442367-event.pdf
PDF 237 KB Posted
- Attached to
- DFCM Construction-Snow College Ephraim Physical Plant Bldg Roof and RTU Replacement-18029700
- Solicitation number
- MW18049
- Issued by
- Sevier County, Utah
About this file
This is an Invitation for Bid (IFB) issued by the Utah Division of Facilities Construction and Management (DFCM) for a roof and rooftop unit (RTU) replacement project at Snow College's Physical Plant Building in Ephraim, Utah. The project involves comprehensive roof renovation, including removal and replacement of existing sprayed foam insulation, associated flashing systems, metal edge flashing, new perimeter roof curbs, rigid roof insulation, single-ply membrane roofing (approximately 13,867 square feet), roof drain replacements, equipment curb replacements, installation of a new roof hatch, seismic structural roof system upgrades, and pedestrian safety barriers. The bid is open from 12/15/2017 to 1/11/2018, with a construction cost estimate of $375,000.00, and is only available to pre-qualified general contractors who completed Stage I of the Request for Solicitation (RFS) process.
The bid is structured as a lump sum (LS) base bid and requires several prerequisite submissions, including a subcontractor list, liquidated damages documentation, completion date information, mandatory pre-bid meeting attendance, pricing details, and a bid bond. Potential bidders must provide specific information such as business organization type, contractor's license number, firm's legal name and address, and a point of contact. Attached documents include a solicitation, project schedule, limited asbestos inspection report, plans, specifications, mandatory meeting attendee list, an addendum, and bid bond requirements. The project is categorized under commodity code 72120 for nonresidential building construction services, specifically covering commercial building renovation and repair.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Construction-Snow College Ephraim Physical Plant Bldg Roof and RTU Replacement-18029700 DFCM Construction-Snow College Ephraim Physical Plant Bldg Roof and RTU Replacement-18029700-Prequalified General Contractors
Open 12/15/2017 3:00 PM MST Type Invitation for Bid
Close 1/11/2018 3:00 PM MST Number MW18049 Currency US Dollar
Sealed Until 1/11/2018 3:00 PM MST
Contacts
Randy Mellor rmellor@utah.gov
Commodity Codes
Commodity Code Description
72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services
99901 DFCM Division Facilities and Construction and Managment
Description
18 January 201818 January 2018 mailto:rmellor@utah.gov mailto:rmellor@utah.gov mailto:rmellor@utah.gov
INVITATION TO BID
ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS
PROJECT
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project:
ROOF AND RTU REPLACEMENT - PHYSICAL PLANT BUILDING
SNOW COLLEGE - EPHRAIM, UTAH
DFCM Project No. 18029700
Project Description: Removal/replacement of existing sprayed foam insulation over built-up roofing system in its entirety, associated flashing systems, and metal edge flashing systems; new perimeter roof curbs for installation of new edge flashing and fascia; new rigid roof insulation with cover board and single-ply membrane roofing system approximately 13,867 square feet (Contractor to field verify total area of work); removal/ replacement of existing roof drain strainer baskets in addition to new overflow drains;
replacement of existing rooftop equipment curbs and new equipment curbs; new roof hatch, including mechanical roof tops and exhaust fans as defined by the contract documents; seismic upgrade to the existing structural roof system as defined by the contract documents; and pedestrian safety barriers and fencing as defined by the contract documents.
Construction Cost Estimate: $375,000.00
Required to View Event
Prerequisites Required to Enter Bid
1. Subcontractor's List Due
2. Liquidated Damages
3. Completion Date
4. Mandatory Pre-bid Meeting
5. Pricing
6. Bid Bond
Buyer Attachments
1. Solicitation
2. Project Schedule
3. Limited Asbestos Inspection
4. Plans
5. Specifications
6. Mandatory Meeting Attendees
7. DFCM Addendum 1
8. Bid Bond
Questions Required Questions
1.1. # of DFCM Addendums
1.2. Business Organization Type
1.3. Contractor's License #
1.4. Firms legal name and address
1.5. Contractor Point of Contact-name, phone number and email.
18 January 201818 January 2018 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598564173Solicitation.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=MUUS5mffDGzlHmrCf1%2BNS%2BzZFk4%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598564173Solicitation.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=MUUS5mffDGzlHmrCf1%2BNS%2BzZFk4%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598564456Project%20Schedule.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=Tcnfq8ATIGe9s3B0FE8qE3J4FIU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598564456Project%20Schedule.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=Tcnfq8ATIGe9s3B0FE8qE3J4FIU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598564235Limited%20Asbestos%20Inspection.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=cGFI66%2F1CM6QW4IYfYU218iZi7w%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598564235Limited%20Asbestos%20Inspection.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=cGFI66%2F1CM6QW4IYfYU218iZi7w%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598565064Plans.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=gPZoBn8A1z5UeMAaW4lGWDA1Jwk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598565064Plans.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=gPZoBn8A1z5UeMAaW4lGWDA1Jwk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598565077Specifications.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=rCH%2FpdjotsJvCPlwZRZ8em72d34%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-598565077Specifications.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=rCH%2FpdjotsJvCPlwZRZ8em72d34%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-600419428Mandatory%20Meeting%20Attendees.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=2GY8xNxXroH2gWlZq4Hnu32PsQI%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-600419428Mandatory%20Meeting%20Attendees.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=2GY8xNxXroH2gWlZq4Hnu32PsQI%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-603276510DFCM%20Addendum%201.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=4AwByYHYx0iKFzNaNqL%2FTDX%2BWtM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-603276510DFCM%20Addendum%201.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=4AwByYHYx0iKFzNaNqL%2FTDX%2BWtM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-413303269Bid%20Bond.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=V9FVJEsBa2NB0wTdkF4ALU2y434%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/442367-413303269Bid%20Bond.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1579367487&Signature=V9FVJEsBa2NB0wTdkF4ALU2y434%3D
Product Line Items Product Line Items
There are no Items added to this event.
Service Line Items Service Line Items
# Item Name, Commodity Code, Description Allow Alternates Qty. UOM Requested Service Delivery
S1 Base Bid 1 LS - Lump Sum
Base Bid: Removal/replacement of existing sprayed foam insulation over built-up roofing system in its entirety, associated flashing systems, and metal edge flashing systems; new perimeter roof curbs for installation of new edge flashing and fascia; new rigid roof insulation with cover board and single-ply membrane roofing system approximately 13,867 square feet (Contractor to field verify total area of work); removal/ replacement of existing roof drain strainer baskets in addition to new overflow drains; replacement of existing rooftop equipment curbs and new equipment curbs; new roof hatch, including mechanical roof tops and exhaust fans as defined by the contract documents; seismic upgrade to the existing structural roof system as defined by the contract documents; and pedestrian safety barriers and fencing as defined by the contract documents.
18 January 201818 January 2018
File details come from the government source that posted it. Updated .