This document is a detailed specification for a United States Coast Guard (USCG) 45-foot Response Boat-Medium (RB-M) drydock availability for fiscal year 2026. The specification covers a comprehensive 91-calendar day repair and maintenance period from 25 June 2026 to 23 September 2026, to be conducted at Station Apra Harbor. The document outlines 31 distinct work items requiring extensive vessel maintenance, including but not limited to: drydocking, hull preservation, component inspections and renewals, water jet drive and engine servicing, non-skid pad replacement, bilge preservation, electrical isolation, sea trials support, and temporary service provisions.
Key technical requirements include preserving 100% of the underwater body, renewing sea valves and hoses, inspecting and servicing main diesel engines and reduction gears, performing ultrasonic testing, renewing anodes, and conducting marine chemist services. The specification provides granular details for each work item, referencing specific Coast Guard drawings, technical publications, and standard specifications. The total work involves meticulous preservation and repair processes across multiple vessel systems, with an emphasis on maintaining the structural integrity, operational readiness, and performance capabilities of the 45-foot Response Boat-Medium. The solicitation is issued by the Department of Homeland Security's US Coast Guard, with a government-furnished property list and extensive technical requirements for potential contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG 45762 (RB-M 45)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2026
Developed By: Tim Tolliver
(Rev-0, 10 July 2025)
USCG 45762 (RB-M-45) DRYDOCK AVAILABILITY FY2026
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform WORK ITEM 3: Hull Plating (U/W Body), Inspect WORK ITEM 4: Fendering System, Inspect WORK ITEM 5: Accessible Spaces, Inspect WORK ITEM 6: Diesel Fuel Tank, Clean and Inspect WORK ITEM 7: Mast, Inspect WORK ITEM 8: Main Diesel Engine(s) and Reduction Gear(s), Remove and Install WORK ITEM 9: Main Diesel Engine Oil Pan Gasket, Renew WORK ITEM 10: Main Diesel Engine(s) To MEPS Generator(s) And Jet Drive(s), Align WORK ITEM 11: Water Jet-Inspect, Perform Service WORK ITEM 12: Jet Drive Anodes, Renew WORK ITEM 13: Sea Strainer, Renew WORK ITEM 14: Engine Exhaust Piping, Inspect WORK ITEM 15: Electrical Isolation, Perform, MEPS WORK ITEM 16: Standard Hoses, Renew WORK ITEM 17: MDE SW Valves, Overhaul WORK ITEM 18: Sea Valves, Renew WORK ITEM 19: Diesel Tanks, Refuel WORK ITEM 20: Fender Faying Surfaces, Preserve, 100 percent WORK ITEM 21: Water Jet Drive, Preserve WORK ITEM 22: U/W Body, Preserve (100%) WORK ITEM 23: Exterior and Interior Non-Skid Pads, Renew WORK ITEM 24: Marine Chemist Services, Provide WORK ITEM 25: Drydock WORK ITEM 26: Temporary Services, Provide WORK ITEM 27: Sea Trial Performance, Support, Provide WORK ITEM 28: Lazarette Bilge, Preserve WORK ITEM 29: Interior Hull Insulation, Inspect WORK ITEM 30: Interior Hull Insulation, Renew WORK ITEM 31: HVAC System, Inspect iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan
Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan
Coast Guard Drawing 45 RB-M 084-005, Rev -, Main Diesel Engine Mounting for 45FT RB-M
Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure
Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A
Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B
Coast Guard Drawing 45 RB-M 110-083, Rev -, Hull Structure Module B - Deck
Coast Guard Drawing 45 RB-M 111-001, Rev -, Shell Plating, Module A
Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement
Coast Guard Drawing 45 RB-M 170-002, Rev B, Folding Mast
Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations
Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations
Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations
Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations
Coast Guard Drawing 45 RB-M 186-001, Rev -, Outfit and Furnishing Foundations
Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement
Coast Guard Drawing 45 RB-M 201-001, Rev B, Main Engine Arrangement
Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement
Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement
Coast Guard Drawing 45 RB-M 252-002, Rev A, Propulsion Control System
Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion
Coast Guard Drawing 45 RB-M 256-101, Rev -, Cooling System HVAC
Coast Guard Drawing 45 RB-M 259-002, Rev -, Exhaust System
Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic
Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System
Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes
Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies
Coast Guard Drawing 45 RB-M 261-100, Rev -, Fuel Fill and Vent Schematic
Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement v (Rev-0)
Coast Guard Drawing 45 RB-M 262-002, Rev -, Lube Oil FLOCS System
Coast Guard Drawing 45 RB-M 311-001, Rev -, APU System Block Schematic
Coast Guard Drawing 45 RB-M 311-004, Rev A, APU Generator Drive System
Coast Guard Drawing 45 RBM 311-004, Rev A, APU Generator Drive System
Coast Guard Drawing 45 RB-M 320-001, Rev D, DC Power Distribution System Schematic
Coast Guard Drawing 45 RB-M 321-100, Rev A, 60Hz Power Distribution System Schematic
Coast Guard Drawing 45 RB-M 321-200, Rev A, Wire Harness Arrangement
Coast Guard Drawing 45 RB-M 321-201, Rev -, Wire Way Arrangement
Coast Guard Drawing 45 RB-M 330-002, Rev B, Lighting System Schematic
Coast Guard Drawing 45 RB-M 406-001, Rev A, Grounding and Bonding Schematic
Coast Guard Drawing 45 RB-M 423-001, Rev B, Electronic Navigation System Schematic
Coast Guard Drawing 45 RB-M 439-002, Rev -, C.C.T.V. System
Coast Guard Drawing 45 RB-M 441-001, Rev F, Radio System Schematic
Coast Guard Drawing 45 RB-M 505-001, Rev A, Hose and Hose Assemblies
Coast Guard Drawing 45 RB-M 511-002, Rev -, Compartment Heating Arrangement
Coast Guard Drawing 45 RB-M 514-001, Rev -, HVAC System Schematic
Coast Guard Drawing 45 RB-M 514-003, Rev -, Air Conditioning Units, Self-Contained
Coast Guard Drawing 45 RB-M 555-100, Rev -, Fire Extinguishing System, Dry Chemical
Coast Guard Drawing 45 RB-M 601-001, Rev D, General Arrangement
Coast Guard Drawing 45 RB-M 622-002, Rev -, Machinery Space Removable Deck Plate
Coast Guard Drawing 45 RB-M 631-001, Rev A, Painting Layout
Coast Guard Drawing 45 RB-M 633-002, Rev -, Cathodic Protection Sacrificial Anode
Coast Guard Drawing 45 RB-M 634-002, Rev -, Deck Covering
Coast Guard Drawing 45 RB-M 635-002, Rev C, Insulation Details
Coast Guard Drawing FL-85-002, Rev C, GFE Boat Hot Work Diagrams
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 4698, SWBS 241, Dec 2013, Marine Transmission Manual
Coast Guard Technical Publication (TP) 4993, SWBS 634, Oct 2011, Nonskid Pads, Peel and Stick Catalog
Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex Strainer - Model RBM-203976
Coast Guard Technical Publication (TP) 5727, SWBS 233, May 2014, Main Diesel Engine (MDE) – Series 60- General Overhaul
Coast Guard Technical Publication (TP) 5737, SWBS 247, Jun 2014, Water Jet – Model FF375S
Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements vi (Rev-0)
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary Services
OTHER REFERENCES
1), 2015, Solvent Cleaning
2), 2004, Mechanical Tool Cleaning
45 RB-M Water Jet Disassembly / Assembly Procedures
American Boat and Yacht Council (ABYC), E-11, AC and DC Electrical Systems on Boats, 2012
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) D4138, Rev A, 2007 (R 2017), Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2019, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49
Standard Practice for Commercial Packaging, ASTM D-3951, Rev-18, Mar 2018.
vii (Rev-0)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 2 (SSPC-SP
The Society for Protective Coatings (SSPC), 2015 (E 2017), Paint Application Specification No. 2 (PA- 2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning viii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 N Hinge Assembly, Marine
Structure NSN: 2040016597188 or PN:
0461-2178 8 ea. 170.91
6 N Gasket (Manhole Cover) NSN: 5330-01-134-1986 PN:
3560BN
4 ea. 16.98
8 N Isolator, Engine Mount NSN: 2990016309011 or PN:
23525490
8 ea. 342.09
8 N Filter Element, Fluid NSN: 4330015403412 or PN:
01030
4 ea. 30.64
8 N Filter Element, Fluid NSN: 2910010228183 or PN:
23530707
2 ea. 11.34
9 N Gasket NSN: 5330-01-481-6087 or
PN: 23522279
2 ea. 36.84
11 N Stainless Steel Ball Joint NSN: 3040016152117 or PN:
59915K483
10 ea. 12.26
11 N Stainless Steel Threaded Rod
NSN: 5306016152224 or PN:
93250A140
1 ea. 10.67
11 N Bearing Bushing NSN: 3120014555212 or PN:
10106911
4 ea. 9.80
11 N Bearing Bushing NSN: 3120580006242 or PN:
36M05101
4 ea. 49.00
11 N **Socket Head Screw NSN: 5305016171580 or PN:
91210050
16 ea. 2.71
11 N **Bolt Kit NSN: 2815016171688 or PN:
93112085A
2 ea. 15.64
11 N **Key NSN: 5315016166360 or PN:
10100824
3 ea. 28.14
11 N Seal NSN: 5330580006238 or PN:
10118902
2 ea. 4.35
11 N Bushing NSN: 3120580006239 or PN:
10105511
2 ea. 48.19
11 N Bearing Bushing NSN: 3120014555272 or PN:
10105111
4 ea. 35.33
11 N **Bolt Kit NSN: 2815016171974 or PN:
93112080F
2 ea. 6.13
11 N **Bolt Kit NSN: 5340016167191 or PN:
93112065K
12 ea. 13.07
11 N Bearing Unit NSN: 3110016166342 or PN:
37506201
2 ea. 614.35
11 N Bushing NSN: 3120580006240 or PN:
10106011
4 ea. 47.21
11 N **Set Screw NSN: 5305016020672 or PN:
91608012
6 ea. 0.58 ix (Rev-0)
11 N **Bolt Kit NSN: 5305016173161 or PN:
93112090K
10 ea. 12.56
11 N O-ring NSN: 5331580006241 or PN:
10202606
6 ea. 14.56
11 N **Mechanical Sealing NSN: 4320580006403 or PN:
10203870
2 ea. 1052.97
11 N Bolt Kit NSN: 5306016164058 or PN:
93310030E
6 ea. 1.92
11 N O-ring NSN: 5331016020679 or PN:
10202631
2 ea. 4.39
11 N O-ring NSN: 5331016020680 or PN:
10202625
4 ea. 15.15
11 N Sealing NSN: 5365016233174 or PN:
41018801
2 ea. 8.87
11 N O-ring NSN: 5331016200368 or PN:
10202611
2 ea. 5.21
11 N Seal Lip NSN: 4730016204613 or PN:
10202590
4 ea. 39.47
11 N Sealing NSN: 5330016163186 or PN:
45002010
2 ea. 535.93
11 N **Lock Nut NSN: 5310016162982 or PN:
10202908
2 ea. 16.63
11 N Lock Washer NSN: 5310016232756 or PN:
10203008
2 ea. 2.34
11 N **Ring Nut NSN: 5310016164016 or PN:
10202912
2 ea. 32.60
11 N Seal NSN: 5330016243735 or PN:
10202540R
6 ea. 19.68
11 N **Screw NSN: 5305016162955 or PN:
93305025
8 ea. 0.28
11 N **Washer NSN: 5310016162966 or PN:
912505
8 ea. 0.06
11 N Gasket NSN: 5330016232867 or PN:
37527805
2 ea. 63.43
11 N Bushing NSN: 5365016202680 or PN:
10108416
8 ea. 15.91
11 N **Bolt Kit NSN: 5305016242899 or PN:
93110060A
4 ea. 12.91
11 N **Bolt Kit NSN: 5305016242922 or PN:
99110040G
14 ea. 6.60
11 N Bushing NSN: 3120014555268 or PN:
10106902
8 ea. 7.90
11 N Gasket NSN: 5330016163014 or PN:
10108901
2 ea. 5.65
11 N **Bolt Kit NSN: 5305016231019 or PN:
93110090A
4 ea. 5.05
11 N Lock Washer NSN: 5310016232699 or PN:
10203012
2 ea. 5.62
11 N O-ring NSN: 5331016242120 or PN: 2 ea. 3.89 x (Rev-0)
10202603 11 N **Screw, Countersunk NSN: 5305016309734 or PN:
99106016 8 ea. 5.65
11 N Seal/Gasket NSN: 1040016337691 or PN:
45011611
2 ea. 57.64
11 N Woodruff Key NSN: 5315016172999 or PN:
10100823
2 ea. 19.09
11 N Washer, Sealing NSN: 5310016452084 or PN:
8755000050
24 ea. 0.06
11 N Screw, Connection NSN: 5305016476396 or PN:
91212045L
8 ea. 6.45
11 N Cylinder, Hydraulic NSN: 2010015904296 or PN:
10121038
2 ea. 2126.60
11 N Shaft, Steering Port NSN: 3010016147047 or PN:
37505816
1 ea. 817.88
11 N Shaft, Steering NSN: 3010015904327 or PN:
37505817
1 ea. 813.34
11 N Cylinder, Hydraulic NSN: 2010015904260 or PN:
10121080
2 ea. 4872.34
12 N Anode, Inspection Hatch (Port & Stbd)
NSN: 5342580003759 or PN:
10108231
2 ea. 46.63
12 N Transom Anode NSN: 5342016020658 or PN:
10108230
4 ea. 52.76
12 N Tunnel Anode NSN: 5342016020668 or PN:
10108220
4 ea. 26.88
12 N Impeller Housing/Bucket/Interceptor
Anode
NSN: 5342226078672 or PN:
10107701
10 ea. 24.94
12 N Guide Vane Chamber Anode
NSN: 5342016020669 or PN:
37517411
2 ea. 44.43
12 N Anode, Anode Hatch NSN: 5342251465439 or PN:
10108210
2 ea. 28.20
12 N Screw Connection NSN: 5305016022100 or PN:
93310025H
4 ea. 2.52
12 N Screw Connection NSN: 5305016275854 or PN:
93308025H
14 ea. 1.30
12 N Screw Connection NSN:5305016022105 or PN:
91206020E
8 ea. 0.49
12 N Screw Connection NSN: 5340016243271 or PN:
93308025E
8 ea. 1.00
12 N O-ring NSN: 5331016020670 or PN:
10202639
2 ea. 6.60
12 N Screw Connection NSN: 5305016240905 or PN:
93310016E
8 ea. 1.58
12 N Screw Connection NSN: 5306016309800 or PN:
93312030E
2 ea. 2.42
12 N Screw Connection NSN: 5305016204602 or PN:
91212025E
8 ea. 1.93
12 N O-ring NSN: 5331226078691 or PN: 2 ea. 9.26 xi (Rev-0)
10202626 12 N Tube Extension NSN: 4730016210708 or PN:
37610802 2 ea. 148.88
12 N Tube Clamp NSN: 4730016200951 or PN:
10217881
2 ea. 20.05
12 N Screw Connection NSN: 5305016022101 or PN:
93310030H
2 ea. 2.08
12 N Connecting Cable NSN: 6145016203663 or PN:
10234301
4 ea. 21.23
12 N Screw Connection NSN: 5305016176732 or PN:
93306016E
8 ea. 0.44
12 N Anode, Corrosion NSN: 5340015899440 or PN:
51125
2 ea. 32.56
12 N Anode, Corrosion NSN: 5340015899425 or PN:
89287
2 ea. 12.34
13 Y *Strainer, Sediment - (Miller Leaman Strainer
3.0 Raw Water Duplex)
NSN:4730-01-599-8545 PN:
ML20750
2 ea. 29,662.70
13 N *Coupling, Flexible NSN:4730-01-645-9479 PN:
PS00617-S
4 ea. 113.76
14 N Mount, Vibration Isolator NSN: 5340-01-645-0607 or
PN: RB1-200
4 ea. 6.00
14 N Mount, Vibration Snubbing Washer
NSN: 5310-01-626-2423 or
PN: 148099-1
4 ea. .90
14 N Gasket (Exhaust Flange Outlet)
NSN: 5330-01-303-5437 or
PN: 23501147
2 ea. 9.61
16 N Parts Kit, Hose Assembly NSN: 4720-01-679-1782 1 ea. $16,071.00 18 N Raw Water Sys De-Icing
Valve, Ball, 1-inch NPT
316 SS
NSN: 4820-01-600-0385 or
PN: V210FP-16
2 ea. 34.92
18 N AC Supply/Discharge Ball Valve, Ball 3/4-inch NPT
316 SS
NSN: 4820-01-600-0389 or
PN: V210FP-12
3 ea. 26.44
18 N AC Overboard Check Valve High-Flow SS
Check Valve 3/4-inch NPT Female
NSN: 4820-01-599-7249 or
PN: 46635K65
1 ea. 60.83
20 N Marker Set, Identification NSN: 7690-01-665-8162 1 ea. $181.73 23 N Non-Skid 45 FT RBM
Whole Kit Contents of kit include box 1 through box
8. (Round and square hatches not included)
NSN: 7220-01-615-5012 1 ea. 5,295.43
23 N Non-Skid 45 FT RBM - Round and Square Hatches
- (Not included in main kit)
NSN: 2040-01-633-4911 1 ea. 123.94
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
2 Ultrasonic Testing (UT) (100) Shots, Perform
4 Fendering System, Inspect
5 Accessible Spaces, Inspect
10 Main Diesel Engine(s) To MEPS Generator(s) And Jet Drive(s), Align
11 Water Jet-Inspect, Perform Service
14 Engine Exhaust Piping, Inspect
20 Fender Faying Surfaces, Preserve, 100 percent
21 Water Jet Drive, Preserve
22 U/W Body, Preserve (100%)
28 Lazarette Bilge, Preserve
31 HVAC System, Inspect xiii (Rev-0)
PRINCIPAL CHARACTERISTICS
45' RB-M
PHYSICAL
Length overall 44 feet, 10.5 inches Unfixed height 20 feet 9 inches Beam, maximum 14 feet, 7.75 inches Full load draft 3 feet, 4 inches Full load displacement 36,500 pounds Max sustained speed 42.5 knots Range 250 nautical miles at 30 knots Mission limits 8 foot seas / 30 knot winds Survivability limits 12 foot seas / 50 knot winds
HULL
Hull manufacturer Marinette Marine Corp.
5086 (GRADE) Aluminum Hin- 2009
MACHINERY
Type 6, cylinder diesel engine Number of units 2, MTU's 60 series 825 hp Propulsion type 2, Rolls-royce water-jet
TANKS
1 (Rev-0)
00000_0824_FLT
REC_00000_FLT_Boats @ Commercial Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must
3 (Rev-0) be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
4 (Rev-0)
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.6.1 Coast Guard turn-over preparation. The Contractor must be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew must be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:
3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.
3.6.1.2 The Contractor may commence/continue work during these time frames.
<<APM Note: Paragraph 3.6.1.3 pertains to 47’ MLB only. For all other SBPL assets delete this paragraph.>>
3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.
3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.
3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
5 (Rev-0)
3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
8 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading (mils)
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Rev-0)
4.2 Tank and Void Assessment form.
13 (Rev-0)
14 (Rev-0)
07400_AKP_0225_BOAT_FLT
WORK ITEM 1: General Welding, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide general welding as identified in Table 1 (Welding).
TABLE 1 – WELDING
ITEM DESCRIPTION LOCATION APPROXIMATE
SQFT.
PHOTO I.D.
(BELOW IN
NOTES)
Perform Clad Welding Pilothouse Deck at COR’s Discretion 25 Square Inches N/A
Perform Clad Welding Pilothouse Antenna Mounts 42 Square Inches N/A
Perform Clad Welding Underneath P/S Strainers in the Bilge 16 Square Feet N/A
Perform Clad Welding P/S Bulkhead Exhaust Tubes in the E/R 30 Square Inches N/A
Repair Cracked Railing Aft Swim Platform Taft Rail 25 Square Inches Photos #1 & #2
Perform Clad Welding Lazarette Bilge (Centerline) 10 Square Feet N/A
Perform Clad Welding Auxiliary Space Bilge 5 Square Inches N/A
Perform Clad Welding Survivor’s Compartment Bilge 10 Square Inches N/A
Crop and Renew Hinges Engineroom Hatch Hinges 08 Each in Total Photos #3 & #4
Detail and Clean Threads Main Diesel Engine Mounts 08 in Total Photos #5 & #6
Perform Clad Welding Mast, Actuator, and Elec. Connections N/A N/A
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED COST
($/UNIT)
N Hinge Assembly, Marine Structure NSN: 2040016597188 or
PN: 0461-2178
8 ea. 170.91
15 (Rev-0)
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing FL-85-002, Rev C, GFE Boat Hot Work Diagrams
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
None.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirement. The Contractor shall provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with Coast Guard Drawing FL-85-002 and SFLC Std Spec 0740.
3.3 Bidding. The Contractor shall ensure for bidding purposes this specification will be broke down by the following:
One linear foot of welding/brazing.
Four square inches of clad/overlay welding.
One hour of fabrication.
One square foot of plate renewal.
16 (Rev-0)
TABLE 2 – PLATE TYPE
STEEL PLATE ALUMINUM PLATE
THICKNESS WEIGHT
PER SQFT.
TYPE/GRADE THICKNESS WEIGHT
PER SQFT
TYPE/ALLOY
3/16 (.1875) 7.66 lb 1/4 (.250) 10.21 lb 1/4 (.250) 3.53 lb 5/16 (.3125) 12.76 lb 5/16 (.3125) 4.41 lb 3/8 (.375) 15.31 lb 3/8 (.375) 5.29 lb 1/2 (.500) 20.42 lb 1/2 (.500) 7.06 lb
3.4 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
This section is not applicable to this work item.
Photo #1:
Photo #2:
17 (Rev-0)
Photo #3:
Photo #4:
18 (Rev-0)
Photo #5:
Photo #6:
19 (Rev-0)
10000_AKP_0423_45RBM
WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
3.3 Reporting
3.1.2 Tech Rep.
None.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
20 (Rev-0)
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 UT measurement. The Contractor must perform a total of 100 UT measurements in accordance with SFLC Std Spec 0000 and SFLC Std Spec 0740.
3.2.1 Standard measurements. The Contractor must take 70 standard thickness measurements for the designated locations numbered 1 thru 70 between the boot top and keel, (Refer to Figure 1 and Figure 2).
3.2.1.1 The Contractor must record each measured metal thickness in the Standard Underwater (U/W) Body Test Results Report, (Refer to Table 1 and Table 2).
3.2.1.2 The Contractor must calculate each percent loss.
3.2.1.3 The Contractor must record each percent loss in the Standard U/W Body Test Results Report.
3.2.2 Additional measurements. The Contractor must take 30 additional thickness measurements at locations designated by the Coast Guard inspector and numbered 1A through 30A between the boot top and keel, (Refer to Figure 1 and Figure 2).
3.2.2.1 The Contractor must record each measured metal thickness in the Additional U/W Body Test Results Report, (Refer to Table 3).
3.2.2.2 The Contractor must calculate each percent loss.
3.2.2.3 The Contractor must record each percent loss in the Additional U/W Body Test Results Report.
3.2.3 Minimum thickness. The Contractor must record the minimum thickness found for each designated hull section. (A, B, and C) in the Underwater Hull Body Minimum Thickness Test Results Report, (Refer to Table 4).
3.3 Reporting. The Contractor must submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.
4. NOTES
4.1 Coast Guard Personnel. The Coast Guard inspector will witness all readings.
21 (Rev-0)
FIGURE 1. BOTTOM SHELL PLATING EXPANDED
22 (Rev-0)
FIGURE 2. STERN SECTION SHELL PLATING
TABLE 1 - STANDARD U/W BODY TEST RESULTS REPORT
DATE: ____________________________
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)
23 (Rev-0)
24 (Rev-0)
TABLE 2 - STANDARD U/W BODY TEST RESULTS REPORT (STERN)
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)
LOCATION
AREA
DESIGN
THICKNESS
MINIMUM
ALLOWABLE THICKNESS
UT
READINGS
*PERCENT LOSS
STERN SECTION “C”
61 .250 .187 62 .250 .187 63 .250 .187
STERN SECTION “B”
64 .250 .187 65 .250 .187 66 .250 .187 67 .250 .187
STERN SECTION “A”
68 .250 .187 69 .250 .187 70 .250 .187
25 (Rev-0)
TABLE 3 - ADDITIONAL U/W BODY TEST RESULTS REPORT
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)
LOCATION AREA DESIGN
THICKNESS
MINIMUM
ALLOWED
THICKNESS
UT READING *PERCENT LOSS
PORT SIDE AREAS “A, B, C”
1A .250 .187 2A .250 .187 3A .250 .187 4A .250 .187 5A .250 .187 6A .250 .187 7A .250 .187 8A .250 .187 9A .250 .187
10A .250 .187 11A .250 .187 12A .250 .187
STARBOARD SIDE AREAS “A, B, C”
13A .250 .187 14A .250 .187 15A .250 .187 16A .250 .187 17A .250 .187 19A .250 .187 20A .250 .187 21A .250 .187 22A .250 .187 23A .250 .187 24A .250 .187
STERN AREAS “A, B, C”
25A .250 .187 26A .250 .187 27A .250 .187 28A .250 .187 29A .250 .187 30A .250 .187
26 (Rev-0)
TABLE 4 - UNDERWATER HULL BODY MINIMUM THICKNESS TEST RESULTS REPORT
DATE: ______________________
LOCATIONS MIN. THICKNESS FOUND DESIGN
THICKNESS
MINIMUM
ALLOWED
THICKNESS
AT 25%
LOSS
MINIMUM
ALLOWED
THICKNESS
AT 50%
LOSS
(A) (B) (C)
Port Hull: Boot Top to Keel
.250 .187 .125
STBD Hull: Boot Top to Keel
Stern Hull: Boot Top to Keel
Comments:
27 (Rev-0)
11000_AKP_0423_45RBM
WORK ITEM 3: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan
Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure
Coast Guard Drawing 45 RB-M 631-001, Rev A, Painting Layout
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D4138, Rev A, 2007 (R 2017), Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
The Society for Protective Coatings…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .