This solicitation requests quotes for the procurement of beryllium vacuum windows for the Brookhaven Linac Isotope Producer at Brookhaven National Laboratory. Quotes are due by November 6, 2023 and award is expected to be made by November 30, 2023. The contractor shall design, manufacture, test, and deliver the windows in accordance with the statement of work, which specifies requirements for the beryllium material, leak rate, outgassing, welding, cleaning, and acceptance testing. Pricing shall be quoted FOB destination, with payment terms of net 30 days. Qualifiers for the offeror include ISO certifications, experience manufacturing similar products, reliable beryllium supply, and capability to perform machining and welding of beryllium and aluminum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.1b_Enclosure_1_DRAFT_FFP_431610_Amend_2.docx | DOCX document | |
| Questions_and_Answers_10.30.23.pdf | ||
| B.1c1_d25-m-4190.pdf | ||
| B.1c_Attach_1-SOW_7.14.23.pdf | ||
| B.1c2_spec_cad1119.pdf | ||
| B.1b_Enclosure_1_DRAFT_FFP_431610.docx | DOCX document | |
| B.1d_Attach_2-Design.pdf | ||
| B.1e_Attach_3-QA-101_10.12.23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brookhaven National Laboratory Number: D25-M-4235sow Brookhaven Science Associates Date: 07/14/2023
Collider Accelerator Department Revision: B
STATEMENT OF WORK
for the
Beryllium Dome Window Assembly for BLIP
Prepared by
Sumanta Nayak
08/31/2023
Approved by
Sumanta Nayak, M.E., Vacuum Group C-AD
Dan Weiss
Date
9/20/2023
Dan Weiss, M.E., Vacuum Group Leader C-AD
Joseph Tuozzolo
Joseph Tuozzolo, Chief M.E C-AD
Raymond Fliller
Ray Fliller, ESSHQ Division C-AD Date
David Passarello
David Passarello, QA Assurance C-AD
Working
ELEC APPVL IN
W
INDCHILL
This page intentionally left blank, to accommodate back-to-back printing.
CONTENTS
Contents
1 SCOPE
1.1 Background
1.2 Definitions/Acronyms
2 APPLICABLE DOCUMENTS
3 REQUIREMENTS
3.1 Contractor Responsibilities
3.2.1 Window Material: Beryllium PF-60 or equivalent
3.2.2 Performance Requirements
3.2.3 Detailed Design Requirements
3.2.4 Manufacturing Requirements
3.2.5 Acceptance Test Procedures (ATP)
3.3 Qualifiers
3.4 Management
3.4.1 Program Plan
3.4.2 Progress Communications
3.4.3 Manufacturing/Inspection/Test Plan
3.4.4 Performance Reporting
3.4.5 “Witness” Points
3.5 Design Reviews
3.5.1 Preliminary Design Review Meeting
3.5.2 Final Design Review Meeting
3.6 Documentation and Data Management
3.6.1 Report/Documentation Format
3.6.2 Engineering Drawing Practices
3.6.3 End Item Documentation Package
3.6.4 Records
3.7 Environment, Safety and Health (ESH)
3.8 Marking and Serialization
3.9 Packaging
4 QUALITY ASSURANCE
Working
ELEC APPVL IN
4.1 Quality System and Facility Access
5 DELIVERABLES
6 SCHEDULE
7 VALUE ENGINEERING
1 SCOPE
This Statement of Work (SOW) will be the basis for the procurement of the Beryllium Hemispherical Dome Window Assembly to be used at the Brookhaven Linac Isotope Producer (BLIP) at Brookhaven National Laboratory (BNL) managed by Brookhaven Science Associates (BSA). This document outlines the Contractor’s responsibilities and obligations necessary for completing the requirements as set forth herein.
1.1 Background
To separate the high vacuum upstream side from low vacuum downstream end of the BLIP, a Beryllium (Be) vacuum window is being used. Because of its low mass density, Be is the best choice material for the high flux proton beam used to irradiate materials in BLIP. BLIP has been using Be windows to reduce beam loss for more than two decades. The Be window is attached to an Aluminum housing, with flanges at both ends, through electron-beam welding. Since these windows are used in a high radiation beamline, their reliability is critical to operations and to keep radiation dose received by staff low.
1.2 Definitions/Acronyms
ASME American Society of Mechanical
Engineers ASTM American Society for Testing and
Materials ATP Acceptance Test Procedure
FDR Final Design Review PDR Preliminary Design Review UHV Ultra High Vacuum
2 APPLICABLE DOCUMENTS
In the event of a conflict between the Technical Documentation and the SOW, the Contractor shall immediately notify the BSA Contractual Representative who shall in each instance determine which document takes precedence and advise the Contractor accordingly. Failure to notify BSA of a document conflict shall not relieve the Contractor’s responsibility to ensure full compliance to all requirements.
The following documents are an integral part of the SOW; the applicable revision level will be the latest that is in effect at the time of award:
Document Number Document Title
D25-M-4190-RevA BLIP Beryllium Hemispherical Dome Window Assembly
SPEC_CAD1119 Specification for fabrication and cleaning of CAD chamber assemblies and vacuum components
ASTM D3951 Standard Practice for Commercial Packaging
ASTM A700 Standard practices for Packaging, Marking, and Loading Methods for Steel Products for Shipment
Working
ELEC APPVL IN
3 REQUIREMENTS
In accordance with the applicable specifications, referenced documents, and instructions as defined in this SOW, the Contractor shall be responsible for providing the window assembly as defined below.
3.1 Contractor Responsibilities
In accordance with this SOW and all referenced documents, the Contractor shall furnish all equipment, chemicals, materials, tools, jigs/fixtures, test equipment, facilities, and labor to perform the work necessary to design, manufacture, clean, coat, inspect and test, and ship the assembly as required in this SOW and the referenced technical drawings and specifications.
The Contractor shall have an effective storage and age control system for items (such as epoxy) where acceptability is limited by the age or manner of storage of the item.
3.2 Design and Manufacturing Requirements
3.2.1 Window Material: Beryllium PF-60 or equivalent
As stated in the drawing D25-M-4190, the window shall be made from Beryllium PF-60 or equivalent grade. The equivalent grade shall have very similar material composition, physical, thermal, and mechanical properties. It shall also exhibit excellent mechanical properties with temperature up to 500 0C. BSA reserves the right to examine the equivalent grade proposed by the contractor and ask the contractor to provide information on its manufacturing details and above-mentioned properties.
3.2.2 Performance Requirements
3.2.2.1 Leak Rate
Leak tight is hereby defined as an allowable leak rate of
Working
ELEC APPVL IN
3.2.2.3 Outgassing
The outgassing rate of the Beryllium window assembly shall not exceed 1 x 10-10 Torr Liters/sec cm2 after pumping for 100 hours. Conventional all-metal ultra-high vacuum (UHV) practices shall be used in making the window assembly.
The Beryllium window assembly shall exhibit no traces of HCL, oils or other contaminants with atomic mass of 35 or greater than 40 amu with the exception of 44 when tested using a residual gas analyzer with a minimum detectable partial pressure of 1x10-11 torr N2. The predominate gas component shall be hydrogen and be at least 60% of the total pressure after being pumped for 100 hours. The sum of partial pressures of atomic mass 35 and 40 thru 100 excluding atomic mass 44, shall be less than 1% of the total pressure of the system.
3.2.3 Detailed Design Requirements
3.2.3.1 Preliminary Design
The Contractor shall be responsible for providing a preliminary detailed fabrication drawing based on the referenced design document (D25-M-4190-RevA) provided by BSA. The detailed drawing shall show the material specification, weld joint location and details, dimensions and tolerances, bakeable temperature and maximum leak rate.
3.2.3.2 Final Design
The Contractor shall be responsible for providing a final detailed fabrication drawing that reflects the state of the developed design as it evolved from the preliminary drawing. The Contractor shall be responsible for developing the overall design of any equipment in accordance with the supporting documents as identified herein.
3.2.3.3 Approval to Proceed
BSA must approve in writing the FDR Report, including any modifications introduced at the Final Design Review, before the Contractor proceeds with ordering of material and components.
Ordering of long-lead-time materials and components prior to the approval of the FDR Report must be reviewed and approved in writing by BSA. BSA might ask for weld test coupons of the welds to be performed. The BSA Technical Representative might review and approve the weld test coupons in writing before any welding is performed.
3.2.4 Manufacturing Requirements
3.2.4.1 Machining Beryllium
Machining and/or forming of Be components, if necessary, shall be followed by chemical etch performed to best practices to remove surface microcracks.
3.2.4.2 Machining Lubricants
Acceptable lubricants include C/M Cool, Kool Mist No. 77, Mobil Cut-Max, and Missile Lube No. 5. Other types of aqueous base lubricants may only be used with written approval of the BSA Technical Representative. Silicon or sulfur based machining lubricants shall not be used when machining any components unless approved in writing by BSA. If sulfur based lubricants are used, the contractor shall clean to meet UHV level cleanliness requirements specified herein.
Working
ELEC APPVL IN
3.2.4.3 Welding Joints
All the joints shall be welded by electron beam (EB). The weld bead must not protrude into the
ID.
3.2.4.4 Cleaning Procedure
Cleaning procedures prior to EB welding shall be determined by the Contractor. All these procedures shall be compatible with standard UHV practice.
3.2.4.5 Clean Assembly Procedures
After cleaning, all components shall be handled in accordance with their intended use in an UHV system. They shall be kept free of contamination due to handling and contact with dirt or oil. Any parts that have been contaminated prior to welding shall be cleaned again.
The following guidelines shall be followed to keep the window assembly free from contamination:
1. Welding, inspection, and packaging of the window assembly shall take place in a dedicated clean area.
2. The component parts and assembly shall be kept in clean plastic bags unless they are being inspected or used for fabrication.
3. Clean parts shall only be handled with clean white nylon, powder free latex, or lint free cotton gloves. Clean lab coats and separate elastic-cuffed sleeves shall be worn to prevent contact of the workers’ arms and/or bodies with the clean parts.
4. All tools and inspection gauges which come in contact with the clean component parts shall be cleaned prior to use. When not in use, tools shall be covered and stored to maintain cleanliness. Tools shall not be made of material which can contaminate the clean parts.
5. Work bench surfaces shall be thoroughly cleaned with detergent, rinsed with water, and then wiped with alcohol. The surface shall be hard and non-absorbent (stainless steel, formica etc.).
Wood bench tops or similar materials are not acceptable.
3.2.4.6 Cleanliness
The completed assembly shall be clean and require no further cleaning at BNL. No traces of hydrocarbons, organic or inorganic residues from the fabrication or handling shall be present.
Both the internal and external surfaces of the assembly shall be free of Be dust. Surface contamination by Beryllium dust shall not exceed 0.2µg/100cm2. Each piece shall be tested and documented for surface contamination by the Contractor.
3.2.5 Acceptance Test Procedures (ATP)
The Contractor shall provide an ATP that is in accordance with this SOW and all referenced documents noted herein. The ATP must be approved in writing by the BSA Technical Representative prior to use. The ATP shall ensure that the following test requirements as defined below are achieved.
3.2.5.1 Factory Acceptance Testing
The following tests shall be carried out by the Contractor:
1. Dimensional Inspection: Dimensions of the window assembly shall be measured for conformance to the FDR Report. The window thickness must be measure at multiple locations and reported. The Contractor shall produce an inspection report confirming the dimensions and tolerances as per the FDR report. The Contractor shall provide detailed information concerning inspection procedures and equipment to the BSA Technical Representative for written approval.
2. Leak Test: The Contractor shall perform a leak test as per ASTM Specification E 498, “Standards Test Methods for Leaks Using the Mass Spectrometer Leak Detector or Residual Gas Analyzer in the TRACER Probe Mode”, Method A. The pumping must be carried out from convex side of the window such that convex side is in vacuum and concave side is at atmospheric pressure. During leak checking, the entire face of concave side of the window including the weld joint with Aluminum shall be exposed to Helium at 1 atm pressure for minimum 1 hour. This can be done by bagging that area using plastic and tape.
The leak rate must not exceed 1 x 10-10 Atm.cc He/sec for the entire duration of the test.
The leak detector used shall be calibrated at the beginning and ending of each working shift with a standard traceable to the National Institute of Standards and Technology (NIST).
Records shall be kept of the calibration process.
Special care shall be taken not to contaminate the window assembly and only oil free vacuum pumps shall be used to eliminate back streaming roughing oil. Viton O-rings may be used as temporary seals for leak detection. No lubricants or greases of any kind are to be used on the O-ring seals.
3. Bake and Leak Rate Tests: After leak checking, the Contractor shall bake the assembly for
8 hours minimum at 1500C excluding ramp up and ramp down time at the rate 500C/hr max. The assembly must remain leak tight during and after baking. After the bakeout is finished and the assembly is at room temperature, it shall be vented to atmospheric pressure with dry, high purity (99.9%) nitrogen bottle gas or from an evaporated liquid nitrogen source. Once vented, the assembly shall be stored in a clean dry sealable plastic bag to avoid any exposure to water, humidity, or debris. If the contractor doesn’t have the capability to do bakeout test, BSA can do it and the contractor must agree to honor BSA’s finding.
3.2.5.2 Acceptance Testing at BNL
Upon receipt, BSA reserves the right to perform acceptance testing to include dimension check, Be dust check, a leak test, outgassing test and bake test. Beryllium dust shall not exceed 0.2µg/100cm2. The leak test will be performed at room temperature, during and after bake out. A bake test to be carried out at 1500C for 72 hours excluding ramp up and ramp down time at the rate 500C/hr max. A limited dimension check will also be carried out at BNL.
Conformance to the outgassing requirements of section 3.2.2.3 shall be tested using conventional all-metal UHV practices. During initial pump down and after bake out, a residual gas analyzer
Working
ELEC APPVL IN
scan shall be performed for atomic mass 0 to 100. The results of these readings shall be used to determine conformance with sections 3.2.2.3 of this specification.
3.2.5.3 List of Documents/test coupon
The following documents/articles shall be provided to BSA upon completion of factory and/or acceptance testing.
1. Dimensional inspection results.
2. Material certification.
3. Bake test and leak test results.
4. Be dust check test results.
3.3 Qualifiers
The Offeror has ISO certifications to show that they are meeting the quality standards for customers and complying all regulatory requirements.
The Offeror shall show records of successful completion of works similar to the work mentioned in the attached drawing here for UHV application involving Beryllium and Aluminum in the past 3 years. BSA reserves the right to visit the Offeror’s manufacturing facilities.
The Offeror has a reliable well established Beryllium supplier or has stock of Beryllium required for this job.
The Offeror is able to perform forming, heat treatment, machining and etching on Beryllium while following all safety guidelines on Beryllium and industrial regulations.
The Offeror is able to perform electron beam welding between dissimilar material such as Beryllium and Aluminum.
3.4 Management
3.4.1 Program Plan
Within three (3) weeks after award of the Contract, the Contractor shall deliver a PDR (fabrication drawing). The Contractor may start ordering materials as soon as the Contract is awarded and written approval is obtained. Once the FDR report is approved by BSA, the Contractor shall provide a detailed Program Plan, which includes a milestone schedule defining the material procurement, inspection and testing. The job shall be complete and delivered at BNL no later than 40 weeks after the FDR report is approved by BSA.
3.4.2 Progress Communications
Two (2) weeks after Contract award, bi-weekly program technical and progress telecommunications and/or meetings between the Contractor and BSA shall be held at a mutually scheduled time. The discussions shall include the Contractor’s progress, technical and contractual questions, presentations of analysis or testing results, design reviews, value engineering, trouble shooting, material status, tooling status, resources, and manufacturing issues.
Working
ELEC APPVL IN
3.4.3 Manufacturing/Inspection/Test Plan
A manufacturing/inspection/test plan shall be developed which identifies the manufacturing processes required to complete all efforts as identified in this SOW. The plan shall be submitted for review and approval by BSA within one (1) week after the FDR report is approved by BSA.
The Plan may be a single document, or may make use of existing travelers or other suitable planning and control documents. It shall address the Material Requirements Planning (MRP), and at a minimum include inspection and test steps. If the Contractor does not have an MRP system in place, then details for purchasing all raw materials, shop loading (by work center), and a schedule for manufacturing all components and assemblies through packaging and shipping shall be provided by the Contractor.
3.4.4 Performance Reporting
Throughout the life of the Contract, the Contractor shall supply a written report by the fifth of every month to the BSA Technical Representative and Contractual Representative clearly detailing progress through the prior month with respect to the program. This shall include milestone charts, detailed progress, open items, problems, recommended solutions, and risk mitigation.
3.4.5 “Witness” Points BSA reserves the right, after review of the Program Plan, to designate selected inspection, and/or test operations as “witness” points. The Contractor shall provide BSA with ten (10) working days’ notice in advance of such witness points during the inspection/test cycle.
The BSA Technical Representative shall review and provide written approval prior to shipment of the Window Assembly.
3.5 Design Reviews
3.5.1 Preliminary Design Review Meeting
A PDR meeting shall be held in accordance with the schedule set forth in section 6 herein. To ensure that the requirements are compliant with this SOW, applicable specifications, and interface control drawings, the Contractor shall provide a draft detailed fabrication drawing as mentioned in section 3.2.3.1. The drawing shall be reviewed at the PDR to be held at the Contractor’s facility and in video conference format. The Contractor shall be responsible for maintaining and submitting the minutes of the PDR and shall also incorporate any agreed-to changes into the final drawing, both of which shall be submitted within five (5) working days of the PDR for subsequent review and written approval by BSA.
3.5.1.1 Weld Qualification
Upon BSA’s request, the Contractor shall provide a weld coupon report to BNL that includes cross sections to confirm weld penetration for each type of weld to be performed.
3.5.1.2 UHV Level Cleanliness Qualification
Upon BSA’s request, The Contractor shall provide Beryllium and Aluminum coupon to BNL to undergo outgassing tests to establish the conformance to outgassing performance requirements as specified in section 3.2.2.3.
Since the entire test coupon will be tested inside a vacuum chamber, the cleanliness of its entire surface shall be maintained to UHV level. The test coupon shall undergo all the machining and cleaning/etching steps like the actual window assembly would undergo.
3.5.2 Final Design Review Meeting
An FDR meeting shall be held in accordance with the schedule set forth in section 6 herein. The Contractor shall provide, a final detailed fabrication drawing that shall consist of the requirements set forth in section 3.2.3.2. The FDR to be held at BNL, shall cover all pertinent issues relating to the final detailed design of the Window Assembly. The Contractor shall be responsible for maintaining and submitting minutes of the FDR and shall also incorporate any agreed-to changes into the final detailed fabrication drawing, both of which are to be submitted to BSA within five
(5) working days of the FDR for subsequent review and approval. After written approval of the final drawing by BSA, the Contractor shall promptly begin manufacturing the Window Assembly.
Upon written approval of the final drawing, the design is to be considered “frozen” and no changes are permitted to the design, materials, processes, methods, and tooling, or component-level substitutions, without written approval by BSA.
3.6 Documentation and Data Management
3.6.1 Report/Documentation Format
All reports submitted shall include an introduction, body, and a conclusion. Large documents shall include a table of contents. For calculations, equations shall be shown with values for each variable so the analysis can be reviewed. Diagrams shall be included for clarity and labels shall be consistent with design drawings for specific items, such as vessel penetrations.
All documentation provided by the Contractor shall be in English.
The Contractor shall provide an electronic copy (email, plus either CD ROM or USB data storage device) of all documentation required by this SOW.
3.6.2 Engineering Drawing Practices
All Contractor-generated engineering drawings shall be in accordance with ASME Y14.100, Engineering Drawing Practices. All dimensions and tolerances shall be U.S. Customary units with metric (SI) units as a secondary notation.
3.6.3 End Item Documentation Package
The Contractor shall provide with the End Item Documentation Package an electronic copy and three (3) physical copies of the following documentation packages in accordance with the schedule set forth in this SOW. The End Item Documentation Package shall consist of all documentation identified in this SOW and include the following:
a) Documentation of visual and dimensional inspections, materials, cleaning procedures etc.
b) Final Inspection and Test Reports: Final test reports of all required or necessary inspections, examinations, and tests, properly validated by the Contractor’s authorized
Working
ELEC APPVL IN
personnel shall be recorded and compiled in a measurement and test report and be supplied to BSA.
c) Material Test Reports: Copies of material test reports for specified materials, showing physical and chemical properties.
d) Nonconformance Reports: Nonconformance reports identified as “rework / repair” or “use-as-is” shall be provided if applicable.
e) A listing of the as-built configuration of each delivered item; this may be defined by the use of drawing numbers and revisions, unique parts lists or other such means of positive identification
f) The Contractor shall provide a Certificate of Conformance that certifies the following:
Materials used are those which have been specified by the BSA, and that the items delivered were produced from materials for which the Contractor has on file, reports of chemical or physical analysis, or any other equivalent evidence of conformance.
Processes used in the fabrication of items delivered were in compliance with the SOW or BSA approved procedures or specifications.
The items as delivered comply with all applicable drawings, specifications, deviations/waivers and other requirements of the procurement documentation.
3.6.4 Records
The Contractor shall retain objective evidence, including records, of the inspections and tests performed in the course of manufacturing, testing, inspecting, preserving, packaging, and preparation for shipment of procured items. These records shall be made available to BSA for review upon request. These records shall be maintained for a minimum of three (3) years, unless otherwise specified in the procurement documentation, after the completion of the Contract.
3.7 Environment, Safety and Health (ESH)
The Contractor shall design and build all equipment in accordance with ESH requirements in the appropriate specifications, codes, standards, and other documents listed in Section 2 of this SOW.
3.8 Marking and Serialization
Where labeling is required, the position of serialization and/or labeling of the identification number/nameplate shall be agreed upon between the Contractor and BSA prior to acceptance of final design.
3.9 Packaging
All items shipped to BNL shall comply with the requirements for preservation, packaging and marking as stated in the latest revision of ASTM Standard D 3951 Standard Practice for Commercial Packaging.
The Window Assembly shall be packaged by the Contractor in clean, transparent chloride-free plastic bags conforming to the relevant packaging requirements of ASTM A700. Both ends of the window shall be covered by hard plexiglass to protect the window. Packaging shall include measures to prevent moisture from collecting in and around the Window Assembly. Plastic
Working
ELEC APPVL IN
“peanuts” or other such loose packing materials shall not be used by the Contractor. Any such packing materials shall be returned to the Contractor at the Contractor’s expense.
The Contractor shall prepare and load the Window Assembly for shipment and deliver it undamaged to the F.O.B destination: Brookhaven National Laboratory, Upton, New York 11973.
The Contractor is responsible for on time delivery and is liable for all damage incurred in shipment.
In preparation for shipping, the Window Assembly shall be covered or wrapped for protection against weather elements, dust, and damage to projections, shock loads i.e. G-shock measurements, impacts, and rubbing. The method of shipping will be specified by BSA one (1) month prior to delivery.
4 QUALITY ASSURANCE
4.1 Quality System and Facility Access
The Contractor shall maintain a documented quality assurance system, which provides the processes to ensure that each component produced for acceptance conforms to the requirements of this document and the applicable technical documentation. The quality system shall be available for review. BSA representatives shall have access to the Contractor’s facility during agreed upon fabrication, inspection and testing processes. The Contractor shall provide ten (10) working days’ notice in advanced of the agreed upon witness points.
4.2 Configuration Management
The Contractor shall establish and maintain a system to assure that all end items are of the proper configuration, and that all approved configuration changes are incorporated at the specified affected points. Records shall be maintained verifying the configuration of each item. The Contractor shall immediately notify the BSA Contractual Representative of any significant changes (those that may affect form, fit, function, reliability, safety, or interchangeability) in design, fabrication methods, material or processing.
For changes in configuration, a request for change approval shall be submitted to BSA for consideration. Changes in configuration may be made by the Contractor only with the written approval of BSA.
4.3 Responsibility for Subcontractor
It is the responsibility of the Contractor to impose applicable technical and quality requirements upon their subcontractors. BSA reserves the right to disapprove, in writing, any subcontractor.
4.4 Responsibility for Conformance
The Contractor is responsible to provide items which conform to the requirements of the Contract regardless of any assessments, surveillances, inspections and/or tests by BSA or its representatives at either the Contractor’s or BSA’s facility. The Contractor is responsible for notifying the BSA Contractual Representative of any recalls or alerts associated with this Contract.
4.5 Measuring and Test Equipment (M&TE) Calibration
The Contractor shall calibrate any M&TE used in the fulfillment of the Contract requirements against certified standards that are traceable to national standards such as the National Institute of Standards and Technology (NIST), or an international standard, or a physical constant. The Contractor shall notify BSA of any condition found during the calibration, servicing or repair of measuring and test equipment that can affect the end item requirements.
4.6 Inspections and Test Requirements
Unless otherwise specified in the Contract, the Contractor shall be responsible for the performance of all inspections and tests specified herein. Except as otherwise specified in the Contract, the Contractor shall utilize facilities suitable for the performance of the inspection and test requirements, specified herein, which are acceptable to BSA. BSA reserves the right to re-perform any of the inspections and/or tests set forth in this document or referenced specifications where deemed necessary to assure that supplies and services conform to prescribed requirements at no cost to the Contractor. BSA and/or their representative shall have the option to witness all of the tests defined in this SOW.
4.7 Rework and Repairs
If failures occur or repairs are required to an assembly or any component during manufacturing or testing that affects form, fit, function, reliability, safety, or interchangeability the process shall stop and BSA shall be immediately notified. BSA at their discretion may ask for retesting, additional review and evaluation to determine root causes, analyses of failure modes(s) or proposals for repair. Proposals for repair shall include adequate information for evaluating the repair, testing the effectiveness of repair, and methods to prevent damage to the existing work. No proposed repair shall be initiated without approval of BSA. No repair shall be considered successfully accomplished without inspection and written approval by BSA. All repairs shall be at the expense of the Contractor.
4.8 Failure Reporting, Analysis and Corrective Action
The Contractor shall maintain a failure reporting, analysis, and corrective action system which shall, as a minimum, evaluate, analyze, and correct failures occurring during end-item acceptance testing and inspection. The results of all failure evaluations and analyses shall be documented and available for review by the BSA Contractual Representative.
5 DELIVERABLES
The Contractor shall supply the following:
Item Deliverable Due BSA Approval
1 Program Plan 2 weeks after award of contract Yes 2 Technical and Progress Reporting Bi-weekly thereafter No 3 Preliminary Design Drawing 2 weeks after award of contract Yes 4 Final Design Drawing Within a week after PDR Yes 5 Inspection/Test Plan Within two weeks after FDR Yes 6 Performance reports 5th of each month after Item # 5 No 7 Submit inspection report to BNL for review 51 weeks after FDR Yes 8 Delivery to BNL 52 weeks after FDR approval Yes 9 End Item Documentation With Window Assembly Yes
6 SCHEDULE
The following schedules are for planning purposes only. Schedule requirements set forth in the contract will take precedence.
Milestone Calendar weeks after award
Calendar weeks after FDR approval
Preliminary Design Review 2 - Final Design Review 3-4 - Factory acceptance Testing - 50 Inspection reports - 51 Delivery of Equipment to BNL - 52 Delivery of End Item Documentation - 52
7 VALUE ENGINEERING
The Contractor is encouraged to make recommendations for changes that might lead to an improvement in performance, reliability, quality, safety, or reduction in cost. Where it appears a substantial improvement in simplicity of design, performance, ease of maintenance or reliability will result from the use of materials and processes other than those specified, it is desirable that their use be investigated. When investigations point to advantages that may be realized, the recommendation for change shall be presented to BSA for review and, if approved, authorized in writing. An equitable agreement will be negotiated between BSA and the Contractor to share the savings of any recommended change that is approved and implemented.
| Contents |
| 1 SCOPE |
| 1.1 Background |
| 1.2 Definitions/Acronyms |
| 2 APPLICABLE DOCUMENTS |
| 3 REQUIREMENTS |
| 3.1 Contractor Responsibilities |
| 3.2.1 Window Material: Beryllium PF-60 or equivalent |
| 3.2.2 Performance Requirements |
| 3.2.2.1 Leak Rate |
| 3.2.2.2 Operating Conditions |
| 3.2.2.3 Outgassing |
| 3.2.3 Detailed Design Requirements |
| 3.2.3.1 Preliminary Design |
| 3.2.3.2 Final Design |
| 3.2.3.3 Approval to Proceed |
| 3.2.4 Manufacturing Requirements |
| 3.2.4.1 Machining Beryllium |
| 3.2.4.2 Machining Lubricants |
| 3.2.4.3 Welding Joints |
| 3.2.4.4 Cleaning Procedure |
| 3.2.4.5 Clean Assembly Procedures |
3.2.4.6 Cleanliness
| 3.2.5 Acceptance Test Procedures (ATP) |
| 3.2.5.1 Factory Acceptance Testing |
| 3.2.5.2 Acceptance Testing at BNL |
| 3.2.5.3 List of Documents/test coupon |
| 3.3 Qualifiers |
| 3.4 Management |
| 3.4.1 Program Plan |
| 3.4.2 Progress Communications |
| 3.4.3 Manufacturing/Inspection/Test Plan |
| 3.4.4 Performance Reporting |
| 3.4.5 “Witness” Points |
| 3.5 Design Reviews |
| 3.5.1 Preliminary Design Review Meeting |
| 3.5.1.1 Weld Qualification |
| 3.5.1.2 UHV Level Cleanliness Qualification |
3.5.2 Final Design Review Meeting
| 3.6 Documentation and Data Management |
| 3.6.1 Report/Documentation Format |
| 3.6.2 Engineering Drawing Practices |
| 3.6.3 End Item Documentation Package |
| 3.6.4 Records |
| 3.7 Environment, Safety and Health (ESH) |
| 3.8 Marking and Serialization |
| 3.9 Packaging |
| 4 QUALITY ASSURANCE |
| 4.1 Quality System and Facility Access |
| 5 DELIVERABLES |
| 6 SCHEDULE |