STRUCTURAL DETAILS 69kV 1Ø LOW BUS SUPPORT - SUBSTATION EXPANSION V102-03A EXISTING CONDITIONS PLAN - BUILDING 1003A CS109-11A PROPOSED SITE PLAN -BUILDING 1011A
MP108 MECHANICAL PIPING -PLAN -PLAN -SECTOR 4 -TUNNEL SS01-SUB STRUCTURAL STATION LAYOUT - SUBSTATION EXPANSION 1003A (POWER SUPPLY & DI WATER) S111-07A FRAMING PLAN -ROOF -BUILDING 1007A V109-11A EXISTING CONDITIONS PLAN - BUILDING 1011A
MP107 MECHANICAL PIPING -PLAN -PLAN -SECTOR 4 -TUNNEL FD01-SUB FOUNDATION & FENCE PLAN LAYOUT - SUBSTATION EXPANSION S101-07A FOUNDATION PLAN -BUILDING 1007A 1011A (POWER SUPPLY & DI WATER)
MP106 MECHANICAL PIPING -PLAN -PLAN -SECTOR 3 -TUNNEL GD04-SUB GROUNDING DETAILS 13-16 - SUBSTATION EXTENSION EC101-01A TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1001A
MP105 MECHANICAL PIPING -PLAN -PLAN -SECTOR 3 -TUNNEL GD03-SUB GROUNDING DETAILS 9-12 - SUBSTATION EXTENSION E706-01A ELECTRICAL SCHEDULES LP106-07A LANDSCAPE PLAN -BUILDING 1007A EY101-09A FIRST FLOOR SECURITY PLAN -BUILDING 1009A
MP104 MECHANICAL PIPING -PLAN -PLAN -SECTOR 2 -TUNNEL GD02-SUB GROUNDING DETAILS 1-8 - SUBSTATION EXTENSION E705-01A ELECTRICAL SCHEDULES CU346 PROPOSED UTILITY PROFILES - BUILDING 1007A EC101-09A TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1009A
MP103 MECHANICAL PIPING -PLAN -PLAN -SECTOR 2 -TUNNEL GD01-SUB GROUNDING STATION LAYOUT - SUBSTATION EXPANSION E704-01A ELECTRICAL SCHEDULES CU328 PROPOSED SANITARY PROFILES - BUILDING 1007A E707-09A ELECTRICAL SCHEDULES
MP102 MECHANICAL PIPING -PLAN -PLAN -SECTOR 1 -TUNNEL CC04-SUB CONDUIT & CABLE DETAILS 1-6 - SUBSTATION EXTENSION E703-01A ELECTRICAL SCHEDULES CU305 PROPOSED STORM PROFILES - BUILDING 1007A E706-09A ELECTRICAL SCHEDULES
MP101 MECHANICAL PIPING -PLAN -PLAN -SECTOR 1 -TUNNEL CC03-SUB CONDUIT SCHEDULE -SUBSTATION EXPANSION E702-01A ELECTRICAL SCHEDULES CU106-07A PROPOSED UTILITY PLAN - BUILDING 1007A E705-09A ELECTRICAL SCHEDULES
MH106 HVAC -PLAN -PART PLAN -SECTOR 11 -TUNNEL -HELIUM LOOP CC02-SUB PULLBOX DETAILS & DUCT SECTIONS -SUBSTATION EXPANSION E701-01A ELECTRICAL SCHEDULES CG106-07A PROPOSED GRADING AND DRAINAGE PLAN -BUILDING 1007A E704-09A ELECTRICAL SCHEDULES
MH105 HVAC -PLAN -PART PLAN -SECTOR 11 -TUNNEL -ALCOVE C CC01-SUB CONDUIT & CABLE STATION LAYOUT - SUBSTATION EXPANSION E602-01A UNIT SUBSTATION 1001A ONELINE DIAGRAM CS106-07A PROPOSED SITE PLAN -BUILDING 1007A E703-09A ELECTRICAL SCHEDULES
MH104 HVAC -PLAN -PART PLAN -SECTOR 11 -TUNNEL -ALCOVE B E610-SUB BUILDING 638A -BASEMENT/VAULT CABLE TRAY -SUBSTATION EXPANSION E601-01A UNIT SUBSTATION 1001A ONELINE DIAGRAM V106-07A EXISTING CONDITIONS PLAN - BUILDING 1007A E702-09A ELECTRICAL SCHEDULES
MH103 HVAC -PLAN -PART PLAN -SECTOR 10 -TUNNEL -ALCOVE A E609-SUB BUILDING 638A -BASEMENT/VAULT CABLE TRAY -SUBSTATION EXPANSION EP101-01A ELECTRICAL POWER PLAN -BUILDING 1001A 1007A (POWER SUPPLY & DI WATER) E701-09A ELECTRICAL SCHEDULES
MH102 HVAC -PLAN -PART PLAN -SECTOR 10 -TUNNEL -HELIUM LOOP E608-SUB BUILDING 638A VAULT WALL ELEVATIONS -SUBSTATION EXPANSION EL101-01A LIGHTING PLAN -BUILDING 1001A E604-09A UNIT SUBSTATION 1009D ONELINE DIAGRAM
MH101 HVAC -PLAN -OVERALL PLAN -SECTORS 10-12 -TUNNEL E607-SUB BUILDING 638A -BASEMENT/VAULT ACCESS -SUBSTATION EXPANSION EY101-05T FIRST FLOOR SECURITY PLAN -BUILDING 1005T E603-09A UNIT SUBSTATION 1009C ONELINE DIAGRAM
MS105 MECHANICAL SITE -SECTORS 1009-1011 E606-SUB BUILDING 638A -INTERIOR WALL ELEVATIONS -SUBSTATION EXPANSION MP604-01A MECHANICAL PIPING -DIAGRAM -PS HX CHILLED WATER SYSTEM -1001A EC101-05T TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1005T E602-09A UNIT SUBSTATION 1009B ONELINE DIAGRAM
MS104 MECHANICAL SITE -SECTORS 1006-1008 E605-SUB BUILDING 638A UPPER FLOOR CABLE TRAY -SUBSTATION EXPANSION MP603-01A MECHANICAL PIPING -DIAGRAM -TUNNEL COOLING WATER DIST -1001A E706-05T ELECTRICAL SCHEDULES E601-09A UNIT SUBSTATION 1009A ONELINE DIAGRAM
MS103 MECHANICAL SITE -SECTORS 1003-1005 E604-SUB BUILDING 638A UPPER FLOOR LAYOUT -SUBSTATION EXPANSION MP602-01A MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1001A E705-05T ELECTRICAL SCHEDULES EP101-09A ELECTRICAL POWER PLAN -BUILDING 1009A
MS102 MECHANICAL SITE -SECTORS 1012-1002 E603-SUB GENERAL ARRANGEMENT ELEVATIONS - SUBSTATION EXPANSION MP601-01A MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1001A E704-05T ELECTRICAL SCHEDULES
MS101 MECHANICAL SITE -PLAN E602-SUB GENERAL ARRANGEMENT STATION LAYOUT - SUBSTATION EXPANSION MH601-01A MECHANICAL HVAC -DIAGRAM -BUILDING 1001A E703-05T ELECTRICAL SCHEDULES MP605-09A MECHANICAL PIPING -DIAGRAM -PS HX CHILLED WATER SYSTEM -1009A
M001 MECHANICAL -SYMBOLS AND ABBREVIATIONS E601-SUB SITE PLAN - SUBSTATION EXPANSION MH401-01A MECHANICAL HVAC -ENLARGED PLAN -AHU E702-05T ELECTRICAL SCHEDULES MP604-09A MECHANICAL PIPING -DIAGRAM -PS DIRECT CHILLED WTR SYS -1001A 1009A
E601R-SUB SITE PLAN REMOVAL DRAWING - EXISTING CONDITIONS MP302-01A MECHANICAL PIPING -SECTIONS -BUILDING 1001A E701-05T ELECTRICAL SCHEDULES MP603-09A MECHANICAL PIPING -DIAGRAM -TUNNEL COOLING WATER DIST -1009A
P701 PLUMBING SCHEDULES E110-3-SUB 69kV THREE LINE DIAGRAM -SUBSTATION EXTENSION MP301-01A MECHANICAL PIPING -SECTIONS -BUILDING 1001A E602-05T UNIT SUBSTATION 1005TB ONELINE DIAGRAM MP602-09A MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1009A
P501 PLUMBING DETAILS E110-2-SUB 69kV THREE LINE DIAGRAM -SUBSTATION EXTENSION MH301-01A MECHANICAL HVAC -SECTIONS -BUILDING 1001A E601-05T UNIT SUBSTATION 1005T ONELINE DIAGRAM MP601-09A MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1009A
P001 PLUMBING SYMBOLS AND ABBREVIATIONS E110-1-SUB 69kV THREE LINE DIAGRAM -SUBSTATION EXTENSION MP102-01A MECHANICAL PIPING -AREA PLAN -BUILDING 1001A EP101-05T ELECTRICAL POWER PLAN -BUILDING 1005T MH601-09A MECHANICAL HVAC -DIAGRAMS -BUILDING 1009A
E109-SUB DC DISTRIBUTION DETAILS -SUBSTATION EXTENSION MP101-01A MECHANICAL PIPING -AREA PLAN -BUILDING 1001A EL101-05T LIGHTING PLAN -BUILDING 1005T MH-401-09A MECHANICAL HVAC -ENLARGED PLAN -AHU
FA-506 FIRE ALARM MATRIX -SUBSTATION 638 E108-SUB AC DISTRIBUTION DETAILS -SUBSTATION EXTENSION MH102-01A MECHANICAL HVAC -PLAN -BUILDING 1001A MP302-09A MECHANICAL PIPING -SECTIONS -BUILDING 1009A
FA-505 FIRE ALARM MATRIX - 1010C E104-SUB SWITCHGEAR LAYOUT -SUBSTATION EXTENSION MH101-01A MECHANICAL HVAC -PLAN -BUILDING 1001A MP605-05T MECHANICAL PIPING -DIAGRAM -PS HX CHILLED WATER SYSTEM -1005T MP301-09A MECHANICAL PIPING -SECTIONS -BUILDING 1009A
FA-504 FIRE ALARM MATRIX - 1004G, 1012E E103-SUB SWITCHGEAR LAYOUT DIAGRAM -SUBSTATION EXTENSION M101-01A MECHANICAL -OVERALL PLAN -BUILDING 1001A MP604-05T MECHANICAL PIPING -DIAGRAM -PS DIRECT CHILLED WTR SYS -1005T MH301-09A MECHANICAL HVAC -SECTIONS -BUILDING 1009A
FA-503 FIRE ALARM MATRIX - 1001A, 1003A, 1005T, 1007A, 1009A, 1011A, 1012C E102-SUB 13kV ONE LINE DIAGRAM -SUBSTATION EXTENSION MP603-05T MECHANICAL PIPING -DIAGRAM -TUNNEL COOLING WATER DIST -1005T MP104-09A MECHANICAL PIPING -AREA PLAN -BUILDING 1009A
FA-502 FIRE ALARM MATRIX - 1006G, 1010D, 1010E E101-SUB 69kV ONE LINE DIAGRAM -SUBSTATION EXTENSION PP103-01A PLUMBING -ROOF PLAN -BUILDING 1001A MP602-05T MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1005T MP103-09A MECHANICAL PIPING -AREA PLAN -BUILDING 1009A
FA-501 FIRE ALARM GENERAL DETAILS - ALL BUILDINGS TS01-SUB TITLE SHEET -SUBSTATION EXPANSION PP102-01A PLUMBING-FIRST FLOOR PLAN -BUILDING 1001A MP601-05T MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1005T MP102-09A MECHANICAL PIPING -AREA PLAN -BUILDING 1009A
FA-001 FIRE ALARM LEGENDS AND NOTES - ALL BUILDINGS PP101-01A PLUMBING -UNDERSLAB PLAN -BUILDING 1001A MH601-05T MECHANICAL HVAC -DIAGRAMS -BUILDING 1005T MP101-09A MECHANICAL PIPING -AREA PLAN -BUILDING 1009A
FA101-SUB FIRE ALARM PLAN -SUBSTATION EXTENSION MH401-05T MECHANICAL HVAC -ENLARGED PLANS -AHU MH104-09A MECHANICAL HVAC -ARE PLAN -BUILDING 1009A
AG300 INTERIOR SIGN DETAILS Q101-01A FIRST FLOOR EQUIPMENT PLAN -BUILDING 1001A MP301-05T MECHANICAL PIPING -SECTIONS -BUILDING 1005T MH103-09A MECHANICAL HVAC -AREA PLAN -BUILDING 1009A
A730 TOILET LAYOUTS AND MOUNTING DIAGRAM S311-SUB SECTIONS - SUBSTATION A100-01A SITE PLAN AND SECTION -BUILDING 1001A MH301-05T MECHANICAL HVAC -SECTIONS -BUILDING 1005T MH102-09A MECHANICAL HVAC -AREA PLAN -BUILDING 1009A
A700 STANDARD PARTITION TYPE S101-SUB PLANS, ELEVATIONS, AND WALL SECTIONS -SUBSTATION MP103-05T MECHANICAL PIPING -AREA PLAN -BUILDING 1005T MH101-09A MECHANICAL HVAC -AREA PLAN -BUILDING 1009A
A601 DOOR & FRAME TYPES AND DETAILS S111-01A FRAMING PLAN -ROOF -BUILDING 1001A MP102-05T MECHANICAL PIPING -AREA PLAN -BUILDING 1005T M101-09A MECHANICAL -OVERALL PLAN -BUILDING 1009A
A501 WALL DETAIL LP111-SUB LANDSCAPE PLAN -SUBSTATION S101-01A FOUNDATION PLAN -BUILDING 1001A MP101-05T MECHANICAL PIPING -AREA PLAN -BUILDING 1005T
A350 WALL SECTIONS CU334 PROPOSED SANITARY PROFILES - SUBSTATION MH101-05T MECHANICAL HVAC -PLAN -BUILDING 1005T PP106-09A PLUMBING -ROOF PLAN -BUILDING 1009A AREA B
A110 OVERALL SITE PLAN CU310 PROPOSED STORM PROFILES - SUBSTATION LP101-01A LANDSCAPE PLAN -BUILDING 1001A M101-05T MECHANICAL -OVERALL PLAN -BUILDING 1005T PP105-09A PLUMBING -ROOF PLAN -BUILDING 1009A AREA A
A001 ABBREVIATIONS, SYMBOLS & NOTES CU111-SUB PROPOSED UTILITY PLAN - SUBSTATION CU341 PROPOSED UTILITY PROFILES - BUILDING 1001A PP104-09A PLUMBING -FIRST FLOOR PLAN -BUILDING 1009A AREA B
CG111-SUB PROPOSED GRADING AND DRAINAGE PLAN -SUBSTATION CU322 PROPOSED SANITARY PROFILES - BUILDING 1001A PP103-05T PLUMBING -ROOF PLAN -BUILDING 1005T PP103-09A PLUMBING -FIRST FLOOR PLAN -BUILDING 1009A AREA A
S571 EXTERIOR SITE DETAILS CS111-SUB PROPOSED SITE PLAN -SUBSTATION CU321 PROPOSED SANITARY PROFILES - BUILDING 1001A PP102-05T PLUMBING -FIRST FLOOR PLAN -BUILDING 1005T PP102-09A PLUMBING -UNDERSLAB PLAN -BUILDING 1009A AREA B
S561 EXTERIOR DECK DETAILS V111-SUB EXISTING CONDITIONS PLAN - SUBSTATION CU301 PROPOSED STORM PROFILES - BUILDING 1001A PP101-05T PLUMBING -UNDERSLAB PLAN -BUILDING 1005T PP101-09A PLUMBING -UNDERSLAB PLAN -BUILDING 1009A AREA A
S542 STEEL COMPOSITE BEAM DETAILS CU101-01A PROPOSED UTILITY PLAN - BUILDING 1001A
S541 STEEL COMPOSITE BEAM DETAILS G101-SUB LIFE SAFETY PLAN -SUBSTATION EXTENSION CG101-01A PROPOSED GRADING AND DRAINAGE PLAN -BUILDING 1001A FA101-05T FIRE ALARM PLAN -1005T FA101-09A FIRST FLOOR FIRE ALARM PLAN -BUILDING 1009A
S532 STEEL FRAMING DETAILS G100-SUB CODE ANALYSIS -SUBSTATION EXTENSION CS101-01A PROPOSED SITE PLAN -BUILDING 1001A F501-05T FIRE PROTECTION DETAILS -1005T F501-09A FIRE PROTECTION DETAILS -BUILDING 1009A
S531 STEEL FRAMING DETAILS V101-01A EXISTING CONDITIONS PLAN - BUILDING 1001A F101-05T FIRE PROTECTION PLAN -1005T F101-09A FIRST FLOOR FIRE PROTECTION PLAN -BUILDING 1009A
S521 CONC SLAB-ON-GRADE DETAILS BUILDING 638 SUBSTATION EXTENSION 1001A (POWER SUPPLY & DI WATER)
S513 CONC SUBSTRUCTURE DETAILS AG201-05T WAYFINDING EXTERIOR ELEVATIONS -BUILDING 1005T AG201-09A WAYFINDING EXTERIOR ELEVATIONS -BUILDING 1009A
S512 CONC SUBSTRUCTURE DETAILS PEMBS EY101-P FIRST FLOOR SECURITY PLAN -BUILDING 1001A, 1003A, 1007A & 1011A AG101-05T WAYFINDING FIRST FLOOR PLAN -BUILDING 1005T AG101-09A WAYFINDING FIRST FLOOR PLAN -BUILDING 1009A
S511 CONC SUBSTRUCTURE DETAILS CSS Q101-05T FIRST FLOOR EQUIPMENT PLAN -BUILDING 1005T Q101-09A FIRST FLOOR EQUIPMENT PLAN -BUILDING 1009A
S501 CONC REINFORCEMENT DETAILS EY504 SECURITY DETAILS FA101-P FIRE ALARM PLAN -BUILDING 1001A, 1003A, 1007A & 1011A I101-05T FIRST FLOOR FINISH PLAN -BUILDING 1005T I101-09A FIRST FLOOR FINISH PLAN -BUILDING 1009A
S001 STRUCTURAL NOTES AND ABBREVIATIONS EY503 SECURITY DETAILS F501-P FIRE PROTECTION DETAILS -BUILDING 1001A, 1003A, 1007A & 1011A A600-05T DOOR & FRAME SCHEDULE -BUILDING 1005T A600-09A DOOR & FRAME SCHEDULE
EY502 SECURITY DETAILS F101-P FIRE PROTECTION PLAN -BUILDING 1001A, 1003A, 1007A & 1011A A301-05T BUILDING SECTIONS -BUILDING 1005T A301-09A BUILDING SECTIONS -BUILDING 1009A
LP112 LANDSCAPE DETAILS EY501 SECURITY DETAILS A201-05T EXTERIOR ELEVATIONS -BUILDING 1005T A201-09A EXTERIOR ELEVATIONS -BUILDING 1009A
C506 DETAILS EY001 SECURITY SYMBOLS AND ABBREVIATIONS AG201-P WAYFINDING EXTERIOR ELEVATIONS -BUILDING 1001A, 1003A, 1007A & 1011A A105-05T FIRST FLOOR REFLECTED CEILING PLAN -BUILDING 1005T A105-09A FIRST FLOOR REFLECTED CEILING PLAN -BUILDING 1009A
C505 MISCELLANEOUS DETAILS EC601 TELECOMMUNICATIONS FIBER DIAGRAM AG101-P WAYFINDING FIRST FLOOR PLAN -BUILDING 1001A, 1003A, 1007A & 1011A A102-05T ROOF PLAN -BUILDING 1005T A102-09A ROOF PLAN -BUILDING 1009A
C504 WATER DETAILS EC514 TELECOMMUNICATIONS DETAILS I101-P FIRST FLOOR FINISH PLAN -BUILDING 1001A, 1003A, 1007A & 1011A A101-05T FIRST FLOOR PLAN -BUILDING 1005T A101-09A FIRST FLOOR PLAN -BUILDING 1009A
C503 SANITARY DETAILS EC513 TELECOMMUNICATIONS DETAILS A600-P DOOR & FRMAE SCHEDULE -BUILDING 1001A, 1003A, 1007A & 1011A A100-05T SITE PLAN AND SECTION -BUILDING 1005T A100-09A SITE PLAN AND SECTION -BUILDING 1009A
C502 STORM DETAILS EC512 TELECOMMUNICATIONS DETAILS A301-P BUILDING SECTIONS -BUILDING 1001A, 1003A, 1007A & 1011A
C501 SITE DETAILS EC511 TELECOMMUNICATIONS DETAILS A201-P EXTERIOR ELEVATIONS -BUILDING 1001A, 1003A, 1007A & 1011A S111-05T FRAMING PLAN -ROOF-BUILDING 1005T S112-09A FRAMING PLAN -ROOF -BUILDING 1009A -AREA B
CU100 OVERALL PROPOSED UTILITY PLAN EC510 TELECOMMUNICATIONS DETAILS A105-P FIRST FLOOR RCP -BUILDING 1001A, 1003A, 1007A & 1011A S101-05T FOUNDATION PLAN -BUILDING 1005T S111-09A FRAMING PLAN -ROOF -BUILDING 1009A -AREA A
CG100 OVERALL PROPOSED GRADING AND DRAINAGE PLAN EC509 TELECOMMUNICATIONS DETAILS A102-P ROOF PLAN -BUILDING 1001A, 1003A, 1007A & 1011A S102-09A FOUNDATION PLAN -BUILDING 1009A -AREA B
CS100 OVERALL PROPOSED SITE PLAN EC508 TELECOMMUNICATIONS DETAILS A101-P FIRST FLOOR PLAN -BUILDING 1001A, 1003A, 1007A & 1011A LP104-05T LANDSCAPE PLAN -BUILDING 1005T S101-09A FOUNDATION PLAN -BUILDING 1009A -AREA A
V100 OVERALL EXISTING CONDITIONS PLAN EC507 TELECOMMUNICATIONS DETAILS CU344 PROPOSED UTILITY PROFILES - BUILDING 1005T
C002 LEGEND AND ABBREVIATIONS - CIVIL EC506 TELECOMMUNICATIONS DETAILS S901-ALB ISOMETRICS - ALCOVE B CU343 PROPOSED UTILITY PROFILES - BUILDING 1005T LP107-09A LANDSCAPE PLAN -BUILDING 1009A
C001 GENERAL NOTES - CIVIL EC505 TELECOMMUNICATIONS DETAILS S312-ALB FRAMING SECTIONS -ALCOVE B CU325 PROPOSED SANITARY PROFILES - BUILDING 1005T CU347 PROPOSED UTILITY PROFILES - BUILDING 1009A
EC504 TELECOMMUNICATIONS DETAILS S311-ALB FRAMING SECTIONS -ALCOVE B CU324 PROPOSED SANITARY PROFILES - BUILDING 1005T CU329 PROPOSED SANITARY PROFILES - BUILDING 1009A
OVERALL SITE INFORMATION & TYPICAL ABBREVIATIONS, DETAILS
EC503 TELECOMMUNICATIONS DETAILS S101-ALB PLANS, ELEVATIONS, AND SECTIONS - ALCOVE B CU303 PROPOSED STORM PROFILES - BUILDING 1005T CU306 PROPOSED STORM PROFILES - BUILDING 1009A
EC502 TELECOMMUNICATIONS DETAILS SD101-ALB DEMO PLANS, ELEVATIONS, AND SECTIONS - ALCOVE B CU104-05T PROPOSED UTILITY PLAN - BUILDING 1005T CU107-09A PROPOSED UTILITY PLAN - BUILDING 1009A
EC501 TELECOMMUNICATIONS DETAILS CG104-05T PROPOSED GRADING AND DRAINAGE PLAN -BUILDING 1005T CG107-09A PROPOSED GRADING AND DRAINAGE PLAN -BUILDING 1009A
EC401 ENLARGED PLAN G101-P LIFE SAFETY PLAN - BUILDING 1001A, 1003A, 1007A & 1011A CS104-05T PROPOSED SITE PLAN -BUILDING 1005T CS107-09A PROPOSED SITE PLAN -BUILDING 1009A
G001 SHEET INDEX - VOLUME I-1 EC100 TELECOMMUNICATIONS SITE PLAN -OVERALL G100-P CODE ANALYSIS - BUILDING 1001A, 1003A, 1007A & 1011A V104-05T EXISTING CONDITIONS PLAN - BUILDING 1005T V107-09A EXISTING CONDITIONS PLAN - BUILDING 1009A
COVER SHEET - VOLUME I EC001 TELECOMMUNICATIONS LEGENDS, NOTES AND ABBREVIATIONS SHARED - 1001A, 1003A, 1005T, 1007A, 1009A & 1011A (POWER SUPPLY & DI WATER)
E600 ONELINE DIAGRAM SCHEDULES G101-05T LIFE SAFETY PLAN -1005T G101-09A FIRST FLOOR LIFE SAFETY PLAN -BUILDING 1009A
E002 ELECTRICAL LEGENDS, NOTES AND ABBREVIATIONS G100-05T CODE ANALYSIS -1005T G100-09A CODE ANALYSIS -BUILDING 1009A
GENERAL INFORMATION
E001 ELECTRICAL LEGENDS, NOTES AND ABBREVIATIONS
1001A, 1003A, 1005T, 1007A, 1009A, 1011A (POWER SUPPLY & DI WATER)
1005T (POWER SUPPLY & DI WATER) 1009A (POWER SUPPLY & DI WATER)
SHEET NUMBER DRAWING NAME SHEET NUMBER DRAWING NAME SHEET NUMBER DRAWING NAME SHEET NUMBER DRAWING NAME SHEET NUMBER DRAWING NAME
MARK DATE DESCRIPTION
11/01/2023 PRELIMINARY DESIGN 30% REVIEW SUBMITTAL
03/29/2024 PRELIMINARY DESIGN 60% REVIEW SUBMITTAL
08/30/2024 FINAL DESIGN 30% REVIEW SUBMITTAL
12/13/2024 FINAL DESIGN 60% REVIEW SUBMITTAL
cosulliva Text Box Not Export Controlled
ELECTRON-ION COLLIDER
UNDER CONTRACT WITH
UNITED STATES DEPARTMENT OF ENERGY
PLANT ENGINEERING DIVISION
UPTON, NEW YORK 11973
JOB TITLE
JOB NO.
SCALE
ESHG RISK LEVEL
BLDG. NO.
DWN. BY
APP'D. BY
DATE
REV'D BY
DWG. TITLE
DWG. NO.
08/30/2024
G002
SHEET INDEX - VOLUME II
10376646
H. YANG
HDR Architecture
HDR ARLINGTON
3001 WASHINGTON BLVD., SUITE 200
ARLINGTON, VIRGINIA 22201
H. YANG
D. CAPELLI
MH601-12E MECHANICAL HVAC -DIAGRAMS -BUILDING 1012E
MH301-12E MECHANICAL HVAC -SECTIONS -BUILDING 1012E
MH101-12E MECHANICAL HVAC -PLAN -BUILDING 1012E
PP103-12E PLUMBING -ROOF PLAN -BUILDING 1012E
PP102-12E PLUMBING -FIRST FLOOR PLAN -BUILDING 1012E
PP101-12E PLUMBING -UNDERSLAB PLAN -BUILDING 1012E
FA101-12E FIRE ALARM PLAN - BUILDING 1012E EY104-10C SECOND FLOOR SECURITY PLAN -BUILDING 1010C -B
F501-12E FIRE PROTECTION DETAIL -BUILDING 1012E EY103-10C SECOND FLOOR SECURITY PLAN -BUILDING 1010C -A
F101-12E FIRE PROTECTION PLAN -BUILDING 1012E EY102-10C FIRST FLOOR SECURITY PLAN -BUILDING 1010C -B
EY101-10C FIRST FLOOR SECURITY PLAN -BUILDING 1010C -A
AG201-12E WAYFINDING EXTERIOR ELEVATIONS -BUILDING 1012E EC102-10C TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1010C -AREA B
AG101-12E WAYFINDING FIRST FLOOR PLAN -BUILDING 1012E EC101-10C TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1010C -AREA A
Q101-12E FIRST FLOOR EQUIPMENT PLAN -BUILDING 1012E E705-10C ELECTRICAL SCHEDULES
I101-12E FIRST FLOOR FINISH PLAN -BUILDING 1012E EY101-10E SECURITY FLOOR PLANS -BUILDING 1010E E704-10C ELECTRICAL SCHEDULES
A600-12E DOOR & FRAME SCHEDULE EC101-10E TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1010E E703-10C ELECTRICAL SCHEDULES
A301-12E BUILDING SECTIONS -BUILDING 1012E E703-10E ELECTRICAL SCHEDULES E702-10C ELECTRICAL SCHEDULES
A201-12E EXTERIOR ELEVATIONS -BUILDING 1012E E702-10E ELECTRICAL SCHEDULES E701-10C ELECTRICAL SCHEDULES
A105-12E FIRST FLOOR REFLECTED CEILING PLAN -BUILDING 1012E E701-10E ELECTRICAL SCHEDULES E611-10C UNIT SUBSTATION 1010CK ONELINE DIAGRAM
A102-12E ROOF PLAN -BUILDING 1012E E602-10E UNIT SUBSTATION 1010F ONELINE DIAGRAM E610-10C UNIT SUBSTATION 1010CJ ONELINE DIAGRAM
A101-12E FIRST FLOOR PLAN -BUILDING 1012E E601-10E UNIT SUBSTATION 1010E ONELINE DIAGRAM E609-10C UNIT SUBSTATION 1010CI ONELINE DIAGRAM
A100-12E SITE PLAN AND SECTION -BUILDING 1012E EP101-10E ELECTRICAL POWER PLAN -LEVEL 1 & 2 -BUILDING 1010E E608-10C UNIT SUBSTATION 1010CH ONELINE DIAGRAM
EL101-10E LIGHTING PLAN -BUILDING 1010E E607-10C UNIT SUBSTATION 1010CG ONELINE DIAGRAM
S301-12E BUILDING SECTIONS - BUILDING 1012E E606-10C UNIT SUBSTATION 1010CF ONELINE DIAGRAM
S111-12E FRAMING PLAN - ROOF - BUILDING 1012E MP602-10E MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1010E E605-10C UNIT SUBSTATION 1010CE ONELINE DIAGRAM
S101-12E FOUNDATION PLAN - BUILDING 1012E MP601-10E MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1010E E604-10C UNIT SUBSTATION 1010CD ONELINE DIAGRAM
MP101-10E MECHANICAL PIPING -AREA PLAN -BUILDING 1010E E603-10C UNIT SUBSTATION 1010CC ONELINE DIAGRAM
LP110-12 LANDSCAPE PLAN -BUILDINGS 1012C AND 1012D MH101-10E MECHANICAL HVAC -AREA PLAN -BUILDING 1010E E602-10C UNIT SUBSTATION 1010CB ONELINE DIAGRAM
CU110-12 PROPOSED UTILITY PLAN - BUILDINGS 1012C AND 1012E M101-10E MECHANICAL -OVERALL PLAN -BUILDING 1010E E601-10C UNIT SUBSTATION 1010CA ONELINE DIAGRAM
CG110-12 PROPOSED GRADING AND DRAINAGE PLAN - BUILDINGS 1012C AND 1012E EP104-10C ELECTRICAL POWER PLAN -LEVEL 2 -BUILDING 1010C -AREA B
CS110-12 PROPOSED SITE PLAN -BUILDINGS 1012C AND 1012E PP103-10E PLUMBING -ROOF PLAN -BUILDING 1010E EP103-10C ELECTRICAL POWER PLAN -LEVEL 2 -BUILDING 1010C -AREA A
V110-12 EXISTING CONDITIONS PLAN - BUILDINGS 1012C AND 1012E PP102-10E PLUMBING -FIRST FLOOR PLAN -BUILDING 1010E EP102-10C ELECTRICAL POWER PLAN -LEVEL 1 -BUILDING 1010C -AREA B
PP101-10E PLUMBING -UNDERSLAB PLAN -BUILDING 1010E EP101-10C ELECTRICAL POWER PLAN -LEVEL 1 -BUILDING 1010C -AREA A
G101-12E LIFE SAFETY PLAN -BUILDING 1012E EL102-10C LIGHTING PLAN -LEVEL 2 -B1010C
G001-12E CODE ANALYSIS -BUILDING 1012E FA101-10E FIRE ALARM PLANS -BUILDING 1010E EL101-10C LIGHTING PLAN -LEVEL 1 -B1010C
1012E (KICKER POWER SUPPLY) F501-10E FIRE PROTECTION DETAILS
F101-10E FIRE PROTECTION PLANS -BUILDING 1010E MP601-10C MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1010C
EY101-12C FIRST FLOOR SECURITY PLAN -BUILDING 1012C MH601-10C MECHANICAL HVAC -DIAGRAMS -BUILDING 1010C
EC101-12C TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1012C AG201-10E WAYFINDING EXTERIOR ELEVATIONS -BUILDING 1010E MH402-10C MECHANICAL HVAC -ENLARGED PLAN -AHU WEST
EP101-12C ELECTRICAL POWER PLAN -BUILDING 1012C AG101-10E WAYFINDING FLOOR PLANS -BUILDING 1010E MH401-10C MECHANICAL HVAC -ENLARGED PLAN -AHU EAST
E703-12C ELECTRICAL SCHEDULES Q101-10E EQUIPMENT FLOOR PLANS -BUILDING 1010E MH301-10C MECHANICAL HVAC -SECTIONS -BUILDING 1010C
E702-12C ELECTRICAL SCHEDULES I101-10E FLOOR FINISH PLANS -BUILDING 1010E MP108-10C MECHANICAL PIPING -AREA PLAN -SECOND FLOOR -BUILDING 1010C
E701-12C ELECTRICAL SCHEDULES A600-10E DOOR & FRAME SCHEDULE MP107-10C MECHANICAL PIPING -AREA PLAN -SECOND FLOOR -BUILDING 1010C
E602-12C UNIT SUBSTATION 1012D ONELINE DIAGRAM A301-10E BUILDING SECTIONS -BUILDING 1010E MP106-10C MECHANICAL PIPING -AREA PLAN -SECOND FLOOR -BUILDING 1010C
E601-12C UNIT SUBSTATION 1012C ONELINE DIAGRAM A201-10E EXTERIOR ELEVATIONS -BUILDING 1010E MP105-10C MECHANICAL PIPING -AREA PLAN -SECOND FLOOR -BUILDING 1010C
EL101-12C LIGHTING PLAN -BUILDING 1012C A105-10E REFLECTED CEILING PLANS -BUILDING 1010E MH104-10C MECHANICAL HVAC -2ND FLR. EAST PART PLAN -BUILDING 1010C
A102-10E ROOF PLAN -BUILDING 1010E MH103-10C MECHANICAL HVAC -2ND FL. WEST PART PLAN -BUILDING 1010C
MH601-12C MECHANICAL HVAC -DIAGRAM A101-10E FLOOR PLANS -BUILDING 1010E M102-10C MECHANICAL -OVERALL PLAN -SECOND FLOOR -BUILDING 1010C
MH301-12C MECHANICAL HVAC -SECTIONS -BUILDING 1012C A100-10E SITE PLAN AND SECTION -BUILDING 1010E MP104-10C MECHANICAL PIPING -AREA PLAN -FIRST FLOOR -BUILDING 1010C
MH101-12C MECHANICAL HVAC -PLAN -BUILDING 1012C MP103-10C MECHANICAL PIPING -AREA PLAN -FIRST FLOOR -BUILDING 1010C
S111-10E FRAMING PLANS - BUILDING 1010E MP102-10C MECHANICAL PIPING -AREA PLAN -FIRST FLOOR -BUILDING 1010C
PP103-12C PLUMBING -ROOF PLAN - BUILDING 1012C S101-10E FOUNDATION PLAN - BUILDING 1010E MP101-10C MECHANICAL PIPING -AREA PLAN -FIRST FLOOR -BUILDING 1010C
PP102-12C PLUMBING -FIRST FLOOR PLAN - BUILDING 1012C MH102-10C MECHANICAL HVAC -1ST FLR. EAST PART PLAN -BUILDING 1010C
PP101-12C PLUMBING -UNDERSLAB PLAN - BUILDING 1012C LP108-10 LANDSCAPE PLAN -BUILDINGS 1010C, 1010D, AND 1010E MH101-10C MECHANICAL HVAC -1ST FL. WEST PART PLAN -BUILDING 1010C
CU348 PROPOSED UTILITY PROFILES - BUILDINGS 1010C, 1010D, AND 1010E M101-10C MECHANICAL -OVERALL PLAN -FIRST FLOOR -BUILDING 1010C
FA101-12C FIRE ALARM PLAN -BUILDING 1012C CU331 PROPOSED SANITARY PROFILES - BUILDINGS 1010C, 1010D, AND 1010E
F501-12C FIRE PROTECTION DETAILS -BUILDING 1012C CU330 PROPOSED SANITARY PROFILES - BUILDINGS 1010C, 1010D, AND 1010E PP108-10C PLUMBING -ROOF PLAN - BUILDING 1010C -AREA B
F101-12C FIRE PROTECTION PLAN -BUILDING 1012C CU308 PROPOSED STORM PROFILES - BUILDINGS 1010C, 1010D, AND 1010E PP107-10C PLUMBING -ROOF PLAN - BUILDING 1010C -AREA A
CU307 PROPOSED STORM PROFILES - BUILDINGS 1010C, 1010D, AND 1010E PP106-10C PLUMBING -SECOND FLOOR PLAN - BUILDING 1010C -AREA B
AG201-12C WAYFINDING EXTERIOR ELEVATIONS -BUILDING 1012C CU108-10 PROPOSED UTILITY PLAN -BUILDINGS 1010C, 1010D, AND 1010E PP105-10C PLUMBING -SECOND FLOOR PLAN - BUILDING 1010C -AREA A
AG101-12C WAYFINDING FIRST FLOOR PLAN -BUILDING 1012C CG108-10 PROPOSED GRADING AND DRAINAGE PLAN - BUILDINGS 1010C, 1010D, AND 1010E PP104-10C PLUMBING -FIRST FLOOR PLAN - BUILDING 1010C -AREA B
Q101-12C FIRST FLOOR EQUIPMENT PLAN -BUILDING 1012C CS108-10 PROPOSED SITE PLAN -BUILDINGS 1010C, 1010D, AND 1010E PP103-10C PLUMBING -FIRST FLOOR PLAN - BUILDING 1010C -AREA A
I101-12C FIRST FLOOR FINISH PLAN -BUILDING 1012C V108-10 EXISTING CONDITIONS PLAN - BUILDINGS 1010C, 1010D, AND 1010E PP102-10C PLUMBING -UNDERSLAB PLAN - BUILDING 1010C -AREA B
A600-12C DOOR & FRAME SCHEDULE PP101-10C PLUMBING -UNDERSLAB PLAN - BUILDING 1010C -AREA A
A301-12C BUILDING SECTIONS -BUILDING 1012C G101-10E LIFE SAFETY PLANS -BUILDING 1010E
A201 -12C EXTERIOR ELEVATIONS -BUILDING 1012C G100-10E CODE ANALYSIS - BUILDING 1010E FA104-10C LEVEL TWO FIRE ALARM PLAN AREA B -BUILDING 1010C
A105-12C FIRST FLOOR REFLECTED CEILING PLAN-BUILDING 1012C 1010E (CRYOGENIC PLANT) FA103-10C LEVEL TWO FIRE ALARM PLAN AREA A -BUILDING 1010C
A102-12C ROOF PLAN -BUILDING 1012C FA102-10C LEVEL ONE FIRE ALARM PLAN AREA B -BUILDING 1010C
A101-12C FIRST FLOOR PLAN -BUILDING 1012C EY101-06G SECURITY FLOOR PLAN -BUILDING 1006G FA101-10C LEVEL ONE FIRE ALARM PLAN AREA A -BUILDING 1010C
A100-12C SITE PLAN AND SECTION -BUILDING 1012C EC101-06G TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1006G F501-10C FIRE PROTECTION DETAILS -BUILDING 1010C
E705-06G ELECTRICAL SCHEDULES F104-10C LEVEL TWO FIRE PROTECTION PLAN AREA B -BUILDING 1010C
S111-12C FRAMING PLAN -ROOF -BUILDING 1012C E704-06G ELECTRICAL SCHEDULES F103-10C LEVEL TWO FIRE PROTECTION PLAN AREA A -BUILDING 1010C
S101-12C FOUNDATION PLAN -BUILDING 1012C E703-06G ELECTRICAL SCHEDULES F102-10C LEVEL ONE FIRE PROTECTION PLAN AREA B -BUILDING 1010C
E702-06G ELECTRICAL SCHEDULES F101-10C LEVEL ONE FIRE PROTECTION PLAN AREA A -BUILDING 1010C
LP110-12 LANDSCAPE PLAN -BUILDINGS 1012C AND 1012D E701-06G ELECTRICAL SCHEDULES
CU110-12 PROPOSED UTILITY PLAN - BUILDINGS 1012C AND 1012E E602-06G UNIT SUBSTATION 1006C ONELINE DIAGRAM AG202-10C WAYFINDING EXTERIOR ELEVATIONS - BUILDING 1010C
CG110-12 PROPOSED GRADING AND DRAINAGE PLAN - BUILDINGS 1012C AND 1012E E601-06G UNIT SUBSTATION 1006D ONELINE DIAGRAM AG201-10C WAYFINDING EXTERIOR ELEVATIONS - BUILDING 1010C
CS110-12 PROPOSED SITE PLAN -BUILDINGS 1012C AND 1012E EP101-06G ELECTRICAL POWER PLAN -BUILDING 1006G AG104-10C WAYFINDING SECOND FLOOR PLAN - BUILDING 1010C
V110-12 EXISTING CONDITIONS PLAN - BUILDINGS 1012C AND 1012E AG103-10C WAYFINDING SECOND FLOOR PLAN - BUILDING 1010C
MP602-06G MECHANICAL PIPING -DIAGRAM -COOLING WATER SYSTEM -1006G AG102-10C WAYFINDING FIRST FLOOR PLAN - BUILDING 1010C
G101-12C LIFE SAFETY PLAN - BUILDING 1012C MP601-06G MECHANICAL PIPING -DIAGRAM -CONDENSER WATER SYSTEM -1006G AG101-10C WAYFINDING FIRST FLOOR PLAN - BUILDING 1010C
G100-12C CODE ANALYSIS -BUILDING 1012C MP101-06G MECHANICAL PIPING -AREA PLAN -BUILDING 1006G Q104-10C SECOND FLOOR EQUIPMENT PLAN -BUILDING 1010C
1012C (KICKER POWER SUPPLY) MH101-06G MECHANICAL HVAC -AREA PLAN -BUILDING 1006G Q103-10C SECOND FLOOR EQUIPMENT PLAN -BUILDING 1010C
M101-06G MECHANICAL -OVERALL PLAN -BUILDING 1006G Q102-10C FIRST FLOOR EQUIPMENT PLAN -BUILDING 1010C
EY101-04G FIRST FLOOR SECURITY PLAN -BUILDING 1004G Q101-10C FIRST FLOOR EQUIPMENT PLAN -BUILDING 1010C
EC101-04G TELECOMMUNICATIONS FLOOR PLAN -BUILDING 1004G…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .